Drawings.pdf
PDF 2 MB Posted
- Attached to
- Gatehouse Roof (EPDM), Guard Railings, and Hatch Replacement, Thomaston Dam, Thomaston, CT
- Solicitation number
- W912WJ22Q0088
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ22Q0088-00003.pdf | ||
| Amendment W912WJ22Q0088-00002.pdf | ||
| Amendment W912WJ22Q0088-00001.pdf | ||
| Specifications.pdf | ||
| Solicitation W912WJ22Q0088.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING/DEMOLITION FLOOR PLANS
PROPOSED FLOOR PLANS
CONSTRUCTION DETAILS
ELECTRICAL FLOOR PLANS DEMOLITION
DESIGN FILESHEET NO.
G-001
INDEX TO DRAWINGS
SHEET TITLE
AD101
A-101
A-501
ED101
HOU-TH-134_G-001.DWG COVER SHEET AND INDEX
HOU-TH-134_AD101.DWG
HOU-TH-134_A-101.DWG
HOU-TH-134_A-501.DWG
HOU-TH-134_ED101.DWG
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
New England District
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL
OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET
APPROVED FOR TECHNICAL ADEQUACY BY:
TECHNICAL LEAD ENGINEER DATE
DATE
DATE
DATE
DATE
APPROVED BY:
APPROVAL RECOMMENDED BY:
CHIEF, ENGINEERING DIVISION
This project was designed by the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents, within the scope of their employment as required by ER 1110-1-8152.
REVIEWED BY:
CHIEF, GEOTECHNICAL/WATER RESOURCES BRANCH
REVIEWED BY:
CHIEF, DESIGN BRANCH
CHIEF, GEO-ENVIRONMENTAL ENGINEERING BRANCH
GATEHOUSE ROOF MEMBRANE REPLACEMENT
THOMASTON DAM
THOMASTON, CONNECTICUT
W912WJ22Q0088
JUNE 2022
G-001
C O
VE
R
S H
EE
T
AN
D
IN
D
EX
M .H
O
LM
Q U
IS
T
M .H
O
LM
Q U
IS
T
K.
JO
N
ES
J.
N
EW
M
AN
AN
SI
D 1:
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G
AT
EH
O
U
SE
R O
O F
M
EM
BR
AN
E R
EP
LA
C
EM
EN
T
TH
O
M
AS
TO
N
D
AM
TH
O
M
AS
TO
N
, C O
N N
EC
TI
C U
T W
2W
J2 2Q
H O
U -T
H -1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
NOT TO SCALE
LOCATION PLAN
MASSACHUSETTS
NEW
HAMPSHIRE
MAINE
CANADA
VT.
CONN.
R.I.
HARTFORD
PROV.
CAPE COD
BOSTON
PORTSMOUTH
CONCORD
PORTLAND
AUGUSTA
BANGOR
N
ATLANTIC
OCEAN
PROJECT
LOCATION
THOMASTON DAM
NOT TO SCALE
VICINITY PLAN
THOMASTON DAM
GATEHOUSE
ELECTRICAL LEGENDE-001 HOU-TH-134_E-001.DWG
PLANS-ROOF, MAIN, HEATER ROOM & GENERATOR FLOORS
ELEVATIONS AND SECTIONS
ENTRANCE DETAILS
DRAWING NUMBER
REFERENCE DRAWINGS
SHEET TITLE
STEEL REINFORCEMENT- ROOF SLAB, GENERATOR FLOOR...
HC-1-1261
HC-1-1262
ELECTRICAL PLANSHC-1-1276
HC-1-1248
HC-1-1260
ELECTRICAL FLOOR PLANS NEW WORK7 E-101 HOU-TH-134_E-101.DWG
ELECTRICAL LIGHTNING PROTECTION SYSTEMS DETAILS8 E-501 HOU-TH-134_E-501.DWG
6 ELECTRICAL SECTIONSHC-1-1277
CONTRACTOR STAGING AREA:
APPROXIMATELY: 2,500 SF.
PROVIDE TEMPORARY FENCING AT STAGING AREA
CONTRACTOR STAGING AREA
N/A
N/A
AutoCAD SHX Text N
Michael.H.Holmquist Text Box
JN
E6EDDMHH
Text Box 6/1/2022
Matt Tessier Text Box
1 JUN 22
Michael.H.Holmquist Text Box
3 JUN 22
'-0
1'
-0
'-0
1'
-0
20'-0" 1'-0"
18'-0" 1'-0"
CHIMNEY
CANOPY BELOW
CONCRETE PARAPET WALL,
TYPICAL
B
F
A
D
E
G
K
J
C
SLOPED TO
SCUPPER
H
'-0
20'-0"
GENERATOR FLOOR
(ELEVATION 530.50)
REINFORCED CONCRETE
ROOF CANOPY OVERHANG
ACCESS BRIDGE BELOW, TO
ENTRY LEVEL
LADDER UP TO ROOF
HATCH
LADDER DOWN TO ENTRY LEVEL
HVAC DUCT FROM BELOW
FLOOR PANELS AT
FLOOR OPENING
A
K
AD101
EX
IS
TI
N
G /D
EM
O
LI
TI
O N
F
LO
O R
P
LA
N S
M .H
O
LM
Q U
IS
T
M .H
O
LM
Q U
IS
T
K.
JO
N
ES
J.
N
EW
M
AN
AN
SI
D 1/
4"
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G
AT
EH
O
U
SE
R O
O F
M
EM
BR
AN
E R
EP
LA
C
EM
EN
T
TH
O
M
AS
TO
N
D
AM
TH
O
M
AS
TO
N
, C O
N N
EC
TI
C U
T W
2W
J2 2Q
H O
U -T
H -1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SCALE: 1/4" = 1'-0"
EXISTING/DEMOLITION ROOF PLAN (T.O. SLAB EL. 546.17')H9
DEMOLITION KEYED NOTES
REMOVE AND DISPOSE OF ALL COMPONENTS OF EXISTING ROOFING IN THEIR
ENTIRETY. ROOF DECK/SLAB, ABUTTING WALLS/PARAPET AND WALLS BELOW,
REMAIN IN PLACE.
· BROOM CLEAN EXISTING ROOF DECK/SLAB TO ENSURE PROPER
INSTALLATION OF NEW ROOFING, INSULATION AND ALL ASSOCIATED
COMPONENTS THEREIN. ADDITIONAL CLEANING MAY BE REQUIRED TO
FULLY REMOVE ALL REMNANTS OF OLD ROOFING MATERIALS INCLUDING,
BUT NOT LIMITED TO, ADHESIVES, RESINS, OILS, GREASE, MASTIC,
SEALANTS, ETC.
· AFTER ROOF DEMOLITION WORK IS COMPLETE, SUBMIT PHOTO
DOCUMENTATION OF POST-DEMOLITION CONDITIONS. REVIEW EXISTING
CONDITIONS IN FIELD WITH COR PRIOR TO PROCEEDING WITH NEW WORK.
REMOVE EXISTING COPPER SCUPPER LINER. REMOVE PARTIAL CONCRETE
PARAPET WALL TO ENLARGE EXISTING SCUPPER OPENING. SCUPPER WIDTH
TO REMAIN, OPENING HEIGHT TO BE INCREASED. SEE DETAIL H7/A-501.
REMOVE PARTIAL CONCRETE PARAPET WALL FOR NEW 1'-6" WIDE X 8" TALL
SCUPPER PENETRATION. SEE DETAIL H13/A-501.
REMOVE EXISTING GALVANIZED GUARD RAILING, POSTS, AND BRACKETS. AT
REMOVED BRACKETS FILL ANCHOR HOLES WITH REPAIR MORTAR, SEE
KEYNOTE #3 ON A-501 FOR REPAIR MORTAR PROPERTIES. TYPICAL 16
LOCATIONS.
REMOVE EXISTING ROOF HATCH ASSEMBLY AND PRESSURE TREATED WOOD
CURB BELOW.
REMOVE EXISTING ABANDONED GENERATOR EXHAUST THIMBLE, FLASHING,
AND PIPING DOWN TO CONCRETE DECK.
SALVAGE AND STORE FOR RE-INSTALLATION EXISTING GALVANIZED ANTENNA
POST MOUNTED TO GUARD RAILING. EXISTING PIEZOMETER ANTENNA TO BE
DISCONNECTED PRIOR TO DECONSTRUCTION BY OTHERS. PROVIDE MINIMUM
14 DAYS NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE PRIOR
TO START OF DECONSTRUCTION FOR COORDINATION OF REMOVAL.
SALVAGE AND STORE FOR RE-INSTALLATION EXISTING GALVANIZED ANTENNA
POST MOUNTED TO GUARD RAILING. EXISTING RESERVOIR CONTROL CENTER
(RCC) EQUIPMENT TO BE DISCONNECTED PRIOR TO DECONSTRUCTION BY
OTHERS. PROVIDE MINIMUM 14 DAYS NOTICE TO THE CONTRACTING
OFFICER'S REPRESENTATIVE PRIOR TO START OF DECONSTRUCTION FOR
COORDINATION OF REMOVAL.
REMOVE EXISTING BOLTS (X3) EMBEDDED INTO TOP OF PARAPET WALL AS
REQUIRED FOR INSTALLATION OF NEW ROOF MEMBRANE AND PARAPET
COPING.
CUT AND REMOVE PORTION OF EXISTING PVC CONDUIT AT ROOF DECK
ABOVE, AND BELOW AS REQUIRED FOR PROPOSED CONNECTION TO RIGID
CONDUIT.
SCALE: 1/4" = 1'-0"
EXISTING/DEMOLITION GENERATOR LEVEL PLAN (T.O. SLAB EL. 530.50')A9
DEMOLITION LEGEND
A
B
C
D
E
F
G
EXISTING CONSTRUCTION TO BE SALVAGED OR REMOVED
0 4' 8'2'
0 4' 8'2'
PLAN
NORTH
PLAN
NORTH
1. THE CONTRACTOR SHALL EXAMINE THE PROJECT DOCUMENTS AND NOTIFY THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) IMMEDIATELY OF ANY
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
2. ALL DIMENSIONS, LOCATIONS, UTILITIES AND DETAILS ARE APPROXIMATE AND
MUST BE VERIFIED BY THE CONTRACTOR PRIOR TO PROCEEDING WITH THE
WORK PRESENTED HEREIN. EXISTING CONDITIONS MAY VARY FROM CONDITIONS
SHOWN. CONTRACTOR TO NOTIFY COR IMMEDIATELY IF ANY DISCREPANCIES
DISCOVERED AFFECT DEMOLITION OR NEW WORK.
3. THE CONTRACTOR SHALL VERIFY AND COORDINATE ALL DIMENSIONS OF
MANUFACTURED EQUIPMENT AND BUILDING COMPONENTS.
4. FOLLOW ALL MANUFACTURER'S SPECIFICATIONS AND INSTALLATION
INSTRUCTIONS UNLESS OTHERWISE NOTED.
5. CONTRACTOR TO FIELD-VERIFY ALL ROOF PENETRATIONS AND ALL
ROOF-MOUNTED EQUIPMENT. CONTRACTOR SHALL FIELD-VERIFY ALL ELECTRICAL
AND COMMUNICATION EQUIPMENT AND FEATURES THAT PENETRATE THE ROOF
AND/OR ARE MOUNTED ON THE ROOF.
6. NEW CONSTRUCTION DETAILS ARE BASED UPON INDUSTRY STANDARDS.
CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR REVIEW AND ACCEPTANCE OF
ALL STANDARD AND NON-STANDARD ROOF DETAILS. SEE SPECIFICATIONS FOR
FURTHER INFORMATION REGARDING SHOP DRAWINGS AND OTHER REQUIRED
SUBMITTALS.
GENERAL NOTES
DEMOLITION NOTES
1. PROTECT AREAS OF EXISTING WORK TO REMAIN.
2. IN ADDITION TO DEMOLITION INDICATED IN THE DEMOLITION KEYED NOTES,
THE CONTRACTOR SHALL PERFORM ALL DEMOLITION REQUIRED TO INSTALL
THE NEW WORK AS SHOWN AND AS SPECIFIED.
3. ALL HOLES CUT THROUGH CONCRETE SHALL BE BY LINE CORING UNLESS
OTHERWISE APPROVED BY THE COR. NO STRUCTURAL MEMBERS SHALL BE
CUT WITHOUT PRIOR WRITTEN APPROVAL OF THE COR. ALL WORK SHALL BE
PERFORMED BY MECHANICS SKILLED IN THIS TYPE OF WORK. ALL CORING
SHALL BE DONE WITH EXTREME CARE TO AVOID SPALLING/BLOW OUT AT THE
OPPOSITE FACE.
4. ALL CONCRETE CUTTING AND CORING SHALL BE PERFORMED IN SUCH A
MANNER AS TO MINIMIZE THE EXTENT OF PATCHING.
5. CONCRETE ROUGH PATCHING SHALL BE SUCH AS TO BRING THE CUT OR
CORED AREA FLUSH WITH EXISTING CONSTRUCTION UNLESS SHOWN
OTHERWISE. FINISH PATCHING SHALL MATCH EXISTING SURFACES AS
APPROVED.
H
J
K
ABBREVIATIONS
B.O. BOTTOM OF
CL CENTERLINE
EL ELEVATION
MECH MECHANICAL
MIN MINIMUM
T.O. TOP OF
EXISTING CONSTRUCTION TO REMAIN
Michael.H.Holmquist
JN
H7 A-501
'-0
1'
-0
'-0
1'
-0
20'-0" 1'-0"
18'-0" 1'-0"
CHIMNEY
CANOPY BELOW
CONCRETE PARAPET WALL,
TYPICAL
SEE A9/A-101 FOR
WORK AT CANOPY
2 H2 A-101
H1 A-501
1'-6"
TYPICAL SCUPPER
WIDTH
CL
2'- 0"
2'- 0"
CENTER ON WALL, TYPICAL
RAILING POST LAYOUT
CL
1'-6" 2'-6"
SLOPE
MIN. 1/2"/1'-0"
TYPICAL.
RAILING POST LAYOUT
THIS WALL ONLYH13
A-501
SLOPE
SLO
PE SLOPE
SLOPE SLO
PE
1" / 1
'-0
(TYP)
SLOPE
TAPERED INSULATION SYSTEM NOTES:
1. MINIMUM ROOF SLOPE:
1/2" PER. FOOT
2. MINIMUM CRICKET AND SADDLE SLOPE:
1" PER. FOOT
3. MINIMUM 8" MEMBRANE HEIGHT AT CURBS
'-0
20'-0"
GENERATOR FLOOR
(ELEVATION 530.50)
REINFORCED CONCRETE
ROOF CANOPY OVERHANG
ACCESS BRIDGE BELOW, TO
ENTRY LEVEL
LADDER UP TO ROOF
HATCH
LADDER DOWN TO ENTRY LEVEL
HVAC DUCT FROM BELOW
FLOOR PANELS AT
FLOOR OPENING
D1 A-501
0'-8"
SL
O
PE
T
O D
R
IP
ED
G
E M
IN
. 1 8"
P
ER
F O
O T
SL
O
PE
T
O D
R
IP
ED
G
E M
IN
. 1 8"
P
ER
F O
O T
OFFSET HORIZONTAL RAILING FOR HATCH
CLEARANCE AT THIS SECTION.
4'
-10
4'-
+/- 3'-5"
SECURE ROOF HATCH RAILING TO
PERIMETER GUARD POST.
2'- 6"
2'- 0"
EXTEND HATCH RAILING TO PROVIDE
+/- 24" OF CLEAR SPACE OUTSIDE OF
HATCH OPENING
COORDINATE OFFSET DISTANCE WITH GUARD
RAILING AND ROOF HATCH TOLERANCES
D1 A-101
D5 A-101
A13 A-501
0'- 4"
1'- 4"
+/- 0'-5"
1710A1 A-101
3'-0"
CONSTRUCT RAILING WITH OFFSET FOR
CLEARANCE AT ROOF HATCH WITH HORIZONTAL
AND VERTICAL GUARD RAILING COMPONENTS.
A7 A-501
VERTICAL GRAB (X2) BAR AT HATCH.
MAINTAIN HATCH CLEARANCE.
0'-4"
+/- 0'-5"
- 1
'-6
- 2
1'-6"
CENTER VERTICAL GRAB BARS ON HATCH OPENING
PROVIDE TWO VERTICAL GRAB POSTS
MOUNTED TO HORIZONTAL GUARD
RAILS AS PART OF RAILING ASSEMBLY.
MINIMUM 8" MEMBRANE
CURB, TYPICAL AT ALL
PENETRATIONS AND CURBS
9"9"
CL
1 5
ROOF
4"
4'-0" +/- 1'-4"
3' -6
HIGH
POINT
TOP OF
RAILING
1' -6
EQUAL EQUAL
+/- 1'-8" +/- 3'-4"
3' -6
EXTENDED HATCH RAILING
A-101
PR
O
PO
SE
D F
LO
O
R P
LA
N
S
M .H
O
LM
Q U
IS
T
M .H
O
LM
Q U
IS
T
K.
JO
N
ES
J.
N
EW
M
AN
AN
SI
D 1/
4"
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G
AT
EH
O
U
SE
R O
O F
M
EM
BR
AN
E R
EP
LA
C
EM
EN
T
TH
O
M
AS
TO
N
D
AM
TH
O
M
AS
TO
N
, C O
N N
EC
TI
C U
T W
2W
J2 2Q
H O
U -T
H -1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SCALE: 1/4" = 1'-0"
PROPOSED ROOF PLAN (T.O. SLAB EL. 546.17')H9
SCALE: 1/4" = 1'-0"
PROPOSED GENERATOR LEVEL PLAN (T.O. SLAB EL. 530.50')A9
0 4' 8'2'
0 4' 8'2'
PLAN
NORTH
PLAN
NORTH
SCALE: 1/2" = 1'-0"
ENLARGED PLAN AT HATCHH2
0 2' 4'1'
SCALE: 1/2" = 1'-0"
HATCH CROSS SECTIOND1 SCALE: 1/2" = 1'-0"
HATCH LONGITUDINAL SECTIOND5
0 2' 4'1'
NEW CONSTRUCTION KEYNOTES
PROVIDE NEW BLACK 90 MIL ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM)
ROOF SYSTEM. INSTALL MEMBRANE OVER COVERBOARD OVER MINIMUM R-30
RIGID TAPERED INSULATION OVER VAPOR RETARDER, TYPICAL.
AT ENLARGED AND NEW SCUPPER OPENINGS, PREPARE SURFACES
INACCESSIBLE TO SHOT BLASTING, BASE OF PERIMETER WALLS AND UNDER
SECURED EQUIPMENT, USING DIAMOND DISK GRINDING OR LIGHT
SCARIFICATION TO PRODUCE A LEVEL OF COARSENESS EQUAL TO ICRI
310.2R CSP 5 OR BETTER. RESULTING SURFACES MUST APPEAR CLEAN AND
CONTAIN THE APPROPRIATE LEVEL OF SURFACE COARSENESS.
PROVIDE NEW COPPER SCUPPER LINER LOCATED IN NEW PARAPET WALL
OPENING. EXTEND SCUPPER 3" FROM FACE OF PARAPET. SEE H13/A-501 FOR
ADDITIONAL INFORMATION.
PROVIDE NEW COPPER SCUPPER LINER AT ENLARGED PARAPET WALL
OPENING. SEE H7/A-501 FOR ADDITIONAL INFORMATION.
PROVIDE NEW 3'-0" X 2'-6" ELECTRIC ACTUATION ROOF HATCH WITH
INSULATED CURB. INSTALL AT EXISTING ROUGH OPENING. PROVIDE NEW
PRESSURE TREATED BLOCKING SECURED TO ROOF DECK. COORDINATE
INSTALL HEIGHT FOR MINIMUM 8" MEMBRANE FLASHING UP HATCH CURB.
PROVIDE NEW COPPER WALL COPING AT THE TOP OF PARAPET WALLS.
PROVIDE NEW PRESSURE TREATED BLOCKING MECHANICALLY ATTACHED TO
TOP OF CONCRETE WALLS, INSTALL ROOF MEMBRANE UP PARAPET WALLS
AND OVER THE TOP OF NEW BLOCKING. COVER WITH NEW COPING
ATTACHED TO CONTINUOUS CLEAT, TYPICAL AT ALL PARAPETS. SEE H1/A-501.
PROVIDE NEW GUARD RAIL MOUNTING BRACKET, TYPICAL, MINIMUM TWO
BRACKETS PER PARAPET WALL SEGMENT AROUND ROOF PERIMETER.
INSTALL BRACKET OVER A LAYER OF ROOF MANUFACTURER'S WATER BLOCK
AND WITH THE APPROPRIATE ROOF MANUFACTURER'S HIGH GRADE SEALANT
AROUND BRACKET PERIMETER. SEE A17/A-501 FOR ADDITIONAL
INFORMATION.
PROVIDE TERMINATION BAR AND COPPER COUNTER FLASHING AT
PERIMETER OF MEMBRANE. MEMBRANE SHALL EXTEND UP WALL MIN. 8"
ABOVE ADJACENT HORIZONTAL SURFACE. SEE A1/A-501 FOR ADDITIONAL
INFORMATION.
PROVIDE CORNER MOUNTED GUARD RAILING BRACKETS MOUNTED TO HATCH
CURB CORNER. PROVIDE BRACKETS COMPATIBLE WITH HATCH ASSEMBLY.
PROVIDE MANUFACTURED SAFETY GATE WITH SELF CLOSING MECHANISM.
RE-INSTALL SALVAGED GALVANIZED ANTENNA POST AND MOUNTING
HARDWARE. MOUNT ANTENNA POST TO GUARD RAILING POST. ( PIEZOMETER
EQUIPMENT TO BE RE-INSTALLED ONTO ANTENNA POST BY OTHERS. )
PROVIDE NEW RIGID WEATHER HEAD AND 4" RIGID CONDUIT INSTALLED
THROUGH ROOF DECK. SEE A13/A501. PROVIDE 4" RUBBER PIPE SLEEVE
WHERE PROPOSED RIGID CONDUIT MEETS EXISTING PVC CONDUIT BELOW
ROOF DECK.
RE-INSTALL SALVAGED GALVANIZED ANTENNA POST AND MOUNTING
HARDWARE. MOUNT ANTENNA POST TO GUARD RAILING POST. ( RCC
EQUIPMENT TO BE RE-INSTALLED ONTO ANTENNA POST BY OTHERS. )
PROVIDE NEW EPDM ROOF SYSTEM AT CANOPY, INSTALL OVER ROOF
MANUFACTURER'S APPROVED TAPERED SUBSTRATE TO DIRECT WATER TO
DRIP EDGE.
PROVIDE NEW COPPER FASCIA AT PERIMETER OF ROOF. PROVIDE GRAVEL
STOP/RAISED PROFILE TO DIRECT WATER TO DRIP EDGES.
PROVIDE COPPER DRIP EDGE FOR ROOF DRAINAGE. EXTEND EDGE FROM
FACE OF FASCIA.
GALVANIZED STEEL GUARD RAIL SYSTEM AROUND PERIMETER OF ROOF AND
HATCH. SEE A5/A-101 AND H1/A-501 FOR ELEVATION AND CROSS SECTION
INFORMATION RESPECTIVELY.
PROVIDE MINIMUM 30"X30" WALKWAY PADS APPROVED BY ROOF
MANUFACTURER, TYPICAL.
INSTALL ROOF MANUFACTURER'S COVERBOARD OVER CONCRETE ROOF
OPENING AT REMOVED THIMBLE. INSTALL PRIOR TO ROOF ASSEMBLY.
SCALE: 1/2" = 1'-0"
TYPICAL GUARD RAILING ELEVATIONA5
SCALE: 1/2" = 1'-0"
HATCH ELEVATIONA1
Michael.H.Holmquist
7"
1/ 2"
4"
EXISTING
CONCRETE
PARAPET WALL
EXISTING CONCRETE ROOF
SLAB
VAPOR RETARDER, TYPICAL
VAPOR RETARDER,
WRAP UP PARAPET
WALL TO ROOF
MEMBRANE AND SEAL
RIGID INSULATION, TYPICAL
COVER BOARD OVER TAPERED
RIGID INSULATION, TYPICAL
EPDM MEMBRANE OVER
BONDING ADHESIVE
CONTINUOUS LAP SEALANT
CANT STRIP
EPDM FLASHING MEMBRANE
AND BONDING ADHESIVE
EPDM TO EXTEND
MINIMUM 1/2" BEYOND
BLOCKING, TYPICAL
DRIP EDGE
HOT-DIPPED
GALVANIZED ROOF NAILS
2x TREATED BLOCKING
SLOPED TO ROOF
CONTINUOUS CLEAT
COPPER METAL COPING
3' -6
M
IN
IM
U M
F R
O M
H
IG
H P
O
IN
T O
F W
AL
KI
N G
S U
R
FA
C E
ROOF MANUFACTURER'S
HIGH GRADE SEALANT
GUARD RAILING ANCHOR
SET IN WATER BLOCK, SEE
A17/A-501 FOR BRACKET.
1.5" NOMINAL
GALVANIZED STEEL PIPE
GUARD RAILING. OUTSIDE
DIAMETER +/- 2".
1' -6
- 2
'-4
STAINLESS STEEL
SLEEVE ANCHORS,
TYPICAL 4 PER BRACKET.
HIGH POINT OF ROOF
EPDM MEMBRANE OVER
BONDING ADHESIVE
CONTINUOUS SEALANT AT
PERIMETER OF FLASHING
ROOF MANUFACTURER'S
FLASHING OVER PRIMER
FASTENER
CORNER FLASHING
SCUPPER SLEEVE
WOOD NAILER AT
SCUPPER
OPENING, TYPICAL
1 14" HOT DIPPED
GALVANIZED ROOFING
NAILS, 4" O.C. MAXIMUM
CENTER FLASHING OVER
EDGE OF SCUPPER FLANGE
CENTER COVER FLASHING
OVER FLASHING BELOW
PROVIDE ADDITIONAL SLOPED RIGID INSULATION OR
SOLID BLOCKING CUT TO PROVIDE CONTINUOUS
ROOF SLOPE THROUGH SCUPPER OPENING
CONTINUOUS SEALANT
EDGE OF SCUPPER TURNED
VERTICAL TO DIRECT WATER AWAY
FROM STRUCTURE, TYPICAL
DRIP EDGE
COPPER METAL
FASCIA WITH DRIP
EDGE, TYPICAL 3
SIDES
0' -6
- 0 '-6
/2
8" C
LE
AR
T.O. EXISTING SCUPPER OPENING
T.O. PROPOSED FINISHED OPENING
3 COPPER SCUPPER, TYPICAL
GENTLY REMOVE CONCRETE SHOWING RUST
STAINING TO EXPOSE RUSTED METAL REBAR
SURFACE BELOW. WIRE BRUSH CLEAN TO
REMOVE RUST, PATCH WITH PATCHING
COMPOUND TO MAINTAIN 2 INCH COVER.
SEE H7/A-501 FOR
SCUPPER
FLASHING NOTES
0' -5
- 0 '-7
/2
T.O. PROPOSED
FINISH OPENING
MINIMUM R-30
INSULATION AT
LOW POINT OF
ROOF, TYPICAL
B.O. PROPOSED
FINISH OPENING
CONCRETE ROOF DECK
SLOPED REPAIR MATERIAL
FOR CONTINUOUS SLOPE
FROM ROOF THROUGH
SCUPPER.
EXTEND COPPER DRIP
EDGE OF SCUPPER AWAY
FROM STRUCTURE
8" C
LE
AR
0'-3"
RIGID 4" CONDUIT WITH RIGID
WEATHERHEAD ABOVE
STAINLESS CLAMP, TYPICAL
PREFABRICATED RUBBER BOOT
CAP W/ GRADUATED STEPS AND
WEATHER-PROOF PRESSURE SEAL
TO COLLAR
ROOF MANUFACTURER'S SEALANT
AT FLASHING PERIMETER, TYPICAL
FLASHING OVER PRIMER
SEAL VAPOR
RETARDER TO CONDUIT
STEEL EXPANSION
ANCHOR
8" MIN. GALVANIZED
THREADED ROD, TYP.
GALVANIZED STEEL MOUNTING CHANNEL
EXISTING
PVC
CONDUIT
RUBBER PIPE
SLEEVE
NEW RIGID
CONDUIT
4 4
STAINLESS STEEL WOOD
SCREWS
FULLY ADHERED TAPERED
INSULATION, TO FORM
CRICKET BETWEEN HATCH
AND PARAPET
STAINLESS STEEL SLEEVE
ANCHOR
PRESSURE-TREATED 2X
WOOD BLOCKING
APPROPRIATE PRIMER OR
BONDING ADHESIVE AT
ROOF HATCH INSULATED
CURB
FULLY ADHERED ROOF
MEMBRANE, WRAPPED UP
FROM CRICKET AND
PARAPET WALL
SPLICE TAPE
ASSEMBLY THICKNESS
EXAGGERATED FOR
CLARITY.
OFF SET CENTER OF
HORIZONTAL GUARD RAILINGS
THIS AREA FROM RAILING POSTS.
+/- 0'-2 1/2"
+/- 0'-5"
EXISTING
LADDER
CONTINUOUS
CLEAT
COPPER FASCIA
WITH DRIP EDGE
1 14" HOT DIPPED
GALVANIZED
ROOF NAILS
RAISED FASCIA
PROFILE TO DIRECT
WATER TOP DRIP EDGE.
ROOF MEMBRANE OVER
BONDING ADHESIVE
NEW PRESSURE TREATED 1X, SHAPE TO
CONCRETE SLAB, SECURE TO SLAB AT
EXISTING EMBEDDED ANCHOR BOLTS
- 9
FLASHING OVER PRIMER
WITH CONTINUOUS BEAD OF
SEALANT AT FLASHING ENDS
EXISTING EMBEDDED ANCHOR BOLT
CANT AS REQUIRED.
HEIGHT WILL VARY
FASCIA MOUNTED TO CURB,
CURB HEIGHT DOES NOT VARY
FOR LEVEL FASCIA PROFILE.
BREAK METAL COVER
A1 A-501
METAL TERMINATION BAR FASTENED 12" O.C. MAX
AND SET IN CONTINUOUS BED OF WATER BLOCK
EPDM FLASHING MEMBRANE AND BONDING ADHESIVE
CONTINUOUS BEAD OF MEMBRANE MANUFACTURER'S SEALANT
METAL REGLET COUNTERFLASHING SET IN
CONTINUOUS BED OF MANUFACTURER'S WATERBLOCK
CONTINUOUS BEAD OF MEMBRANE
MANUFACTURER'S SEALANT
EXISTING CONCRETE WALL
5"
0'-0 3/8"
0' -4
FRONT ELEVATION SIDE ELEVATION
PLAN VIEW
3/8" THICK x 6" WIDE x 5"
HIGH STEEL BRACKET
MOUNT PLATE ANCHORED
TO BACK OF PARAPET
0'-1"
EQ.
0'-1"
EQ.
PRE-DRILL 9/16" Ø
HOLES TO ALLOW FOR
INSTALLATION OF
SLEEVE ANCHORS
3/8" STEEL PLATE
BRACKET ARM
0'-6" 0'-2" 0'-1 1/8" 0'-0 3/8"
0' -5
0'-2"
1/8"
1/8"
3/ 4"
1/
2"
GUARD RAIL POST
1 1/2"
A-501
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
M .H
O
LM
Q U
IS
T
M .H
O
LM
Q U
IS
T
K.
JO
N
ES
J.
N
EW
M
AN
AN
SI
D 1-
1/ 2"
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G
AT
EH
O
U
SE
R O
O F
M
EM
BR
AN
E R
EP
LA
C
EM
EN
T
TH
O
M
AS
TO
N
D
AM
TH
O
M
AS
TO
N
, C O
N N
EC
TI
C U
T W
2W
J2 2Q
H O
U -T
H -1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SCALE: 1 1/2" = 1'-0"
TYPICAL PARAPET SECTION DETAILH1
GENERAL NOTES:
1. PROVIDE ROOF CRICKETS AT ALL CURBS (ROOF HATCH, MECH. EQUIP., ETC.)
TO SLOPE AWAY FROM CURBS AGAINST WHICH THEY ARE FORMED.
2. PROVIDE CONTINUOUS PRESSURE-TREATED WOOD NAILERS AND BLOCKING
AT ALL ROOF CURBS. TAPER TREATED WOOD NAILERS AS REQUIRED TO
MAINTAIN CONTINUOUS FLUSH CONDITION AND CONSTANT ROOF SLOPE.
3. CURB MEMBRANE SHALL BE A MINIMUM OF 8 IN. ABOVE THE ROOF SURFACE,
BUT SHALL NOT BE LESS THAN 6 IN. ABOVE THE HIGH POINT OF A CRICKET.
KEYED NOTES:
1. NEW FULLY-ADHERED ROOF MEMBRANE INSTALLED OVER BONDING ADHESIVE,
COVERBOARD, RIGID INSULATION AND VAPOR RETARDER.
2. SEE POST-INSTALLED CONCRETE AND MASONRY ANCHORS SPECIFICATIONS
FOR ADDITIONAL GUIDANCE. BOLTS TO BE STAINLESS STEEL AND HAVE A
DIAMETER OF 1/2", EFFECTIVE EMBEDMENT OF 2”, SPACING AS INDICATED AND
CAPACITY TO COLLECTIVELY RESIST A FORCE OF AT LEAST 200 POUNDS (890
N) APPLIED IN A DOWNWARD OR OUTWARD DIRECTION WITHIN 2 INCHES (5 CM)
OF THE TOP EDGE, AT ANY POINT ALONG THE TOP RAIL, PER OSHA 1910.29.
3. PROVIDE A TROWEL APPLIED TWO-COMPONENT, POLYMER-MODIFIED,
CEMENTITIOUS, NON-SAG MORTAR FOR VERTICAL AND OVERHEAD SURFACES.
SHRINKAGE SHALL BE 0.05% OR LESS AS MEASURED BY ASTM C-157 AS
MODIFIED BY ICRI 320.3R. TENSILE ADHESION STRENGTH SHALL BE 2000 PSI OR
GREATER AS MEASURED BY ASTM C-882. 28 DAY COMPRESSIVE STRENGTH
SHALL BE 6000 PSI OR GREATER AS MEASURED BY ASTM C-109.
PREPARE THE SURFACE AND APPLY THE POLYMER MODIFIED REPAIR
MATERIAL IN STRICT ACCORDANCE WITH THE MANUFACTURER'S PRINTED
INSTRUCTIONS.
DO NOT RETEMPER POLYMER MODIFIED REPAIR MATERIAL THAT HAS STARTED
TO SET.
4. AT PIPE PENETRATIONS, PROVIDE ASTM C920, TYPE S OR M, GRADE P, CLASS
25, USE T, SEALANT. PROVIDE BACKUP MATERIAL THAT IS COMPRESSIBLE,
NONSHRINK, NONREACTIVE WITH THE SEALANT, AND ON NON-ABSORPTIVE
MATERIAL SUCH AS EXTRUDED BUTYL OR POLYCHLOROPRENE FOAM RUBBER.
IMMEDIATELY PRIOR TO INSTALLATION OF FIELD-MOLDED SEALANTS, CLEAN
THE JOINT OF ALL DEBRIS AND FURTHER CLEAN USING WATER, CHEMICAL
SOLVENTS OR OTHER MEANS AS RECOMMENDED BY THE SEALANT
MANUFACTURER.
5. EPDM ROOFING MEMBRANE OVER MANUFACTURER'S APPROVED TAPERED
SUBSTRATE. MINIMUM SLOPE 1/8" PER FOOT.
SCALE: 1 1/2" = 1'-0"
ROOF HATCH SECTION DETAIL AT PARAPETA7 SCALE: 1 1/2" = 1'-0"
WEATHERHEAD SECTION DETAILA13
1' 2'0 6"
1' 2'0 6"1' 2'0 6"
SCALE: 1 1/2" = 1'-0"
MODIFIED EXISTING SCUPPER SECTION DETAILH7 SCALE: 1 1/2" = 1'-0"
TYPICAL NEW SCUPPER SECTIONH13
SCALE: 1 1/2" = 1'-0"
CANOPY SECTION DETAILD1
1' 2'0 6" 1' 2'0 6"
1' 2'0 6"
SCALE: 3" = 1'-0"
COUNTER FLASHING DETAILA1
6"0 3" 1'
SCALE: 3" = 1'-0"
DETAIL OF GUARDRAIL BRACKETSA17
6"0 3" 1'
Michael.H.Holmquist
EQUIPMENT LEGEND
208Y/120 VOLT, 3Ø, 4 WIRE PANEL
480Y/277 VOLT, 3Ø, 4 WIRE PANEL
XL
XD
XN
XR
XM
RESPONSIBLE FOR MAINTAINING CIRCUITRY TO DEVICES
TO POWER SOURCE AND LABEL BREAKER IN
PANELBOARD AS SPARE. CONTRACTOR SHALL BE
CONDUIT AS REQUIRED SO AS TO PROVIDE A
COMPLETE OPERATIONAL INSTALLATION.
TO BE REMOVED. CUT BACK AND MAKE SAFE ALL
ASSOCIATED BRANCH CIRCUIT WIRING CONDUIT BACK
EQUIPMENT TO BE REMOVED AND REPLACED WITH NEW.
"XL" ADJACENT TO EQUIPMENT DENOTES RELOCATED
EXISTING AT NEW LOCATION
UNAFFECTED BY DEMOLITION.
"XD" ADJACENT TO EQUIPMENT DENOTES EXISTING
"XR" ADJACENT TO EQUIPMENT DENOTES EXISTING
"XN" ADJACENT TO EQUIPMENT DENOTES EXISTING
"XM" ADJACENT TO EQUIPMENT DENOTES EXISTING
SYMBOLS OUT OF FUNCTION DENOTES EXISTING
TO BE RELOCATED AS SHOWN. CUT BACK AND/OR
EXTEND EXISTING BRANCH CIRCUIT WIRING AND
EQUIPMENT TO REMAIN.
EXISTING EQUIPMENT LEGEND BUILDING GROUNDING GRID LEGEND
BOLTED CONNECTION
EXOTHERMICALLY WELDED CONNECTION
GROUND ROD
GROUNDING CABLE
AMPERES
AMERICANS WITH DISABILITIES ACT
AMPERE INTERRUPTING CAPACITY
AUTOMATIC TRANSFER SWITCH
ALUMINUM
INSTITUTE
ARCHITECT
AMERICAN NATIONAL STANDARDS
AUTHORITY HAVING JURISDICTION
ABOVE FINISH GRADE
AIR HANDLING UNIT
ABOVE FINISH FLOOR
AMERICAN WIRE GAUGE
BELOW FINISH GRADE
AUTOMATIC TEMPERATURE CONTROL
CONDUIT
CIRCUIT
COLUMN
CONTROL POWER TRANSFORMER
CIRCUIT BREAKER
CENTERLINE
CATALOG
CURRENT LIMITING FUSE
BUILDING
DIRECT DIGITAL CONTROL
COPPER
DRAWING
CURRENT TRANSFORMER
FAN COIL UNIT
ELECTRICAL CONTRACTOR
EXHAUST FAN
EMERGENCY
FIRE ALARM
ELECTRICAL METALLIC TUBING
ELECTRIC WATER COOLER
EMERGENCY POWER OFF
GROUND FAULT INTERRUPTER
GROUND OR GROUNDING
FLEXIBLE METAL CONDUIT
FULL LOAD AMPERES
ISOLATED GROUND
HAND, OFF, AUTOMATIC SWITCH
INTERLOCK
INSTITUTE OF ELECTRICAL AND
THOUSAND CIRCULAR MILS
ELECTRONIC ENGINEERS
INTERMEDIATE METAL CONDUIT
GALVANIZED RIGID METALLIC CONDUIT
CERTIFIED BALLAST MANUFACTURERS
HOA
IG
IEEE
IMC
INT
kcmil
FLA
FT
FMC
GFI
GRMC
GND,G
FEET
EM
EPO
EMT
F
FCU
FA
EWC
FUSE
DDL
CU
CT
DWG
EC
EF
CB
CKT
CBM
CPT
CLF
COL
CL
BFG
ATC
AWG
CAT
C
BLDG
AHU
AIC
AL
ATS
ARCH
ANSI
A
ADA
AFG
AFF
AHJ
PT POTENTIAL TRANSFORMER
PHASE
QUANTITY
REQUIRED
ROOF TOP UNIT
TELEPHONE
SYMMETRICAL
POLYVINYL CHLORIDE
RIGID METAL CONDUIT
ROOT MEAN SQUARED
RIGID NON-METALLIC CONDUIT
BREAKER
UNIT HEATER
TRANSFORMER
WEATHERPROOF
WATER HEATER
UNLESS OTHERWISE NOTED
UNDERGROUND OR UNDERGRADE
UNDERWRITERS LABORATORIES
UNINTERRUPTABLE POWER SUPPLY
THERMAL MAGNETIC CIRCUITTMCB
WH
XFMR
WP
W V
DELTA
WYE
WIRE
VOLT
UG
UL
UPS
UH
U.O.N.
SP
RTU
RNMC
SW
TEL
SYM
SWITCH
SPARE
PWR
QTY
PVC
RMC
RMS
REQ'D
POWER
KILOWATTS
CONDUIT
LIGHTING
MISCELLANEOUS
MAIN LUGS ONLY
KILOVOLT AMPERES
NORMALLY CLOSED
METAL CLAD CABLE
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MOTOR CIRCUIT PROTECTOR
LIQUIDTIGHT FLEXIBLE METAL
ASSOCIATION
NOT TO SCALE
PUSHBUTTON
NOT IN CONTRACT
NATIONAL ELECTRICAL
NATIONAL ELECTRIC CODE
MANUFACTURES ASSOCIATION
NATIONAL FIRE PROTECTION
PROVIDED UNDER OTHER SECTIONS
NORMALLY OPEN OR NUMBERNO
NTS
POS
PNL
P
PB
PANEL
POLE
NEC
NEMA
N.I.C.
NFPA
MC
MCB
MCC
MCP
MLO
NC
MISC
kW kVA
LTG
LFMC
GENERAL ABBREVIATIONS
DOWN CONDUCTOR WITH GROUND ROD
AIR TERMINAL - 36 INCHES LONG
BOLTED BONDING CONNECTION
LIGHTNING PROTECTION CABLE
EXOTHERMIC BONDING CONNECTION
LP
CABINET UNIT HEATERCUH
IN EXISTING LOCATION.
TO BE REMOVED, STORED, CLEANED AND REINSTALLED
"XS" ADJACENT TO EQUIPMENT DENOTES EXISTINGXS
LIGHTNING PROTECTION LEGEND
G
Ø Y
BUILDING SYSTEM GROUND BUS
HPF HIGH POWER FACTOR
GROUND ROD INSPECTION PIT
20A, 125V, 2P, 3W DUPLEX RECEPTACLE
"WP" - WEATHERPROOF WHILE-IN-USE COVER
"GFCI" - GROUND FAULT CIRCUIT INTERRUPTER
WP
GFCI
SPD SURGE PROTECTIVE DEVICE
PC PHOTOCELL
CB CONTROL BOX - ELECTRIC ROOF HATCH
HOMERUN TO PANELBOARD. "B" INDICATES PANEL, "2"
INDICATES CIRCUIT NUMBER FOR REFERENCE, ( 20A-1P,
UNLESS NOTED OTHERWISE.) PROVIDE 2-12AWG, 1-12AWG
GND IN CONDUIT AS SPECIFIED ON THE FLOOR PLANS
B-2
EXISTING CONDUIT EMBEDDED IN CONCRETE
E-001
EL
EC
TR
IC
AL
LE
G
EN
D
J.
C
LI
N
E
J.
C
LI
N
E
J.
N
EW
TO
N
J.
N
EW
M
AN
AN
SI
D N
.T .S
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G
AT
EH
O
U
SE
R O
O F
M
EM
BR
AN
E R
EP
LA
C
EM
EN
T
TH
O
M
AS
TO
N
D
AM
TH
O
M
AS
TO
N
, C O
N N
EC
TI
C U
T W
2W
J2 2Q
H O
U -T
H -1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Michael.H.Holmquist
CHIMNEY
CANOPY BELOW
CONCRETE PARAPET WALL,
TYPICAL
MCMC
MC
MC
MC
M C
M C
MC
M C
MC
M C
M C
FURNACE FUEL
VENT PIPE
ANTENNA
ROOF HATCH
CHIMNEY
FLEW CAP
PC
XD
XD
XD
DN
CONTROL VALVES
3-4 WAY
XM
XM
XM
XM
XM
XS
EXISTING 277/480V, 3PHASE, 4WIRE PANEL "A" AND SURGE
PROTECTIVE DEVICE.
EXISTING 5KVA, 480V-120/208V WYE TRANSFORMER FOR
EXISTING PANEL "B"
EXISTING ENCLOSED CIRCUIT BREAKER FOR SECONDARY
DISCONNECT OF TRANSFORMER FOR EXISTING PANEL "B".
EXISTING 120/208V, 3PHASE, 4WIRE PANEL "B".
EXISTING SURFACE MOUNTED LED FLOODLIGHT TO BE
REMOVED, STORED, CLEANED, AND REINSTALLED AFTER
NEW ROOF WORK HAS BEEN COMPLETED AS SHOWN ON
E-101. MAINTAIN AND PROTECT EXISTING BRANCH CIRCUIT
WIRING DURING CONSTRUCTION.
DISCONNECT AND REMOVE ALL AIR TERMINALS (TYPICAL).
DISCONNECT AND REMOVE MAIN CONDUCTOR "MC" OF
LIGHTNING PROTECTION SYSTEM (TYPICAL).
DISCONNECT AND REMOVE ALL BONDING CONDUCTORS
AND BONDS TO ROOF TOP EQUIPMENT TO INCLUDE BUT
NOT LIMITED TO THE ROOF HATCH, THE ANTENNA AND
THE GUARD RAILING.
DOWN CONDUCTORS ARE EXISTING TO REMAIN TO BE
DISCONNECTED AND RECONNECTED (TYPICAL FOR 2).
CONTRACTOR SHALL PROVIDE A MEANS OF TEMPORARY
ATTACHMENT OF THE DOWN CONDUCTOR THE THE
EXTERIOR OF THE BUILDING TO FACILITATE THE
INSTALLATION OF THE ROOF AND WALL CAP. EXISTING
CONFIGURATION OF CONDUCTOR AND CONDUCTOR
LENGTHS TO REMAIN FOR REINSTALLATION.
DISCONNECT AND REMOVE EXISTING RECEPTACLES
(TYPICAL FOR 2). REMOVE BRANCH CIRCUIT WIRING BACK
TO POWER SOURCE. PROVIDE PULL STRING FOR NEW
CONDUCTORS TO BE PULLED IN.
DISCONNECT AND REMOVE EXISTING PHOTOCELL.
REMOVE ALL EXISTING ASSOCIATED WIRING.
1. FOR LEGEND AND GENERAL NOTES REFER TO E-001.
2. FOR NEW WORK REFER TO E-101.
3. REFER TO ATTACHED RECORD DRAWINGS FOR
ADDITIONAL INFORMATION.
ED101
EL
EC
TR
IC
AL
FL
O O
R P
LA
N
S D
EM
O
LI
TI
O N
J.
C
LI
N
E
J.
C
LI
N
E
J.
N
EW
TO
N
J.
N
EW
M
AN
AN
SI
D 1/
4"
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G
AT
EH
O
U
SE
R O
O F
M
EM
BR
AN
E R
EP
LA
C
EM
EN
T
TH
O
M
AS
TO
N
D
AM
TH
O
M
AS
TO
N
, C O
N N
EC
TI
C U
T W
2W
J2 2Q
H O
U -T
H -1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
DETAIL A10 KEYNOTES
DETAIL H10 KEYNOTES
SCALE: 1/4" = 1'-0"
EXISTING/DEMOLITION ROOF PLAN (EL. 546.17')H10
SCALE: 1/4" = 1'-0"
EXISTING/DEMOLITION ENTRANCE LEVEL PLAN (EL. 517.20')A10
0 4' 8'2'
0 4' 8'2'
PLAN
NORTH
PLAN
NORTH
GENERAL NOTES
Michael.H.Holmquist
GENERATOR FLOOR
(ELEVATION 530.50)
REINFORCED CONCRETE
ROOF CANOPY OVERHANG
ACCESS BRIDGE BELOW, TO
ENTRY LEVEL
LADDER UP TO ROOF
HATCH
LADDER DOWN TO ENTRY LEVEL
HVAC DUCT FROM BELOW
FLOOR PANELS AT
FLOOR OPENING
CB
B-4
XM
XM
XM
XM
XM
DN
CONTROL VALVES
3-4 WAY
EXISTING 277/480V, 3PHASE, 4WIRE PANEL "A" AND SURGE
PROTECTIVE DEVICE.
EXISTING 5KVA, 480V-120/208V WYE TRANSFORMER FOR
EXISTING PANEL "B"
EXISTING ENCLOSED CIRCUIT BREAKER FOR SECONDARY
DISCONNECT OF TRANSFORMER FOR EXISTING PANEL "B".
EXISTING 120/208V, 3PHASE, 4WIRE PANEL "B". RECESSED
MOUNTED.
EXISTING LED FLOODLIGHT REINSTALLED AND
RECONNECTED TO EXISTING BRANCH CIRCUIT WIRING
AND CONTROL.
MCMC
MC
MC
MC
M C
M C
MC
M C
MC
M C
M C
FURNACE FUEL
VENT PIPE
ANTENNA
ROOF HATCH
CHIMNEY
FLEW CAPCHIMNEY
CANOPY BELOW
CONCRETE PARAPET WALL,
TYPICAL
GFCI
WP
GFCI
WP
5 B-2
AIR TERMINALS (TYPICAL).
MAIN CONDUCTOR "MC" OF LIGHTNING PROTECTION
SYSTEM (TYPICAL).
BOND ALL ROOF MOUNTED EQUIPMENT AS REQUIRED
INCLUDING BUT NOT LIMITED TO THE ANTENNA, THE
GUARD RAILING AND THE ROOF HATCH.
BOND EXISTING DOWN CONDUCTORS TO NEW MAIN
CONDUCTOR UPON COMPLETE INSTALLATION OF NEW
ROOF AND WALL CAP (TYPICAL FOR 2).
PROVIDE RECEPTACLES (TYPICAL FOR 2). PROVIDE
BRANCH CIRCUIT WIRING IN EXISTING CONDUIT EMBEDDED
IN CONCRETE WALL AND ROOF. BRANCH CIRCUIT WIRING
ORIGINATES AT EXISTING POWER PANEL "B". WIRE TO
EXISTING CIRCUIT BREAKER. REFER TO PROJECT
REFERENCE DRAWING FOR CONDUIT ROUTING. PROVIDE
2-12AWG, 1-12AWG GND IN EXISTING CONDUIT EMBEDDED
IN CONCRETE. REFER TO REFERENCE DRAWINGS FOR
ROUTING.
ALL COMPONENTS SUCH AS, BUT NOT LIMITED TO AIR
TERMINAL BASE PLATES, CABLE FASTENERS, BONDING
PLATES ETC. THAT REQUIRE PHYSICAL ATTACHMENTH TO
THE ROOFING SYSTEM SHALL BE BY ADHESIVE MEANS PER
INDUSTRY STANDARD. SCREWS, BOLTS, NAILS ETC. ARE
UNACCEPTABLE AS A MEANS OF ATTACHMENT FOR ALL
COMPONENTS OF THE LIGHTNING PROTECTION SYSTEM.
PROVIDE BRANCH CIRCUIT WIRING FOR ELECTRIC ROOF
HATCH. USE CONDUIT MADE SPARE FROM PREVIOUS
GENERATOR EQUIPMENT ROUTED TO POWER PANEL "B".
USE GALVANIZED RIGID STEEL FOR ALL EXPOSED
CONDUIT. PROVIDE 2-12AWG, 1-12AWG FROM THE
AUTOMATIC ROOF HATCH AND THE ASSOCIATED CONTROL
BOX. COORDINATE LOCATION WITH MANUFACTURER'S
RECOMMENDATIONS AND THE COR.
1. FOR LEGEND AND GENERAL NOTES REFER TO E-001.
2. FOR DEMOLITION WORK REFER TO ED101.
3. FOR LIGHTNING PROTECTION SYSTEM DETAILS
REFER TO E-501
4. REFER TO ATTACHED RECORD DRAWINGS FOR
ADDITIONAL INFORMATION.
5. PROVIDE CERTIFICATION FROM A COMMERCIAL
THIRD-PARTY INSPECTION COMPANY WHOSE SOLE
WORK IS LIGHTNING PROTECTION, STATING THAT
THE LIGHTNING PROTECTIONS SYSTEM COMPLIES
WITH NFPA 780. THIRD PARTY INSPECTION COMPANY
CANNOT BE THE SYSTEM INSTALLER OR THE
SYSTEM DESIGNER. ALTERNATIVELY, PROVIDE A UL
LIGHTNING PROTECTION INSPECTION MASTER LABEL
CERTIFICATE INDICATING COMPLIANCE TO NFPA 780.
E-101
EL
EC
TR
IC
AL
FL
O O
R P
LA
N
S N
EW
W
O R
K
J.
C
LI
N
E
J.
C
LI
N
E
J.
N
EW
TO
N
J.
N
EW
M
AN
AN
SI
D 1/
4"
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G
AT
EH
O
U
SE
R O
O F
M
EM
BR
AN
E R
EP
LA
C
EM
EN
T
TH
O
M
AS
TO
N
D
AM
TH
O
M
AS
TO
N
, C O
N N
EC
TI
C U
T W
2W
J2 2Q
H O
U -T
H -1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
DETAIL B10 KEYNOTES
DETAIL J1 KEYNOTES
SCALE: 1/4" = 1'-0"
PROPOSED ROOF PLAN (EL. 546.17')J1
0 4' 8'2'
PLAN
NORTH
DETAIL J10 KEYNOTES
SCALE: 1/4" = 1'-0"
PROPOSED GENERATOR LEVEL (EL. 530.50')J10
SCALE: 1/4" = 1'-0"
PROPOSED ENTRANCE LEVEL PLAN (EL. 517.20')B10
0 4' 8'2'
0 4' 8'2'
PLAN
NORTH
PLAN
NORTH
GENERAL NOTES
Michael.H.Holmquist
E-501
EL
EC
TR
IC
AL
LI
G H
TN
IN
G P
R O
TE
C
TI
O
N S
SY
ST
EM
D
ET
AI
LS
J.
C
LI
N
E
J.
C
LI
N
E
J.
N
EW
TO
N
J.
N
EW
M
AN
AN
SI
D N
.T .S
JU
N
E
US Army Corps of Engineers ®
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E: O
F
SHEET ID
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G
AT
EH
O
U
SE
R O
O F
M
EM
BR
AN
E R
EP
LA
C
EM
EN
T
TH
O
M
AS
TO
N
D
AM
TH
O
M
AS
TO
N
, C O
N N
EC
TI
C U
T W
2W
J2 2Q
H O
U -T
H -1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
CABLE
SPLICER
BONDING
CONDUCTOR
BOND PLATE
MECHANICAL
EQUIPMENT
METAL
PLUMBING
VENT PIPE
NOTE:
PROVIDE PIPE MOUNTED AIR TERMINAL FOR PVC PIPE
ADJUSTABLE PIPE BONDING
STRAP
CONCEALED BELOW ROOF,
EXCEPT ON FLAT ROOF
ALUMINUM ROOF
CONDUCTOR (CLASS
1)
AIR TERMINAL
FLAT SURFACE
BASE
LIGHTNING
CONDUCTOR
CABLE
FASTENER
NOTE:
1. ELECTRICAL SUBCONTRACTOR TO COORDINATE LIGHTNING PROTECTION
MOUNTING DETAILS WITH ROOFING CONTRACTOR.
2. ALL COMPONENTS SUCH AS, BUT NOT LIMITED TO AIR TERMINAL BASE
PLATES, CABLE FASTENERS, BONDING PLATES ETC. THAT REQUIRE
PHYSICAL ATTACHMENT TO THE ROOFING SYSTEM SHALL BE BY
ADHESIVE MEANS PER INDUSTRY STANDARD. SCREWS, BOLTS, NAILS ETC.
ARE UNACCEPTABLE AS MEANS FOR ATTACHMENT FOR ALL COMPONENTS
OF THE LPS.
FLANGE
BONDING PLATE
BONDING PLATE BONDING LUG
HEAVY DUTY
BONDING LUG
BONDING PLATE
UL
U L
3/4" x 10'
GROUND ROD
EXOTHERMIC WELD
CONNECTION
#1/0 AWG BARE
COPPER (STRANDED)
DOWN CONDUCTOR
1" CONDUIT
1" CONDUIT
NO GUTTER
WITH GUTTER
GUTTER, REF.
ARCH.
PROVIDE 1" - 2"
CLEARANCE
TYP.
NOTE:
1. ELECTRICAL SUBCONTRACTOR TO COORDINATE LIGHTNING PROTECTION
MOUNTING DETAILS WITH ROOFING CONTRACTOR.
2. ALL COMPONENTS SUCH AS, BUT NOT LIMITED TO AIR TERMINAL BASE
PLATES, CABLE FASTENERS, BONDING PLATES ETC. THAT REQUIRE
PHYSICAL ATTACHMENT TO THE ROOFING SYSTEM SHALL BE BY
ADHESIVE MEANS PER INDUSTRY STANDARD. SCREWS, BOLTS, NAILS
ETC. ARE UNACCEPTABLE AS MEANS FOR ATTACHMENT FOR ALL
COMPONENTS OF THE LPS.
BI-METAL
CONNECTOR
BONDING
CONNECTOR
PARALLEL
CONNECTOR
PARALLEL
CONNECTOR
CROSS RUN
CONNECTOR
EXOTHERMIC WELD
"X" CONNECTION
GROUND ROD
EXOTHERMIC WELD
"T" CONNECTION TO
GROUND ROD
EXOTHERMIC WELD
END CONNECTION
VERTICAL PLATE
EXOTHERMIC WELD
"T" CONNECTION
SCALE: N.T.S.
BONDING CONNECTION DETAILK1
(SYMBOL ) SCALE: N.T.S.
AIR TERMINAL (SYMBOL )K5 SCALE: N.T.S.
BONDING LUGS & PLATES DETAILK9 SCALE: N.T.S.
CABLE CONNECTIONS DETAILK13
SCALE: N.T.S.
GROUND ROD DETAILE5SCALE: N.T.S.
VENT PIPE BONDINGE1 SCALE: N.T.S.
EXOTHERMIC WELD CONNECTION BELOW GRADEE9
SCALE: N.T.S.
DOWN CONDCUTOR ROUTINGK17
(SYMBOL )
NOTE:
1. SUPPORT AIR TERMINALS MORE THAN 24 INCHES IN LENGTH BY SUITABLE
BRACE PER INDUSTRY STANDARD. AIR TERMINAL SHALL BE SUPPORTED
AT NOT LESS THAN ON-HALF THE HEIGHT OF THE TERMINAL.
2. ALL COMPONENTS SUCH AS, BUT NOT LIMITED TO AIR TERMINAL BASE
PLATES, CABLE FASTENERS, BONDING PLATES ETC. THAT REQUIRE
PHYSICAL ATTACHMENT TO THE ROOFING SYSTEM SHALL BE BY
ADHESIVE MEANS PER INDUSTRY STANDARD. SCREWS, BOLTS, NAILS ETC
ARE UNACCEPTABLE AS MEANS FOR ATTACHMENT FOR ALL COMPONENTS
OF THE LPS.
Michael.H.Holmquist
| Sheets and Views |
| G-001 COVER SHEET |
| AD101 ARCH. DEMOLITION PLANS |
| ROOF PLAN |
| GENERATOR LEVEL PLAN |
| A-101 ARCH. PROPOSED PLANS |
| PROPOSED ROOF PLAN |
| PROPOSED GENERATOR LEVEL PLAN |
| ENLARGED HATCH PLAN |
| HATCH CROSS SECTION |
| HATCH LONGITUDINAL SECTION |
| HATCH ELEVATION |
| TYPICAL GUARD RAILING ELEVATION |
| A-501 ARCH. DETAILS |
| TYPICAL PARAPET SECTION DETAIL |
| EXISTING SCUPPER SECTION DETAIL |
| TYPICAL SCUPPER SECTION DETAIL |
| CANOPY SECTION DETAIL |
| HATCH SECTION DETAIL AT PARAPET |
| WEATHERHEAD SECTION DETAIL |
| E-001 ELECTRICAL GENERAL NOTES |
| ED101 ELECTRICAL DEMO PLANS |
| E-101 ELECTRICAL PROPOSED |
| E-501 ELETRICAL LIGHTNING PROTECTION SYSTEMS DETAILS |
| REFERENCE DRAWINGS |
| STEEL REINFORCEMENT-ROOF SLAB, GENERATOR FLOOR, MAIN FLOOR |
| PLANS-ROOF, MAIN, HEATER ROOM & GENERATOR FLOOR |
| ELEVATIONS & SECTIONS |
| ENTRANCE DETAILS |
| ELECTRICAL PLANS |
| ELECTRICAL SECTIONS |
| 2022-06-01T13:16:13-0400 | |
| HOLMQUIST.MICHAEL.HAYES.1596758157 |
| 2022-06-01T14:16:59-0400 | |
| TESSIER.MATTHEW.E.1377053253 | |
| I am approving this document |
| 2022-06-03T15:27:37-0400 | |
| MARGOLIS.DAVID.I.1228573805 |
File details come from the government source that posted it. Updated .