This document is an amendment to a federal solicitation for the construction of a pedestrian bridge. The U.S. Army Corps of Engineers Engineering District New England is seeking bids to replace the Blain Road Pedestrian Bridge over West Thompson Lake in North Grosvenor Dale, Connecticut. The amendment provides responses to requests for information from bidders. It clarifies that the project site will have road access repaired by the time construction begins, removing the need for a temporary access road. It also addresses a seasonal stream on the access path that will be drained during road repairs. Finally, it confirms that bids must follow the contract plans and specifications requiring a steel through truss bridge design rather than a pre-manufactured aluminum option.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is necessary to provide responses to Requests for Information (RFIs). All other aspects remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ21B0010

X 9B. DATED (SEE ITEM 11)

19-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-May-2021

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ21B0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

AMENDMENT 0005

Question #1: The existing access to the south abutment will require some kind of temporary road to be installed. Please confirm that the contractor can leave the temporary access road in place upon completion of the project.

Government Response 1: The Project Office has a contract in place to repair the road to its original width, which will include regrading and adding gravel as necessary. This work is scheduled to begin the week of 24 May and the intent is to have it finished mid-June. Therefore, a temporary access road will be unnecessary.

Question #2: There appears to be an existing flow of water in the middle of the access of the south abutment over 300’ and eventually conflicting with the south abutment itself. It is unclear if this is only due to rain events or an actual permanent creek (see attached picture for reference).

Confirm what precautions must be taken, if any.

Government Response 2: The flow of water down the middle of the access path is due to a fallen tree. During the road repair work, the tree will be removed, and the swale will be restored to flow adjacent to the road.

Question #3: Would a pre-manufactured Aluminum bridge system be considered for the required pedestrian bridge structure?

Government Response 3: The project should be bid according to the Contract Plans and Specifications. Specification Section 05 50 14, PART 2 PRODUCTS paragraph 2.1 BRIDGE SYSTEM TYPE, states “Bridge shall be a steel through truss with underhung floor.”

(End of Summary of Changes)