Amendment 0003_Measurement and Payment.pdf
PDF 40 KB Posted
- Solicitation number
- W912WJ21B0006
About this file
This document is an amendment to the technical specifications for the Buffumville Lake Electrical Upgrades project in Charlton, Massachusetts. The amendment includes two payment items for the work on this contract. Item Number 0001 covers all electrical improvements as shown on the contract drawings and specifications, except for the utility work covered under Item Number 0002. Item Number 0002 establishes a $5,000 allowance to cover electric utility charges including pole removal and meter replacement work done by the utility company. Progress payments will be based on the work completed under these two payment items. The solicitation number for this project is W912WJ21B0006 and is being conducted by the Department of the Army Corps of Engineers New England District for electrical upgrades at Buffumville Lake in Charlton, Massachusetts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical Improvements, Buffumville Lake Dam, Charlton, MA
Section 01 22 00 Page 1
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEM
The payment item for the work of this contract for which contract job payments will be made is listed in the BIDDING SCHEDULE and described below.
The job price and payment made for the item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.2 BIDDING SCHEDULE - PAYMENT ITEM
Payment items for the work of this contract on which the contract progress payments will be based are listed in the BIDDING SCHEDULE and are described below. All costs for items of work, which are not specifically mentioned to be included in a particular Bidding Schedule job payment item shall be included in the listed item most closely associated with the work involved.
A. Item Number 0001, "Electrical Improvements".
All costs for labor, equipment, and materials for electrical improvements, as shown on the contract drawings and in accordance with the specifications. This item includes all the work of this project except the electric utility work included in Item Number 0002.
Unit of Measure: Job.
B. Item Number 0002, "Allowance for Electric Utility Charges".
The allowance of $5,000 is to pay for electric utility charges for this project including pole removal and meter replacement and shall be included in the lump sum bid under this item. Payment for electrical company charges shall be up to but not exceeding the $5,000 allowance.
Unit of Measure: Job.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section --
| PART 1 GENERAL |
| 1.1 JOB PAYMENT ITEM |
| 1.2 BIDDING SCHEDULE - PAYMENT ITEM |
| PART 2 PRODUCTS (Not Applicable) |
| PART 3 EXECUTION (Not Applicable) |