This document contains an amendment to a solicitation for the rehabilitation of canal gates at the Fox Point Hurricane Barrier in Providence, Rhode Island. The amendment revises specification sections to require the use of carbon steel instead of stainless steel for certain components, updates product standards, and replaces language regarding seals and retaining bars. It also attaches an updated project schedule. The solicitation is an invitation for bid set aside for small businesses, with bids due at 1:00 PM EST and bid opening at 2:00 PM EST. The U.S. Army Corps of Engineers, New England District is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidAbstract.pdf | ||
| W912WJ20B0010 Amendment 0005.pdf | ||
| FP-21_S-601_Bid Amendment 0004.pdf | ||
| W912WJ20B0010 Amendment 0004.pdf | ||
| Amendment W912WJ20B0010-0003.pdf | ||
| Amendment_W912WJ20B0010-0002.pdf | ||
| Amendment_W912WJ20B0010-0001.pdf | ||
| Drawings.pdf | ||
| Specs.pdf | ||
| W912WJ20B0010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation W912WJ20B0010
Rehab Canal Gates Fox Point Hurricane Barrier, Providence, Rhode Island
AMENDMENT 0004
August 25, 2020
SPECIFICATION CHANGES
1. Amend Section 01 11 00 “SUMMARY OF WORK” as follows:
A. Under subparagraph 1.2 titled “WORK COVERED BY CONTRACT DOCUMENTS”, subparagraph 3, sentence 1, revise verbiage “new mounting plates and new stainless steel hardware,” to read “new mounting plates and new carbon steel hardware,...”
2. Amend Section 05 13 00 “REHABILITATE CANAL GATES” as follows:
A. Under Subpart “PART 2 PRODUCTS” remove verbiage from subpart in its entirety and replace it with the following:
2.1 CARBON GRADE STEEL
2.1.1 Carbon Steel Bars and Shapes
Carbon grade steel shall conform to ASTM A 36. Carbon grade steel shall be used for any seal components of the canal gates which may need replacing such as backer plates, retaining bars, and support bars.
2.2 STAINLESS STEEL
2.2.1 Stainless Steel Bars and Shapes
Stainless steel bars and shapes shall conform to ASTM A276/A276M, UNS S31603, Condition A, hot-finished or cold-finished. Stainless steel bars and shapes shall be used for any components of the canal gate wheel assembly which may need replacing such as the axle, retaining block, washer, and the two-piece collar.
2.2.2 Stainless Steel Castings
Stainless steel castings shall conform to ASTM A744/A744M, Grade CF8M, UNS J92900.
Stainless steel castings shall be used for the canal gate wheels.
2.3 CARBON STEEL BOLTS
Carbon steel bolts shall conform to ASTM A 307, Grade A with carbon steel nuts conforming to ASTM A 563, Grade A. Carbon steel bolts and nuts shall be used for all seal attachments made after the completion of the painting.
2.4 NUTS DIMENSIONAL STYLE
Carbon steel nuts shall be Hex Style when used with ASTM A 307 bolts.
2.5 WASHERS
Plain steel washers shall conform to ASTM F 844. Bronze washers shall be silicone bronze.
2.6 NICKEL ALUMINUM BRONZE
Bushings shall be nickel aluminum bronze in accordance with ASTM B271/B271M or ASTM B505/B505M, UNS C95800 (nickel aluminum bronze copper casting alloy), and per requirements in specified in Section 35 05 40.17 SELF-LUBRICATED MATERIALS, FABRICATION, HANDLING, AND ASSEMBLY.
2.7 WELDING
All welding shall be performed in accordance with AWS D1.1/D1.1M. Surfaces and edges to be welded shall be prepared in accordance with AWS D1.1/D1.1M. All welding shall be by an electric arc welding process using a method which excludes the atmosphere from the molten metal. The electrode, electrode-flux combination, and grade of weld metal shall conform to the appropriate AWS Specification for the base metal and welding process being used. All welds shall be prequalified as described in AWS D1.1/D1.1M, Subsection 5.1.
2.8 STRUCTURAL STEEL FABRICATION
Shop cutting of structural steel may be by mechanically guided or hand-guided torches, provided an accurate profile with a surface that is smooth and free from cracks and notches is obtained.
2.9 CANAL GATE SEALS
All of the canal gate rubber seals shall be replaced in-kind. Rubber seal dimensions and configurations shall be as shown in accordance with the details on Sheet 156 of the Information Drawings. The Contractor shall verify existing rubber seal dimensions prior to fabrication. The rubber seal compound shall be either natural rubber or neoprene and shall be molded only. The seals shall have molded corners and splices shall be vulcanized. The compound shall have no reclaimed polymers and include reinforcing carbon black, zinc oxide, accelerators, antioxidants, vulcanizing agents and plasticizers. The rubber seal profile shall be properly cured into a homogeneous form and kept free of oils, grease, or other materials which would deteriorate the rubber. Physical characteristics of the seals shall meet the following minimum requirements:
COMPOUND OPTIONS: Natural Rubber/Neoprene
TEST METHOD PHYSICAL TEST TEST
VALUE
SPECIFICATION
DUROMETER HARDNESS
(SHORE A)
60 - 70 ASTM D2240
TENSILE STRENGTH 2500 PSI (MIN) ASTM D412
ELONGATION AT BREAK 400%(MIN) ASTM D412
300% MODULUS 900 PSI (MIN) ASTM D412
COMPRESSION SET 30% (MAX) ASTM D395
METHOD B
WATER ABSORPTION
(NATURAL RUBBER AND
BLENDS - AGED THEN
IMMERSED AT 70 C FOR
166 HRS NEOPRENE -
AGED THEN IMMERSED AT
212 C FOR 22 HRS)
10% BY WEIGHT (MAX) ASTM D471
AGING : TENSILE
STRENGTH (48 HRS OF
AGING)
80% OF STRENGTH (MIN) ASTM A572/A572M
LOW TEMPERATURE
BRITTLENESS
NON BRITTLE
3' @ -40 C: Natural Rubber 3' @ -25 C: Neoprene
ASTM D2137METHOD A
B. Under Subpart “PART 3 EXECUTION” remove verbiage from subpart 3.2.2 in its entirety and replace it with the following:
3.2.2 Rubber Seals and Seal Retaining Bars
All rubber seals, seal retaining bars, and 5/8" diameter bolts attaching the seal retaining bars to the gates shall be replaced. The steel components of the seals shall be painted in accordance with Section 09 97 02 PAINTING OF CANAL GATES following the connection per the details shown on Sheet 156 of the Information Drawings.
PLAN CHANGES
1. S-601 – See updated S-601 – Work Schedule, which is attached under this amendment.