W912WJ20B0007 Amendment 0002.pdf
PDF 369 KB Posted
- Solicitation number
- W912WJ20B0007
About this file
This amendment modifies an invitation for bid for a shoreline revetment project at the Pleasant Point Passamaquoddy Tribal Reservation in Perry, Maine. The U.S. Army Corps of Engineers, New England District is seeking bids for construction of approximately 1,500 linear feet of revetment to prevent ongoing shoreline erosion threatening tribal housing, a church, and senior center. The bid due date is extended to June 30, 2020 and bidders must submit to both the Contract Specialist and Contracting Officer. The amendment provides details on the site visit attendees and answers to requests for information covering stone reuse, matching existing stone, road weight limits, Tribal Employment Rights requirements, commercial scale availability, and the pre-approval process for revetment materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| W912WJ20B0007 Amendment 0004.pdf | ||
| W912WJ20B0007 Amendment 0003.pdf | ||
| W912WJ20B0007 Amendment 0001.pdf | ||
| Drawings.pdf | ||
| Drawings.pdf | ||
| Specifications.pdf | ||
| W912WJ20B0007-Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above referenced solicitation is hereby amended to include site visit attendees, the site visit presentation, and requests for information.
Additionally, the bid opening date is extended.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ20B0007
X 9B. DATED (SEE ITEM 11)
21-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jun-2020
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ20B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
All Requests for Information should be submitted no later than 19 Jun 2020.
Bidders are reminded that bids must be submitted to BOTH the Contract Specialist AND Contracting Officer in accordance with the Virtual Bid Opening Instructions. Failure to do so may result in rejection of bid.
Site Visit Attendees
1. Steve Wight – The Lander Group
2. Cheryl Stasiak – DRS Enterprises
3. Lauren Jacobs – USACE
4. Brian Raymond – Dirigo Materials
5. Dot Lundberg – USACE
6. Erin Bradley – USACE
7. Mike Vining – Gordon Contracting
8. Bahman Moghaddame-Jafari – USACE
9. Glenn Cairns – George Cairns and Sons, Inc.
10. Chris Hatfield – USACE
11. Heather Skorik – USACE
12. Michael Stover – USEPA Region 1
W912WJ20B0007
RFIs
1. Question: Can any of the existing rocks be resued?
Answer: No, the existing rocks must be stockpiled at the designated location on the contract drawings.
2. To match stone that remains in place do you know the source of the stone used?
Answer: There is no intent to match the existing stone. The Contractor shall follow the requirements in the Contract specifications for the proposed stone. Refer to section 35 31 19, Shoreline Revetment Protection.
3. Is there any weight restrictions on the roads?
Answer: The Contractor is responsible to investigate the restriction on the roads. Refer to specification section 01 50 00, Temporary Construction Facilities and Controls.
4. What does the Tribal Employment Rights entail?
Answer: Per block 10 of the original solicitation, the contractor should work with the Tribes to determine the requirements of the Tribal Employment Rights Ordinance (TERO).
5. Are there commercial scales in area if necessary for weighing source material?
Answer: It is the Contractor’s responsibility to find and utilize a commercial weight station that meets the requirements of section 01 22 00, Measurement and Payments.
6. Will there be pre-approval of boulder selection prior to placement and if any are rejected who is responsible for the cost of removal?
Answer: Yes, there will be pre-approval process prior to placement of any material. The removal of the rejected material is at the Contractor’s expense, as all requirements are outlined in the specifications. Refer to specification section 35 31 19, Shoreline Revetment Protection.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 23-Jun-2020 01:00 PM to 30-Jun-2020 01:00 PM.
(End of Summary of Changes)