Amendment 0002

View the file

Other files

File Type Posted
Map_2.pdf PDF
Map_1.pdf PDF
HDD_Construction_Photos.pdf PDF
Amendment_W912WJ19Q0125-0001.pdf PDF
Solicitation_W912WJ19Q0125.pdf PDF
PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W13G86922140670001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is necessary to provide a response to a Request for Information. Response #5 w ill apply to this amendment. Closing w ill be extended until September 24, 2019 at 2:00 PM.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ19Q0125

X 9B. DATED (SEE ITEM 11)

04-Sep-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Sep-2019

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ19Q0125

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

REQUEST FOR INFORMATION

Site Visit Attendee List:

NAME COMPANY/AGENCY

Mark Domaracki Hager Geoscience Inc.

Jennifer Samela USACE Bob Leitch USACE Tracy Dorgan USACE Joe Colombo Natick DPW Vee Fistel Natick DPW

REQUEST FOR INFORMATION:

Questions:

Q1. Is there information on the sewer line trending east-west?

A1. The depth to sewer flow in the pipe, measured from the top of the manhole rim, is 13.5’. The pipe is 12-inch diameter and reported to be cast iron.

Q2. Are there time of day requirements?

A2. Yes, listed below as referenced to the marked-up site map.

Area 1 – Exit roadway work needs to be performed between 0600 and 1100 OR during weekend timeframe to avoid exit traffic.

Area 2 – Entrance roadways need to be performed after 1400 OR during weekend timeframe to avoid entrance traffic.

Q3. Is the area in front of Building 15 have a study border?

A3. Yes, area delineated on the attached figure as Area 3.

Q4. Is there any additional construction information on the 3-HDPE lines in front of Building 15?

A4. Yes, construction pictures attached to this amendment.

Q5. The PWS states a minimum of three complimentary methods. Will multiple radar frequencies and multiple PUL techniques count as three methods?

A5. Yes, multiple radar frequencies and multiple PUL techniques, used in any appropriate combination will count as three complimentary methods.

CLARIFICATIONS:

All utilities in front of Building 15 are to be located as required

W912WJ19Q0125

Access to all buildings will be made available to determine the starting point of below grade utilities.

The lines installed in front of Building 15 (includes 3-HDPE pipes) and the east-west trending sewer line near the entry point may require different equipment frequencies to ensure they are accurately located at all depths.

The 3-HDPE lines include 1-480 volt line which provides power to extraction wells that operate 24 hours/day, 7 days/week. This electrical line extends to Building 94 located approx. 1100 feet north of the northeast corner of Building 15

All parking lots will be “coned off” by base security in the evening before the work is to be performed to disallow vehicles to be parked in that area the next day.

There is a steep topographical grade between the area labelled as Area 1 and Area 2 that the Contractor should be prepared to make the respective field data corrections for.

There are numerous mature trees present within the survey area.

The sewer manhole lid and drain-lid removal should be executed by the base DPW and scheduled accordingly.

Coordination and communications with base personnel should be in accordance with the PWS.

Benchmarks are for mapping are located in the vicinity of Building 15 and Building 92.

Horizontal Directional Drilling was filled with a clay material to maintain the integrity of the holes.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 23-Sep-2019 02:00 PM to 24-Sep-2019 02:00 PM.

(End of Summary of Changes)