Amendment_W912WJ19Q0006-0002.pdf
PDF 5 MB Posted
- Solicitation number
- W912WJ19Q0006
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_W912WJ19Q0006-0003.pdf | ||
| Amendment_W912WJ19Q0006-0001.pdf | ||
| Solicitation_W912WJ19Q0006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W13G86905785360001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is necessary to post the Site Visit Attendee List, provide answ ers to Requests for Information, and provide revised versions of the Plans and Specifications.
Closing w ill remain April 19, 2019 at 5:00 PM. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Apr-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ19Q0006
X 9B. DATED (SEE ITEM 11)
28-Feb-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Apr-2019
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912WJ
FACILITY CODECODE
ROBERT.C.GARRAHAN@USACE.ARMY.MILEMAIL:978-318-8814TEL:
ROBERT C GARRAHAN / ADDED BY UPASS
W912WJ19Q0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUEST FOR INFORMATION
Hodges Village Dan Electrical Upgrades Attendee List (March 13, 2019):
NAME COMPANY
Jay Poulin J.D. Poulin Electric Inc.
Jon Poulin Poulin Construction Jay Harris Colony Construction Steve Teal Sanborn Electric Ethan Sanborn Sanborn Electric Bill Simpson Smokestack Lighting Inc.
Larry Harris LaFleur Electric Nicole Giles USACE James Hachigan USACE Timothy Russell USACE Jason Robinson USACE Brian Head USACE Janet Patev USACE Brooke Morgan USACE Jennifer Samela USACE
Request for Information:
1. Do the specifications for sealant specify rodent-resistant?
Answer: The sealant properties have to indicate that it is rodent-proof and waterproof, as indicated on Plan Sheet E-101, keyed note 1.
2. Do conduits go through the walls?
Answer: Yes, conduits go through the wall to a junction box.
3. Is demolition of the furnace included in this Statement of Work (SOW)?
Answer: No, the US Army Corps of Engineers will be responsible for demolition of the existing furnace. The awarded Contractor will be responsible for installation of the new furnace.
4. Is the Contractor responsible for painting the floor? Is that included in the SOW?
Answer: Any new penetrations or sealed penetrations will need to be painted. The entire floor does not need to be painted.
5. When pipes are cut off will they need to be cut flush? Will hydraulic cement be required around the cut pipes?
Answer: As per Keyed Note 3 on Plan Sheet E-101, Contractors are to “Seal abandoned penetrations with sealant flush with finished floor“.
6. Will the drop lights need to be relocated on the lower level since the service disconnects will be mounted under the power supply conduits?
Answer: Yes. As per Keyed Note 10 on Revised Plan Sheet E-101, the drop light mounting assembly will need to be relocated. It can be moved lower on the wall, but must remain on the same wall that they are currently mounted on.
7. Where should the new conduits be installed on the lower level?
Answer: Conduits should be ceiling mounted as high as possible.
8. Will another switched feeder need to be run to supply power to the emergency light on the lower level since the power is currently turned on and off with the circuit breaker?
Answer: Yes. See Revised Plan Sheet E-103 for details regarding the switched feeder that will need to be run.
9. What is the size of the disconnect?
Answer: As per Paragraph 2.8 SERVICE ENTRANCE DISCONNECT in Spec Section 26 20 00, ELECTRICAL DISTRIBUTION SYSTEM, the service disconnect will be 200 amp.
10. What is the middle conduit on the lower level of the Gatehouse above the drop lights?
Answer: That conduit is the feed to the project office.
11. Core drilling specification indicates that the floor should be x-rayed. X-rays may not show all obstacles, are we still required to use X-ray?
Answer: Yes. As per Paragraph 3.1.4.5 Core Drilling for Conduit Penetration, in Spec Section 26 20 00 ELECTRICAL DISTRIBUTION SYSTEM, Contractors are to submit a Core Drilling Plan for government approval. The Core Drilling Plan is to include the non-destructive testing (NDT) method that the Contractor wants to use. The Core Drilling Plan will be reviewed by the Government as to the acceptability of the proposed NDT method.
12. Is fall protection required?
Answer: Yes, fall protection will be required when accessing the lower level of the Gatehouse and the roof of the Gatehouse. Fall protection will need to comply with the standards set forth in the U.S. Army Corps of Engineers Safety Manual, EM385-1-1. Fall protection must be addressed on the Accident Prevention Plan. Contractors are urged to review EM385-1-1 for fall protection requirements prior to submitting a quote.
13. Are there any issues with having the power off for an extended length of time?
Answer: Yes, outages must be coordinated with the Project Office. Time without power should be minimized to the maximum extend practical.
14. Will supply of backup generators be required?
Answer: As per Paragraph 8. Hours of Operation, in the Statement of Work, “Interruptions to power must be coordinated with the USACE Hodges Village Project Manager. If power outages are anticipated to last longer than 8 hours, arrangements must be made to supply emergency power to the gate operators. An emergency generator is onsite and a temporary connection from the generator to the gate operators would be acceptable.”
15. Will the existing conduits remain on the lower level?
Answer: As per Keyed Notes 5 and 6 on Sheet ED101, existing conduits will be demolished, but there will still be a conduit on this level, as shown on Revised Sheet E-101.
16. Will new feeders need to be run? Are feeders expected to be continuous or will splicing be permitted?
Answer: No, new feeders will not be needed to be run. Yes, splicing will be permitted.
Contractor should provide conductors, wires and splicing as required. See keyed note 5 on amended sheet E-101.
17. What is to be done with the data lines that run by the conduits on the lower level?
Answer: Data lines should remain. They can be moved out of the way for work and then returned to their original location.
18. Will the Contractor need to add a switch for the lights on the lower level and where should switches be located?
Answer: Yes, please see revised Plan Sheet E-103.
19. Are there surge protectors on the signal lines?
Answer: Yes, see Keyed Note 5 on Revised Plan Sheet E-102 which says “Provide Surge Protective Devices on Antenna and Instrumentation cables on the roof entering the structure.”
20. To be inspected and certified, the grounding and down leads would need to be fastened every three (3) feet. Is the Contractor to provide this fastening?
Answer: Yes, see amended sheet E-102.
21. Is the Contractor to install a new ground rod to ensure that the lightning protection system is adequately grounded?
Answer: Yes, see amended sheet E-102.
22. Are there bonds between the utilities and lightning protection?
Answer: Yes, see amended sheet E-102.
23. Are there any restrictions or exemptions to using an eleven (11) foot lightning rod on the Gatehouse roof?
Answer: See amended sheet E-102, mounting detail is updated to provide better support.
24. Are there any restrictions on the support brackets and where they can be attached for an eleven (11) foot lightning rod, as the supports shown in the drawings may be inadequate?
Answer: Yes, see amended sheet E-102.
25. Are the feeders coming in to the Gatehouse to remain?
Answer: Yes
26. Will the feed for the furnace be replaced when the furnace is demolished or will the Contractor be responsible for providing a new feed?
Answer: The feed will be brought back to the white junction box when the furnace is demolished. The white junction box is located on the southwest wall, to the right (west) of the entrance door, on the Operator’s level.
27. Is the Contractor to provide motion sensors?
Answer: Yes, description and specifications will be provided in Amendment 0002. See sheet E-103.
28. Is the lower level considered a permit required confined space?
Answer: No.
29. Will the grab bars be considered sufficient anchor points for fall protection for the lower level and the roof?
Answer:
*You would need a competent person in Fall Protection/Structural Engineer to review these as anchor points or require the Contractor to provide their own anchor point. Ladder rungs (bolted side rails of ladders) are generally considered sufficient anchor points. Self Retracting Life Lines would not be recommended until they were reviewed and approved to arrest a fall prior to impact with the level below.
30. Do the fuel lines need to be moved?
Answer: No
31. Is magnetic testing acceptable instead of x-ray for locating rebar?
Answer: As per Paragraph 3.1.4.5 Core Drilling for Conduit Penetration, in Spec Section 26 20 00 ELECTRICAL DISTRIBUTION SYSTEM, Contractors are to submit a Core Drilling Plan for government approval. The Core Drilling Plan is to include the non-destructive testing (NDT) method that the Contractor wants to use. The Core Drilling Plan will be reviewed by the Government as to the acceptability of the proposed NDT method.
32. Question: It looks like on the one line they are calling for EPD breakers, but the schedule does not show EPD breakers. Are they required?
Answer: See revised specification 26 20 00 Paragraph 2.10 Panelboard MDP Item j. EPD breakers are not required, but meet the salient characteristics of the specification.
Alternative submittals must provide as much equal protection and coordination as the EDP breakers.
33. If EPD breakers are required we would have to series rate the panel to use 10k rated breakers?
Answer: The panel buss must be rated as specified in revised Spec Section 26 20 00 Amendment 1 Paragraph 2.10 Panelboard MDP Item b. Series rated breakers will not be accepted, see revised Spec Section 26 20 00 Amendment 1 Paragraph 2.10 Panelboard MDP Item j. Ignore series ratings on overcurrent protective devices, and instead use the non-series ratings.
34. The one line shows a 150 Amp main breaker, the schedule has a 175 Amp main breaker.
Which is the correct main breaker rating?
Answer: The correct size is 150A. Plan sheet E-502, MDP Schedule, has been revised.
(End of Summary of Changes)
Electrical Upgrades, Hodges Village Dam, Oxford, MA
AM 0002
AMENDMENT 0002 OF SOLICITATION
1.1 CHANGE TO SPECIFICATION
1.1.1 Narrative Addition
Specification Section 26 20 00 ELECTRICAL DISTRIBUTION SYSTEM, Add
Subpart 2.5 SWITCHES as follows:
2.5.1 Toggle Switches
NEMA WD 1, UL 20, single pole, totally enclosed with bodies of thermoplastic or thermoset plastic and mounting strap with grounding screw. Include the following:
a. Handles: thermoplastic.
b. Wiring terminals: screw-type, side-wired.
c. Contacts: silver-cadmium and contact arm - one-piece copper alloy.
d. Switches: rated quiet-type ac only, 120/277 volts, with current rating and number of poles indicated.
2.5.2 Motion Sensor
Provide exterior motion sensor light switch with photocell for dusk till dawn operation in the location indicated on the plans. Switch must be rated for 120V 20A 1-pole applications. Switch must be rated
NEMA-3R or higher. Switch must be rated for operation from -4 to 110 degrees Fahrenheit. Switch must be equipped with adjustable time delay.
1.1.2 Narrative Changes
Specification Section 26 20 00 ELECTRICAL DISTRIBUTION SYSTEM, change
Subpart 2.10 PANELBOARD MDP, subparagraph b to read:
“Panelboard must have a minimum short circuit rating of 10,000 in rms symmetrical amperes at rated voltage.”
Instead of “Panelboard must have a minimum short circuit rating of 18,000 in rms symmetrical….”
And
Specification Section 26 20 00 ELECTRICAL DISTRIBUTION SYSTEM, change
Subpart 2.10 2.10 PANELBOARD MDP, subparagraph j to read:
“Branch circuit breakers must be as indicated on the plans, listed in the panelboard manufacturer’s literature for use in the panel, and must be 10 kAIC or higher. Series rated breakers will not be accepted.”
Instead of “Branch circuit breakers must be as indicated on the plans, listed in the panelboard manufacturer’s literature for use in the panel, and must be 18 kAIC or higher. Series rated breakers will not be accepted.”
Electrical Upgrades, Hodges Village Dam, Oxford, MA
AM 0002
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
F
T H
A -H
V -1
O X
F O
R D
M A
S S
A C
H U
S E
T T S
H O
D G
E S V
IL
L A
G E D
A M
E L E
C T
R
IC
A L U
P G
R A
D E
S
SHEET ID
®of Engineers
US Army Corps
W
W J
Q
OXFORD, MASSACHUSETTS
HODGES VILLAGE DAM
ELECTRICAL UPGRADES
D
H A
S S
E T
T
A N
S I
D
G-001 of Engineers
US Army Corps
SOLICITATION NO.:
CONTRACT NO.:
New England District
VILLAGE
HODGES
VERMONT
MASSACHUSETTS
NEW HAMPSHIRE
POND
NORWICH
HUNTINGTON
HOLYOKE
NORTHAMPTON
RESERVOIR
QUABBIN
WORCESTER
CHARLTON
SPRINGFIELD
CONNECTICUT
MASSACHUSETTS
WESTFIELD
IS
L
A N
D
R H
O D
E
POND
QUABOAG
PROJECT
LOCATION
C3
N
NOT TO SCALE
C1
LOCATION PLANVICINITY MAP
DESIGN FILESHEET NO.
G-001
INDEX TO DRAWINGS
SHEET TITLE
E-001
SHEET NO. DRAWING NUMBER
INDEX TO INFORMATION DRAWINGS
THA-HV-119_G-001.DGN
THA-HV-119_E-001.DGN
THA-HV-119_E-101.DGN
MAINE
AUGUSTA
BANGOR
OCEAN
ATLANTIC
HAMPSHIRE
NEW
PORTLAND
CONCORD
PORTSMOUTH
VT.
MASSACHUSETTS
BOSTON
LOCATION
PROJECT
PROV.
R.I.
HARTFORD
CONN.
CAPE
COD
TH-1-1446
SHEET TITLE FROM ORIGINAL CONSTRUCTION DRAWINGS
TH-1-1424
ELECTRICAL NOTES, LEGEND AND ABBREVIATIONS
CANADA
1 THA-77
OUTLET WORKS - GATE TOWER SECTIONAL PLANS (ORIGINAL CONSTRUCTION)
ELECTRICAL - GENERAL LAYOUT (ORIGINAL CONSTRUCTION)
THA-HV-119_ED-101.DGN
THA-HV-119_ED-601.DGN ELECTRICAL ONE LINE DIAGRAM DEMOLITION
ED101
ED601
THA-HV-119_E-102.DGNE-102
E-501 THA-HV-119_E-501.DGN
THA-HV-119_E-502.DGN
THA-HV-119_E-601.DGN
THA-HV-119_ED-102.DGN
E-103
E-502
E-601
:1
B
H E
A D
J
C L
IN
E
M A
R C
H
W912WJ19Q0006
26 OF 47 TH-1-1426
D E
C
ED102
TOWER FLOOR PLAN ELECTRICAL DEMOLITION
ELECTRICAL LIGHTING DEMOLITION
TOWER FLOOR PLAN INSTALLATION
ELECTRICAL LIGHTNING PROTECTION PLAN DEMOLITION AND PROPOSED
ELECTRICAL LIGHTING INSTALLATION
ELECTRICAL PANEL SCHEDULES DEMOLITION AND INSTALLATION
ELECTRICAL ONE LINE DIAGRAM INSTALLATION
COVER SHEET AND INDEX TO DRAWINGS
C O
V E
R S
H E
E T A
N D I
N D
E X T
O D
R A
W
IN
G S
DAM CREST ROAD
C5
SITE PLAN
GATE TOWER
PROJECT OFFICE
ISSUE DATE: MARCH 2019
E-101
THA-HV-119_E-103.DGN
SYSTEM GROUNDING DETAIL ARC FLASH LABEL AND CONDUITS SCHEDULE.
REINFORCING II (ORIGINAL CONSTRUCTION)
REPLACE ELECTRIC FEEDER SYSTEM 1988
LOCATION
MANHOLE
J S
W A
L L E
Y
L1
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
A -H
V -1
O X
F O
R D
M A
S S
A C
H U
S E
T T S
H O
D G
E S V
IL
L A
G E D
A M
E L E
C T
R
IC
A L U
P G
R A
D E
S
SHEET ID
®of Engineers
US Army Corps
W
W J
Q
D
H A
S S
E T
T
A N
S I
D
E-001
E L E
C T
R
IC
A L N
O T
E S L E
G E
N D A
N D A
B B
R E
V
IA
T
IO
N S
AMPERES
AMERICAN WIRE GAUGE
CONDUIT
CIRCUIT
COLUMN
CIRCUIT BREAKER
CENTERLINE
BUILDING
EMERGENCY
FIRE ALARM
ELECTRICAL METALLIC TUBING
GROUND FAULT INTERRUPTER
GROUND OR GROUNDING
FULL LOAD AMPERES
THOUSAND CIRCULAR MILS
GALVANIZED RIGID METALLIC CONDUIT
kcmil
FLA
FT
GFI
GRMC
GND,G
FEET
EM
EMT
F
FA
FUSE
CB
CKT
COL
AWG
C
BLDG
A
PHASE
QUANTITY
TELEPHONE
POLYVINYL CHLORIDE
RIGID METAL CONDUIT
TRANSFORMER
UNLESS OTHERWISE NOTED
UNDERGROUND OR UNDERGRADE
UNDERWRITERS LABORATORIES
XFMR
W
V
DELTA
WYE
WIRE
VOLT
UG
UL
U.O.N.
SP
TEL
SPARE
PWR
QTY
PVC
RMC
POWER
KILOWATTS
LIGHTING
MISCELLANEOUS
MAIN LUGS ONLY
KILOVOLT AMPERES
MAIN CIRCUIT BREAKER
ASSOCIATION
NOT TO SCALE
PUSHBUTTON
NATIONAL ELECTRICAL
NATIONAL ELECTRIC CODE
MANUFACTURES ASSOCIATION
NATIONAL FIRE PROTECTION
NTS
PNL
P1
PB
PANEL
NEC
NEMA
NFPA
MCB
MLO
MISC
kW kVA
LTG
GENERAL ABBREVIATIONS
Y
EXISTING MANHOLE TO REMAIN
EXISTING UTILITY POLE TO REMAIN
Ex
E
Ex
ESx
ES
UNDERGROUND ELECTRIC WIRING TO BE REMOVED
EXISTING ELECTRIC UNDERGROUND SECONDARY
EXISTING ELECTRIC OVERHEAD
NEW ELECTRIC UNDERGROUND PRIMARY
NEW ELECTRIC UNDERGROUND SECONDARY
EXISTING ELECTRIC UNDERGROUND PRIMARY
EQUIPMENT LEGEND
JUNCTION AND/OR PULL BOX
CONNECTION TO EQUIPMENT
MOTOR NUMERAL INDICATES HORSEPOWER
MAGNETIC MOTOR STARTER
DISCONNECT SWITCH (UNFUSED)
DISCONNECT SWITCH (FUSED)
JUNCTION AND/OR PULL BOX, WITH FLEX
OVERLOAD PROTECTION. "P" DENOTES EQUIPPED WITH
CONTRACTOR TO EQUIPMENT BY OTHERS.
AND CONDUCTORS BY THE ELECTRICAL
DENOTES FLEXIBLE LIQUID TIGHT CONNECTION
MANUAL MOTOR STARTER COMPLETE WITH THERMAL
PILOT LIGHT, PROVIDED BY ELECTRICAL CONTRACTOR.
METER (MICRO PROCESSOR BASED)
PANELBOARD
SYSTEM GROUND OR EQUIPMENT GROUND
T1
J
J
S
PC
RATING
P
M
PANEL
SD
DRY TYPE TRANSFORMER "T1"
SPD
SUPPRESSER)
SURGE PROTECTIVE DEVICE (TRANSIENT VOLTAGE SURGE
MOUNTED ON EAVE.
PHOTOCELL EQUAL TO TORK 2101
UP/DOWN/STOP PUSH BUTTON CONTROL
PB PULL BOX
CIRCUITRY TURNING UP
CIRCUITRY TURNING DOWN
NOTED.
HOMERUN TO PANEL "LP" CIRCUIT #2 VIA 60A-3P
L2PA-2
PP-3P
CIRCUITRY, RACEWAYS AND FEEDERS LEGEND
PP-1,3,5
GENERAL NOTES:
125 VOLT, 2 POLE, 3 WIRE, 20 AMP., DUPLEX
RECEPTACLE. "2" DENOTES CIRCUIT NUMBER.
125 VOLT, 2 POLE, 3 WIRE, 20 AMP., DOUBLE
125 VOLT, 2 POLE, 3 WIRE, 20 AMP., DUPLEX
RECEPTACLE EQUIPPED WITH INTEGRAL GROUND
WIRING DEVICES LEGEND
SINGLE POLE TOGGLE SWITCH "b" DENOTES SWITCH
ALL RECEPTACLES SHALL BE INSTALLED WITH GROUND PRONG
IN THE UP POSITION.
CONTROL
FAULT INTERRUPTER.
DUPLEX RECEPTACLE.
1.
125 VOLT, 2 POLE, 3 WIRE, 20 AMP., DUPLEX
RECEPTACLE EQUIPPED WITH INTEGRAL GROUND
FAULT INTERRUPTER AND MOUNTED IN CAST
OUTLET BOX WITH WEATHERPROOF COVER.
ALL RECEPTACLES SHALL BE SIDE WIRED.2.
WP
GFI
b
EQUAL
AEROSPACE MS90555C442813S OR APPROVED
RECEPTACLE, AS MANUFACTURED BY AMPHENOL
EQUAL
AEROSPACE MS90555C444413S OR APPROVED
RECEPTACLE, AS MANUFACTURED BY AMPHENOL
LIGHTING EQUIPMENT LEGEND
XL
XD
XN
XR
XM
RESPONSIBLE FOR MAINTAINING CIRCUITRY TO DEVICES
PANELBOARD AS SPARE. CONTRACTOR SHALL BE
CONDUIT AS REQUIRED SO AS TO PROVIDE A
COMPLETE OPERATIONAL INSTALLATION.
TO BE REMOVED. CUT BACK AND MAKE SAFE ALL
EQUIPMENT TO BE REMOVED AND REPLACED WITH NEW.
"XL" ADJACENT TO EQUIPMENT DENOTES RELOCATED
EXISTING AT NEW LOCATION
UNAFFECTED BY DEMOLITION.
"XD" ADJACENT TO EQUIPMENT DENOTES EXISTING
"XR" ADJACENT TO EQUIPMENT DENOTES EXISTING
"XN" ADJACENT TO EQUIPMENT DENOTES EXISTING
"XM" ADJACENT TO EQUIPMENT DENOTES EXISTING
SYMBOLS OUT OF FUNCTION DENOTE EXISTING
TO BE RELOCATED AS SHOWN. CUT BACK AND/OR
EXTEND EXISTING BRANCH CIRCUIT WIRING AND
EQUIPMENT TO REMAIN.
EXISTING EQUIPMENT LEGEND
IN EXISTING LOCATION.
TO BE REMOVED, STORED, CLEANED AND REINSTALLED
"XS" ADJACENT TO EQUIPMENT DENOTES EXISTING
XS
RACEWAY LEGEND
ASSOCIATED BRANCH CIRCUIT WIRING AND CONDUIT
BACK TO POWER SOURCE AND LABEL BREAKER IN
CIRCUIT BREAKER. BRANCH CIRCUIT WIRING SHALL BE AS
OFF POSITION TO CONTROL PROJECTION SCREEN.
SINGLE POLE DOUBLE THROW TOGGLE SWITCH WITH CENTER
3/4" UNLESS OTHERWISE NOTED.
SPECIFICATIONS AND N.E.C. MINIMUM SIZE CONDUIT SHALL BE
PROVIDE GROUNDING CONDUCTORS IN ACCORDANCE WITH
ISOLATED GROUND CONDUCTORS ARE NOT INDICATED.
CONDUCTORS. EQUIPMENT GROUNDING CONDUCTORS AND
DENOTE TWO #12 AWG CU (MINIMUM) PHASE AND NEUTRAL
(MINIMUM) PHASE AND NEUTRAL CONDUCTORS. NO TICKS
BREAKERS. TICKS INDICATE QUANTITY OF #12 AWG CU
HOMERUN TO PANEL "LP", CIRCUIT #1,3,5 VIA 20A-1P CIRCUIT
NOTES:
B
EMH-1
CMH-1
COMMUNICATIONS MANHOLE. NUMERAL INDICATES
MANHOLE NUMBER
ELECTRIC MANHOLE. NUMERAL INDICATES MANHOLE
NUMBER
Cx EXISTING COMMUNICATION UNDERGROUND
CLCL or
S1 SWITCH NUMBER ONE
P POLE
PANEL NUMBER ONE
LITHONIA WLTV-LED.
WET LOCATION. UNIT SHALL BE EQUIVALENT TO
WHITE LED LAMP HEADS. UNIT SHALL BE LISTED FOR
EMERGENCY LIGHTING BATTERY UNIT WITH TWO 1.9 WATT
TO HUBBELL #PVL3-30LU-4K-BZ.
LED WALLPACK, UL LISTED FOR WET LOCATION, EQUAL
EXISTING LIGHT NUMBER ONE TO REMAIN.
J
C L
IN
E
J S
W A
L L E
Y
M A
R C
H
B
H E
A D
:1
REQUEST FOR INFORMATIONRFI
COPPERCU
COR CONTRACTING OFFICER'S REPRESENTATIVE
USED INTERCHANGEABLY THROUGHOUT THESE DOCUMENTS.
12. THE TERMS "GATE TOWER", "TOWER", "GATE HOUSE", AND "INTAKE STRUCTURE" ARE
AND OPERATING CONDITION AFTER THE WORK OF THIS CONTRACT.
I. VERIFY EXISTING EQUIPMENT AND SYSTEMS ARE RESTORED TO ITS ORIGINAL
H. REMOVE AND DISPOSE OF EQUIPMENT INDICATED TO BE DEMOLISHED.
AND ACCESSIBLE LOCATIONS.
G. REMOVE ABANDONED CONDUIT FROM CEILINGS, EXPOSED AREAS
F. ABANDON IN PLACE UNUSED CONDUIT CONCEALED IN FLOORS OR WALLS.
E. REMOVE AND DISPOSE OF UNUSED CONDUIT OR CONDUCTORS.
WORKING ORDER.
D. VERIFY EQUIPMENT TURNED OVER TO THE GOVERNMENT IS CLEAN AND IN
C. RELOCATE PIPING AND DUCTWORK AS REQUIRED TO COMPLETE WORK.
TEMPORARY WORK.
OPERATE THE FACILITY DURING THE WORK, TO INCLUDE
B. DISCONNECT/RECONNECT/REINSTALL EQUIPMENT AS REQUIRED TO
A. TEMPORARILY RELOCATE EQUIPMENT AS REQUIRED TO COMPLETE WORK.
BUT IS NOT LIMITED TO:
COMPLETE AND PROPER ELECTRICAL INSTALLATION. THIS WORK MUST INCLUDE
INCLUDED IN THE CONTRACT AS REQUIRED TO PROVIDE AND MAINTAIN A
NECESSARY ADDITIONS AND ALTERATIONS TO EXISTING WORK MUST BE11.
INSTALLATIONS.
FOR EASE OF DISCONNECTING WITH MINIMUM OF INTERFERENCE WITH OTHER
OF EQUIPMENT COMPONENTS AS MUCH AS PRACTICAL. CONNECT THE EQUIPMENT
ELECTRICAL EQUIPMENT TO FACILITATE MAINTENANCE, REPAIR AND REPLACEMENT
AND OVERHEAD EQUIPMENT TO PROVIDE MAXIMUM HEADROOM. INSTALL
WHERE MOUNTING HEIGHTS ARE NOT DETAILED, INSTALL ELECTRICAL SERVICES10.
ONE BOX WITH A SINGLE COVER PLATE IF PRACTICAL.
WHENEVER SIMILAR DEVICES ARE SHOWN TOGETHER, THEY MUST BE GANGED IN9.
FIRE RESISTANT CONSTRUCTION.
SIDE WALL HORIZONTAL SPACING COMPLY WITH STATE BUILDING CODE REGARDING
ASSEMBLIES SUCH THAT AREA OF BOX PER WALL AREA AND OUTLET ON OPPOSITE
COORDINATE EXACT LOCATION OF BOXES IN TWO HOUR OR LESS RATED
MUST BE MOUNTED 8" APART ON CENTER HORIZONTALLY. CONTRACTOR SHALL
RECEPTACLES AND TELECOMMUNICATIONS OUTLETS SHOWN ADJACENT ON DRAWINGS8.
THREE CIRCUITS IN SINGLE CONDUIT WILL NOT BE ACCEPTED.
RECEPTACLE CIRCUITS MAY BE EXEMPTED WITH ENGINEERING APPROVAL. MORE THAN
IS NOT PERMITTED WITHOUT PRIOR WRITTEN APPROVAL. LIGHTING AND
CONSOLIDATING INDIVIDUAL CONDUIT HOME RUNS SHOWN ON THE DRAWINGS7.
FIXTURE OR EQUIPMENT UNLESS OTHERWISE INDICATED.
MOUNTING HEIGHTS OF DEVICES ARE TO CENTER OF DEVICES, OUTLET,6.
NEC 250.122.
CIRCUITS MUST BE RUN WITH GREEN EQUIPMENT GROUNDING CONDUCTOR SIZED PER5.
REQUIRING A NEUTRAL i.e. NO SHARED NEUTRAL.
SEPARATE NEUTRAL CONDUCTORS MUST BE RUN WITH BRANCH CIRCUITS4.
PANEL AND CIRCUIT NUMBER.
LABEL AND IDENTIFY JUNCTION BOXES WITH TYPE OF SYSTEM,
SPACE. UPDATE DIRECTORIES FOR ALTERED PANELS.
EQUIPMENT SERVED, ROOM NUMBERS, SPARE BREAKER OR EMPTY
PANELS MUST HAVE TYPED, COMPLETED DIRECTORIES INDICATING3.
DOOR SWINGS, CABINETS, COUNTERS, ETC.
COORDINATE DEVICE LOCATIONS INDICATED IN PLAN VIEW DRAWINGS WITH ACTUAL
DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF ELECTRICAL EQUIPMENT.2.
SPECIFICATIONS.
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE IN ACCORDANCE WITH THE
FACILITY. MINIMIZE DURATION OF ELECTRIC SHUT-DOWNS. WORK MUST BE SCHEDULED
TO MINIMIZE DISRUPTION TO THEWORK FOR THIS PROJECT MUST BE COORDINATED1.
LADDER
HOIST
GATE
SLIDE
UP TO R7 AND R8
FUEL TANK
HATCH COVER
IN FLOOR
LADDER
ACCESS
COVER
DOWN
GUARD RAIL
FLOAT WELL
CABINET
LADDER
ACCESS
DOWN
LADDER
HATCH
THROUGH
CEILING
LADDER
ACCESS
DOWN
GUARD RAIL
GUARD RAIL
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
A -H
V -1
O X
F O
R D
M A
S S
A C
H U
S E
T T S
H O
D G
E S V
IL
L A
G E D
A M
E L E
C T
R
IC
A L U
P G
R A
D E
S
SHEET ID
®of Engineers
US Army Corps
W
W J
Q
SWITCHBOARD
LOCKER
POWER
JCT. BOX
CEILING HEIGHT 114"
B R
IA
N H
E A
D
A N
S I
D
C1
N
0 2' 4'1'SCALE: 1/2" = 1' - 0"
C6
N
0 2' 4'1'SCALE: 1/2" = 1' - 0"
T O
W E
R F
L O
O R P
L A
N
B R
IA
N H
E A
D
E L E
C T
R
IC
A L D
E M
O L
IT
IO
N
KEYED NOTES:
EXISTING ELECTRICAL FLOOR PLAN LOWER LEVEL
DEMOLISH SWITCHBOARD. RETAIN UTILITY AND FEEDER CIRCUITS FOR
CONNECTION TO NEW EQUIPMENT, SEE SHEET E-601. RETAIN BRANCH
CIRCUITS FOR CONNECTION TO NEW EQUIPMENT.
REMOVE BATTERY CHARGER AND RETAIN FOR REINSTALLATION. DEMOLISH
ASSOCIATED CONDUIT AND WIRE.
DEMOLISH LIGHTING PANEL, RETAIN BRANCH CIRCUIT CONDUCTORS FOR
CONNECTION TO NEW PANEL.
RELOCATE LOCKER AS INDICATED ON SHEET E-102 KEYED NOTE 6.
DEMOLISH CONDUIT AND WIRE FROM ENTRY POINT TO THE SWITCHBOARD.
DEMOLISH ASSOCIATED JUNCTION BOXES. SEAL ABANDONED
PENETRATION AND FINISH FLOOR TO MATCH EXISTING ON THE UPPER
LEVEL.
REROUTE EXISTING FEEDERS AND BRANCH CIRCUITS AS INDICATED ON
SHEET E-101. SEAL ABANDONED PENETRATIONS AND FINISH FLOOR TO
MATCH EXISTING ON THE UPPER LEVEL.
:1
M A
R C
H
J
C L
IN
E
ED101
EXISTING ELECTRICAL FLOOR PLAN OPERATOR'S LEVEL
FROM CEILING
CONDUITS SUSPENDED
J S
W A
L L E
Y
FUEL TANK
HATCH COVER
IN FLOOR
LADDER
ACCESS
COVER
DOWN
GUARD RAIL
FLOAT WELL
CABINET
POWER
JCT. BOX
CEILING HEIGHT 114"
LADDER
ACCESS
DOWN
LADDER
HATCH
THROUGH
CEILING
LADDER
ACCESS
DOWN
GUARD RAIL
GUARD RAIL
FROM CEILING
CONDUITS SUSPENDED
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
A -H
V -1
O X
F O
R D
M A
S S
A C
H U
S E
T T S
H O
D G
E S V
IL
L A
G E D
A M
E L E
C T
R
IC
A L U
P G
R A
D E
S
SHEET ID
®of Engineers
US Army Corps
W
W J
Q
B R
IA
N H
E A
D
B R
IA
N H
E A
D
A N
S I
D
E L E
C T
R
IC
A L
L
IG
H T
IN
G
D E
M O
L
IT
IO
N
C1 0 2' 4'1'SCALE: 1/2" = 1' - 0"
C6
SCALE: 1/2" = 1' - 0" 0 2' 4'1'
KEYED NOTES:
1 1
N N
SOURCE. APPROXIMATE LOCATION INDICATED.
DEMOLISH EXTERIOR LIGHT AND ASSOCIATED CONDUIT AND WIRE BACK TO
CONDUIT BACK TO SOURCE.
DEMOLISH LIGHT TROFFER AND ASSOCIATED CONDUCTORS AND EXPOSED
M A
R C
H
J
C L
IN
E
ED102
:1
LIGHTING PLAN DEMOLITION LOWER LEVELLIGHTING PLAN DEMOLITION OPERATOR'S LEVEL
J S
W A
L L E
Y
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
A -H
V -1
O X
F O
R D
M A
S S
A C
H U
S E
T T S
H O
D G
E S V
IL
L A
G E D
A M
E L E
C T
R
IC
A L U
P G
R A
D E
S
SHEET ID
®of Engineers
US Army Corps
W
W J
Q
SPD
NOT LABELEDSPARE
UTILITY METER
SWITCHBOARD
GENERATOR
GATE HOIST#1 GATE HOIST #2
UTILITY PRI
UTILITY SEC
BATTERY CHARGERBLOCK HEATER
LIGHTING PNL
P.O. PANEL
GATE HOIST #1
5 HP
GATE HOIST #2
5 HP
GENERATOR
55 kVA
UTILITY
BATTERY CHARGER
0.5 Amps
BLOCK HEATER
0.5 Amps
UTILITY XFMR
45 kVA
13.2 - 0.208 kV
1%
1-1/C-2/0 AWG
CU, 720', [Conduit]
1-1/C-2/0 AWG
CU, 20', [Conduit]
1-1/C-10 AWG
CU, 25', [Conduit]
1-1/C-10 AWG
CU, 18', [Conduit]
1-1/C-8 AWG
CU, 20', [Conduit]
1-1/C-3 AWG
CU, 3150', [Conduit]
1-1/C-350 kcmil
CU, 210', [Conduit]
1-1/C-12 AWG
CU, 10', [Conduit]
1-1/C-12 AWG
CU, 20', [Conduit]
(Generic) 150 AF
150/125 150/125
(Generic) 150 AF
OPEN
(Generic) 150 AF
150/125
(Generic) 150 AF
150/100
(Generic) 30AF
30/15
OPEN
(Generic) 30AF
30/30
(Generic) 30AF
30/15
(Generic) 30AF
30/15
(Generic) 150 AF
150/60
(Generic) 50AF
50/50
(Generic) 50AF
50/40
(Generic) 50AF
50/40
PANEL
PANEL
B R
IA
N H
E A
D
B R
IA
N H
E A
D
A N
S I
D
E L E
C T
R
IC
A L
O N
E L
IN
E D
IA
G R
A M
D E
M O
L
IT
IO
N
KEYED NOTES:
B1
ONE LINE DIAGRAM DEMOLITION
SCALE: NOT TO SCALE
CONNECTION TO NEW PANEL.
DEMOLISH LIGHTING PANEL, RETAIN BRANCH CIRCUIT CONDUCTORS FOR
ASSOCIATED CONDUIT AND WIRE.
REMOVE BATTERY CHARGER AND RETAIN FOR REINSTALLATION. DEMOLISH
CIRCUITS FOR CONNECTION TO NEW EQUIPMENT.
CONNECTION TO NEW EQUIPMENT, SEE SHEET E-601. RETAIN BRANCH
DEMOLISH SWITCHBOARD. RETAIN UTILITY AND FEEDER CIRCUITS FOR
J
C L
IN
E
J S
W A
L L E
Y
:1
M A
R C
H
ED601
FUEL TANK
HATCH COVER
IN FLOOR
LADDER
ACCESS
COVER
DOWN
GUARD RAIL
FLOAT WELL
CABINET
CEILING HEIGHT 114"
LADDER
ACCESS
DOWN
LADDER
HATCH
THROUGH
CEILING
LADDER
ACCESS
DOWN
GUARD RAIL
GUARD RAIL
FROM CEILING
CONDUITS SUSPENDED
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
A -H
V -1
O X
F O
R D
M A
S S
A C
H U
S E
T T S
H O
D G
E S V
IL
L A
G E D
A M
E L E
C T
R
IC
A L U
P G
R A
D E
S
SHEET ID
®of Engineers
US Army Corps
W
W J
Q
LOCKER
U N
IT
H E A T E R
D
H A
S S
E T
T
A N
S I
D
E-101
D1
N
0 2' 4'1'SCALE: 1/2" = 1' - 0"
D5
N
0 2' 4'1'SCALE: 1/2" = 1' - 0"
:1
KEYED NOTES:
ELECTRICAL FLOOR PLAN OPERATOR'S LEVEL INSTALLATION ELECTRICAL FLOOR PLAN LOWER LEVEL INSTALLATION
T O
W E
R F
L O
O R P
L A
N
IN
S
T A
L L
A T
IO
N
M A
R C
H
B
H E
A D
J
C L
IN
E
J S
W A
L L E
Y S
M
A R
C L
A R
IF
IE
D S
P L
IC
IN
G I
N J
U N
C T
IO
N B
O X
HARDWARE AS REQUIRED.
EXISTING RECEPTACLE. PROVIDE CONCRETE ANCHORS AND MOUNTING
INSTALLED PER KEYED NOTE 1. CONFIRM PLUG ASSEMBLY REACHES
RELOCATE DROP LIGHT MOUNTING ASSEMBLY TO BELOW THE DISCONNECT
ETC. AS REQUIRED TO MAKE THE INSTALLATION COMPLETE.
INSTRUCTIONS. PROVIDE CEILING MOUNTING BRACKETS, THREADED RODS,
CONDUCTOR SIZES. INSTALL UNIT HEATER PER MANUFACTURER'S
CONDUIT AND CABLE SCHEDULE ON SHEET E-501 FOR CONDUIT AND
WIRE BACK TO PANEL MDP, SEE PANEL SCHEDULE SHEET E-502. SEE
PROVIDE UNIT HEATER AS SPECIFIED IN 26 20 00. PROVIDE CONDUIT AND
METER PER MANUFACTURER'S INSTRUCTIONS.
METER ABOVE THE PANELBOARD INSTALLED PER KEYED NOTE 3. INSTALL
PROVIDE PANELBOARD METER PER SPECIFICATION 26 20 00. MOUNT
SPD PER MANUFACTURER'S INSTRUCTIONS.
INSTALL SPD BELOW THE WINDOW HEIGHT AGAINST THE WALL. INSTALL
PROVIDE SURGE PROTECTIVE DEVICE (SPD) AS SPECIFIED IN 26 20 00.
NEW LOCATION OF LOCKER RELOCATED PER SHEET ED-102 KEYED NOTE 4.
REQUIRED TO EXTEND FEEDERS TO NEW PANEL LOCATION.
ABOVE THE FINISHED FLOOR. PROVIDE SPLICING IN JUNCTION BOX AS
COMPLETE. SUSPEND JUNCTION FROM CEILING AS HIGH AS POSSIBLE
ANCHORS, FASTENERS, ETC, AS REQUIRED TO MAKE THE INSTALLATION
PROVIDE JUNCTION BOX PER SPECIFICATION 26 20 00. PROVIDE CONCRETE
CHARGING CIRCUIT.
PER KEYED NOTE 3. PROVIDE CONDUIT AND WIRE TO RESTORE BATTERY
HEIGHT. PROVIDE CONDUIT AND WIRE BACK TO PANELBOARD INSTALLED
MOUNT BATTERY CHARGER AGAINST THE WALL BELOW THE WINDOW
INSTALL BATTERY CHARGER RETAINED PER SHEETS ED-102 AND ED-601.
ABANDONED PENETRATIONS WITH SEALANT FLUSH WITH FINISHED FLOOR.
SEAL PROVIDE CORE DRILLING AS SPECIFIED IN 26 20 00. SHEET ED-601.
POWERED FROM DEMOLISHED SWITCHBOARD AND LIGHTING PANEL, SEE
PROVIDE CONDUIT AND WIRE TO RESTORE POWER TO BRANCH CIRCUITS
PROVIDE CONDUIT WIRE BACK TO ATS INSTALLED PER KEYED NOTE 2.
PROVIDE PANELBOARD PER 26 20 00 AND SHEETS E-601 AND E-501.
EXISTING GENERATOR, REUSE EXISTING CONDUIT WHERE PRACTICAL.
INSTALLED PER KEYED NOTE 1. PROVIDE CONDUIT AND WIRE BACK TO
E-601. PROVIDE CONDUIT AND WIRE BACK TO SERVICE DISCONNECT
PROVIDE AUTOMATIC TRANSFER SWITCH, ATS, PER 26 20 00 AND SHEET
OFF THE WALL AT LEAST AN 1/8TH INCH.
MUST BE RATED FOR DAMP ENVIRONMENTS. DISCONNECT MUST BE SET
ETC AS REQUIRED TO MAKE THE INSTALLATION COMPLETE. COMPONENTS
INDICATED ON SHEET G-001. PROVIDE CONCRETE ANCHORS, FASTENERS,
AND WATERPROOF SEALANT BOTH AT THIS LOCATION AND THE MANHOLE
EXISTING FEEDER FROM UTILITY SOURCE. SEAL CONDUIT WITH RODENT
SHEET E-601. PROVIDE CONDUIT AS SHOWN AND PROVIDE CONNECTION TO
PROVIDE FUSIBLE SERVICE DISCONNECT PER SPECIFICATION 26 20 00 AND
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
A -H
V -1
O X
F O
R D
M A
S S
A C
H U
S E
T T S
H O
D G
E S V
IL
L A
G E D
A M
E L E
C T
R
IC
A L U
P G
R A
D E
S
SHEET ID
®of Engineers
US Army Corps
W
W J
Q
B R
IA
N H
E A
D
B R
IA
N H
E A
D
A N
S I
D
E-102
E L E
C T
R
IC
A L
L
IG
H T
N
IN
G P
R O
T E
C T
IO
N P
L A
D1
D5
0 2' 4'1' 0 2' 4'1'
SCALE: 1/2" TO 1' SCALE: 1/2" TO 1'
A1
LIGHTNING PROTECTION DETAIL
SCALE: NTS
1 1
1 1
J
C L
IN
E
D E
M O
L
IT
IO
N A
N D P
R O
P O
S E
D :1
M A
R C
H
LIGHTNING PROTECTION DEMOLITION ON GATE HOUSE ROOF LIGHTNING PROTECTION INSTALLATION ON GATE HOUSE ROOF
N
AIR TERMINAL
11' ABOVE ROOF DECK
CABLE CONNECTOR
MAIN CONDUCTOR
PARAPET WALL
KEYED NOTES:
GENERAL NOTE:
SUPPORT BRACKET
J S
W A
L L E
Y S
R
E L
O C
A T
E M
A
IN
C
O N
D U
C T
O R
A D
D S
P D
A D
D S
U P
P O
R T S
M
A R
ROOF DECK
TYPICAL OF FOUR
PROVIDE SUPPORT BRACKET
75% OF AIR TERMINAL HEIGHT
50% OF AIR TERMINAL HEIGHT
TYPICAL
CLIP CABLE SUPPORT
FOLLOW ROOFING WORK.
MUST PRECEDE ROOFING WORK AND INSTALLATION MUST
ROOF UNDER A SEPARATE CONTRACT. DEMOLITION WORK
COORDINATE WORK WITH ROOFING CONTRACTOR REPLACING
TO THE TOP OF THE PARAPET WALL.
SYSTEM PROPOSED FOR CONNECTING THE AIR TERMINAL
THE SUBMITTAL SHOULD ALSO INCLUDE THE ANCHOR BOLT
OF THE SUPPORT BRACKETS TO THE AIR TERMINAL.
THAT IDENTIFIES THE MATERIAL TYPE, SIZE AND THICKNESS
CONTRACTOR IS TO PREPARE AND SUBMIT A SUBMITTAL
2.
1.
SYSTEM.
PROTECTION DOWN CONDUCTOR TO GROUNDING ELECTRODE
TO EXISTING GROUNDING ELECTRODE SYSTEM. BOND LIGHTNING
NFPA 70. PROVIDE BARE COPPER CONDUCTOR FROM GROUND ROD
PROVIDE GROUND ROD AS SPECIFIED IN 26 20 00 INSTALLED PER
NFPA 780.
CONDUCTORS EVERY THREE FEET. INSTALLATION MUST BE PER
PROVIDE NFPA 780 RATED FASTENERS ON EXISTING DOWN
STRUCTURE, TYPICAL OF FIVE.
INSTRUMENTATION CABLES ON THE ROOF ENTERING THE
PROVIDE SURGE PROTECTIVE DEVICES ON ANTENNA AND
BELOW ROOF MEMBRANE ON EXTERIOR OF THE PARAPET WALL.
PERIMETER OF THE PARAPET WALL. INSTALL MAIN CONDUCTOR
ETC AS REQUIRED TO RUN MAIN CONDUCTOR AROUND THE
PROVIDE MAIN CONDUCTOR, SUPPORTS, ANCHORS, CONNECTORS,
REQUIRED TO MAKE INSTALLATION COMPLETE.
SHEET. ADJUST PLACEMENT OF AIR TERMINAL AND SUPPORTS AS
AND ALONG THE AIR TERMINAL PER DETAIL A1 THIS PARAPET WALL
THE TOP OF THE PROVIDE SUPPORT BRACKETS AT BASE BY
TOP OF AIR TERMINAL MUST BE 11 FEET ABOVE THE ROOF DECK.
SUPPORTS, ANCHORS, ETC. AS REQUIRED.
PROVIDE AIR TERMINAL PER SPECIFICATION 26 41 00. PROVIDE
NOT USED.
CONDUCTORS.
CONDUCTORS FOR USE WITH NEW AIR TERMINALS AND NEW MAIN
DEMOLISH AIR TERMINALS AND MAIN CONDUCTORS. RETAIN DOWN
COVER
ACCESS
LADDER
CHIMNEY
EXHAUST
FURNACE
COVER
ACCESS
LADDER
CHIMNEY
EXHAUST
FURNACE
LOCKER
FUEL TANK
HATCH COVER
IN FLOOR
LADDER
ACCESS
COVER
DOWN
GUARD RAIL
FLOAT WELL
CABINET
U N
IT
H E A T E R
CEILING HEIGHT 114"
LADDER
ACCESS
DOWN
LADDER
HATCH
THROUGH
CEILING
LADDER
ACCESS
DOWN
GUARD RAIL
GUARD RAIL
FROM CEILING
CONDUITS SUSPENDED
OPERATING LEVEL
EXISTING LIGHT SWITCH
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
A -H
V -1
O X
F O
R D
M A
S S
A C
H U
S E
T T S
H O
D G
E S V
IL
L A
G E D
A M
E L E
C T
R
IC
A L U
P G
R A
D E
S
SHEET ID
®of Engineers
US Army Corps
W
W J
Q
B R
IA
N H
E A
D
B R
IA
N H
E A
D
A N
S I
D
E L E
C T
R
IC
A L
L
IG
H T
IN
G
IN
S
T A
L L
A T
IO
N
C1 0 2' 4'1'SCALE: 1/2" = 1' - 0"
C6
SCALE: 1/2" = 1' - 0" 0 2' 4'1'
KEYED NOTES:
1 1
N N
J
C L
IN
E
E-103
:1
M A
R C
H
LIGHTING PLAN INSTALLATION OPERATOR'S LEVEL LIGHTING PLAN INSTALLATION LOWER LEVEL
J S
W A
L L E
Y S
NOTE FOUR. MOUNT LIGHT TROFFERS AGAINST CEILING.
AND WIRE BACK TO SOURCE THROUGH SWITCH INSTALLED PER KEYED
PROVIDE LIGHT TROFFER PER SPECIFICATION 26 20 00. PROVIDE CONDUIT
PER KEYED NOTE FIVE ON THE LOWER LEVEL.
CONDUIT AND WIRE BACK TO SOURCE AND TO LIGHT TROFFERS INSTALLED
PROVIDE TOGGLE LIGHT SWITCH AS SPECIFIED IN 26 20 00. PROVIDE
ILLUMINATES WHEN NORMAL POWER FAILS.
OTHER LIGHTS ON EACH LEVEL AND WIRED SUCH THAT THE LIGHT
SPECIFICATION 26 20 00. EMERGENCY LIGHT MUST BE SWITCHED WITH THE
EMERGENCY LIGHT TO BE EQUIPPED WITH BATTERY BACKUP PER
COMPLETE.
ANCHORS, SUPPORTS, ETC AS REQUIRED TO MAKE THE INSTALLATION
FINISHED FLOOR. LOCATION INDICATED IN APPROXIMATE. PROVIDE
WALL USING EXISTING MOUNTING PLATE LOCATED SIX FEET ABOVE
INSTALLED ON THE ROOF ABOVE THE ENTRY. INSTALL LIGHT ON EXTERIOR
AND WIRE BACK TO SOURCE WIRED THROUGH EXISTING MOTION SENSOR
PROVIDE EXTERIOR LIGHT PER SPECIFICATION 26 20 00. PROVIDE CONDUIT
TROFFERS AGAINST CEILING 11' ABOVE THE FINISHED FLOOR.
AND WIRE BACK TO SOURCE THROUGH EXISTING SWITCH. MOUNT LIGHT
PROVIDE LIGHT TROFFER PER SPECIFICATION 26 20 00. PROVIDE CONDUIT
KEYED NOTES CONTINUED:
NOTE TWO.
BACK TO SOURCE AND OUT TO LIGHTS INSTALLED PER KEYED
TOP OF THE ROOF PARAPET WALL. PROVIDE CONDUIT AND WIRE
PHOTOCELL PER SPECIFICATION 26 20 00. INSTALL SWITCH ON
PROVIDE EXTERIOR MOTION SENSOR LIGHT SWITCH WITH 6
M
A R
A D
D L
IG
H T S
W
IT
C H L
O W
E R L
E V
E L A
N D E
X T M
O T
IO
N S
E N
S R
O R
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
A -H
V -1
O X
F O
R D
M A
S S
A C
H U
S E
T T S
H O
D G
E S V
IL
L A
G E D
A M
E L E
C T
R
IC
A L U
P G
R A
D E
S
SHEET ID
®of Engineers
US Army Corps
W
W J
Q
D
H A
S S
E T
T
A N
S I
D
E-501
SYSTEM GROUNDING DETAIL
SCALE: N.T.S.
A1
25.6 2.0
23.5 1.8
21.1 1.5
4.2
VOLTAGE
(INCHES)
BOUNDARY
APPROACH
(CAL/cm2)
ENERGY
INCIDENT
23.4 1.8
CONDUIT AND CABLE SCHEDULE
VOLTAGE
CONDUCTORS
OF
NUMBER
(AWG)
SIZE
WIRE
(AWG)
SIZE
GROUND
SIZE -TYPE
CONDUIT
LENGTH
APPROX.
CONDUIT AND CABLE SCHEDULE NOTES
SOURCE LOAD
3.0"-RGS
30'
120/208V 10'
120/208V
120/208V
SERVICE ENTRANCE DISCONNECT N/A
PANEL MDP
PANEL MDP
120/208V
120/208V
120/208V
120/208V
2/0 2.0"-RGS
2/0
1.5"-RGS
10'
20'
BRANCH CIRCUITS (NOTE 2) 120/208V
SEE PLANS
AS RQRD
GENERATOR 4 6120/208V 20'0.75"-RGS
EQUIPMENT
PANEL MDP
NOTE:
STEEL COLUMN
#4 MIN.
A B C
A B C
GN
55 KW GENERATOR SET
(EXISTING)
PHASE AND NEUTRAL 2/0
(NOT EXISTING, CONTRACTOR TO PROVIDE)
#6 EQUIPMENT GROUNDING CONDUCTOR
DERIVED SYSTEM.
GROUNDED AS A SEPARATELY
VERIFY GENERATOR IS NOT
SWITCH
TRANSFER
AUTOMATIC
SECONDARY
TRANSFORMERS
POLE MOUNTED
SOCKET
METER
A B C
G
N
PHASE AND NEUTRAL #2/0
150A FUSE
MANHOLE
DISCONNECT
SERVICE
TIGHT SEAL
WATER AND RODENT
TIGHT SEAL
WATER AND RODENT
CONDUCTOR
GROUNDING
#6 EQUIPMENT
PHASE AND NEUTRAL #2/0
N G
CBA
UTILITY CONDUCTORS
PHASE AND NEUTRAL
EXISTING
#2/0 CONDUCTORS
PHASE AND NEUTRAL
EXISTING
#4 MIN.
SYSTEM BONDING JUMPER
CONDUCTOR
GROUNDING
#6 EQUIPMENT
UTILITY METER
SERVICE ENTRANCE DISCONNECT
PANEL MDP
PANEL MDP
ATS
ATS
PANEL MDP
BLOCK HEATER
BATTERY CHARGER
GATE HOIST #1
GATE HOIST #2PANEL MDP
ATS
PANEL MDP
PROJECT OFFICE
120/208V 2/0 720'
2.0"-RGS
3 3150'
12 0.75"-RGS
12 0.75"-RGS
3 10 10 25'
3 10 10 20'
2 12 12
2/0
UTILITY METER 120/208V
SERVICE ENTRANCE DISCONNECT 120/208V
ATS
GENERATOR
120/208V
120/208V
120/208V
120/208V 8.3 0.3PROJECT OFFICE PANEL
120/208V 20.7 1.5GATE HOIST #1
120/208V 21.4 1.5GATE HOIST #2
J
C L
IN
E
M A
R C
H
B
H E
A D
:1
1ARC FLASH LABELS SCHEDULE
A N
D C
O N
D U
IT
S
C H
E D
U L E
REVIEW PRIOR TO GENERATING AND PLACING ARC FLASH LABELS.
INDEPENDENT ARC FLASH RISK ASSESSMENT AND SUBMIT RESULTS FOR
ARC FLASH LABEL MAY NOT BE ACCURATE. CONTRACTOR MUST CONDUCT AN
AND USED OTHER THAN THOSE SPECIFICALLY IDENTIFIED IN THE SPECS, THIS
IF DIFFERENT WIRE OR OVERCURRENT PROTECTIVE DEVICES ARE APPROVED
A R
C F
L A
S H L
A B
E L
S Y
S T
E M G
R O
U N
D
IN
G D
E T
A
IL
PANEL MDP 120/208V 3 4 8 1.0"-RGSUNIT HEATER 40'
0.75"-RGS
0.75"-RGS
0.75"-RGS
ADDITION TO THE CURRENT CARRYING CONDUCTORS.
3. NUMBER OF CONDUCTORS IS THE NUMBER OF CURRENT CARRYING CONDUCTORS, THE GROUND WIRE IS IN
2. REFEED CIRCUITS SHOWN ON PANEL SCHEDULE, SEE SHEET E-601.
1. LENGTH ON THIS SCHEDULE IS APPROXIMATE, CONTRACTOR SHALL CONFIRM LENGTH IN THE FIELD.
SEE PANEL SCHEDULE SHEET E-601.
PANEL-MDP
CONTRACT)
EXISTING (NOT IN
CONTRACT)
EXISTING (NOT IN
J S
W A
L L E
Y
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
A -H
V -1
O X
F O
R D
M A
S S
A C
H U
S E
T T S
H O
D G
E S V
IL
L A
G E D
A M
E L E
C T
R
IC
A L U
P G
R A
D E
S
SHEET ID
®of Engineers
US Army Corps
W
W J
Q
CKT#
AMPS POLES DESCRIPTION CKT# AMPS POLES DESCRIPTION
NORMAL
SWBD
GE GGB 800A FRAME
120/208V 3-PHASE 4-WIRE
125 MCB 50 KAIC
FED FROM: GENERATOR & UTILITY
REMARKS: TWO INTERLOCKED MAIN BREAKERS
SWITCHGEAR: UTILITY
LOCATION: MAIN LEVEL
340 GATE #1 (ON) 340 GATE #2 (ON)
215 SPARE (ON)
BLOCK HEATER (OFF)
BATTERY CHARGER (ON)
SUB PANEL (ON)SURGE PROTECTIVE DEVICE (ON)
100 GARAGE/OFFICE (ON)
BLANK
NOT LABELED (ON)
CKT#
AMPS POLES DESCRIPTION CKT# AMPS POLES DESCRIPTION
NORMAL150A MCB 10 KAIC
120/208V 3-PHASE 4-WIRE MDP
SWITCHGEAR: UTILITYFED FROM: UTILITY
REMARKS: FED VIA ATS
LOCATION: OPERATOR LEVEL
340 GATE #1 (ON)
SURGE PROTECTIVE DEVICE (ON)
100 GARAGE/OFFICE (ON)
BLANK
NOT LABELED (ON)
340 GATE #2 (ON)
215 SPARE (ON)
BLOCK HEATER (OFF)
BATTERY CHARGER (ON)
20 1
20 1
FLOOD LIGHTS NORTH (ON)
FLOOD LIGHTS SOUTH (ON)
DAMPER MOTOR (ON)
OIL BURNER (ON)
SPARE (ON)
DAMPER GENSET INTAKE (ON)
20 1
20 1
20 1
FLOOR LIGHTS MAIN (ON)
LIGHTS BELOW 2ND & 3RD (ON)
LIGHTS BELOW 4TH & 5TH (ON)
ENTRANCE LIGHTS (ON)
RECEPTACLES OPERATIONS FLOOR (ON)
20 1
SPARE (OFF)
SPARE (OFF)
SPARE (OFF)20 1
SPARE (OFF)
SPARE (OFF)
SPARE (OFF)
SPARE (OFF)
UNIT HEATER (ON)
SQUARE D I-LINE
20 1
CKT#
AMPS POLES DESCRIPTION CKT# AMPS POLES DESCRIPTION
NORMAL
LOCATION: ENTRY DOOR
225A MLO - KAIC
120/208V 3-PHASE 4-WIRE
20 1
20 1
20 1
20 1
EATON POWERLINE PRL1A
SUB PANEL
REMARKS:
FED FROM: SWBD BKR 1,3,5 SWITCHGEAR: UTILITY
FLOOD LIGHTS NORTH (ON)
FLOOD LIGHTS SOUTH (ON)
DAMPER MOTOR (ON)
OIL BURNER (ON)
SPARE (ON)
DAMPER GENSET INTAKE (ON)
20 1
20 1
NOT LABELED (ON)
NOT LABELED (OFF)
NOT LABELED (ON)
NOT LABELED (ON)
NOT LABELED (ON)
NOT LABELED (ON)
NOT LABELED (ON)
NOT LABELED (ON)
NOT LABELED (ON)
FLOOR LIGHTS MAIN (ON)
LIGHTS BELOW 2ND & 3RD (ON)
LIGHTS BELOW 4TH & 5TH (ON)
ENTRANCE LIGHTS (ON)
RECEPTACLES OPERATIONS FLOOR (ON)
ABANDONED (ON)
20 1
20 1
120 NOT LABELED (ON)
NOT LABELED (ON)
NOT LABELED (ON)
NOT LABELED (ON)
NOT LABELED (ON)
NOT LABELED (ON)
NOT LABELED (ON)
20 1
120 NOT LABELED (ON)
NOT LABELED (ON)
B R
IA
N H
E A
D
B R
IA
N H
E A
D
A N
S I
D
E-502
E L E
C T
R
IC
A L
P A
N E
L S
C H
E D
U L E
S
E1
PANEL SCHEDULES DEMOLITION
SCALE: NOT TO SCALE
B1
PANEL SCHEDULE INSTALLATION
SCALE: NOT TO SCALE
J
C L
IN
E
SUBMIT A LIST OF THE UNLABELED BREAKERS IN USE TO THE GOVERNMENT.
NOTE: CONTRACTOR SHALL INVESTIGATE PANEL TO DETERMINE IF THE UNLABELED BREAKERS ARE IN USE.
D E
M O
L
IT
IO
N A
N D I
N S
T A
L L
A T
IO
N :1
M A
R C
H
J S
W A
L L E
Y S
C
O R
R E
C T M
A
IN
B
R E
A K
E R S
IZ
E A
P R
IL
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
A -H
V -1
O X
F O
R D
M A
S S
A C
H U
S E
T T S
H O
D G
E S V
IL
L A
G E D
A M
E L E
C T
R
IC
A L U
P G
R A
D E
S
SHEET ID
®of Engineers
US Army Corps
W
W J
Q
SPDNOT LABELEDSPARE SPARE
UTILITY METER
GENERATOR
GATE HOIST#1 GATE HOIST #2
UTILITY PRI
UTILITY SEC
BATTERY CHARGERBLOCK HEATER
SERVICE ENTRANCE
PANEL
P.O. PANEL
ATS
GATE HOIST #1
5 HP
Induction
GATE HOIST #2
5 HP
Induction
GENERATOR
55 kVA
UTILITY
BATTERY CHARGER
0.5 Amps
BLOCK HEATER
0.5 Amps
SINGLE PHASE LDS
6.18 kVA
UTILITY XFMR
45 kVA
13.2 - 0.208 kV
1%
1-1/C-2/0 AWG
CU, 720', [Conduit]
1-1/C-2/0 AWG
CU, 20', [Conduit]
1-1/C-10 AWG
CU, 25', [Conduit]
1-1/C-10 AWG
CU, 18', [Conduit]
1-1/C-350 kcmil
CU, 210', [Conduit]
1-1/C-12 AWG
CU, 10', [Conduit]
1-1/C-12 AWG
CU, 20', [Conduit]
1-1/C-2/0 AWG
CU, 30', [Conduit]
1-1/C-2/0 AWG
CU, 10', [Conduit]
SQD HD
150/150
(Generic) 150 AF
150/125
SQD KA
250/100
SQD QO-EPD - 2P
60/30
OPEN
SQD QO-EPD
60/30
SQD QO-EPD - 2P
60/15
SQD QO-EPD - 2P
60/15
SQD QO-EPD
60/30
SQD QO-EPD
60/30
SQD QO-EPD
60/40
SQD QO-EPD
60/40
BUSS FRS-R(RK5)
150A~
1-1/C-3 AWG
CU, 3150', [Conduit]
PANELBOARD
B R
IA
N H
E A
D
B R
IA
N H
E A
D
A N
S I
D
E-601
E L E
C T
R
IC
A L
O N
E L
IN
E D
IA
G R
A M
IN
S
T A
L L
A T
IO
N
KEYED NOTES:
B1
SCALE: NOT TO SCALE
ONE LINE DIAGRAM INSTALLATION
J
C L
IN
E
J S
W A
L L E
Y
:1
M A
R C
H
REQUIRED.
AS INDICATED ON SHEET E-101. PROVIDE CONDUIT AND WIRE AS
INSTALL BATTERY CHARGER RETAINED PER SHEET ED-601 KEYED NOTE 2
SWITCHBOARD AND LIGHTING PANEL, SEE SHEET ED-601.
POWER TO BRANCH CIRCUITS POWERED FROM DEMOLISHED
INSTALLED PER KEYED NOTE 2. PROVIDE CONDUIT AND WIRE TO RESTORE
PANEL SCHEDULE SHEET E-501. PROVIDE CONDUIT WIRE BACK TO ATS
PROVIDE PANELBOARD AS SPECIFIED IN 26 20 00 AND AS INDICATED IN
GENERATOR.
PER KEYED NOTE 1. PROVIDE CONDUIT AND WIRE BACK TO EXISTING
PROVIDE CONDUIT AND WIRE BACK TO SERVICE DISCONNECT INSTALLED
PROVIDE AUTOMATIC TRANSFER SWITCH, ATS, AS SPECIFIED IN 26 20 00.
SEAL CONDUIT WITH RODENT PROOF AND WATER TIGHT SEALANT.
STEEL CONDUIT FROM DISCONNECT BACK TO CONDUIT PENETRATION.
CONDUCTORS ON THE LINE SIDE OF THE DISCONNECT. PROVIDE RIGID
THE INDICATED FUSES. TERMINATE EXISTING UTILITY FEEDER
PROVIDE FUSIBLE SERVICE DISCONNECT PER SPECIFICATION 26 20 00 WITH
| Plans REVISED.pdf |
| THA-HV-119_G-001 |
| THA-HV-119_E-001 |
| THA-HV-119_ED-101 |
| THA-HV-119_ED-102 |
| THA-HV-119_ED-601 |
| THA-HV-119_E-101 |
| THA-HV-119_E-102 |
| THA-HV-119_E-103 |
| THA-HV-119_E-501 |
| THA-HV-119_E-502 |
| THA-HV-119_E-601 |
| Information Drawings.pdf |
| THA-1-1424 |
| TH-1-1446.046 |
| THA-77 |
File details come from the government source that posted it.