Amendment_W912WJ19Q0006-0002.pdf

PDF 5 MB Posted

Attached to
Electrical Upgrades, Hodges Village Dam, Oxford. MA
Solicitation number
W912WJ19Q0006
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Amendment_W912WJ19Q0006-0003.pdf PDF
Amendment_W912WJ19Q0006-0001.pdf PDF
Solicitation_W912WJ19Q0006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W13G86905785360001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is necessary to post the Site Visit Attendee List, provide answ ers to Requests for Information, and provide revised versions of the Plans and Specifications.

Closing w ill remain April 19, 2019 at 5:00 PM. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Apr-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ19Q0006

X 9B. DATED (SEE ITEM 11)

28-Feb-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Apr-2019

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912WJ

FACILITY CODECODE

ROBERT.C.GARRAHAN@USACE.ARMY.MILEMAIL:978-318-8814TEL:

ROBERT C GARRAHAN / ADDED BY UPASS

W912WJ19Q0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REQUEST FOR INFORMATION

Hodges Village Dan Electrical Upgrades Attendee List (March 13, 2019):

NAME COMPANY

Jay Poulin J.D. Poulin Electric Inc.

Jon Poulin Poulin Construction Jay Harris Colony Construction Steve Teal Sanborn Electric Ethan Sanborn Sanborn Electric Bill Simpson Smokestack Lighting Inc.

Larry Harris LaFleur Electric Nicole Giles USACE James Hachigan USACE Timothy Russell USACE Jason Robinson USACE Brian Head USACE Janet Patev USACE Brooke Morgan USACE Jennifer Samela USACE

Request for Information:

1. Do the specifications for sealant specify rodent-resistant?

Answer: The sealant properties have to indicate that it is rodent-proof and waterproof, as indicated on Plan Sheet E-101, keyed note 1.

2. Do conduits go through the walls?

Answer: Yes, conduits go through the wall to a junction box.

3. Is demolition of the furnace included in this Statement of Work (SOW)?

Answer: No, the US Army Corps of Engineers will be responsible for demolition of the existing furnace. The awarded Contractor will be responsible for installation of the new furnace.

4. Is the Contractor responsible for painting the floor? Is that included in the SOW?

Answer: Any new penetrations or sealed penetrations will need to be painted. The entire floor does not need to be painted.

5. When pipes are cut off will they need to be cut flush? Will hydraulic cement be required around the cut pipes?

Answer: As per Keyed Note 3 on Plan Sheet E-101, Contractors are to “Seal abandoned penetrations with sealant flush with finished floor“.

6. Will the drop lights need to be relocated on the lower level since the service disconnects will be mounted under the power supply conduits?

Answer: Yes. As per Keyed Note 10 on Revised Plan Sheet E-101, the drop light mounting assembly will need to be relocated. It can be moved lower on the wall, but must remain on the same wall that they are currently mounted on.

7. Where should the new conduits be installed on the lower level?

Answer: Conduits should be ceiling mounted as high as possible.

8. Will another switched feeder need to be run to supply power to the emergency light on the lower level since the power is currently turned on and off with the circuit breaker?

Answer: Yes. See Revised Plan Sheet E-103 for details regarding the switched feeder that will need to be run.

9. What is the size of the disconnect?

Answer: As per Paragraph 2.8 SERVICE ENTRANCE DISCONNECT in Spec Section 26 20 00, ELECTRICAL DISTRIBUTION SYSTEM, the service disconnect will be 200 amp.

10. What is the middle conduit on the lower level of the Gatehouse above the drop lights?

Answer: That conduit is the feed to the project office.

11. Core drilling specification indicates that the floor should be x-rayed. X-rays may not show all obstacles, are we still required to use X-ray?

Answer: Yes. As per Paragraph 3.1.4.5 Core Drilling for Conduit Penetration, in Spec Section 26 20 00 ELECTRICAL DISTRIBUTION SYSTEM, Contractors are to submit a Core Drilling Plan for government approval. The Core Drilling Plan is to include the non-destructive testing (NDT) method that the Contractor wants to use. The Core Drilling Plan will be reviewed by the Government as to the acceptability of the proposed NDT method.

12. Is fall protection required?

Answer: Yes, fall protection will be required when accessing the lower level of the Gatehouse and the roof of the Gatehouse. Fall protection will need to comply with the standards set forth in the U.S. Army Corps of Engineers Safety Manual, EM385-1-1. Fall protection must be addressed on the Accident Prevention Plan. Contractors are urged to review EM385-1-1 for fall protection requirements prior to submitting a quote.

13. Are there any issues with having the power off for an extended length of time?

Answer: Yes, outages must be coordinated with the Project Office. Time without power should be minimized to the maximum extend practical.

14. Will supply of backup generators be required?

Answer: As per Paragraph 8. Hours of Operation, in the Statement of Work, “Interruptions to power must be coordinated with the USACE Hodges Village Project Manager. If power outages are anticipated to last longer than 8 hours, arrangements must be made to supply emergency power to the gate operators. An emergency generator is onsite and a temporary connection from the generator to the gate operators would be acceptable.”

15. Will the existing conduits remain on the lower level?

Answer: As per Keyed Notes 5 and 6 on Sheet ED101, existing conduits will be demolished, but there will still be a conduit on this level, as shown on Revised Sheet E-101.

16. Will new feeders need to be run? Are feeders expected to be continuous or will splicing be permitted?

Answer: No, new feeders will not be needed to be run. Yes, splicing will be permitted.

Contractor should provide conductors, wires and splicing as required. See keyed note 5 on amended sheet E-101.

17. What is to be done with the data lines that run by the conduits on the lower level?

Answer: Data lines should remain. They can be moved out of the way for work and then returned to their original location.

18. Will the Contractor need to add a switch for the lights on the lower level and where should switches be located?

Answer: Yes, please see revised Plan Sheet E-103.

19. Are there surge protectors on the signal lines?

Answer: Yes, see Keyed Note 5 on Revised Plan Sheet E-102 which says “Provide Surge Protective Devices on Antenna and Instrumentation cables on the roof entering the structure.”

20. To be inspected and certified, the grounding and down leads would need to be fastened every three (3) feet. Is the Contractor to provide this fastening?

Answer: Yes, see amended sheet E-102.

21. Is the Contractor to install a new ground rod to ensure that the lightning protection system is adequately grounded?

Answer: Yes, see amended sheet E-102.

22. Are there bonds between the utilities and lightning protection?

Answer: Yes, see amended sheet E-102.

23. Are there any restrictions or exemptions to using an eleven (11) foot lightning rod on the Gatehouse roof?

Answer: See amended sheet E-102, mounting detail is updated to provide better support.

24. Are there any restrictions on the support brackets and where they can be attached for an eleven (11) foot lightning rod, as the supports shown in the drawings may be inadequate?

Answer: Yes, see amended sheet E-102.

25. Are the feeders coming in to the Gatehouse to remain?

Answer: Yes

26. Will the feed for the furnace be replaced when the furnace is demolished or will the Contractor be responsible for providing a new feed?

Answer: The feed will be brought back to the white junction box when the furnace is demolished. The white junction box is located on the southwest wall, to the right (west) of the entrance door, on the Operator’s level.

27. Is the Contractor to provide motion sensors?

Answer: Yes, description and specifications will be provided in Amendment 0002. See sheet E-103.

28. Is the lower level considered a permit required confined space?

Answer: No.

29. Will the grab bars be considered sufficient anchor points for fall protection for the lower level and the roof?

Answer:

*You would need a competent person in Fall Protection/Structural Engineer to review these as anchor points or require the Contractor to provide their own anchor point. Ladder rungs (bolted side rails of ladders) are generally considered sufficient anchor points. Self Retracting Life Lines would not be recommended until they were reviewed and approved to arrest a fall prior to impact with the level below.

30. Do the fuel lines need to be moved?

Answer: No

31. Is magnetic testing acceptable instead of x-ray for locating rebar?

Answer: As per Paragraph 3.1.4.5 Core Drilling for Conduit Penetration, in Spec Section 26 20 00 ELECTRICAL DISTRIBUTION SYSTEM, Contractors are to submit a Core Drilling Plan for government approval. The Core Drilling Plan is to include the non-destructive testing (NDT) method that the Contractor wants to use. The Core Drilling Plan will be reviewed by the Government as to the acceptability of the proposed NDT method.

32. Question: It looks like on the one line they are calling for EPD breakers, but the schedule does not show EPD breakers. Are they required?

Answer: See revised specification 26 20 00 Paragraph 2.10 Panelboard MDP Item j. EPD breakers are not required, but meet the salient characteristics of the specification.

Alternative submittals must provide as much equal protection and coordination as the EDP breakers.

33. If EPD breakers are required we would have to series rate the panel to use 10k rated breakers?

Answer: The panel buss must be rated as specified in revised Spec Section 26 20 00 Amendment 1 Paragraph 2.10 Panelboard MDP Item b. Series rated breakers will not be accepted, see revised Spec Section 26 20 00 Amendment 1 Paragraph 2.10 Panelboard MDP Item j. Ignore series ratings on overcurrent protective devices, and instead use the non-series ratings.

34. The one line shows a 150 Amp main breaker, the schedule has a 175 Amp main breaker.

Which is the correct main breaker rating?

Answer: The correct size is 150A. Plan sheet E-502, MDP Schedule, has been revised.

(End of Summary of Changes)

Electrical Upgrades, Hodges Village Dam, Oxford, MA

AM 0002

AMENDMENT 0002 OF SOLICITATION

1.1 CHANGE TO SPECIFICATION

1.1.1 Narrative Addition

Specification Section 26 20 00 ELECTRICAL DISTRIBUTION SYSTEM, Add

Subpart 2.5 SWITCHES as follows:

2.5.1 Toggle Switches

NEMA WD 1, UL 20, single pole, totally enclosed with bodies of thermoplastic or thermoset plastic and mounting strap with grounding screw. Include the following:

a. Handles: thermoplastic.

b. Wiring terminals: screw-type, side-wired.

c. Contacts: silver-cadmium and contact arm - one-piece copper alloy.

d. Switches: rated quiet-type ac only, 120/277 volts, with current rating and number of poles indicated.

2.5.2 Motion Sensor

Provide exterior motion sensor light switch with photocell for dusk till dawn operation in the location indicated on the plans. Switch must be rated for 120V 20A 1-pole applications. Switch must be rated

NEMA-3R or higher. Switch must be rated for operation from -4 to 110 degrees Fahrenheit. Switch must be equipped with adjustable time delay.

1.1.2 Narrative Changes

Specification Section 26 20 00 ELECTRICAL DISTRIBUTION SYSTEM, change

Subpart 2.10 PANELBOARD MDP, subparagraph b to read:

“Panelboard must have a minimum short circuit rating of 10,000 in rms symmetrical amperes at rated voltage.”

Instead of “Panelboard must have a minimum short circuit rating of 18,000 in rms symmetrical….”

And

Specification Section 26 20 00 ELECTRICAL DISTRIBUTION SYSTEM, change

Subpart 2.10 2.10 PANELBOARD MDP, subparagraph j to read:

“Branch circuit breakers must be as indicated on the plans, listed in the panelboard manufacturer’s literature for use in the panel, and must be 10 kAIC or higher. Series rated breakers will not be accepted.”

Instead of “Branch circuit breakers must be as indicated on the plans, listed in the panelboard manufacturer’s literature for use in the panel, and must be 18 kAIC or higher. Series rated breakers will not be accepted.”

Electrical Upgrades, Hodges Village Dam, Oxford, MA

AM 0002

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

C O

N C

O R

D

M A

-2

V

IR

G

IN

IA

R

O A

D

N E

W E

N G

L A

N D D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D R

A W

IN

G C

O D

E

S C

A L E

S H

E E

T

F

T H

A -H

V -1

O X

F O

R D

M A

S S

A C

H U

S E

T T S

H O

D G

E S V

IL

L A

G E D

A M

E L E

C T

R

IC

A L U

P G

R A

D E

S

SHEET ID

®of Engineers

US Army Corps

W

W J

Q

OXFORD, MASSACHUSETTS

HODGES VILLAGE DAM

ELECTRICAL UPGRADES

D

H A

S S

E T

T

A N

S I

D

G-001 of Engineers

US Army Corps

SOLICITATION NO.:

CONTRACT NO.:

New England District

VILLAGE

HODGES

VERMONT

MASSACHUSETTS

NEW HAMPSHIRE

POND

NORWICH

HUNTINGTON

HOLYOKE

NORTHAMPTON

RESERVOIR

QUABBIN

WORCESTER

CHARLTON

SPRINGFIELD

CONNECTICUT

MASSACHUSETTS

WESTFIELD

IS

L

A N

D

R H

O D

E

POND

QUABOAG

PROJECT

LOCATION

C3

N

NOT TO SCALE

C1

LOCATION PLANVICINITY MAP

DESIGN FILESHEET NO.

G-001

INDEX TO DRAWINGS

SHEET TITLE

E-001

SHEET NO. DRAWING NUMBER

INDEX TO INFORMATION DRAWINGS

THA-HV-119_G-001.DGN

THA-HV-119_E-001.DGN

THA-HV-119_E-101.DGN

MAINE

AUGUSTA

BANGOR

OCEAN

ATLANTIC

HAMPSHIRE

NEW

PORTLAND

CONCORD

PORTSMOUTH

VT.

MASSACHUSETTS

BOSTON

LOCATION

PROJECT

PROV.

R.I.

HARTFORD

CONN.

CAPE

COD

TH-1-1446

SHEET TITLE FROM ORIGINAL CONSTRUCTION DRAWINGS

TH-1-1424

ELECTRICAL NOTES, LEGEND AND ABBREVIATIONS

CANADA

1 THA-77

OUTLET WORKS - GATE TOWER SECTIONAL PLANS (ORIGINAL CONSTRUCTION)

ELECTRICAL - GENERAL LAYOUT (ORIGINAL CONSTRUCTION)

THA-HV-119_ED-101.DGN

THA-HV-119_ED-601.DGN ELECTRICAL ONE LINE DIAGRAM DEMOLITION

ED101

ED601

THA-HV-119_E-102.DGNE-102

E-501 THA-HV-119_E-501.DGN

THA-HV-119_E-502.DGN

THA-HV-119_E-601.DGN

THA-HV-119_ED-102.DGN

E-103

E-502

E-601

:1

B

H E

A D

J

C L

IN

E

M A

R C

H

W912WJ19Q0006

26 OF 47 TH-1-1426

D E

C

ED102

TOWER FLOOR PLAN ELECTRICAL DEMOLITION

ELECTRICAL LIGHTING DEMOLITION

TOWER FLOOR PLAN INSTALLATION

ELECTRICAL LIGHTNING PROTECTION PLAN DEMOLITION AND PROPOSED

ELECTRICAL LIGHTING INSTALLATION

ELECTRICAL PANEL SCHEDULES DEMOLITION AND INSTALLATION

ELECTRICAL ONE LINE DIAGRAM INSTALLATION

COVER SHEET AND INDEX TO DRAWINGS

C O

V E

R S

H E

E T A

N D I

N D

E X T

O D

R A

W

IN

G S

DAM CREST ROAD

C5

SITE PLAN

GATE TOWER

PROJECT OFFICE

ISSUE DATE: MARCH 2019

E-101

THA-HV-119_E-103.DGN

SYSTEM GROUNDING DETAIL ARC FLASH LABEL AND CONDUITS SCHEDULE.

REINFORCING II (ORIGINAL CONSTRUCTION)

REPLACE ELECTRIC FEEDER SYSTEM 1988

LOCATION

MANHOLE

J S

W A

L L E

Y

L1

O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

C O

N C

O R

D

M A

-2

V

IR

G

IN

IA

R

O A

D

N E

W E

N G

L A

N D D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D R

A W

IN

G C

O D

E

S C

A L E

S H

E E

T

A -H

V -1

O X

F O

R D

M A

S S

A C

H U

S E

T T S

H O

D G

E S V

IL

L A

G E D

A M

E L E

C T

R

IC

A L U

P G

R A

D E

S

SHEET ID

®of Engineers

US Army Corps

W

W J

Q

D

H A

S S

E T

T

A N

S I

D

E-001

E L E

C T

R

IC

A L N

O T

E S L E

G E

N D A

N D A

B B

R E

V

IA

T

IO

N S

AMPERES

AMERICAN WIRE GAUGE

CONDUIT

CIRCUIT

COLUMN

CIRCUIT BREAKER

CENTERLINE

BUILDING

EMERGENCY

FIRE ALARM

ELECTRICAL METALLIC TUBING

GROUND FAULT INTERRUPTER

GROUND OR GROUNDING

FULL LOAD AMPERES

THOUSAND CIRCULAR MILS

GALVANIZED RIGID METALLIC CONDUIT

kcmil

FLA

FT

GFI

GRMC

GND,G

FEET

EM

EMT

F

FA

FUSE

CB

CKT

COL

AWG

C

BLDG

A

PHASE

QUANTITY

TELEPHONE

POLYVINYL CHLORIDE

RIGID METAL CONDUIT

TRANSFORMER

UNLESS OTHERWISE NOTED

UNDERGROUND OR UNDERGRADE

UNDERWRITERS LABORATORIES

XFMR

W

V

DELTA

WYE

WIRE

VOLT

UG

UL

U.O.N.

SP

TEL

SPARE

PWR

QTY

PVC

RMC

POWER

KILOWATTS

LIGHTING

MISCELLANEOUS

MAIN LUGS ONLY

KILOVOLT AMPERES

MAIN CIRCUIT BREAKER

ASSOCIATION

NOT TO SCALE

PUSHBUTTON

NATIONAL ELECTRICAL

NATIONAL ELECTRIC CODE

MANUFACTURES ASSOCIATION

NATIONAL FIRE PROTECTION

NTS

PNL

P1

PB

PANEL

NEC

NEMA

NFPA

MCB

MLO

MISC

kW kVA

LTG

GENERAL ABBREVIATIONS

Y

EXISTING MANHOLE TO REMAIN

EXISTING UTILITY POLE TO REMAIN

Ex

E

Ex

ESx

ES

UNDERGROUND ELECTRIC WIRING TO BE REMOVED

EXISTING ELECTRIC UNDERGROUND SECONDARY

EXISTING ELECTRIC OVERHEAD

NEW ELECTRIC UNDERGROUND PRIMARY

NEW ELECTRIC UNDERGROUND SECONDARY

EXISTING ELECTRIC UNDERGROUND PRIMARY

EQUIPMENT LEGEND

JUNCTION AND/OR PULL BOX

CONNECTION TO EQUIPMENT

MOTOR NUMERAL INDICATES HORSEPOWER

MAGNETIC MOTOR STARTER

DISCONNECT SWITCH (UNFUSED)

DISCONNECT SWITCH (FUSED)

JUNCTION AND/OR PULL BOX, WITH FLEX

OVERLOAD PROTECTION. "P" DENOTES EQUIPPED WITH

CONTRACTOR TO EQUIPMENT BY OTHERS.

AND CONDUCTORS BY THE ELECTRICAL

DENOTES FLEXIBLE LIQUID TIGHT CONNECTION

MANUAL MOTOR STARTER COMPLETE WITH THERMAL

PILOT LIGHT, PROVIDED BY ELECTRICAL CONTRACTOR.

METER (MICRO PROCESSOR BASED)

PANELBOARD

SYSTEM GROUND OR EQUIPMENT GROUND

T1

J

J

S

PC

RATING

P

M

PANEL

SD

DRY TYPE TRANSFORMER "T1"

SPD

SUPPRESSER)

SURGE PROTECTIVE DEVICE (TRANSIENT VOLTAGE SURGE

MOUNTED ON EAVE.

PHOTOCELL EQUAL TO TORK 2101

UP/DOWN/STOP PUSH BUTTON CONTROL

PB PULL BOX

CIRCUITRY TURNING UP

CIRCUITRY TURNING DOWN

NOTED.

HOMERUN TO PANEL "LP" CIRCUIT #2 VIA 60A-3P

L2PA-2

PP-3P

CIRCUITRY, RACEWAYS AND FEEDERS LEGEND

PP-1,3,5

GENERAL NOTES:

125 VOLT, 2 POLE, 3 WIRE, 20 AMP., DUPLEX

RECEPTACLE. "2" DENOTES CIRCUIT NUMBER.

125 VOLT, 2 POLE, 3 WIRE, 20 AMP., DOUBLE

125 VOLT, 2 POLE, 3 WIRE, 20 AMP., DUPLEX

RECEPTACLE EQUIPPED WITH INTEGRAL GROUND

WIRING DEVICES LEGEND

SINGLE POLE TOGGLE SWITCH "b" DENOTES SWITCH

ALL RECEPTACLES SHALL BE INSTALLED WITH GROUND PRONG

IN THE UP POSITION.

CONTROL

FAULT INTERRUPTER.

DUPLEX RECEPTACLE.

1.

125 VOLT, 2 POLE, 3 WIRE, 20 AMP., DUPLEX

RECEPTACLE EQUIPPED WITH INTEGRAL GROUND

FAULT INTERRUPTER AND MOUNTED IN CAST

OUTLET BOX WITH WEATHERPROOF COVER.

ALL RECEPTACLES SHALL BE SIDE WIRED.2.

WP

GFI

b

EQUAL

AEROSPACE MS90555C442813S OR APPROVED

RECEPTACLE, AS MANUFACTURED BY AMPHENOL

EQUAL

AEROSPACE MS90555C444413S OR APPROVED

RECEPTACLE, AS MANUFACTURED BY AMPHENOL

LIGHTING EQUIPMENT LEGEND

XL

XD

XN

XR

XM

RESPONSIBLE FOR MAINTAINING CIRCUITRY TO DEVICES

PANELBOARD AS SPARE. CONTRACTOR SHALL BE

CONDUIT AS REQUIRED SO AS TO PROVIDE A

COMPLETE OPERATIONAL INSTALLATION.

TO BE REMOVED. CUT BACK AND MAKE SAFE ALL

EQUIPMENT TO BE REMOVED AND REPLACED WITH NEW.

"XL" ADJACENT TO EQUIPMENT DENOTES RELOCATED

EXISTING AT NEW LOCATION

UNAFFECTED BY DEMOLITION.

"XD" ADJACENT TO EQUIPMENT DENOTES EXISTING

"XR" ADJACENT TO EQUIPMENT DENOTES EXISTING

"XN" ADJACENT TO EQUIPMENT DENOTES EXISTING

"XM" ADJACENT TO EQUIPMENT DENOTES EXISTING

SYMBOLS OUT OF FUNCTION DENOTE EXISTING

TO BE RELOCATED AS SHOWN. CUT BACK AND/OR

EXTEND EXISTING BRANCH CIRCUIT WIRING AND

EQUIPMENT TO REMAIN.

EXISTING EQUIPMENT LEGEND

IN EXISTING LOCATION.

TO BE REMOVED, STORED, CLEANED AND REINSTALLED

"XS" ADJACENT TO EQUIPMENT DENOTES EXISTING

XS

RACEWAY LEGEND

ASSOCIATED BRANCH CIRCUIT WIRING AND CONDUIT

BACK TO POWER SOURCE AND LABEL BREAKER IN

CIRCUIT BREAKER. BRANCH CIRCUIT WIRING SHALL BE AS

OFF POSITION TO CONTROL PROJECTION SCREEN.

SINGLE POLE DOUBLE THROW TOGGLE SWITCH WITH CENTER

3/4" UNLESS OTHERWISE NOTED.

SPECIFICATIONS AND N.E.C. MINIMUM SIZE CONDUIT SHALL BE

PROVIDE GROUNDING CONDUCTORS IN ACCORDANCE WITH

ISOLATED GROUND CONDUCTORS ARE NOT INDICATED.

CONDUCTORS. EQUIPMENT GROUNDING CONDUCTORS AND

DENOTE TWO #12 AWG CU (MINIMUM) PHASE AND NEUTRAL

(MINIMUM) PHASE AND NEUTRAL CONDUCTORS. NO TICKS

BREAKERS. TICKS INDICATE QUANTITY OF #12 AWG CU

HOMERUN TO PANEL "LP", CIRCUIT #1,3,5 VIA 20A-1P CIRCUIT

NOTES:

B

EMH-1

CMH-1

COMMUNICATIONS MANHOLE. NUMERAL INDICATES

MANHOLE NUMBER

ELECTRIC MANHOLE. NUMERAL INDICATES MANHOLE

NUMBER

Cx EXISTING COMMUNICATION UNDERGROUND

CLCL or

S1 SWITCH NUMBER ONE

P POLE

PANEL NUMBER ONE

LITHONIA WLTV-LED.

WET LOCATION. UNIT SHALL BE EQUIVALENT TO

WHITE LED LAMP HEADS. UNIT SHALL BE LISTED FOR

EMERGENCY LIGHTING BATTERY UNIT WITH TWO 1.9 WATT

TO HUBBELL #PVL3-30LU-4K-BZ.

LED WALLPACK, UL LISTED FOR WET LOCATION, EQUAL

EXISTING LIGHT NUMBER ONE TO REMAIN.

J

C L

IN

E

J S

W A

L L E

Y

M A

R C

H

B

H E

A D

:1

REQUEST FOR INFORMATIONRFI

COPPERCU

COR CONTRACTING OFFICER'S REPRESENTATIVE

USED INTERCHANGEABLY THROUGHOUT THESE DOCUMENTS.

12. THE TERMS "GATE TOWER", "TOWER", "GATE HOUSE", AND "INTAKE STRUCTURE" ARE

AND OPERATING CONDITION AFTER THE WORK OF THIS CONTRACT.

I. VERIFY EXISTING EQUIPMENT AND SYSTEMS ARE RESTORED TO ITS ORIGINAL

H. REMOVE AND DISPOSE OF EQUIPMENT INDICATED TO BE DEMOLISHED.

AND ACCESSIBLE LOCATIONS.

G. REMOVE ABANDONED CONDUIT FROM CEILINGS, EXPOSED AREAS

F. ABANDON IN PLACE UNUSED CONDUIT CONCEALED IN FLOORS OR WALLS.

E. REMOVE AND DISPOSE OF UNUSED CONDUIT OR CONDUCTORS.

WORKING ORDER.

D. VERIFY EQUIPMENT TURNED OVER TO THE GOVERNMENT IS CLEAN AND IN

C. RELOCATE PIPING AND DUCTWORK AS REQUIRED TO COMPLETE WORK.

TEMPORARY WORK.

OPERATE THE FACILITY DURING THE WORK, TO INCLUDE

B. DISCONNECT/RECONNECT/REINSTALL EQUIPMENT AS REQUIRED TO

A. TEMPORARILY RELOCATE EQUIPMENT AS REQUIRED TO COMPLETE WORK.

BUT IS NOT LIMITED TO:

COMPLETE AND PROPER ELECTRICAL INSTALLATION. THIS WORK MUST INCLUDE

INCLUDED IN THE CONTRACT AS REQUIRED TO PROVIDE AND MAINTAIN A

NECESSARY ADDITIONS AND ALTERATIONS TO EXISTING WORK MUST BE11.

INSTALLATIONS.

FOR EASE OF DISCONNECTING WITH MINIMUM OF INTERFERENCE WITH OTHER

OF EQUIPMENT COMPONENTS AS MUCH AS PRACTICAL. CONNECT THE EQUIPMENT

ELECTRICAL EQUIPMENT TO FACILITATE MAINTENANCE, REPAIR AND REPLACEMENT

AND OVERHEAD EQUIPMENT TO PROVIDE MAXIMUM HEADROOM. INSTALL

WHERE MOUNTING HEIGHTS ARE NOT DETAILED, INSTALL ELECTRICAL SERVICES10.

ONE BOX WITH A SINGLE COVER PLATE IF PRACTICAL.

WHENEVER SIMILAR DEVICES ARE SHOWN TOGETHER, THEY MUST BE GANGED IN9.

FIRE RESISTANT CONSTRUCTION.

SIDE WALL HORIZONTAL SPACING COMPLY WITH STATE BUILDING CODE REGARDING

ASSEMBLIES SUCH THAT AREA OF BOX PER WALL AREA AND OUTLET ON OPPOSITE

COORDINATE EXACT LOCATION OF BOXES IN TWO HOUR OR LESS RATED

MUST BE MOUNTED 8" APART ON CENTER HORIZONTALLY. CONTRACTOR SHALL

RECEPTACLES AND TELECOMMUNICATIONS OUTLETS SHOWN ADJACENT ON DRAWINGS8.

THREE CIRCUITS IN SINGLE CONDUIT WILL NOT BE ACCEPTED.

RECEPTACLE CIRCUITS MAY BE EXEMPTED WITH ENGINEERING APPROVAL. MORE THAN

IS NOT PERMITTED WITHOUT PRIOR WRITTEN APPROVAL. LIGHTING AND

CONSOLIDATING INDIVIDUAL CONDUIT HOME RUNS SHOWN ON THE DRAWINGS7.

FIXTURE OR EQUIPMENT UNLESS OTHERWISE INDICATED.

MOUNTING HEIGHTS OF DEVICES ARE TO CENTER OF DEVICES, OUTLET,6.

NEC 250.122.

CIRCUITS MUST BE RUN WITH GREEN EQUIPMENT GROUNDING CONDUCTOR SIZED PER5.

REQUIRING A NEUTRAL i.e. NO SHARED NEUTRAL.

SEPARATE NEUTRAL CONDUCTORS MUST BE RUN WITH BRANCH CIRCUITS4.

PANEL AND CIRCUIT NUMBER.

LABEL AND IDENTIFY JUNCTION BOXES WITH TYPE OF SYSTEM,

SPACE. UPDATE DIRECTORIES FOR ALTERED PANELS.

EQUIPMENT SERVED, ROOM NUMBERS, SPARE BREAKER OR EMPTY

PANELS MUST HAVE TYPED, COMPLETED DIRECTORIES INDICATING3.

DOOR SWINGS, CABINETS, COUNTERS, ETC.

COORDINATE DEVICE LOCATIONS INDICATED IN PLAN VIEW DRAWINGS WITH ACTUAL

DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF ELECTRICAL EQUIPMENT.2.

SPECIFICATIONS.

WITH THE CONTRACTING OFFICER'S REPRESENTATIVE IN ACCORDANCE WITH THE

FACILITY. MINIMIZE DURATION OF ELECTRIC SHUT-DOWNS. WORK MUST BE SCHEDULED

TO MINIMIZE DISRUPTION TO THEWORK FOR THIS PROJECT MUST BE COORDINATED1.

LADDER

HOIST

GATE

SLIDE

UP TO R7 AND R8

FUEL TANK

HATCH COVER

IN FLOOR

LADDER

ACCESS

COVER

DOWN

GUARD RAIL

FLOAT WELL

CABINET

LADDER

ACCESS

DOWN

LADDER

HATCH

THROUGH

CEILING

LADDER

ACCESS

DOWN

GUARD RAIL

GUARD RAIL

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

C O

N C

O R

D

M A

-2

V

IR

G

IN

IA

R

O A

D

N E

W E

N G

L A

N D D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D R

A W

IN

G C

O D

E

S C

A L E

S H

E E

T

A -H

V -1

O X

F O

R D

M A

S S

A C

H U

S E

T T S

H O

D G

E S V

IL

L A

G E D

A M

E L E

C T

R

IC

A L U

P G

R A

D E

S

SHEET ID

®of Engineers

US Army Corps

W

W J

Q

SWITCHBOARD

LOCKER

POWER

JCT. BOX

CEILING HEIGHT 114"

B R

IA

N H

E A

D

A N

S I

D

C1

N

0 2' 4'1'SCALE: 1/2" = 1' - 0"

C6

N

0 2' 4'1'SCALE: 1/2" = 1' - 0"

T O

W E

R F

L O

O R P

L A

N

B R

IA

N H

E A

D

E L E

C T

R

IC

A L D

E M

O L

IT

IO

N

KEYED NOTES:

EXISTING ELECTRICAL FLOOR PLAN LOWER LEVEL

DEMOLISH SWITCHBOARD. RETAIN UTILITY AND FEEDER CIRCUITS FOR

CONNECTION TO NEW EQUIPMENT, SEE SHEET E-601. RETAIN BRANCH

CIRCUITS FOR CONNECTION TO NEW EQUIPMENT.

REMOVE BATTERY CHARGER AND RETAIN FOR REINSTALLATION. DEMOLISH

ASSOCIATED CONDUIT AND WIRE.

DEMOLISH LIGHTING PANEL, RETAIN BRANCH CIRCUIT CONDUCTORS FOR

CONNECTION TO NEW PANEL.

RELOCATE LOCKER AS INDICATED ON SHEET E-102 KEYED NOTE 6.

DEMOLISH CONDUIT AND WIRE FROM ENTRY POINT TO THE SWITCHBOARD.

DEMOLISH ASSOCIATED JUNCTION BOXES. SEAL ABANDONED

PENETRATION AND FINISH FLOOR TO MATCH EXISTING ON THE UPPER

LEVEL.

REROUTE EXISTING FEEDERS AND BRANCH CIRCUITS AS INDICATED ON

SHEET E-101. SEAL ABANDONED PENETRATIONS AND FINISH FLOOR TO

MATCH EXISTING ON THE UPPER LEVEL.

:1

M A

R C

H

J

C L

IN

E

ED101

EXISTING ELECTRICAL FLOOR PLAN OPERATOR'S LEVEL

FROM CEILING

CONDUITS SUSPENDED

J S

W A

L L E

Y

FUEL TANK

HATCH COVER

IN FLOOR

LADDER

ACCESS

COVER

DOWN

GUARD RAIL

FLOAT WELL

CABINET

POWER

JCT. BOX

CEILING HEIGHT 114"

LADDER

ACCESS

DOWN

LADDER

HATCH

THROUGH

CEILING

LADDER

ACCESS

DOWN

GUARD RAIL

GUARD RAIL

FROM CEILING

CONDUITS SUSPENDED

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

C O

N C

O R

D

M A

-2

V

IR

G

IN

IA

R

O A

D

N E

W E

N G

L A

N D D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D R

A W

IN

G C

O D

E

S C

A L E

S H

E E

T

A -H

V -1

O X

F O

R D

M A

S S

A C

H U

S E

T T S

H O

D G

E S V

IL

L A

G E D

A M

E L E

C T

R

IC

A L U

P G

R A

D E

S

SHEET ID

®of Engineers

US Army Corps

W

W J

Q

B R

IA

N H

E A

D

B R

IA

N H

E A

D

A N

S I

D

E L E

C T

R

IC

A L

L

IG

H T

IN

G

D E

M O

L

IT

IO

N

C1 0 2' 4'1'SCALE: 1/2" = 1' - 0"

C6

SCALE: 1/2" = 1' - 0" 0 2' 4'1'

KEYED NOTES:

1 1

N N

SOURCE. APPROXIMATE LOCATION INDICATED.

DEMOLISH EXTERIOR LIGHT AND ASSOCIATED CONDUIT AND WIRE BACK TO

CONDUIT BACK TO SOURCE.

DEMOLISH LIGHT TROFFER AND ASSOCIATED CONDUCTORS AND EXPOSED

M A

R C

H

J

C L

IN

E

ED102

:1

LIGHTING PLAN DEMOLITION LOWER LEVELLIGHTING PLAN DEMOLITION OPERATOR'S LEVEL

J S

W A

L L E

Y

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

C O

N C

O R

D

M A

-2

V

IR

G

IN

IA

R

O A

D

N E

W E

N G

L A

N D D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D R

A W

IN

G C

O D

E

S C

A L E

S H

E E

T

A -H

V -1

O X

F O

R D

M A

S S

A C

H U

S E

T T S

H O

D G

E S V

IL

L A

G E D

A M

E L E

C T

R

IC

A L U

P G

R A

D E

S

SHEET ID

®of Engineers

US Army Corps

W

W J

Q

SPD

NOT LABELEDSPARE

UTILITY METER

SWITCHBOARD

GENERATOR

GATE HOIST#1 GATE HOIST #2

UTILITY PRI

UTILITY SEC

BATTERY CHARGERBLOCK HEATER

LIGHTING PNL

P.O. PANEL

GATE HOIST #1

5 HP

GATE HOIST #2

5 HP

GENERATOR

55 kVA

UTILITY

BATTERY CHARGER

0.5 Amps

BLOCK HEATER

0.5 Amps

UTILITY XFMR

45 kVA

13.2 - 0.208 kV

1%

1-1/C-2/0 AWG

CU, 720', [Conduit]

1-1/C-2/0 AWG

CU, 20', [Conduit]

1-1/C-10 AWG

CU, 25', [Conduit]

1-1/C-10 AWG

CU, 18', [Conduit]

1-1/C-8 AWG

CU, 20', [Conduit]

1-1/C-3 AWG

CU, 3150', [Conduit]

1-1/C-350 kcmil

CU, 210', [Conduit]

1-1/C-12 AWG

CU, 10', [Conduit]

1-1/C-12 AWG

CU, 20', [Conduit]

(Generic) 150 AF

150/125 150/125

(Generic) 150 AF

OPEN

(Generic) 150 AF

150/125

(Generic) 150 AF

150/100

(Generic) 30AF

30/15

OPEN

(Generic) 30AF

30/30

(Generic) 30AF

30/15

(Generic) 30AF

30/15

(Generic) 150 AF

150/60

(Generic) 50AF

50/50

(Generic) 50AF

50/40

(Generic) 50AF

50/40

PANEL

PANEL

B R

IA

N H

E A

D

B R

IA

N H

E A

D

A N

S I

D

E L E

C T

R

IC

A L

O N

E L

IN

E D

IA

G R

A M

D E

M O

L

IT

IO

N

KEYED NOTES:

B1

ONE LINE DIAGRAM DEMOLITION

SCALE: NOT TO SCALE

CONNECTION TO NEW PANEL.

DEMOLISH LIGHTING PANEL, RETAIN BRANCH CIRCUIT CONDUCTORS FOR

ASSOCIATED CONDUIT AND WIRE.

REMOVE BATTERY CHARGER AND RETAIN FOR REINSTALLATION. DEMOLISH

CIRCUITS FOR CONNECTION TO NEW EQUIPMENT.

CONNECTION TO NEW EQUIPMENT, SEE SHEET E-601. RETAIN BRANCH

DEMOLISH SWITCHBOARD. RETAIN UTILITY AND FEEDER CIRCUITS FOR

J

C L

IN

E

J S

W A

L L E

Y

:1

M A

R C

H

ED601

FUEL TANK

HATCH COVER

IN FLOOR

LADDER

ACCESS

COVER

DOWN

GUARD RAIL

FLOAT WELL

CABINET

CEILING HEIGHT 114"

LADDER

ACCESS

DOWN

LADDER

HATCH

THROUGH

CEILING

LADDER

ACCESS

DOWN

GUARD RAIL

GUARD RAIL

FROM CEILING

CONDUITS SUSPENDED

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

C O

N C

O R

D

M A

-2

V

IR

G

IN

IA

R

O A

D

N E

W E

N G

L A

N D D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D R

A W

IN

G C

O D

E

S C

A L E

S H

E E

T

A -H

V -1

O X

F O

R D

M A

S S

A C

H U

S E

T T S

H O

D G

E S V

IL

L A

G E D

A M

E L E

C T

R

IC

A L U

P G

R A

D E

S

SHEET ID

®of Engineers

US Army Corps

W

W J

Q

LOCKER

U N

IT

H E A T E R

D

H A

S S

E T

T

A N

S I

D

E-101

D1

N

0 2' 4'1'SCALE: 1/2" = 1' - 0"

D5

N

0 2' 4'1'SCALE: 1/2" = 1' - 0"

:1

KEYED NOTES:

ELECTRICAL FLOOR PLAN OPERATOR'S LEVEL INSTALLATION ELECTRICAL FLOOR PLAN LOWER LEVEL INSTALLATION

T O

W E

R F

L O

O R P

L A

N

IN

S

T A

L L

A T

IO

N

M A

R C

H

B

H E

A D

J

C L

IN

E

J S

W A

L L E

Y S

M

A R

C L

A R

IF

IE

D S

P L

IC

IN

G I

N J

U N

C T

IO

N B

O X

HARDWARE AS REQUIRED.

EXISTING RECEPTACLE. PROVIDE CONCRETE ANCHORS AND MOUNTING

INSTALLED PER KEYED NOTE 1. CONFIRM PLUG ASSEMBLY REACHES

RELOCATE DROP LIGHT MOUNTING ASSEMBLY TO BELOW THE DISCONNECT

ETC. AS REQUIRED TO MAKE THE INSTALLATION COMPLETE.

INSTRUCTIONS. PROVIDE CEILING MOUNTING BRACKETS, THREADED RODS,

CONDUCTOR SIZES. INSTALL UNIT HEATER PER MANUFACTURER'S

CONDUIT AND CABLE SCHEDULE ON SHEET E-501 FOR CONDUIT AND

WIRE BACK TO PANEL MDP, SEE PANEL SCHEDULE SHEET E-502. SEE

PROVIDE UNIT HEATER AS SPECIFIED IN 26 20 00. PROVIDE CONDUIT AND

METER PER MANUFACTURER'S INSTRUCTIONS.

METER ABOVE THE PANELBOARD INSTALLED PER KEYED NOTE 3. INSTALL

PROVIDE PANELBOARD METER PER SPECIFICATION 26 20 00. MOUNT

SPD PER MANUFACTURER'S INSTRUCTIONS.

INSTALL SPD BELOW THE WINDOW HEIGHT AGAINST THE WALL. INSTALL

PROVIDE SURGE PROTECTIVE DEVICE (SPD) AS SPECIFIED IN 26 20 00.

NEW LOCATION OF LOCKER RELOCATED PER SHEET ED-102 KEYED NOTE 4.

REQUIRED TO EXTEND FEEDERS TO NEW PANEL LOCATION.

ABOVE THE FINISHED FLOOR. PROVIDE SPLICING IN JUNCTION BOX AS

COMPLETE. SUSPEND JUNCTION FROM CEILING AS HIGH AS POSSIBLE

ANCHORS, FASTENERS, ETC, AS REQUIRED TO MAKE THE INSTALLATION

PROVIDE JUNCTION BOX PER SPECIFICATION 26 20 00. PROVIDE CONCRETE

CHARGING CIRCUIT.

PER KEYED NOTE 3. PROVIDE CONDUIT AND WIRE TO RESTORE BATTERY

HEIGHT. PROVIDE CONDUIT AND WIRE BACK TO PANELBOARD INSTALLED

MOUNT BATTERY CHARGER AGAINST THE WALL BELOW THE WINDOW

INSTALL BATTERY CHARGER RETAINED PER SHEETS ED-102 AND ED-601.

ABANDONED PENETRATIONS WITH SEALANT FLUSH WITH FINISHED FLOOR.

SEAL PROVIDE CORE DRILLING AS SPECIFIED IN 26 20 00. SHEET ED-601.

POWERED FROM DEMOLISHED SWITCHBOARD AND LIGHTING PANEL, SEE

PROVIDE CONDUIT AND WIRE TO RESTORE POWER TO BRANCH CIRCUITS

PROVIDE CONDUIT WIRE BACK TO ATS INSTALLED PER KEYED NOTE 2.

PROVIDE PANELBOARD PER 26 20 00 AND SHEETS E-601 AND E-501.

EXISTING GENERATOR, REUSE EXISTING CONDUIT WHERE PRACTICAL.

INSTALLED PER KEYED NOTE 1. PROVIDE CONDUIT AND WIRE BACK TO

E-601. PROVIDE CONDUIT AND WIRE BACK TO SERVICE DISCONNECT

PROVIDE AUTOMATIC TRANSFER SWITCH, ATS, PER 26 20 00 AND SHEET

OFF THE WALL AT LEAST AN 1/8TH INCH.

MUST BE RATED FOR DAMP ENVIRONMENTS. DISCONNECT MUST BE SET

ETC AS REQUIRED TO MAKE THE INSTALLATION COMPLETE. COMPONENTS

INDICATED ON SHEET G-001. PROVIDE CONCRETE ANCHORS, FASTENERS,

AND WATERPROOF SEALANT BOTH AT THIS LOCATION AND THE MANHOLE

EXISTING FEEDER FROM UTILITY SOURCE. SEAL CONDUIT WITH RODENT

SHEET E-601. PROVIDE CONDUIT AS SHOWN AND PROVIDE CONNECTION TO

PROVIDE FUSIBLE SERVICE DISCONNECT PER SPECIFICATION 26 20 00 AND

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

C O

N C

O R

D

M A

-2

V

IR

G

IN

IA

R

O A

D

N E

W E

N G

L A

N D D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D R

A W

IN

G C

O D

E

S C

A L E

S H

E E

T

A -H

V -1

O X

F O

R D

M A

S S

A C

H U

S E

T T S

H O

D G

E S V

IL

L A

G E D

A M

E L E

C T

R

IC

A L U

P G

R A

D E

S

SHEET ID

®of Engineers

US Army Corps

W

W J

Q

B R

IA

N H

E A

D

B R

IA

N H

E A

D

A N

S I

D

E-102

E L E

C T

R

IC

A L

L

IG

H T

N

IN

G P

R O

T E

C T

IO

N P

L A

D1

D5

0 2' 4'1' 0 2' 4'1'

SCALE: 1/2" TO 1' SCALE: 1/2" TO 1'

A1

LIGHTNING PROTECTION DETAIL

SCALE: NTS

1 1

1 1

J

C L

IN

E

D E

M O

L

IT

IO

N A

N D P

R O

P O

S E

D :1

M A

R C

H

LIGHTNING PROTECTION DEMOLITION ON GATE HOUSE ROOF LIGHTNING PROTECTION INSTALLATION ON GATE HOUSE ROOF

N

AIR TERMINAL

11' ABOVE ROOF DECK

CABLE CONNECTOR

MAIN CONDUCTOR

PARAPET WALL

KEYED NOTES:

GENERAL NOTE:

SUPPORT BRACKET

J S

W A

L L E

Y S

R

E L

O C

A T

E M

A

IN

C

O N

D U

C T

O R

A D

D S

P D

A D

D S

U P

P O

R T S

M

A R

ROOF DECK

TYPICAL OF FOUR

PROVIDE SUPPORT BRACKET

75% OF AIR TERMINAL HEIGHT

50% OF AIR TERMINAL HEIGHT

TYPICAL

CLIP CABLE SUPPORT

FOLLOW ROOFING WORK.

MUST PRECEDE ROOFING WORK AND INSTALLATION MUST

ROOF UNDER A SEPARATE CONTRACT. DEMOLITION WORK

COORDINATE WORK WITH ROOFING CONTRACTOR REPLACING

TO THE TOP OF THE PARAPET WALL.

SYSTEM PROPOSED FOR CONNECTING THE AIR TERMINAL

THE SUBMITTAL SHOULD ALSO INCLUDE THE ANCHOR BOLT

OF THE SUPPORT BRACKETS TO THE AIR TERMINAL.

THAT IDENTIFIES THE MATERIAL TYPE, SIZE AND THICKNESS

CONTRACTOR IS TO PREPARE AND SUBMIT A SUBMITTAL

2.

1.

SYSTEM.

PROTECTION DOWN CONDUCTOR TO GROUNDING ELECTRODE

TO EXISTING GROUNDING ELECTRODE SYSTEM. BOND LIGHTNING

NFPA 70. PROVIDE BARE COPPER CONDUCTOR FROM GROUND ROD

PROVIDE GROUND ROD AS SPECIFIED IN 26 20 00 INSTALLED PER

NFPA 780.

CONDUCTORS EVERY THREE FEET. INSTALLATION MUST BE PER

PROVIDE NFPA 780 RATED FASTENERS ON EXISTING DOWN

STRUCTURE, TYPICAL OF FIVE.

INSTRUMENTATION CABLES ON THE ROOF ENTERING THE

PROVIDE SURGE PROTECTIVE DEVICES ON ANTENNA AND

BELOW ROOF MEMBRANE ON EXTERIOR OF THE PARAPET WALL.

PERIMETER OF THE PARAPET WALL. INSTALL MAIN CONDUCTOR

ETC AS REQUIRED TO RUN MAIN CONDUCTOR AROUND THE

PROVIDE MAIN CONDUCTOR, SUPPORTS, ANCHORS, CONNECTORS,

REQUIRED TO MAKE INSTALLATION COMPLETE.

SHEET. ADJUST PLACEMENT OF AIR TERMINAL AND SUPPORTS AS

AND ALONG THE AIR TERMINAL PER DETAIL A1 THIS PARAPET WALL

THE TOP OF THE PROVIDE SUPPORT BRACKETS AT BASE BY

TOP OF AIR TERMINAL MUST BE 11 FEET ABOVE THE ROOF DECK.

SUPPORTS, ANCHORS, ETC. AS REQUIRED.

PROVIDE AIR TERMINAL PER SPECIFICATION 26 41 00. PROVIDE

NOT USED.

CONDUCTORS.

CONDUCTORS FOR USE WITH NEW AIR TERMINALS AND NEW MAIN

DEMOLISH AIR TERMINALS AND MAIN CONDUCTORS. RETAIN DOWN

COVER

ACCESS

LADDER

CHIMNEY

EXHAUST

FURNACE

COVER

ACCESS

LADDER

CHIMNEY

EXHAUST

FURNACE

LOCKER

FUEL TANK

HATCH COVER

IN FLOOR

LADDER

ACCESS

COVER

DOWN

GUARD RAIL

FLOAT WELL

CABINET

U N

IT

H E A T E R

CEILING HEIGHT 114"

LADDER

ACCESS

DOWN

LADDER

HATCH

THROUGH

CEILING

LADDER

ACCESS

DOWN

GUARD RAIL

GUARD RAIL

FROM CEILING

CONDUITS SUSPENDED

OPERATING LEVEL

EXISTING LIGHT SWITCH

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

C O

N C

O R

D

M A

-2

V

IR

G

IN

IA

R

O A

D

N E

W E

N G

L A

N D D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D R

A W

IN

G C

O D

E

S C

A L E

S H

E E

T

A -H

V -1

O X

F O

R D

M A

S S

A C

H U

S E

T T S

H O

D G

E S V

IL

L A

G E D

A M

E L E

C T

R

IC

A L U

P G

R A

D E

S

SHEET ID

®of Engineers

US Army Corps

W

W J

Q

B R

IA

N H

E A

D

B R

IA

N H

E A

D

A N

S I

D

E L E

C T

R

IC

A L

L

IG

H T

IN

G

IN

S

T A

L L

A T

IO

N

C1 0 2' 4'1'SCALE: 1/2" = 1' - 0"

C6

SCALE: 1/2" = 1' - 0" 0 2' 4'1'

KEYED NOTES:

1 1

N N

J

C L

IN

E

E-103

:1

M A

R C

H

LIGHTING PLAN INSTALLATION OPERATOR'S LEVEL LIGHTING PLAN INSTALLATION LOWER LEVEL

J S

W A

L L E

Y S

NOTE FOUR. MOUNT LIGHT TROFFERS AGAINST CEILING.

AND WIRE BACK TO SOURCE THROUGH SWITCH INSTALLED PER KEYED

PROVIDE LIGHT TROFFER PER SPECIFICATION 26 20 00. PROVIDE CONDUIT

PER KEYED NOTE FIVE ON THE LOWER LEVEL.

CONDUIT AND WIRE BACK TO SOURCE AND TO LIGHT TROFFERS INSTALLED

PROVIDE TOGGLE LIGHT SWITCH AS SPECIFIED IN 26 20 00. PROVIDE

ILLUMINATES WHEN NORMAL POWER FAILS.

OTHER LIGHTS ON EACH LEVEL AND WIRED SUCH THAT THE LIGHT

SPECIFICATION 26 20 00. EMERGENCY LIGHT MUST BE SWITCHED WITH THE

EMERGENCY LIGHT TO BE EQUIPPED WITH BATTERY BACKUP PER

COMPLETE.

ANCHORS, SUPPORTS, ETC AS REQUIRED TO MAKE THE INSTALLATION

FINISHED FLOOR. LOCATION INDICATED IN APPROXIMATE. PROVIDE

WALL USING EXISTING MOUNTING PLATE LOCATED SIX FEET ABOVE

INSTALLED ON THE ROOF ABOVE THE ENTRY. INSTALL LIGHT ON EXTERIOR

AND WIRE BACK TO SOURCE WIRED THROUGH EXISTING MOTION SENSOR

PROVIDE EXTERIOR LIGHT PER SPECIFICATION 26 20 00. PROVIDE CONDUIT

TROFFERS AGAINST CEILING 11' ABOVE THE FINISHED FLOOR.

AND WIRE BACK TO SOURCE THROUGH EXISTING SWITCH. MOUNT LIGHT

PROVIDE LIGHT TROFFER PER SPECIFICATION 26 20 00. PROVIDE CONDUIT

KEYED NOTES CONTINUED:

NOTE TWO.

BACK TO SOURCE AND OUT TO LIGHTS INSTALLED PER KEYED

TOP OF THE ROOF PARAPET WALL. PROVIDE CONDUIT AND WIRE

PHOTOCELL PER SPECIFICATION 26 20 00. INSTALL SWITCH ON

PROVIDE EXTERIOR MOTION SENSOR LIGHT SWITCH WITH 6

M

A R

A D

D L

IG

H T S

W

IT

C H L

O W

E R L

E V

E L A

N D E

X T M

O T

IO

N S

E N

S R

O R

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

C O

N C

O R

D

M A

-2

V

IR

G

IN

IA

R

O A

D

N E

W E

N G

L A

N D D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D R

A W

IN

G C

O D

E

S C

A L E

S H

E E

T

A -H

V -1

O X

F O

R D

M A

S S

A C

H U

S E

T T S

H O

D G

E S V

IL

L A

G E D

A M

E L E

C T

R

IC

A L U

P G

R A

D E

S

SHEET ID

®of Engineers

US Army Corps

W

W J

Q

D

H A

S S

E T

T

A N

S I

D

E-501

SYSTEM GROUNDING DETAIL

SCALE: N.T.S.

A1

25.6 2.0

23.5 1.8

21.1 1.5

4.2

VOLTAGE

(INCHES)

BOUNDARY

APPROACH

(CAL/cm2)

ENERGY

INCIDENT

23.4 1.8

CONDUIT AND CABLE SCHEDULE

VOLTAGE

CONDUCTORS

OF

NUMBER

(AWG)

SIZE

WIRE

(AWG)

SIZE

GROUND

SIZE -TYPE

CONDUIT

LENGTH

APPROX.

CONDUIT AND CABLE SCHEDULE NOTES

SOURCE LOAD

3.0"-RGS

30'

120/208V 10'

120/208V

120/208V

SERVICE ENTRANCE DISCONNECT N/A

PANEL MDP

PANEL MDP

120/208V

120/208V

120/208V

120/208V

2/0 2.0"-RGS

2/0

1.5"-RGS

10'

20'

BRANCH CIRCUITS (NOTE 2) 120/208V

SEE PLANS

AS RQRD

GENERATOR 4 6120/208V 20'0.75"-RGS

EQUIPMENT

PANEL MDP

NOTE:

STEEL COLUMN

#4 MIN.

A B C

A B C

GN

55 KW GENERATOR SET

(EXISTING)

PHASE AND NEUTRAL 2/0

(NOT EXISTING, CONTRACTOR TO PROVIDE)

#6 EQUIPMENT GROUNDING CONDUCTOR

DERIVED SYSTEM.

GROUNDED AS A SEPARATELY

VERIFY GENERATOR IS NOT

SWITCH

TRANSFER

AUTOMATIC

SECONDARY

TRANSFORMERS

POLE MOUNTED

SOCKET

METER

A B C

G

N

PHASE AND NEUTRAL #2/0

150A FUSE

MANHOLE

DISCONNECT

SERVICE

TIGHT SEAL

WATER AND RODENT

TIGHT SEAL

WATER AND RODENT

CONDUCTOR

GROUNDING

#6 EQUIPMENT

PHASE AND NEUTRAL #2/0

N G

CBA

UTILITY CONDUCTORS

PHASE AND NEUTRAL

EXISTING

#2/0 CONDUCTORS

PHASE AND NEUTRAL

EXISTING

#4 MIN.

SYSTEM BONDING JUMPER

CONDUCTOR

GROUNDING

#6 EQUIPMENT

UTILITY METER

SERVICE ENTRANCE DISCONNECT

PANEL MDP

PANEL MDP

ATS

ATS

PANEL MDP

BLOCK HEATER

BATTERY CHARGER

GATE HOIST #1

GATE HOIST #2PANEL MDP

ATS

PANEL MDP

PROJECT OFFICE

120/208V 2/0 720'

2.0"-RGS

3 3150'

12 0.75"-RGS

12 0.75"-RGS

3 10 10 25'

3 10 10 20'

2 12 12

2/0

UTILITY METER 120/208V

SERVICE ENTRANCE DISCONNECT 120/208V

ATS

GENERATOR

120/208V

120/208V

120/208V

120/208V 8.3 0.3PROJECT OFFICE PANEL

120/208V 20.7 1.5GATE HOIST #1

120/208V 21.4 1.5GATE HOIST #2

J

C L

IN

E

M A

R C

H

B

H E

A D

:1

1ARC FLASH LABELS SCHEDULE

A N

D C

O N

D U

IT

S

C H

E D

U L E

REVIEW PRIOR TO GENERATING AND PLACING ARC FLASH LABELS.

INDEPENDENT ARC FLASH RISK ASSESSMENT AND SUBMIT RESULTS FOR

ARC FLASH LABEL MAY NOT BE ACCURATE. CONTRACTOR MUST CONDUCT AN

AND USED OTHER THAN THOSE SPECIFICALLY IDENTIFIED IN THE SPECS, THIS

IF DIFFERENT WIRE OR OVERCURRENT PROTECTIVE DEVICES ARE APPROVED

A R

C F

L A

S H L

A B

E L

S Y

S T

E M G

R O

U N

D

IN

G D

E T

A

IL

PANEL MDP 120/208V 3 4 8 1.0"-RGSUNIT HEATER 40'

0.75"-RGS

0.75"-RGS

0.75"-RGS

ADDITION TO THE CURRENT CARRYING CONDUCTORS.

3. NUMBER OF CONDUCTORS IS THE NUMBER OF CURRENT CARRYING CONDUCTORS, THE GROUND WIRE IS IN

2. REFEED CIRCUITS SHOWN ON PANEL SCHEDULE, SEE SHEET E-601.

1. LENGTH ON THIS SCHEDULE IS APPROXIMATE, CONTRACTOR SHALL CONFIRM LENGTH IN THE FIELD.

SEE PANEL SCHEDULE SHEET E-601.

PANEL-MDP

CONTRACT)

EXISTING (NOT IN

CONTRACT)

EXISTING (NOT IN

J S

W A

L L E

Y

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

C O

N C

O R

D

M A

-2

V

IR

G

IN

IA

R

O A

D

N E

W E

N G

L A

N D D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D R

A W

IN

G C

O D

E

S C

A L E

S H

E E

T

A -H

V -1

O X

F O

R D

M A

S S

A C

H U

S E

T T S

H O

D G

E S V

IL

L A

G E D

A M

E L E

C T

R

IC

A L U

P G

R A

D E

S

SHEET ID

®of Engineers

US Army Corps

W

W J

Q

CKT#

AMPS POLES DESCRIPTION CKT# AMPS POLES DESCRIPTION

NORMAL

SWBD

GE GGB 800A FRAME

120/208V 3-PHASE 4-WIRE

125 MCB 50 KAIC

FED FROM: GENERATOR & UTILITY

REMARKS: TWO INTERLOCKED MAIN BREAKERS

SWITCHGEAR: UTILITY

LOCATION: MAIN LEVEL

340 GATE #1 (ON) 340 GATE #2 (ON)

215 SPARE (ON)

BLOCK HEATER (OFF)

BATTERY CHARGER (ON)

SUB PANEL (ON)SURGE PROTECTIVE DEVICE (ON)

100 GARAGE/OFFICE (ON)

BLANK

NOT LABELED (ON)

CKT#

AMPS POLES DESCRIPTION CKT# AMPS POLES DESCRIPTION

NORMAL150A MCB 10 KAIC

120/208V 3-PHASE 4-WIRE MDP

SWITCHGEAR: UTILITYFED FROM: UTILITY

REMARKS: FED VIA ATS

LOCATION: OPERATOR LEVEL

340 GATE #1 (ON)

SURGE PROTECTIVE DEVICE (ON)

100 GARAGE/OFFICE (ON)

BLANK

NOT LABELED (ON)

340 GATE #2 (ON)

215 SPARE (ON)

BLOCK HEATER (OFF)

BATTERY CHARGER (ON)

20 1

20 1

FLOOD LIGHTS NORTH (ON)

FLOOD LIGHTS SOUTH (ON)

DAMPER MOTOR (ON)

OIL BURNER (ON)

SPARE (ON)

DAMPER GENSET INTAKE (ON)

20 1

20 1

20 1

FLOOR LIGHTS MAIN (ON)

LIGHTS BELOW 2ND & 3RD (ON)

LIGHTS BELOW 4TH & 5TH (ON)

ENTRANCE LIGHTS (ON)

RECEPTACLES OPERATIONS FLOOR (ON)

20 1

SPARE (OFF)

SPARE (OFF)

SPARE (OFF)20 1

SPARE (OFF)

SPARE (OFF)

SPARE (OFF)

SPARE (OFF)

UNIT HEATER (ON)

SQUARE D I-LINE

20 1

CKT#

AMPS POLES DESCRIPTION CKT# AMPS POLES DESCRIPTION

NORMAL

LOCATION: ENTRY DOOR

225A MLO - KAIC

120/208V 3-PHASE 4-WIRE

20 1

20 1

20 1

20 1

EATON POWERLINE PRL1A

SUB PANEL

REMARKS:

FED FROM: SWBD BKR 1,3,5 SWITCHGEAR: UTILITY

FLOOD LIGHTS NORTH (ON)

FLOOD LIGHTS SOUTH (ON)

DAMPER MOTOR (ON)

OIL BURNER (ON)

SPARE (ON)

DAMPER GENSET INTAKE (ON)

20 1

20 1

NOT LABELED (ON)

NOT LABELED (OFF)

NOT LABELED (ON)

NOT LABELED (ON)

NOT LABELED (ON)

NOT LABELED (ON)

NOT LABELED (ON)

NOT LABELED (ON)

NOT LABELED (ON)

FLOOR LIGHTS MAIN (ON)

LIGHTS BELOW 2ND & 3RD (ON)

LIGHTS BELOW 4TH & 5TH (ON)

ENTRANCE LIGHTS (ON)

RECEPTACLES OPERATIONS FLOOR (ON)

ABANDONED (ON)

20 1

20 1

120 NOT LABELED (ON)

NOT LABELED (ON)

NOT LABELED (ON)

NOT LABELED (ON)

NOT LABELED (ON)

NOT LABELED (ON)

NOT LABELED (ON)

20 1

120 NOT LABELED (ON)

NOT LABELED (ON)

B R

IA

N H

E A

D

B R

IA

N H

E A

D

A N

S I

D

E-502

E L E

C T

R

IC

A L

P A

N E

L S

C H

E D

U L E

S

E1

PANEL SCHEDULES DEMOLITION

SCALE: NOT TO SCALE

B1

PANEL SCHEDULE INSTALLATION

SCALE: NOT TO SCALE

J

C L

IN

E

SUBMIT A LIST OF THE UNLABELED BREAKERS IN USE TO THE GOVERNMENT.

NOTE: CONTRACTOR SHALL INVESTIGATE PANEL TO DETERMINE IF THE UNLABELED BREAKERS ARE IN USE.

D E

M O

L

IT

IO

N A

N D I

N S

T A

L L

A T

IO

N :1

M A

R C

H

J S

W A

L L E

Y S

C

O R

R E

C T M

A

IN

B

R E

A K

E R S

IZ

E A

P R

IL

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

C O

N C

O R

D

M A

-2

V

IR

G

IN

IA

R

O A

D

N E

W E

N G

L A

N D D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

D R

A W

IN

G C

O D

E

S C

A L E

S H

E E

T

A -H

V -1

O X

F O

R D

M A

S S

A C

H U

S E

T T S

H O

D G

E S V

IL

L A

G E D

A M

E L E

C T

R

IC

A L U

P G

R A

D E

S

SHEET ID

®of Engineers

US Army Corps

W

W J

Q

SPDNOT LABELEDSPARE SPARE

UTILITY METER

GENERATOR

GATE HOIST#1 GATE HOIST #2

UTILITY PRI

UTILITY SEC

BATTERY CHARGERBLOCK HEATER

SERVICE ENTRANCE

PANEL

P.O. PANEL

ATS

GATE HOIST #1

5 HP

Induction

GATE HOIST #2

5 HP

Induction

GENERATOR

55 kVA

UTILITY

BATTERY CHARGER

0.5 Amps

BLOCK HEATER

0.5 Amps

SINGLE PHASE LDS

6.18 kVA

UTILITY XFMR

45 kVA

13.2 - 0.208 kV

1%

1-1/C-2/0 AWG

CU, 720', [Conduit]

1-1/C-2/0 AWG

CU, 20', [Conduit]

1-1/C-10 AWG

CU, 25', [Conduit]

1-1/C-10 AWG

CU, 18', [Conduit]

1-1/C-350 kcmil

CU, 210', [Conduit]

1-1/C-12 AWG

CU, 10', [Conduit]

1-1/C-12 AWG

CU, 20', [Conduit]

1-1/C-2/0 AWG

CU, 30', [Conduit]

1-1/C-2/0 AWG

CU, 10', [Conduit]

SQD HD

150/150

(Generic) 150 AF

150/125

SQD KA

250/100

SQD QO-EPD - 2P

60/30

OPEN

SQD QO-EPD

60/30

SQD QO-EPD - 2P

60/15

SQD QO-EPD - 2P

60/15

SQD QO-EPD

60/30

SQD QO-EPD

60/30

SQD QO-EPD

60/40

SQD QO-EPD

60/40

BUSS FRS-R(RK5)

150A~

1-1/C-3 AWG

CU, 3150', [Conduit]

PANELBOARD

B R

IA

N H

E A

D

B R

IA

N H

E A

D

A N

S I

D

E-601

E L E

C T

R

IC

A L

O N

E L

IN

E D

IA

G R

A M

IN

S

T A

L L

A T

IO

N

KEYED NOTES:

B1

SCALE: NOT TO SCALE

ONE LINE DIAGRAM INSTALLATION

J

C L

IN

E

J S

W A

L L E

Y

:1

M A

R C

H

REQUIRED.

AS INDICATED ON SHEET E-101. PROVIDE CONDUIT AND WIRE AS

INSTALL BATTERY CHARGER RETAINED PER SHEET ED-601 KEYED NOTE 2

SWITCHBOARD AND LIGHTING PANEL, SEE SHEET ED-601.

POWER TO BRANCH CIRCUITS POWERED FROM DEMOLISHED

INSTALLED PER KEYED NOTE 2. PROVIDE CONDUIT AND WIRE TO RESTORE

PANEL SCHEDULE SHEET E-501. PROVIDE CONDUIT WIRE BACK TO ATS

PROVIDE PANELBOARD AS SPECIFIED IN 26 20 00 AND AS INDICATED IN

GENERATOR.

PER KEYED NOTE 1. PROVIDE CONDUIT AND WIRE BACK TO EXISTING

PROVIDE CONDUIT AND WIRE BACK TO SERVICE DISCONNECT INSTALLED

PROVIDE AUTOMATIC TRANSFER SWITCH, ATS, AS SPECIFIED IN 26 20 00.

SEAL CONDUIT WITH RODENT PROOF AND WATER TIGHT SEALANT.

STEEL CONDUIT FROM DISCONNECT BACK TO CONDUIT PENETRATION.

CONDUCTORS ON THE LINE SIDE OF THE DISCONNECT. PROVIDE RIGID

THE INDICATED FUSES. TERMINATE EXISTING UTILITY FEEDER

PROVIDE FUSIBLE SERVICE DISCONNECT PER SPECIFICATION 26 20 00 WITH

Plans REVISED.pdf
THA-HV-119_G-001
THA-HV-119_E-001
THA-HV-119_ED-101
THA-HV-119_ED-102
THA-HV-119_ED-601
THA-HV-119_E-101
THA-HV-119_E-102
THA-HV-119_E-103
THA-HV-119_E-501
THA-HV-119_E-502
THA-HV-119_E-601
Information Drawings.pdf
THA-1-1424
TH-1-1446.046
THA-77

File details come from the government source that posted it.