Cost Estimate Template

View the file

Other files

File Type Posted
W912WJ18R0021_Solicitation.pdf PDF
Attachment-4_Wage_Rates_final.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tasks

Project:
Description:
Contract No:
Prepared by:
Date
Field EffortData AnalysisReporting
CategoryUnit RateUnitTask 1aTask 1bTask 1cBASE TASKS CATEGORY TOTALS
(quantity)($)(quantity)($)(quantity)($)(quantity)($)
Labor
Labor Category$0.00hr$0.00$0.00$0.000$0.00
Labor Category$0.00hr$0.00$0.00$0.000$0.00
Labor Category$0.00hr$0.00$0.00$0.000$0.00
SubTotal Labor Costs$0.00$0.00$0.000$0.00
Resources
Resource Category$0.00day$0.00$0.00$0.000$0.00
Resource Category$0.00ea$0.00$0.00$0.000$0.00
Resource Category$0.00day$0.00$0.00$0.000$0.00
SubTotal Resources$0.00$0.00$0.000$0.00
Travel
Travel Category$0.00ea$0.00$0.00$0.000$0.00
Travel Category$0.00mi$0.00$0.00$0.000$0.00
Travel Category$0.00day$0.00$0.00$0.000$0.00
SubTotal Travel$0.00$0.00$0.000$0.00
Subcontractor Labor
Labor Category$0.00hr$0.00$0.00$0.000$0.00
Labor Category$0.00hr$0.00$0.00$0.000$0.00
Labor Category$0.00hr$0.00$0.00$0.000$0.00
SubTotal Labor$0.00$0.00$0.000$0.00
Subcontractor Resources
Resource Category$0.00day$0.00$0.00$0.000$0.00
Resource Category$0.00ea$0.00$0.00$0.000$0.00
Resource Category$0.00day$0.00$0.00$0.000$0.00
SubTotal Resources$0.00$0.00$0.000$0.00
Subcontractor Travel
Travel Category$0.00ea$0.00$0.00$0.000$0.00
Travel Category$0.00mi$0.00$0.00$0.000$0.00
Travel Category$0.00day$0.00$0.00$0.000$0.00
SubTotal Travel$0.00$0.00$0.000$0.00
Laboratory Analysis
Analysis Category$0.00ea$0.00$0.00$0.000$0.00
Analysis Category$0.00ea$0.00$0.00$0.000$0.00
Analysis Category$0.00ea$0.00$0.00$0.000$0.00
SubTotal Analysis$0.00$0.00$0.000$0.00
TASK TOTALS
Labor SubTotal0$0.000$0.000$0.00
Resources SubTotal$0.00$0.00$0.00
Travel SubTotal$0.00$0.00$0.00
Analysis SubTotal$0.00$0.00$0.00
TASK FEE
Labor%9$0.008$0.009$0.00
Resources%9$0.008$0.009$0.00
Analysis%9$0.008$0.009$0.00
(no fee on travel)
SUBTOTAL$0.00$0.00$0.00$0.00
FEE$0.00$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
Task 1a$0.00$0.00
Task 1b$0.00$0.00
Task 1c$0.00$0.00
TOTALS$0.00$0.00
TOTAL CONTRACT AMMOUNT$0.00

Fee Calculator

Project:0
Description:0
Contract No:0
Prepared by:0
Date12/31/99
Profit- Alternate Structured Approach to Weighted Guidelines
(EFARS 15.973-101)
Assures:1. Consideration of the relative value of the appropriate factors in the establishment of profit objective.
2. A basis for documentaion of the profit objective.
FACTORRANGEValue
Task 1aTask 1bTask 1c
TECHNICAL COMPLEXITY5% to 10%

LENGTH FACTOR 2% to 4%

SUPPORT OF SOCIOECONOMIC PROGRAMS 0% to 25

FCCM (Deduct) (use negative number) 0% to -1%

TOTAL 0 0 0

Notes:
1. Technical complexity factor varies from 5% for low complexity projects to 10% for high complexity. Factors to be considered inlcude: nature of the work, degree of management, schedule constraints & amount of gov't assistance.
2. Length Factor = 2% for contract of 1 month or less, and increases proportionally to 4% for a cotnract of 21 months or longer.
3. Support of socioeconomic programs factor varies from 0% for a prime contractor with no subcontracting to 2% for a contractor with demonstrates excellent program support.
4. Profit percentage shall be reduced by the factilities capital cost of money (FCCM) factor which shall be:
- 0% if the contract down not have FCCM, otherwise
-The actual FCCM costs (as applied as a percentage of total costs) or 1% of the total costs, whichever is lower.