Amendment_0002.pdf
PDF 47 KB Posted
- Solicitation number
- W912WJ18R0007
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Synopsis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information Amendment 0002 to W912WJ18R0007
5. Where should the certifications that are required be included in the proposal? In an appendix?
As there appears to be a minimum of approximately 20, please verify that these Certifications do not count against the maximum 50 page sheet count for Part I.
RESPONSE: Copies of certifications are not required to demonstrate professional qualifications specified in 3b. If they are provided they will count against the specified page limitation. In Part H of the SF330, indicate how the contractor’s team meets the minimum requirements specified in part 3b of the solicitation.
6. Can resumes beyond the mandatory resumes be included, as long as one stays within the 50 page limit for Part I?
RESPONSE: Yes, after providing the mandatory resumes, additional resumes may be submitted though it does count against the page limit.
7. For Section G, can names of additional staff included in the Org. Chart, but without resumes provided in Section E due to space constraints, be included in the matrix?
RESPONSE: Yes, contractor may list names of additional staff in Section G of the SF 330.
8. The RFP calls for Professional Engineer licensures, but no specific state(s) are given.
Therefore can you confirm that the state of these registrations does not matter?
RESPONSE: No specific state required.
File details come from the government source that posted it.