Solicitation_W912WJ18Q0149.pdf

PDF 1 MB Posted

Attached to
WTL Gate Valves and Hydraulic Pipes Replacement
Solicitation number
W912WJ18Q0149
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Amendment_W912WJ18Q0149-0004.pdf PDF
Amendment_W912WJ18Q0149-0003.pdf PDF
Amendment_0002_Drawing.pdf PDF
Amendment_W912WJ18Q0149-0002.pdf PDF
Amendment_W912WJ18Q0149-0001.pdf PDF
Photos.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEST THOMPSON PROJ OFC

MICHELE CUCCHI

RFD #1

N. GROSVENORDALE CT 06255-9801

TEL: 860-923-1126 FAX:

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W912WJ18Q0149 16-Aug-2018 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

27-Aug-2018(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

978-318-8269GUESLEY LEGER

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W912WJ18Q0149

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job West Thompson Lake Valves and Pipes

FFP

The contractor shall furnish all equipment, materials, and labor for the replacement of hydraulic gate valves and hydraulic pipes at West Thompson Lake; West Thompson Lake Intake Tower, in accordance with the attached Scope of Work.

FOB: Destination

NET AMT

QUOTATION INSTRUCTIONS

*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE

52.236-27 FOR ADDITIONAL INFORMATION. Offerors are notified that the basis for award is price alone.

*PLEASE DIRECT QUESTIONS TO GUESLEY LEGER AT guesley.leger@usace.army.mil. ANY

INFORMATION RECEIVED AT THE SITE VISIT WHICH CONFLICTS WITH THIS SOLICITAION

SHOULD BE BROUGHT TO THE ATTENTION OF MR. LEGER. THE SOLICITATION AND RESULTING

CONTRACT SHALL BE THE GOVERNING DOCUMENT IN ALL CASES.

** QUOTES CAN BE FAXED OR E-MAILED TO GUESLEY LEGER AT (978) 318-8207 or guesley.leger@usace.army.mil. E-mail is the preferred method.

NOTE 1: In accordance with FAR Part 28.102-1(b)(1), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.

(i) Payment bond

(ii) Irrevocable letter of credit

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

NOTE 2:

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company name and credentials/qualifications:

2. Contractors must be registered in the System for Awards Management (SAM) database (www.SAM.gov) to receive an award. (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.

SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks. SAM.gov registration does not have to be “active” to be able to submit a quote. However, contractors must have an active record before a contract award can be made. If SAM.gov registration is not completed in a timely fashion in accordance with the SAM.gov timelines, the Government reserves the right to disqualify the quote in accordance with FAR 52.204-7(d).

Contractors should note that 30 September is the end of the Government fiscal year. As that date approaches, the Government will be unable to delay year-end contract awards and will have to disqualify contractors without an active SAM.gov registration. If you have any questions, please contact the aforementioned point of contact.

3. Provide business DUNS number: _______________________________ (phone 800- 333-0505 for DUNS).

4. Provide business CAGE code: __________________________________

5. Tax Identification Number: ___________________________________

6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above)

7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful offeror will be required to submit this document upon award. The APP must be accepted by the Government Designated Authority prior to the preconstruction conference.

Section C - Descriptions and Specifications

SOW

REPLACE GATE VALVES and HYDRAULIC PIPES

U.S. ARMY CORPS OF ENGINEERS

WEST THOMPSON LAKE, NORTH GROSVENORDALE, CT

Scope of Work

I. OVERVIEW

Scope of work

Furnish all equipment, materials and labor for the replacement of hydraulic gate valves and hydraulic pipes at West Thompson Lake; West Thompson Lake Intake Tower. Replacement of gate valves and hydraulic pipes is to be performed for the purpose of facility maintenance.

1. Location West Thompson Dam – 162 West Thompson Rd., North Grosvenordale, CT 06255

2. Site Visit

Contact the Technical Point of Contact - Marc D’Amato, Park Ranger – via desk phone

(978) 318-8898, cell phone (508)209-4322, or email marc.a.damato@usace.army.mil to arrange a site visit.

3. Schedule The period of performance for work to be completed is no later than 120 days after notice to proceed. The Gate House will be accessible for work Monday through Friday 8:00 AM to 3:00 PM. No work shall be done on weekends or Government holidays. All work must be done during those hours, unless additional hours are approved by the Technical Point of Contact.

4. Safety The contractor will comply with all pertinent provisions of the latest edition of the U.S. Army Corps of Engineers Safety and Health Requirements COE EM 385-1-1. A copy of COE EM 385-1-1 is available for reference at the project office or may be viewed at the following link:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf

The contractor shall also comply with all OSHA work safety standards. The project staff can and will order the cessation of work at any time should the safety of employees and visitors become jeopardized.

5. Pre-work Conference

Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Pre-work Conference.” The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the Government Technical Point of Contact and the Contractor.

No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work conference the contractor shall provide to the name of the project superintendent with a telephone number and email address for project coordination.

The following is a general list of items for discussion during this Preconstruction

Conference:

i. Authority of the Technical Point of Contact and Quality Assurance

Inspectors.

ii. Contractor’s Safety Program (including sub-contractors).

iii. Accident Prevention Plan and Activity Hazard Analysis

iv. Safety Meetings (Documented on NED Form 251)

v. Accident Reporting (ENG Form 3394)

vi. Safety Data Sheet (SDS) requirements

vii. Correspondence, Communication and Administrative Procedures.

viii. Invoice and payment.

6. Permits The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

7. Security

The contractor will comply with all established security policies at the West Thompson Lake project. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent service. The Contractor shall be given a minimum 24-hour notice of any such closure.

8. Contractor Conduct Alcohol and firearms are prohibited on project grounds. Contractor and employees must comply with CFR 36 Rules and Regulations. A copy of CFR 36 Rules and Regulations is viewable at:

http://www.mvr.usace.army.mil/Portals/48/docs/Recreation/ODS/Regulations/RulesandRegu lations.pdf

9. Payment

Payment on this contract will be made after final inspection and acceptance by the Government. The contractor will furnish the Technical Point of Contact with an accurately detailed invoice, broken down by line item, stating the services performed and material quantities used, as well as the amount to be paid by the Government to the Contractor.

Payment shall be made for the actual services performed at the applicable contract price.

Invoice may be mailed to:

West Thompson Lake (Attn. Marc D’Amato) 449 Reardon Rd.

North Grosvenordale, CT 06255 Or emailed to marc.a.damato@usace.army.mil Or faxed to the Park Office at (860) 923-1126 (Attn: Marc D’Amato)

II. TECHNICAL REQUIREMENTS

GENERAL

Requests for Information:

Requests concerning the work of this project should be directed to the Technical Point of Contact

– Marc D’Amato, Park Ranger - at the West Thompson Lake Project Office at (978)318-8898 or via email at marc.a.damato@usace.army.mil.

Submittals:

Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures.

The documents identified below must be prepared in accordance with the applicable standards, submitted for review and accepted by the government prior to the commencement of any field activities:

Proposal and drawings for modifications to gate stem(s) and/or hydraulic pipes Manufacturer Warranty documents for all materials, including Safety Data Sheets

(SDS)

Environmental Protection Plan Accident Prevention Plan (APP) – Prior to the start of field work Activity Hazard Analysis (AHA) – Prior to the start of field work Flushing Plan – 7 days prior to cleaning operations As-Built Sketch: Sketch shall show the changes (both additions & deletion) to the hydraulic system completed during the contract and the relationship to the existing system. The Sketch shall include sufficient detail and labeling to clearly identify the work completed during the contract. The sketch may be computer generated or drawn by hand and shall be on a paper size no smaller than 8.5 inches x 11 inches.

Clean Up:

The Contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials.

Upon completing work in an area the contractor shall remove any tools, equipment, and materials that are not the property of the government. Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.

Government Resources:

The contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, telephone services or other resources. The contractor may use the restroom at the West Thompson Lake, but must coordinate this with project staff, and must proceed directly to and from the restroom.

Omissions:

This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

Quality Assurance:

The contractor is responsible for the quality control of the contract work. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

Other Contracts:

The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor, or by Government employees.

Receiving and Storing Materials:

The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material or supplies for the contractor and will not be responsible for damage to contractor equipment or material.

Project/Site Conditions and Operational Restrictions Flow through West Thompson Dam is controlled by three hydraulically operated slide gates located underneath the intake tower. Hydraulic cylinders are located in the gate chamber at the base of the gate tower. The hydraulic power units (pumps, motors and tank) and gate control valves are located on the operating floor. The gates and the hydraulic system are over 50 years old.

At West Thompson Dam the power units are connected by a single supply pipe so work must be scheduled to minimize down time. The contractor shall provide a means to operate at least one in gate at West Thompson Dam in an emergency flood control situation with 24-hour notice.

Full system shutdown will be permitted for a short time period to allow replacement of system components.

In the event that it becomes necessary to operate the reservoir for flood risk management purposes, the Contractor will be given a minimum 24-hours advance notice. Upon such notification, the Contractor shall suspend construction operations, and take such other actions and perform such additional work as directed by the Technical Point of Contact to prepare the dam for flood risk management operations.

Environmental Protection:

The purpose of the Environmental Protection Plan is to present a comprehensive overview of known or potential environmental issues which the Contractor must address during construction.

Issues of concern shall be defined within the Environmental Protection Plan as outlined in this section. The Contractor shall address each topic at a level of detail appropriate with the environmental issue and required construction task(s). Topics or issues which are not identified in this section, but which the Contractor considers necessary, shall be identified and discussed after those items formally identified in this section.

A. Compliance

No requirement in this Section shall be construed as relieving the Contractor of any applicable Federal, State, and local environmental protection laws and regulations. During construction, the Contractor shall be responsible for identifying, implementing, and submitting for approval any additional requirements to be included in the Environmental Protection Plan.

B. Contents The environmental protection plan shall include - but shall not be limited to - the following, as appropriate for the work:

1. Name(s) of person(s) within the Contractor's organization responsible for ensuring adherence to the Environmental Protection Plan.

2. Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site, if applicable.

3. Spill Control plan shall include the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, 40CFR 355, and/or regulated under State or Local laws and regulations. The Spill Control Plan supplements the requirements of EM 385-1-1. At minimum, this plan shall include:

i. The name of the individual who will report any spills or hazardous substance releases and who will follow up with complete documentation. This individual shall immediately notify the Technical Point of Contact and Environmental Protection Specialist in addition to the legally required Federal, State, and local reporting channels (including the National Response Center 1-800-424-8802) if a reportable quantity is released to the environment.

The plan shall contain a list of the required reporting channels and telephone numbers.

ii. The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup.

iii. Training requirements for Contractor's personnel and methods of accomplishing the training.

iv. A list of materials and equipment to be immediately available at the job site, tailored to cleanup work of the potential hazard(s) identified.

v. The names and locations of suppliers of containment materials and locations of additional oil recovery, cleanup, restoration, and material-placement equipment available in case of an unforeseen spill emergency.

vi. The methods and procedures to be used for expeditious contaminant cleanup.

4. A non-hazardous solid waste disposal plan identifying methods and locations for solid waste disposal. The plan shall include schedules for disposal. The Contractor shall identify any subcontractors responsible for the transportation and disposal of solid waste.

Licenses or permits shall be submitted for solid waste disposal sites that are not a commercial operating facility.

Evidence of the disposal facility's acceptance of the solid waste shall be attached to this plan during the construction.

Damage to Government and Private Property The Contractor shall be responsible for restoring and Government facilities or structures damaged as a result of the firm’s operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm’s operation. The Contractor shall notify the Project Manager immediately of damage to Government and private property and injury to any person resulting from the firm’s operation.

Contractor Qualifications The contractor will have a minimum of five (5) years of experience working with service and repair of hydraulic systems.

PRODUCTS

General Provide materials and mechanical equipment that conform to the requirements indicated or specified, and if not specified, furnish materials and mechanical equipment of the best commercial grade quality suited to the intended use and as approved. The manufacturer's name, address, and catalog number shall be permanently displayed on a nameplate securely attached to each major item of equipment when applicable.

Standard Products All equipment and materials provided shall be the standard products of a reputable manufacturer who has been regularly engaged in the commercial production of similar products for a period of at least five (5) years prior to the award of this contract. All material, supplies and equipment provided shall compatible, meeting or exceeding the current capacity and pressure ratings.

New gate valves, hydraulic pipes, elbows, pipe brackets, connections, and any other associated parts must meet or exceed current industry standard and, where applicable, shall be suitable for use with hydraulic oil and shall withstand pressures of at least 1,000 psi.

The contractor shall provide a sufficient amount of hydraulic fluid to make up any losses resulting from work done on the system. Replacement hydraulic fluid shall be new and must meet or exceed current hydraulic oil standards and be compatible with existing hydraulic system components. The current hydraulic oil is Amalie All Climate 150 Hydraulic Oil which is an all-weather type that has a high viscosity index, low pour point, and antifoam properties. The hydraulic fluid shall be delivered to the site in unopened containers with factory seals intact. Containers shall be clearly labeled.

Existing gate valves and hydraulic pipes are shown in reference drawings.

EXECUTION

Demolition:

The contractor shall remove and properly dispose of existing gate valves and hydraulic pipe sections (specified in reference photos below), hydraulic fluid lost while disconnecting the valves, and any associated parts not being reused.

Installation:

Install the equipment specified to complete the hydraulic power systems for operation of the gates. Installation of all components shall be in accordance with the manufacturer's recommendation and industry standards.

Flushing the system During assembly, avoid the entrance of abrasives, dirt, metal chips, and other foreign materials into the hydraulic system through open ends of piping, tubing, and ports of the components. Submit a detailed procedure for cleaning and flushing the system no less than 7 days before start of cleaning operations. The procedure shall include a detailed description of the equipment, materials, formulations of cleaning agents, solution temperatures, duration of each phase of the cleaning operation, method of removal of cleaning agents, and method of drying after cleaning. When flushing is completed, the system shall be drained and then filled with the specified hydraulic fluid.

Filling and Bleeding the System After refilling, the system shall be bled of air, operated, and periodically bled during operation to remove any air that might have been trapped in the system. Care shall be taken to exclude as much air as possible during refilling.

Painting All exposed exterior surfaces of assemblies and equipment except stainless steel, synthetic rubber, and plastic, shall be shop primed and coated with a durable enamel paint which matches the existing paint scheme.

Pressure Testing & Inspection The piping system a n d c o m p o n e n t s shall be hydrostatically tested to not less than 125 percent of the design working pressure of 1,000 psi. Any equipment that might be damaged by this pressure shall be isolated or removed to prevent damage. The proof test pressure shall be maintained for 12 hours. Gate valves and any welded, flanged, flared, and threaded connections shall be carefully examined for leakage, and all lines shall be inspected for evidence of deflection caused by inadequate anchorage. No leakage or deflection will be allowed.

Final Acceptance Tests

In preparation for the final acceptance tests, and after completion of the installation and proof tests, operate the hydraulic power system to prove acceptability. Preliminary tests shall be conducted at minimum pressures and velocities until initial adjustments have been proven safe for normal operation. Details of all operations shall be constantly monitored for signs of impending trouble and corrections shall be made as necessary to prevent damage to the equipment.

At such time as the Technical Point of Contact may direct, conduct the following complete acceptance tests on the hydraulic power system for approval. Any deficiency adjustments disclosed by the tests shall be corrected immediately and the test repeated until satisfactory results are obtained. No subsequent tests will be permitted until all preceding tests have been completed satisfactorily.

Upon completion of the final acceptance tests, furnish a written statement that the hydraulic power system has been field tested and meets all operational requirements.

Initial Start-Up The hydraulic reservoir shall be inspected to ensure that the fluid is at the proper level.

Combined System Tests Tests and inspections of the hydraulic power system shall be performed concurrently with the testing specified under other sections of these specifications which test the mechanism operated by the hydraulic system. The hydraulic system shall be tested by operating the mechanism through a minimum of three complete cycles. During each test operation, the hydraulic pipes and al l other components shall be inspected for evidence of leakage. The pressure in the supply and return lines for each direction of operation shall be read and recorded. Response of components to operation of applicable controls shall be inspected to ensure that all connections have been made properly.

Test Reports Prepare and complete test reports showing in detail the results of the field tests. The test reports shall include a detailed tabulation showing values of pressures, flow rates, and all adjustments recorded.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 120 dys. ANP 1 WEST THOMPSON PROJ OFC

MICHELE CUCCHI

RFD #1

N. GROSVENORDALE CT 06255-9801

860-923-1126 FOB: Destination

961101

Section H - Special Contract Requirements

SECURITY INFORMATION

SECURITY REQUIREMENTS

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact not later than 5 calendar days after the completion of the training.

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the Technical Point of Contact no later than 3 business days after the initial award.

UAI 5152.231-9000

UAI 5152.231-9000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 199)

(a) This clause does not apply to terminations. See UAI 5152.249-9000, Basis for Settlement of Proposals, and Federal Acquisition Regulation (FAR) part 49.

(b) Allowable costs for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor’s accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor’s accounting records, costs for that equipment shall be based on applicable provisions of Engineer Pamphlet (EP) 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region I. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rated for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization

WAGE RATES

General Decision Number: CT180026 07/06/2018 CT26

Superseded General Decision Number: CT20170026

State: Connecticut

Construction Type: Heavy

Counties: Litchfield and Windham Counties in Connecticut.

HEAVY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 04/13/2018 3 05/18/2018 4 06/15/2018 5 06/22/2018 6 06/29/2018 7 07/06/2018

BRCT0001-015 01/02/2018

Rates Fringes

BRICKLAYER

BRICKLAYERS, CEMENT

MASONS, CEMENT FINISHERS,

STONE MASONS................$ 33.48 31.66

CARP0326-007 05/07/2018

Rates Fringes

CARPENTER

Carpenters, Piledrivers.....$ 32.60 25.34 Diver Tenders...............$ 32.60 25.34 Divers......................$ 41.06 25.34 Millwrights.................$ 33.14 25.74

ELEC0035-008 06/01/2018

WINDHAM COUNTY

Rates Fringes

ELECTRICIAN......................$ 40.00 3%+25.97

ELEC0042-001 09/03/2017

Rates Fringes

Line Construction: (Railroad Construction and Maintenance) Eqiupment Operator..........$ 40.96 6.5%+19.21 Groundmen...................$ 26.50 6.5%+9.00 Heavy Equipment Operators...$ 42.26 6.5%+19.88 Lineman, Cable Splicer, Technician..................$ 48.19 6.5%+22.00 Truck Driver................$ 40.96 6.5%+17.76

ELEC0090-008 06/01/2018

LITCHFIELD COUNTY

Plymouth Township

Rates Fringes

ELECTRICIAN......................$ 37.50 3%+27.91

ELEC0488-011 06/01/2018

LITCHFIELD COUNTY (Excluding Plymouth Township)

Rates Fringes

ELECTRICIAN......................$ 38.82 3%+26.25

ENGI0478-001 04/01/2018

Rates Fringes

Power equipment operators:

GROUP 1...................$ 39.55 24.05

GROUP 2...................$ 39.23 24.05

GROUP 3...................$ 38.49 24.05

GROUP 4...................$ 38.10 24.05

GROUP 5...................$ 37.51 24.05

GROUP 6...................$ 37.20 24.05

GROUP 7...................$ 36.86 24.05

GROUP 8...................$ 36.46 24.05

GROUP 9...................$ 36.03 24.05

GROUP 10...................$ 33.99 24.05

GROUP 11...................$ 33.99 24.05

GROUP 12...................$ 33.93 24.05

GROUP 13...................$ 35.46 24.05

GROUP 14...................$ 33.35 24.05

GROUP 15...................$ 33.04 24.05

GROUP 16...................$ 32.21 24.05

GROUP 17...................$ 31.80 24.05

GROUP 18...................$ 31.15 24.05

Hazardous waste premium $3.00 per hour over classified rate.

Crane with boom, including jib, 150 feet - $1.50 extra.

Crane with boom, including jib, 200 feet - $2.50 extra.

Crane with boom, including jib, 250 feet - $5.00 extra.

Crane with boom, including jib, 300 feet - $7.00 extra.

Crane with boom, including jib, 400 feet - $10.00 extra

All Cranes: When crane operator is operating equipment that requires a fully licensed crane operator to operate he receives an extra $4.00 premium in addition to the hourly wage rate and benefit contributions:

1) Crane handling or erecting structural steel or stone, hoisting engineer(2 drums or over)

2) Cranes(100 ton rated capacity and over) Bauer Drill/Caisson

3) Cranes(under 100 ton rated capacity)

a. PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Crane handling or erecting structural steel or stone, hoisting engineer (2 drums or over), front end loader (7 cubic yards or over), work boat 26 ft. and over.

GROUP 2: Cranes (100 ton capacity & over), Excavator over 2 cubic yards, piledriver ($3.00 premium when operator controls hammer), Bauer Drill/Caisson

GROUP 3: Excavator, cranes (under 100 ton rated capacity), gradall, master mechanic, hoisting engineer (all types of equipment where a drum and cable are used to hoist or drag material regardless of motive power or operation) Rubber Tire Excavator (drott 1085 or similar); Grader Operator;

Bulldozer Fine Grade (slopes, shaping, laser or GPS, etc.)

GROUP 4: Trenching machines, lighter derrick, concrete finishing machine, CMI machine or similar, Koehring Loader (skooper).

GROUP 5: Specialty railroad equipment, asphalt spreader, asphalt reclaiming machine, line grider, concrete pumps, drills with self contained power units, boring machine, post hole digger, auger, pounder, well digger, milling machine (over 24' mandrel), side boom, combination hoe and loader, directional driller

GROUP 6: Front end loader (3 cu. yds. up to 7 cu. yards), bulldozer (Rough grade dozer) .

GROUP 7: Asphalt roller, concrete saws and cutters (ride on types), Vermeer concrete cutter, stump grinder, scraper, snooper, skidder, milling machine (24" and under Mandrel).

GROUP 8: Mechanic, grease truck operator, hydoblaster, barrier mover, power stone spreader, welder, work boat under 26 ft. transfer machine.

GROUP 9: Front end loader (under 3 cubic yards), skid steer loader (regardless of attachments), bobcat or similar, forklift, power chipper, landscape equipment (including hydroseeder).

GROUP 10: Vibratory hammer,ice machine, diesel & air, hammer, etc.

GROUP 11: Conveyor, earth roller, power pavement breaker (whiphammer), robot demolition equipment.

GROUP 12: Wellpoint operator.

GROUP 13: Portable asphalt plant operator, portable concrete plant operator, portable crusher plant operator.

GROUP 14: Compressor battery operator.

GROUP 15: Power Safety boat, Vacuum truck, Zim mixer, Sweeper; (Minimum for any job requiring a CDL license) .

GROUP 16: Elevator operator, tow motor operator (solid tire no rough terrain).

GROUP 17: Generator operator, compressor operator, pump operator,welding machine operator; Heater operator.

GROUP 18: Maintenance engineer.

* IRON0015-001 06/30/2018

Rates Fringes

Ironworkers: (Ornamental, Reinforcing, Structural and Precast Concrete Erection).......$ 35.47 35.14

PAID HOLIDAY: Labor Day provided employee has been on the payroll for the 5 consecutive work days prior to Labor Day.

LABO0056-004 04/01/2018

Rates Fringes

Laborers: (TUNNEL

CONSTRUCTION)

CLEANING, CONCRETE AND

CAULKING TUNNEL:

Concrete Workers, Form Movers and Strippers.......$ 31.28 19.84 Form Erectors..............$ 31.60 19.84

ROCK SHAFT, CONCRETE,

LINING OF SAME AND TUNNEL

IN FREE AIR:

Brakemen, Trackmen, Tunnel Laborers, Shaft Laborers...................$ 31.28 19.84 Laborers Topside, Cage Tenders, Bellman...........$ 31.17 19.84 Miners.....................$ 32.22 19.84

SHIELD DRIVE AND LINER

PLATE TUNNELS IN FREE AIR:

Brakemen and Trackmen......$ 31.28 19.84 Miners, Motormen, Mucking Machine Operators, Nozzlemen, Grout Men, Shaft and Tunnel, Steel and Rodmen, Shield and Erector, Arm Operator, Cable Tenders..............$ 32.22 19.84

TUNNELS, CAISSON AND

CYLINDER WORK IN

COMPRESSED AIR:

Blaster....................$ 38.53 19.84 Brakemen, Trackmen, Groutman, Laborers, Outside Lock Tender, Gauge Tenders..............$ 38.34 19.84 Change House Attendants, Powder Watchmen, Top on Iron Bolts.................$ 36.41 19.84 Mucking Machine Operator...$ 39.11 19.84

a. PAID HOLIDAYS: On tunnel work only: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.

No employee shall be eligible for holiday pay when he fails, without cause, to work the regular work day preceding the holiday or the regular work day following the holiday.

LABO0056-013 04/01/2018

Rates Fringes

LABORER (HEAVY CONSTRUCTION)

GROUP 1.....................$ 30.05 19.84

GROUP 2.....................$ 30.30 19.84

GROUP 3.....................$ 30.55 19.84

GROUP 4.....................$ 31.05 19.84

GROUP 5.....................$ 31.80 19.84

GROUP 6.....................$ 32.05 19.84

GROUP 7.....................$ 16.00 19.84

LABORERS CLASSIFICATIONS

GROUP 1: Laborers (Unskilled), acetylene burner, concrete specialist

GROUP 2: Chain saw operators, fence and guard rail erectors, pneumatic tool operators and powdermen.

GROUP 3: Pipelayers, Jackhammer/Pavement breaker (handheld), mason tenders/catch basin builders, asphalt rakers, air track operators, block paver and curb setter

GROUP 4: Asbestos/lead removal

GROUP 5: Blasters

GROUP 6: Toxic waste remover

GROUP 7: Traffic control signalman

* PAIN0011-003 06/01/2018

Rates Fringes

Painters: (BRIDGE

CONSTRUCTION)

Brush, Roller, Blasting (Sand, Water, etc.) Spray...$ 49.75 21.05

* PAIN0011-018 06/01/2018

Rates Fringes

PAINTER

Blast and Spray.............$ 36.62 21.05 Brush and Roll..............$ 33.62 21.05 Tanks, Towers, Swing........$ 35.62 21.05

* PLUM0777-002 06/01/2018

Rates Fringes

PLUMBER/PIPEFITTER...............$ 42.62 31.21

TEAM0064-001 04/01/2018

Rates Fringes

Truck drivers:

2 Axle Ready Mix............$ 29.23 23.33 2 Axle......................$ 29.13 23.33 3 Axle Ready Mix............$ 29.28 23.33 3 Axle......................$ 29.23 23.33 4 Axle Ready Mix............$ 29.38 23.33 4 Axle......................$ 29.33 23.33 Heavy Duty Trailer 40 tons and over....................$ 29.58 23.33 Heavy Duty Trailer up to 40 tons.....................$ 29.33 23.33 Specialized (Earth moving equipment other than conventional type on-the-road trucks and semi-trailers, including Euclids)....................$ 29.38 23.33

Hazardous waste removal work receives additional $1.25 per hour.

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day and Good Friday, provided the employee has at least 31 calendar days of service and works the last scheduled day before and the first scheduled day after the holiday, unless excused.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment

Exceeding $15,000

MAY 2014

52.222-27 Affirmative Action Compliance Requirements for Construction

APR 2015

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.228-2 Additional Bond Security OCT 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.249-1 Termination For Convenience Of The Government (Fixed

Price) (Short Form)

APR 1984

52.249-10 Default (Fixed-Price Construction) APR 1984 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

OCT 2016

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.227-7033 Rights in Shop Drawings APR 1966 252.232-7004 DOD Progress Payment Rates OCT 2014 252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days after notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL

ITEMS) (JAN 2018).

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.