Amendment0001_18Q0008.pdf

PDF 743 KB Posted

Attached to
Surry Mountain Paint Emergency Service Gate Federal contract opportunity
Solicitation number
W912WJ18Q0008
Issued by
Department of the Army Corps of Engineers Engineering District New England

About this file

**AMENDMENT 0001 HAS BEEN ISSUED AND THE SOLICITATION PERIOD EXTENDED. OFFERORS MUST SUBMIT A SIGNED COPY OF THE AMENDMENT WITH THEIR OFFER. FINAL QUOTES ARE DUE ON OR BEFORE CLOSE OF BUSINESS (5:00 PM EST) ON 23-FEBRUARY-2018.**

View the file

Other files for this federal contract opportunity

Other files attached to Surry Mountain Paint Emergency Service Gate, newest first.
File Type Posted
Amendment0003_18Q0008.pdf PDF
Amendment0002_18Q0008.pdf PDF
W912WJ18Q0008.pdf PDF
Specs_&_Informational_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W13G8672971934

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment has been issued to update the attached Notice to Offerors, and issue a response to contractor requests for information (RFI-Q and A Section). In addition, the solicitation period has been extended through to Close of Business on 23-FEBRUARY-2018. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ18Q0008

X 9B. DATED (SEE ITEM 11)

03-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Feb-2018

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:

SHEILA M WINSTONVINCUILLA / CONTRACT SPECIALIST

W912WJ18Q0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 09-Feb-2018 05:00 PM to 23-Feb-2018 05:00 PM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

RFI - Q AND A

Attendee list of Contractors to the pre-bid site visit, 30 January 2018.

Name Company Phone Number Email address Ron Barone Copia Specialty

Contractors 503-333-2901 ron@copiasc.com lees@copiasc.com Peter Hall CertaPro Painters 603-623-0182 peterhall@certapro.com Gary Boudreau Chas G. Allen, Inc. 508-272-6578 garyboudreau@chasgallen.com Stephen Vincent Vincent Painting sbvincent@myfairpoint.net

Gene Ebbinghaus Coatings Unlimited, Inc. 314-330-2718 gene@coatingsunltd.com Will Gaus Thomas Industrial 314-591-5854 wglaus@thomasindcoatings.com Alan Aulson The Aulson Co. 508-451-1987 Almo21aulson@aol.com Gerry Rancourt Tri-State Painting, LLC 603-581-5332 grancourt@gototsi.com

Questions and answers from pre-bid site visit to Surry Mountain Emergency Gate Painting, 30 January 2018.

1. Can the Contractors remove the handrails that currently surround the gate? Answer: Yes.

2. Is there lead in the paint? Answer: Yes, it should be assumed that the paint contains both lead and PCBs.

The concentration is not known.

3. Can the floor grate be put into place into the existing slots in the floor once the gate has been raised all the way up? Answer: Yes.|

4. What is the distance between the bottom of the gate and the top of the floor grate when the gate is in the full up position? Answer: 6 inches.

5. Is painting the angle iron that is embedded in the floor concrete, that the floor grate rests on part of this contract? Answer: No.

6. Are the roller chains that are on both sides of the gate to be blasted and painted as part of this contract?

Answer: No, do not include any costs involved in removing these items. Simply plan on leaving them in place in the gate, and blocking and protecting them from the abrasive blasting and painting of the rest of the gate.

7. Is this area a confined space? Answer: Due to the limited egress of the stairway and door leading up to the operating level, yes.

8. How can Contractors get their equipment into this space? Answer: Contractors can request that Government personnel use the chain hoist to remove the floor plates that cover the openings in the floor of the Operating level, which is the ceiling to the space where the gate is. Then Contractors must use their own rigging or their own gate hoist to set up over the resultant opening to bring their equipment down to the gate level. As per EM 385-1-1, this will require Contractors to submit lift plans for approval.

9. Are Contractors allowed to use the Government’s chain hoist? Answer: No.

10. Are Contractors allowed to use the overhead beam, located above the Operating level over the openings in the floor? Answer: Yes, but the max load that this beam can withstand is 500 pounds.

11. Does the window that is located high in the wall on the gate level open for ventilation? Answer: Yes.

12. Is there water available in the gatehouse? Answer: No.

13. Is there electricity available in the gatehouse? Answer: There is one outlet present on the gate level, and three outlets present on the Operating level that Contractors may use. These outlets are all 20 amps. If Contractors need more capacity than 20 amps, they must provide it themselves.

14. Where is the storage and staging area? Answer: Contractors can use the entire parking area directly in front of (ie on the south side of) the gatehouse. If needed, the public can be blocked from driving across the spillway bridge, but government personnel must be able to drive across the spillway bridge leading to the gatehouse.

15. Can you clarify what class of Containment will be needed? Answer: The Contractor is responsible for selecting the most appropriate class of containment that will meet the requirements as specified in Spec Section 09 97 02 PAINTING: HYDRAULIC STRUCTURES, Paragraph 1.3.3.2 Containment.

16. Can you clarify the requirement for the SSHO versus the CIH to be present on the site? Answer: In accordance with Paragraph C. Safety, subparagraph 4 and the EM 385-1-1, the SSHO must be present on-site at all times. In accordance with Spec Section 09 97 02, Paragraph 1.3 SAFETY, HEALTH AND ENVIRONMENTAL REQUIREMENTS” and all of the subparagraphs of Paragraph 1.3, the CIH must be present for all environmental, worker exposure and final clearance testing as stated.

17. Can Contractors schedule additional time visiting the site? Answer: Yes. Please schedule additional site visits by contacting Mr. John Asseng, the Project Manager, at (978) 318-8481.

The following have been modified:

NOTICE TO OFFERORS

*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27 ALT I

FOR ADDITIONAL INFORMATION.

*PLEASE DIRECT QUESTIONS TO MS. PAIGE KIMBROUGH at 978-318-8269 or Paige.C.Kimbrough-Rowan@usace.army.mil . ANY INFORMATION RECEIVED AT A SITE VISIT WHICH CONFLICTS WITH THIS SOLICITAION SHOULD BE BROUGHT TO THE ATTENTION OF MS. KIMBROUGH AND

THE TECHNICAL POINT OF CONTACT. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE

GOVERNING DOCUMENT IN ALL CASES.

** QUOTES CAN BE FAXED OR E-MAILED TO MS. PAIGE KIMBROUGH AT (978) 318-8207 or Paige.C.Kimbrough-Rowan@usace.army.mil . E-mail is the preferred delivery method.

NOTE 1: In accordance with FAR Part 28.102-1(b)(1), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.

(i) Payment bond

(ii) Irrevocable letter of credit

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within TEN (10) DAYS after notice of award.

NOTE 2:

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company name and credentials/qualifications:

2. Contractors must be REGISTERED and ACTIVE in the System for Awards Management

(SAM) database (www.SAM.gov) to be eligible for award. Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.

3. Provide business DUNS number: _______________________________ (phone 800-333-0505 for

DUNS).

4. Provide business CAGE code: __________________________________

5. Tax Identification Number: ___________________________________

6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and

Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above)

7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful offeror will be required to submit this document prior to the commencement of work. The APP must be accepted by the Government Designated Authority prior to the preconstruction conference.

8. POTENTIAL OFFERORS ARE NOTIFIED THAT THE BASIS FOR AWARD IS PRICE ALONE.

SECURITY REQUIREMENTS

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact not later than 5 calendar days after the completion of the training.

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the Technical Point of Contact no later than 3 business days after the initial award.

(End of Summary of Changes)