AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er RFIs. The bid opening date remains unchanged. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ18B0028

X 9B. DATED (SEE ITEM 11)

03-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Aug-2018

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ18B0028

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

Requests for Information Previous RFIs are answered in Amendments 0001 and 0002.

Amendment 0003:

3. The number of building point of entry water quality monitoring systems and building hot water monitoring systems are scheduled on drawing MP-103. There is no schedule on drawing MP-104 for building cold water system distal point water quality monitoring systems; please confirm that a total of

(6) base and (1) option building cold water system distal point water quality monitoring systems are required.

[Answer] See spec section 00 41 00 for bid schedule. Amendment 001 updated the plans to correctly reflect the bid schedule shown in spec section 00 41 00.

See specification section 22 11 10. Point of entry monitoring systems are located in each of the seven buildings (Building 2, 3, 4, 7, 8, 23, and 62). There are a total of 7 point of entry monitoring systems (1 per building). Distal point water quality monitoring systems are located at select hydraulically remote areas in each of the seven buildings (Building 2, 3, 4, 7, 8, 23, and 62). There are a total of 14 distal point water quality monitoring systems (one hot and one cold per building). The Point of entry monitoring systems and the Distal Point water quality monitoring systems are part of the base contract.

The option item includes replacing the Chloramination Water Treatment System located in Building 47.

See specification section 22 11 05.

4. Does the temperature transmitter require a local LCD display since this data will be sent directly to the BMS via BACnet IP.

[Answer] Refer to Temperature Analyzers addressed in 22 11 10 para 2.2.C.3 for the the Building Point of Entry WQMS panels and in 22 11 00 para 2.3.D.1 for the Distal Point WQMS panels. The spec sections indicate that these Temperature Analyzers do require a local LCD display.

5. What are water temperatures expected for the analyzers that are connected to the hot water systems?

[Answer] Per specification section 22 11 10 para 2.3.D.1, the Temperature Analyzer must have capability to measure a temperature range from -30-100°C. The range was based on commercially available sensors and can be made smaller to reflect actual conditions expected within the potable water system.

0-40C would be acceptable for the planned use.

W912WJ18B0028

6. What is the desired control logic for the solenoid flushing valve? What parameter should open/close solenoid valve? For example, our turnkey monitoring systems can be set up to initiate flushing based on oxidant residual.

[Answer] See the additional specification pages following Specification Section 22 11 05 – the addendum following the specification section (Section 22 11 05A, “2. Water Quality Systems Monitoring Overview”) which indicates the set point for solenoid control values. The attached revised Section 22 11 05A, as part of this amendment, corrects some set point values.

7. Can the requirement for an all-encompassing NEMA 4X enclosure be waived as long as all components on the water monitoring systems individually meet NEMA 4X classification?

[Answer] No. The entire enclosure for the Water Treatment System Control Unit, and the Water Quality Analyzer Control Units must be NEMA 4X rate. See specification sections 22 11 10 and 22 11 05.

(End of Summary of Changes)