AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide revised plans and responses to RFI's from the site visit. All other aspects of the solicitation remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ18B0019
X 9B. DATED (SEE ITEM 11)
10-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Sep-2018
CODE
US ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA ROAD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ18B0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
AMENDMENT 0001
Westville Electrical Upgrades project, pre-bid site visit, 22 August 2018
AM 0001 Questions and Responses:
1. How deep are the handholes?
Response: The handholes are shown on Plan Sheet TH-1-1689 ELECTRICAL DISTRIBUTION PLANS AND DETAILS” contained within the Information Drawings. The handholes are considered confined space.
2. Are the handholes dry?
Response: Yes, the amount of water that accumulates in the bottom of the holes is less than one inch.
3. Are the wires that the Contractor is to pull in the gatehouse from the operating level down to the lower level to the limitorques in the concrete walls?
Response: As shown on Plan TH-1-1690 CONTROL HOUSE AND SPILLWAY ELECTRICAL PLANS, contained within the Information Drawings, the conductors are within the concrete walls.
4. Is the lower level of the gatehouse considered confined space?
Response: No, the lower level of the gatehouse is not considered confined space.
5. Will the Contractors have a requirement to generate an exit plan from the lower level of the gatehouse?
Response: No, the Contractor does not have a requirement to generate an exit plan from the lower level of the gatehouse.
6. Is there an exit plan for the lower level that the Corps has?
Response: No, there is no exit plan that the Corps has.
7. On Plan Sheet E-602, Detail A1, two wire sizes are shown for the same wire. Is it #6 or #2/0 size?
Response: 4-2/0 are the phase conductors...quantity of 4 and the wire size is 2/0 1-6AWG is the ground conductor.
Plan Sheet E-602, Detail A1 should read:
W912WJ18B0019
PROVIDE 4-2/0
& 1-6AWG GND
IN EXISTING 2"
CONDUIT
Revised Plan Sheet E-602 attached.
8. Are Contractors to replace the Panel in the Storage Building, PP-SG?
Response: Yes, as per Plan Sheet E-103, Detail A6, the Contractors are to replace the Panel PP-SG in the Storage Building.
9. Are Contractors to replace the wiring from the panel to the first device in the storage building? In the storage building, first devices include things like the saw or receptacles. If this is really the case, then replacing the wires means installing extra wiring that isn’t needed.
Response: As per Plan Sheet E-602, Detail A1, Note 12 states: “PROVIDE NEW BRANCH CIRCUIT WIRING FROM THE FIRST DEVICE IN EACH CIRCUIT TO NEW PANEL PP-SG”. The intent of this statement is to avoid splices due to insufficient wire length.
10. Is it the intent of this project to snake wires through the walls of the gatehouse to get to the first device?
Response: Yes. As per Note 3 on Plan Sheet E-102, “WIRING FROM FIRST DEVICE IN EACH CIRCUIT TO BE REPLACED…” There are existing pull boxes to aid in this effort. Refer to Information Drawings that are included in the Plan Set for locations of these pull boxes.
11. Are we replacing ALL the wires? Or just to the first device? This statement is not needed in the storage garage and the Project Office.
Response: As per Plan Sheet E-602, Detail A1, Note 12, which states “PROVIDE NEW BRANCH CIRCUIT WIRING FROM THE FIRST DEVICE IN EACH CIRCUIT TO NEW PANEL PP-SG“, and Plan Sheet E-602, Detail A1, Note 8, which states “…PROVIDE NEW BRANCH CIRCUIT WIRING FROM THE FIRST DEVICE IN EACH CIRCUIT TO NEW PANEL PP- UB,” Contractors are to replace the wiring from the panel to the first device in each circuit in both the storage garage, and the Project Office (also known as the Utility Building). The intent of this statement is to avoid splices due to insufficient wire length.
(End of Summary of Changes)