S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T O
F
F -8
-6
-0
N E
W T
R A
N S
F O
R M
E R Y
A R
D
H A
N O
V E
R
N E
W H
A M
P S
H
IR
E
E N
G
IN
E E
R
IN
G L
A B
O R
A T
O R
Y
C R
R E
L
U .S
A R
M Y C
O L
D R
E G
IO
N S R
E S
E A
R C
H A
N D of Engineers
US Army Corps
W
W J -1
-B -0
EP601A1
ELECTRICAL ONE LINE DIAGRAM
IN DUCT BANK
FEEDERS INSTALLED
7 TYPICAL
IN MAIN LAB
SUGGESTED SEQUENCE OF CONSTRUCTION
KEYED NOTES:
CRREL
M
METERING
CUSTOMER
GOLB
ST-1
RELAY
VFI #1
VFI #1
RELAY
VFI #2
VFI #2
RELAY
VFI #3
VFI #3
RELAY
VFI #4
VFI #4
RELAY
VFI #5
VFI #5
ST-2
BOX
JUNCTION
600AMP
15KV
SWITCH
INTERRUPTER
LOAD
PE4LMCCMDP
65kAIC
K
M
65kAIC
K
M
65kAIC
E
M
1000AT
1200AF
65kAIC
E
M
EXTERIOR SWITCHGEAR LINEUP
NEW 3000A,480/277V, 3Ø, 4W
EMH-MV-NEW
BUS A BUS BBUS A BUS B
MV-1 MV-2
MV-2B MV-1B MV-1A MV-2A
BUS ABUS B
BUS A BUS B
LV-4 LV-3 LV-1
LV-1
LV-2
LV-2
LV-3
LV-4
LV-6 LV-5
1000AT
1200AF
EMH-LV-NEW
UTILITY
POLE
RISER
SWITCH
VFI
ARRESTOR
WITH LIGHTNING
CUTOUT SWITCH
PHASE FUSED
OVERHEAD 3
3500AT
4000AF
ARRESTOR
WITH LIGHTNING
CUTOUT SWITCH
PHASE FUSED
OVERHEAD 3
POLE MOUNT
TRANSFORMER
3-50 KVA
BOX
JUNCTION
BOX
JUNCTION
BOX
JUNCTION
BOX
JUNCTION
480/277 SECONDARY
13.2 KV PRIMARY
DELTA/WYE
TRANSFORMER
OIL FILLED
2 MVA
ARRESTOR
WITH LIGHTINING
CUTOUT SWITCH
PHASE FUSED
OVERHEAD 3
600AMP
15KV
SWITCH
INTERRUPTER
LOAD
480/277 SECONDARY
13.2 KV PRIMARY
DELTA/WYE
TRANSFORMER
OIL FILLED
2.5 MVA
ARRESTOR
WITH LIGHTINING
CUTOUT SWITCH
PHASE FUSED
OVERHEAD 3
480/277 SECONDARY
13.2 KV PRIMARY
DELTA/WYE
TRANSFORMER
OIL FILLED
500 KVA
ARRESTOR
WITH LIGHTINING
CUTOUT SWITCH
PHASE FUSED
OVERHEAD 3
ARRESTOR
WITH LIGHTINING
CUTOUT SWITCH
PHASE FUSED
OVERHEAD 3
POLE-MOUNT
BANK
TRANSFORMER
37.5 KVA
3 PHASE
480/277 SECONDARY
13.2 KV PRIMARY
DELTA/WYE
TRANSFORMER
500 KVA OIL FILLED
480/277 SECONDARY
13.2 KV PRIMARY
DELTA/WYE
TRANSFORMER
OIL FILLED
300 KVA
ADDITION
IN LAB
ADDITION
IN LAB
ADDITION
IN LAB
ADDITION
IN LAB
450AT
600AF
450AT
600AF
IN DUCT BANK
FEEDERS INSTALLED
3500AT
4000AF
1000AT
1600AF
1000AT
1600AF
1200AT
1600AF
1200AT
1600AF
1200AT
1600AF
1200AT
1600AF
1600AT
1600AF
1600AT
1600AF
3000AT
3200AF
3000AT
3200AF
1600AT
1600AF
600AT
600AF
600AT
600AF
600AT
600AF
600AT
600 AF
600AT
600AF
600AT
600AF
600AT
600 AF
600AT
600 AF
600AT
600AF
600AT
600AF
600AT
600 AF
600AT
600 AF
1600AT
1600AF
1600AT
1600AF
600AT
600AF
600AT
600AF
600AT
600AF
600AT
600 AF
600AT
600AF
600AT
600AF
600AT
600 AF
600AT
600 AF
600AT
600AF
600AT
600AF
600AT
600 AF
600AT
600 AF
1600AT
1600AF
IN MAIN LAB
MEDIUM VOLTAGE VAULT.
8. PROVIDE MEDIUM VOLTAGE TAP PER SPECIFICATION 26 05 13 IN
7. SEE FEEDER SCHEDULE ON SHEET EP606.
SHEETS ES-101, ES-102, EP-603, AND EP-604.
CONFIGURATION PER SPECIFICATIONS 26 11 16 AND 26 23 00. SEE
VOLTAGE POWER SWITCHGEAR ARRANGED IN A DOUBLE ENDED
PRIMARY SIDE SWITCHES, TWO TRANSFORMERS, AND A LOW
6. PROVIDE 208V SECONDARY UNIT SUBSTATION WITH TWO 13.8 KV
CONFIGURATION PER SPECIFICATIONS 26 11 16 AND 26 23 00.
VOLTAGE POWER SWITCHGEAR ARRANGED IN A DOUBLE ENDED
PRIMARY SIDE SWITCHES, TWO TRANSFORMERS, AND A LOW
5. PROVIDE 480V SECONDARY UNIT SUBSTATION WITH TWO 13.8 KV
4. PROVIDE CONCRETE LOW VOLTAGE MANHOLE PER CIVIL SHEETS.
3. PROVIDE LOW VOLTAGE DUCT BANK PER CIVIL SHEETS.
2. PROVIDE MEDIUM VOLTAGE DUCT BANK PER CIVIL SHEETS.
1. PROVIDE CONCRETE MEDIUM VOLTAGE MANHOLE PER CIVIL SHEETS.
44. PUT UP TRANSFORMER YARD FENCE.
FEEDER IN MAIN LAB BACK TO TRANSFORMER YARD.
43. DEMOLISH MEDIUM VOLTAGE SWITCHGEAR AND ASSOCIATED
TO TRANSFORMER YARD.
42. DEMOLISH MEDIUM VOLTAGE FEEDER FROM LAB ADDITION BACK
IN LAB ADDITION.
41. DEMOLISH 480V TRANSFORMER AND ASSOCIATED DISTRIBUTION
40. COMMISSION AND ENERGIZE A- SIDE OF THE UNIT SUBSTATIONS.
39. ENERGIZE VI#4.
NEW PANEL AND PULL OLD FEEDERS OUT OF THE EQUIPMENT.
38. SWAP FEEDERS IN CC AND PE4L FROM EXISTING SOURCE TO
37. TERMINATE 480V FEEDER TO LAB ADDITION IN NEW 480V PANEL.
MANHOLE BACK TO VI#4 AND TERMINATE.
36. PULL MEDIUM VOLTAGE CABLE FROM SECOND SPLICE IN
35. DISCONNECT LAB ADDITION FEEDER FROM VI#4.
34. SHUTDOWN VI#4.
AND PE4L.
33. INSTALL FEEDERS FROM NEW PANEL IN LAB ADDITION TO CC
32. INSTALL NEW 1200A 480V PANEL IN LAB ADDITION.
ASSOCIATED PRIMARY SWITCH IN LAB ADDITION.
31. DEMOLISH 300 VA TRANSFORMER WITH 208V SECONDARY AND
30. RE-ENERGIZE VI#4.
29. TERMINATE 208V FEEDER TO LAB ADDITION IN PANEL MBP.
OF THE PANEL.
28. DISCONNECT PANEL MBP FEEDER CABLES AND PULL THEM OUT
SWITCHGEAR.
27. DISCONNECT MEDIUM VOLTAGE TAP IN LAB ADDITION
26. SHUTDOWN VFI#4.
ENERGIZE VFI#5.
25. COMMISSION AND ENERGIZE NEW UNIT SUBSTATIONS AND
FROM B-BUSSES TO THE A-BUSSES.
24. IN THE MAIN LAB TRANSFER SWITCHGEAR SOURCE OF POWER
THE SWITCHGEAR LINEUP.
23. IN THE MAIN LAB DISCONNECT THE B-SIDE TRANSFORMER FROM
OF THE SWITCHGEAR LINEUPS.
22. IN MAIN LAB TERMINATE 480V AND 208V FEEDERS ON THE A-BUS
#5 AND TERMINATE.
21. PULL MEDIUM VOLTAGE CABLE FROM SPLICE IN MANHOLE TO VFI
20. DISCONNECT VFI #5 FEEDER TO MAIN LAB.
19. SHUTDOWN VFI #5 IN VFI SWITCHGEAR.
18. INSTALL MEDIUM VOLTAGE SPLICES IN MANHOLE.
MANHOLE.
SUBSTATION PRIMARY SWITCH BACK TO MEDIUM VOLTAGE
17. INSTALL MEDIUM VOLTAGE CABLES FROM EACH UNIT
SWITCHGEAR LINEUPS.
16. DEMOLISH MAIN LAB TRANSFORMERS ON THE A-SIDE OF THE
BUS B AND LOCK OUT THE A SIDE.
208V SWITCHGEAR FROM MAIN BREAKER BUS A TO MAIN BREAKER
TRANSFORMERS AND TRANSFER POWER AT MAIN LAB 480V AND
LAB 480V AND 208V SWITCHGEAR FROM THEIR A-SIDE
15. DURING HALF DAY SHUTDOWN ON A WEEKEND DISCONNECT MAIN
TERMINATION.
VOLTAGE ROOM AND LEAVE FEEDER PREPARED FOR
14. INSTALL 208V AND 480V FEEDERS TO MAIN LAB ADDITION HIGH
FOR TERMINATION LATER.
208V SWITCHGEAR, LEAVE FEEDER COILED ABOVE THE CEILING
13. INSTALL 208V FEEDER FROM NEW UNIT SUBSTATION TO MAIN LAB
FOR TERMINATION LATER.
480V SWITCHGEAR, LEAVE FEEDER COILED ABOVE THE CEILING
12. INSTALL 480V FEEDER FROM NEW UNIT SUBSTATION TO MAIN LAB
11. INSTALL 208V UNIT SUBSTATION.
10. INSTALL 480V UNIT SUBSTATION.
9. INSTALL MAIN LAB FEEDER CONDUITS.
8. INSTALL CONCRETE PADS FOR NEW UNIT SUBSTATIONS.
7. INSTALL LOW VOLTAGE DUCT BANKS.
6. INSTALL LOW VOLTAGE MANHOLE OUTSIDE TRANSFORMER YARD.
5. INSTALL MEDIUM VOLTAGE MANHOLE IN TRANSFORMER YARD.
4. INSTALL MEDIUM VOLTAGE DUCT BANKS IN TRANSFORMER YARD.
3. EXCAVATE TRANSFORMER YARD EXTENSION.
ROUTES FOR BURIED OBSTACLES AND MARK OBSTACLES.
2. SURVEY TRANSFORMER YARD AREA AND PROPOSED DUCT BANK
1. REMOVE TRANSFORMER YARD FENCE.
NOT TO SCALE
EXTERIOR SWITCHGEAR LINEUP
NEW 4000A, 208/120V, 3Ø, 4W
MH-A MH-B
O N
E L
IN
E D
IA
G R
A M
P A
R T
B R
IA
N H
E A
D
B R
IA
N H
E A
D
1600AT
2000AF
1600AT
2000AF
1600AT
1600AF
SPARE
1600AT
1600AF
SPARE
1600AT
1600AF
SPARE
1600AT
1600AF
SPARE SPARE SPARE
J
C L
IN
E
A N
S I
D :1
A U
G
J
G A
R T
L A
N D
D
R A
W
IN
G R
E V
IS
E D P
E R A
M
S E
P
File details come from the government source that posted it. Updated .