Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is hereby necessary to post the Site Visit Attendance List, Government responses to submitted Requests For Information, edit the Contractor Performance Evaluation reporting threshold, modify clauses, update the w age determination, modify Section 00100 and add a Vicinity and Site Plan. The Due Date for Proposals been extended until 2PM EST on January 27, 2017.
All other aspects of the solicitation remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Jan-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ-17-R-0001
X 9B. DATED (SEE ITEM 11)
06-Dec-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Jan-2017
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
X
W912WJ-17-R-0001
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUESTS FOR INFORMATION AND GOVERNMENT RESPONSES
1. “Projects provided must be physically completed or substantially completed (beneficial occupancy obtained) within the past eight (8) years.” [Solicitation page 13 of 121]
If submitting a substantially completed project, can the design be substantially completed or does construction have to be substantially completed?
RESPONSE: See changes to Section 00100 included in Amendment 0001.
2. How do you wish to receive questions or requests for information (RFI) related to Phase 1 proposals?
RESPONSE: Please submit all RFIs to Contract Specialist, Robert C. Garrahan via email, Robert.C.Garrahan@USACE.army.mil.
3. Has a commissioning agent been hired yet, or do you anticipate developing an RFP for commissioning?
RESPONSE: The Commissioning Agent requirements will be provided in the Phase 2 Request for Proposal (RFP) documents.
4. Will the existing facility be repurposed or demolished?
RESPONSE: It is the expectation that the existing building will be demolished under a future contract. It is noted that the existing building will be operational during the period of performance of this contract.
5. How many teams are expected to go to Phase 2?
RESPONSE: Refer to Evaluation Approach, part A. Basis for Award which indicates “Up to five (5) of the most highly-qualified Offerors who submit a proposal in Phase 1 will be invited to submit proposals for Phase 2…”
6. Will you provide a list of attendees?
RESPONSE: Included in Amendment 0001.
7. Does the new fence follow the property line?
RESPONSE: The drawings included in the Phase 2 RFP documents will indicate the approximate limits of the new fence.
8. Will a map be provided to show the property lines?
RESPONSE: An existing site plan, showing the property lines of the project site, will be included in the Phase 2 RFP documents. A Vicinity Plan and General Site Plan are included under Amendment 0001 to provide a general overview of the project site for proposal preparation purposes.
9. How long can the body counter remain out of service for?
RESPONSE: The Whole Body Counter can remain out of service for relocation for 6 months.
10. What is the truck size and access area sizing and shape for the loading dock?
RESPONSE: The requirements for providing continued access to the existing loading dock will be defined in the Phase 2 RFP documents.
11. Where are service connections to the existing building?
RESPONSE: The service connections to the existing building will be indicated on the drawings in the Phase 2 RFP documents.
12. Body counter (Radiation room) to be dismantled completely to moved?
RESPONSE: Available existing information for the Whole Body Counter and the requirements for its relocation will be provided in the Phase 2 RFP documents. The Design-Build Contractor shall determine how much dismantling is necessary in order to relocate the Whole Body Counter and meet the requirements of the RFP.
13. What code/UFC is applicable for the new fence?
RESPONSE: Any appropriate or required code for the new fence will be included in the Phase 2 RFP documents.
14. Are the ATFP requirements for new buildings required?
RESPONSE: Any ATFP requirements for the new building will be provided in the Phase 2 RFP documents.
15. What is the level of interaction with users, if desired, during design after award? (None, Some, Moderate, Programming)
RESPONSE: Offerors should note that the drawings that will be provided as part of the Phase 2 RFP documents were developed in coordination with the users of the facility, in terms of function, adjacencies, and space requirements. Upon award, the Design-Build Contractor shall interact and coordinate closely and extensively with the USACE and the users on the proposed design of the new building throughout the design-build process from design through construction. Should the Offeror submit provide a revised layout for the building different from the Phase 2 RFP drawings or propose changes to the design in the awarded proposal, the level of interaction and coordination with the USACE and the users will be more extensive, commensurate with the extent of the proposed revisions.
16. According to the direction discussed, Phase 2 bridging document show functional relationships that are required. Does this mean that Phase 2 Architects may have design freedom in terms of aesthetics?
RESPONSE: The Phase 2 RFP documents will indicate the requirements and criteria concerning the aesthetics of the new building. As long as those requirements are met, the Design-Build Contractor will have leeway in terms of the aesthetics of the building.
17. The last paragraph of RFP page 13 of 121 defines a project as “a construction project performed under a single task order or contract which included both design and construction of the project.” This suggests that all featured past experience projects must be design-build projects. While we fully support the utilization of design-build methodology for the proposed project, historically, there have been relatively few design-build research laboratory projects. In order for the government to have the opportunity to evaluate the best project examples from the largest pool of highly experienced design-build teams, we strongly recommend that projects utilizing any type of delivery method, including design-only projects by the offeror’s Designer of Record, be allowed as past project experience in Factor 2 of our proposals. We respectfully request that the project definition be reworded as follows: “ A project is defined as a construction project performed under a single task order or contract, using any type of project delivery method.”
RESPONSE: See changes to Section 00100 included in Amendment 0001.
18. Item C (4) on RFP page 14 of 121 states, “For non-Federal government projects and commercial projects a Past Performance Questionnaire (PPQ), as set forth in Attachment 2, must be completed and submitted. The Offeror shall complete Blocks 1-4 of the PPQ and send it to the non-Federal project or commercial project client. The client shall complete Blocks 5-8 along with the two page questionnaire and return to the Offeror in a sealed envelope. The Offeror shall insert the sealed envelope in its proposal (Volume I).” In recent years, the norm for USACE and other federal agencies has been to allow offerors to submit PPQs without sealed envelopes and including them as part of the proposal document. Furthermore, offeror’s have frequently been allowed to submit PPQs that have been previously submitted with other proposals. This approach has proven to be much more convenient to customers because it streamlines the evaluation process, simplifies the logistics of sending PPQs, and reduces the number of times offerors need to impose on their customers to fill out PPQs. We respectfully request that the government adopt this well-established and effective approach to providing customer past performance evaluation. Please confirm that it is acceptable to submit federal PPQs previously submitted in other proposals and without sealed envelopes.
RESPONSE: The Proposal Submission Requirements shall be as stated in Paragraph C (4).
19. Please provide the last date we can submit requests for information for this solicitation.
RESPONSE: The Government requests that all RFI’s be submitted at least 5 business days prior to the date that proposals are due.
18. What is the personnel corridor requirements between the new building and the existing building?
RESPONSE: There is no connecting personnel corridor required between the existing building and the new building.
19. Do we show projects for sub consultants? And if so, do they have to show a minimum of 2, or would their projects be part of the total of their contractor's projects?
RESPONSE: Team Experience are for Offeror’s team members as defined in the solicitation, A. Proposal Submission Requirements, 4. Content Requirement, b. Phase 1, Volume I, Factor 2: Team Experience, pgs. 12-14. All submitted projects are subject to the maximum limit of 6, as well as the other requirements specified in Section 00100 of the solicitation.
20. On page 13 of 121 is states that the maximum number of projects is 6. Does this apply to the combined projects of Construction Manager and Designer?
Or does this apply to each team members projects?
RESPONSE: The experience of each member of the offeror’s team can be shown in combined projects, as long as each team member is included in each project in the same capacity as that proposed. No more than 6 projects total will be evaluated.
21. Can we use PPQs from past solicitations?
RESPONSE: PPQ’s may not be reused from past solicitations. The PPQs must be submitted in accordance with section 00100 of the solicitation.
22. Items 3 (a) and 3 (b) on RFP page 11 of 121 state: “ A Table of Contents shall be created using the Table of Content feature in MS Word.” -and- “All of the proposal electronic files shall be in their native format, i.e., doc, xls, ppt, etc.
and provided on CDs or DVDs.” These statements suggest that the government is expecting proposals to only be created with Microsoft software (MS Work, Excel, Powerpoint). Many offerors use other software to produce proposals (such as Adobe InDesign). Please confirm that it is acceptable to use other non-Microsoft software to produce our proposal, and that only a PDF format digital copy of the proposal is required to be provided on CD or DVD.
RESPONSE: The Offerors shall submit as required in the Solicitation. The requirements indicated in paragraphs 3(a) and 3(b) do not indicate the Government expects proposals to only be created with Microsoft software –but rather, that native formats be provided and that “price breakdown information to aid in price evaluation…” be provided in Microsoft Excel compatible format.
23. Item 2 (b) on RFP page 10 of 121 states: “A standard 12-point minimum font size applies.” Our experience has been that 12 point font is much larger than needed for acceptable readability and consumes much more page space than smaller point sizes. We respectfully request that the font size minimum be reduced to 10 point.
RESPONSE: The proposal shall be submitted as required in the Solicitation.
SITE ATTENDANCE LIST
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
SECTION 00100 CHANGE SUMMARY:
The following changes have been made:
Phase 1, Factor 1
Change the factor title in its entirety, wherever the following appears in the solicitation.
From: Technical Approach Narrative To: Conceptual
Technical Approach.
Phase 2, Factor 1
Change the factor title in its entirety, wherever the following appears in the solicitation.
From: Technical Design Information To: Detailed
Technical Approach.
Section C Evaluation Approach, 5., Phase 1, Volume I, Factor 3: Past Performance, Quality Assessment. [Page 26]
The following sentence has been added to the end of the Quality Assessment Paragraph. Added: The Quality Assessment will be reflected in the confidence assessment.
Section C. EVALUATION APPROACH, 3. Phase 1, Volume I, Factor 1: Conceptual Technical Approach. The Combined Technical/Risk Rating Table have been revised and updated in accordance with the revised DOD Source Selection Procedures (April 1, 2016) Evaluation Tables.
E6COMRCG
Sticky Note Completed set by E6COMRCG
TABLE 1 – COMBINED TECHNICAL/RISK RATINGS
Color Rating Description
Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
Section C. EVALUATION APPROACH, 5. Phase 1, Volume I, Factor 3: Past Performance. The Performance Confidence Assessment Rating Table have been revised and updated in accordance with the revised DOD Source Selection Procedures (April 1, 2016) Evaluation Tables.
Revised To:
C.EVALUATION APPROACH, 4. Phase 1, Volume I, Factor 2: Team Experience. The following language is hereby added after Paragraph 4.
Added:
“Additional consideration will be given for submitted recent and relevant projects which included both design and construction (Design-Build) of the project performed under a single contract or task order.”
A. PROPOSAL SUBMISSION REQUIREMENTS, Proposal Submission Requirements,
4. Content Requirement, .b Phase 1, Volume I, Factor 2: Team Experience.
7th Paragraphs to 9th Paragraphs have changed [Pages 13& 14]
From:
Projects provided must be physically completed or substantially completed (beneficial occupancy obtained) within the past eight (8) years.
Additional consideration may be given for submitted projects that meet any or all of the following criteria:
Table 3 – Performance Confidence Assessments Rating Definition Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence
Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Revised To:
• Design and construction of a new, multi-story laboratory
• Design in accordance with NIH Design Requirements Manual for Biomedical Laboratories and Animal Research Facilities (DRM)
• Have a value of at least $40,000,000
• Have achieved a minimum of LEED Silver certification
• Construction on an occupied site
A project is defined as a construction project performed under a single task order or contract which included both design and construction of the project. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole should not be submitted as a project; rather Offerors should submit the work performed under a task order as a project.
To:
Construction of all submitted projects, including Design-Build, Design, and Construction projects, must be physically completed or substantially completed (beneficial occupancy obtained) within the past eight (8) years.
Projects may be for either design or construction, or the project may be a design-build project. Example projects include a task order for design; a task order for construction; a task order for design-build; a stand-alone contract for design; a stand-alone contract for construction; or a stand-alone Design-Build contract.
Additional consideration may be given for submitted projects that meet any or all of the following criteria:
• Design and construction of a new, multi-story laboratory
• Design in accordance with NIH Design Requirements Manual for
Biomedical Laboratories and Animal Research Facilities (DRM)
• Have a value of at least $40,000,000
• Have achieved a minimum of LEED Silver certification
• Construction on an occupied site
Additional consideration will be given for submitted recent and relevant projects which included both design and construction (Design-Build) of the project performed under a single contract or task order. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole should not be submitted as a project; rather Offerors should submit the work performed under a task order as a project.
END OF SECTION 00100 CHANGE SUMMARY
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
SECTION 008000
CONTRACTOR PERFORMANCE EVALUATIONS
In accordance with the provisions of Subpart 36.201 (Evaluation of Contractor Performance) of the Federal Acquisition Regulation (FAR), construction Contractor's performance shall be evaluated throughout the performance of the contract. The United States Army Corps of Engineers (USACE) follows the procedures outlined in Engineering Regulation 415-1-17 to fulfill this FAR requirement. For construction contracts awarded at or above $700,000.00, the USACE will evaluate contractor's performance and prepare a performance report using the Contractor Performance Assessment Reporting System (CPARS), which is now a web-based system. After an evaluation (interim or final) is written up by the USACE, the Contractor will have the ability to access, review and comment on the evaluation for a period of 60 days. Accessing and using CPARS typically requires specific software, called PKI certification, which is installed on the user's computer. However, although users are encouraged to use PKI certificates whenever possible, a recent temporary waiver has been approved to allow industry users to access the system without a PKI certificate. Contractors wishing to log on without a PKI certificate shall select the "Contractor (pending PKI)" logon option. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and is purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and for contacting vendors can be found on the web site:
http://www.cpars.navy.mil/. If the Contractor wishes to participate in the performance evaluation process, access to CPARS and PKI certification is the sole responsibility of the Contractor.
END OF SECTION 008000 CHANGE SUMMARY
WAGE RATES
General Decision Number: MA160001 12/23/2016 MA1
Superseded General Decision Number: MA20150001
State: Massachusetts
Construction Type: Building
Counties: Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk and Suffolk Counties in Massachusetts.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 01/15/2016 2 01/22/2016 3 02/19/2016 4 04/01/2016 5 04/08/2016 6 05/13/2016 7 06/17/2016 8 07/08/2016 9 07/15/2016 10 08/26/2016 11 09/02/2016 12 09/16/2016 13 09/23/2016 14 10/14/2016 15 10/21/2016 16 11/04/2016 17 11/25/2016 18 12/02/2016 19 12/16/2016 20 12/23/2016
ASBE0006-001 09/01/2016
Rates Fringes
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems
(ZONE A)...................$ 45.09 26.35
(ZONE B)...................$ 40.58 26.35
ZONES:
ZONE A
BARNSTABLE COUNTY (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet, Yarmouth) BRISTOL COUNTY (Easton), MIDDLESEX COUNTY, and NORFOLK COUNTY (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxborough, Holbrook, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon, Stoughton, Walpole, Wellesley, Westwood, Weymouth)
ZONE B
BARNSTABLE COUNTY (Barnstable, Bourne, Falmouth, Mashpee, Sandwich), BRISTOL COUNTY (All cities except Easton),and NORFOLK COUNTY (Bellingham, Franklin, Plainville)
ASBE0006-002 12/01/2015
BARNSTABLE (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet and Yarmouth); BRISTOL (Easton); ESSEX; MIDDLESEX; NORFOLK (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Holbrook, Hull, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon Stoughton, Walpole, Wellesley, Westwood, and Weymouth) AND SUFFOLK COUNTIES
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)....$ 32.23 18.65
ASBE0006-010 09/01/2016
BARNSTABLE (Barnstable, Bourne, Falmouth, Mashpee and Sandwich); BRISTOL (Acushnet, Attleboro city, Berkeley, Dartmouth, Dighton, Fairhaven, Fall river City, Freetown, Marion, Mansfield, New Bedford City, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton City and Westport); DUKES; NANTUCKET; NORFOLK (Bellingham, Franklin, Plainville, and Wrentham); PLYMOUTH (Lakeville, Mattapoisett, Middleboro, Rochester and Wareham)
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)....$ 40.58 26.35
BOIL0029-001 01/01/2016
Rates Fringes
BOILERMAKER......................$ 41.62 24.42
BRMA0001-008 03/01/2016
FOXBORO CHAPTER
BRISTOL (Attleboro, Berkley, Dighton, Mansfield, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton) AND NORFOLK (Bellingham, Canton, Dedham, Foxboro, Franklin, Norfolk, Norwood, Plainville, Sharon, Walpole, Westrwood, Wrentham) COUNTIES
Bricklayer, Cement Mason, Plasterer........................$ 47.76 31.42
BRMA0001-009 03/01/2016
LOWELL CHAPTER
MIDDLESEX (Acton, Asby, Ayer, Bedford, Billerica, Boxboro, Carlisle, Chemsford, Dracut, Dunstble, Ft. Denvens, Groton, Littleton, Lowell, North Acton, Pepperell, Shirley, South Acton, Tewksbury, Townsend, Tyngsboro, West Acton, Westford, Wilmington)
Bricklayer and plasterer.........$ 47.76 31.42
BRMA0001-010 03/01/2016
LOWELL CHAPTER
MIDDLESEX (Ashland, Framingham, Holliston, Hopkinton, Hudson, Maynard, Natick, Sherbvorn, Stow); and NORFOLK (Medfield, Medway,Millis)
BRICKLAYER.......................$ 47.76 31.42
BRMA0003-001 02/01/2016
Rates Fringes
Marble & Tile Finisher...........$ 38.08 29.58 Marble, Tile & Terrazzo Workers..........................$ 49.90 31.31
TERRAZZO FINISHER................$ 48.80 31.15
BRMA0003-003 08/01/2016
BOSTON CHAPTER
MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Somerville); NORFOLK (Brookline, Milton); and SUFFOLK
BRICKLAYER.......................$ 50.76 29.77
BRMA0003-006 08/01/2016
LYNN CHAPTER
ESSEX (Amesbury, Andover, Beverly, Boxford, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipsewich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuen, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salisbury, Salem, Saugus, Swampscott, Topsfield Wakefield, Wenham, West Newbury);
and MIDDLESEX (Reading, North Reading, Wakefield)
Bricklayer, cement mason and plasterer........................$ 50.76 29.77
BRMA0003-007 08/01/2016
WALTHAM CHAPTER
MIDDLESEX (Belmont, Burlington, Concord, Lexington, Lincoln, Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston, Winchester, Woburn)
Bricklayer and plasterer.........$ 50.76 29.77
BRMA0003-008 08/01/2016
NEWTON CHAPTER
MIDDLESEX (Newton) and NORFOLK (Dover, Needham, Wellesley) plasterer........................$ 50.76 29.77
BRMA0003-009 08/01/2016
NEW BEDFORD
BARNSTABLE; BRISTOL (Acushnet, Darmouth, Farhaven, Fall River, Freetown, New Bedford, Somerset, Swansea, Westport); DUKES; and
NANTUCKET COUNTIES
plasterer........................$ 50.76 29.77
BRMA0003-010 08/01/2016
QUINCY CHAPTER
NORFOLK COUNTY (Avon, Braintree, Cohasset, Holbrook, Quincy, Randolph, Soughton, Weymouth) plasterer........................$ 50.76 29.77
CARP0026-001 09/01/2016
BRISTOL (Attleborough, North Attleborough); ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); AND NORFOLK (Bellingham, Canton, Foxboro, Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood, Plainville, Sharon, Walpole, Wellesley, Westwood, Wrentham)
CARPENTER........................$ 37.80 27.40
CARP0033-001 09/01/2016
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK
CARPENTER........................$ 44.73 27.85
CARP0056-011 08/01/2015
SUFFOLK (All of County); and those areas of BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX & NORFOLK COUNTIES situated inside Boston Beltway (I-495) and North of Cape Cod Canal. ALL of
DUKES AND NANTUCKET COUNTIES
PILEDRIVERMAN....................$ 42.04 29.73
CARP0056-012 08/01/2015
The areas of BARNSTABLE, BRISTOL, and NORFOLK COUNTIES situated OUTSIDE Boston Beltway (I-495) and South of Cape Cod Canal
CARP0056-013 08/01/2015
Those areas of ESSEX and MIDDLESEX COUNTIES situated OUTSIDE Boston Beltway (I-495)
CARP0424-003 09/01/2016
NORFOLK COUNTY (Braintree, Cohassett, Scituate, Weymouth, Quincy)
CARP0624-005 09/01/2016
DUKES; NANTUCKET
Rates Fringes
CARPENTER........................$ 44.73 27.85
CARP0624-007 09/01/2016
BARNSTABLE; BRISTOL (Except Attleboro & North Attleboro); AND NORFOLK (Avon, Holbrook, Randolph, Stoughton) COUNTIES
CARP1121-001 10/01/2015
Rates Fringes
MILLWRIGHT.......................$ 36.79 28.38
* CARP2168-001 09/01/2016
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK
FLOOR LAYER: Carpet.............$ 42.65 28.32
* CARP2168-004 09/01/2016
BRISTOL; ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); Remainder of Norfolk County
FLOOR LAYER: Carpet.............$ 42.65 28.32
* CARP2168-005 09/01/2016
BARNSTABALE; DUKES; AND NANTUCKET
Rates Fringes
FLOOR LAYER: Carpet.............$ 42.65 28.32
ELEC0096-001 12/01/2015
MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend)
ELECTRICIAN......................$ 39.37 11%+18.26
Teledata System Installer........$ 26.83 3%+20.46
ELEC0099-001 06/01/2016
BRISTOL (Attleboro, North Attleboro, Seekonk)
Rates Fringes
ELECTRICIAN......................$ 36.83 58.39%
Teledata System Installer........$ 27.62 13.42%+13.57
ELEC0103-001 09/01/2016
ESSEX; MIDDLESEX (Excluding Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend); NORFOLK (Excluding Avon, Holbrook, Plainville, Randolph, Stoughton) SUFFOLK
Teledata System Installer........$ 35.35 29.10
ELEC0103-002 09/01/2016
ESSEX (Amesbury, Andover, Boxford, Georgetown, Groveland, Haverhill, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, West Newbury); MIDDLESEX (Bedford, Billerica, Boxboro, Burlington, Carlisle, Chelmsford, Dracut, Dunstable littleton, Lowell, North Reading, Tewksbury, Tyngsboro, Westford, Wilmington)
ELECTRICIAN......................$ 47.13 31.12
ELEC0103-004 09/01/2016
ESSEX (Beverly, Danvers, Essex, Gloucester, Hamilton, Ipswich, Manchester, Marblehead, Middleton, Peabody, Rockport, Salem, Topsfield, Wenham)
ELEC0103-005 09/01/2016
ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX (Acton, Arlington, Belmont, Cambridge, Concord, Everett, Framingham, Holliston, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Frankloin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham and Hull);SUFFOLK
ELEC0104-001 08/28/2016
Rates Fringes
Line Construction:
Cableman....................$ 44.35 24.66+A Equipment Operator..........$ 37.70 21.58+A Groundman...................$ 24.39 9.96+A Lineman.....................$ 44.35 24.66+A
A. PAID HOLIDAYS: New Year's Day; Memorial Day;
Independence Day; Labor Day; Thanksgiving Day; Christmas Day and Columbus Day, provided the employee has been employed 5 working days prior to any one of the listed holidays.
ELEC0223-005 09/01/2016
BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton)
ELECTRICIAN......................$ 39.21 27.75%+10.60
ELEC0223-006 09/01/2016
BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton)
Teledata System Installer........$ 33.33 27.75%+10.35
ELEV0004-001 01/01/2016
Rates Fringes
ELEVATOR MECHANIC................$ 54.53 29.985+a+b
FOOTNOTE FOR ELEVATOR MECHANICS:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
* ENGI0004-001 12/01/2016
Rates Fringes
Power equipment operators:
Group 1.....................$ 45.38 26.15+A Group 2.....................$ 44.94 26.15+A Group 3.....................$ 31.17 26.15+A Group 4.....................$ 37.65 26.15+A Group 5.....................$ 22.96 26.15+A Group 6.....................$ 26.94 26.15+A
FOOTNOTE FOR POWER EQUIPMENT OPERATORS:
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Labor Day, Memorial Day, Independence Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day
HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):
Over 150 ft. +2.12 Over 185 ft. +3.72 Over 210 ft. +5.23 Over 250 ft. +7.92 Over 295 ft. +10.97 Over 350 ft. +12.76
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
Group 1: Crane; shovel; truck crane; cherry picker;
dragline; trench hoe; backhoe; three drum machine; derrick;
pile driver; elevator tower; hoist; gradall; shovel dozer;
front end loader; fork lift; suger; boring machine; rotaryu drill; post hole hammer; post hole digger; pumpcrete machine; asphalt plant (on site); concrete batching and/or mixing plant (on site); crusher plant (on site); paving concrete mixer; timber jack Group 2: Sonic or vibratory hammer; grader; scraper; tandem scraper; concrete pump; bulldozer; tractor; york rake;
mulching machine; portable steam boiler; portable steam generator; roller; spreader; tamper (self propelled or tractor drawn); asphalt paver; mechanic - maintenance;
paving screed machine; stationary steam boiler; paving concrete finishing machine; cal truck; ballast regulator;
switch tamper; rail anchor machine; tire truck Group 3: Pumps (1-3 grouped); compressor; welding machine (1-3 grouped); generator; concrete vibrator; heater (power driven 1- 5); well point system (operating);
syphon-pulsometer; concrete mixer; valves controlling permanent plant air or steam; conveyor; Jackson type tamper; single diaphragm pump; lighting plant Group 4: Assistant engineer (fireman) Group 5: Oiler (other than truck cranes and gradalls) Group 6: Oiler (on truck cranes and gradalls) stant engineer (on truck crane and gradall)
IRON0007-006 03/16/2016
AREA 1: BRISTOL (Easton); ESSEX (Beverly, Gloucester, Lynn,Lynnfield, Manchester, Marblehead, Nahant, Rockport, Salem, Saugus, Swampscott); MIDDLESEX (Arlington, Bedford, Belmont, Burlington, Cambridge, Carlisle, Concord, Dunstable, Everett, Framingham, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Except Medway);
SUFFOLK
AREA 2: ESSEX (Amesbury, Andover, Boxford, Danvers, Essex, Georgetown, Hamilton, Haverhill, Ipswich, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, Topsfield, Wenham, West Newbury); MIDDLESEX (Action, Billericia, Chelmsford, Dracut, Groton, Groveland, Littleton, Lowell, Middleton, North Reading, Pepperell, Tewksbury, Tyngsboro, Westford, Wilmington)
Ironworkers:
AREA 1......................$ 42.89 29.89
AREA 2......................$ 38.48 29.89
IRON0007-010 03/16/2016
MIDDLESEX (Ashby, Ashland, Ayer, Boxboro, Holliston, Hopkinton, Hudson, Marlboro, Shirley, Stow, Townsend); NORFOLK (Medway)
IRONWORKER.......................$ 42.89 29.89
IRON0037-005 03/16/2016
BARNSTABLE; BRISTOL (Acushnet, Attleboro, Berkley, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, Mansfield, New Bedford, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton, Westport); DUKES; NANTUCKET;
NORFOLK (Billingham, Franklin, Plainville, Wrentham)
IRONWORKER.......................$ 34.01 25.22
LABO0014-001 06/01/2016
Rates Fringes
Plasterer tender
BARNSTABLE, BRISTOL,
DUKES, ESSEX, NANTUCKET,
MIDDLESEX (with the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline Dedham and Milton) COUNTIES.$ 31.65 21.30 SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer Island, Nut Island);
MIDDLESEX COUNTY
(Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only);
NORFOLK COUNTY (Brookline, Dedham, and Milton only)....$ 35.85 22.45
LABO0022-009 06/01/2016
SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer & Nut Islands); MIDDLESEX COUNTY (Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop, and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only)
Laborers:
Group 1.....................$ 35.85 22.45 Group 2.....................$ 36.10 22.45 Group 3.....................$ 36.60 22.45 Group 4.....................$ 36.85 22.45 Group 5.....................$ 36.60 22.45 Group 6.....................$ 37.85 22.45 Group 7.....................$ 20.50 22.45
LABORERS CLASSIFICATIONS
GROUP 1: Laborers; Carpenter Tenders
GROUP 2: Jackhammer operator; pavement breaker; asphalt raker carbide core drilling machine; chain saw operator;
pipelayer; barco type jumping tampers; laser beam; concrete pump; mason tender; motorized mortar mixer; ride-on motorized buggy; fence and beam rail erector
GROUP 3: Air track, block paver; rammer; curb setter, hydraulic and similar self-powered drills
GROUP 4: Blaster; powderman
GROUP 5: Pre-cast floor and roof plank erector
GROUP 6: Asbestos removal laborers/haz-mat laborers
GROUP 7: Flaggers
LABO0022-010 06/01/2016
Counties of BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET;
MIDDLESEX (with the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakfield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline, Dedham and Milton)
Laborers:
Group 1.....................$ 31.65 21.30 Group 2.....................$ 31.90 21.30 Group 3.....................$ 32.40 21.30 Group 4.....................$ 32.65 21.30 Group 5.....................$ 32.40 21.30 Group 6.....................$ 33.65 21.30
LABORERS CLASSIFICATIONS
GROUP 1: Laborers; Carpenter Tenders
GROUP 2: Jackhammer operator; pavement breaker; asphalt raker carbide core drilling machine; chain saw operator;
pipelayer; barco type jumping tampers; laser beam; concrete pump; mason tender; motorized mortar mixer; ride-on motorized buggy; fence and beam rail erector
GROUP 3: Air track, block paver; hammer; curb setter, hydraulic and similar self-powered drills
GROUP 4: Blaster; powderman
GROUP 5: Pre-cast floor and roof plank erector
GROUP 6: Asbestos removal laborers/haz-mat laborers
LABO1421-004 07/01/2016
BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK
AND SUFFOLK COUNTIES
Laborers: (Wrecking) Group 1.....................$ 36.00 22.45 Group 2.....................$ 36.75 22.45 Group 3.....................$ 37.00 22.45 Group 4.....................$ 32.00 22.45 Group 5.....................$ 35.10 22.45 Group 6.....................$ 36.00 22.45
Group 1: Adzeman, Wrecking Laborer.
Group 2: Burners, Jackhammers.
Group 3: Small Backhoes, Loaders on tracks, Bobcat Type Loaders, Hydraulic "Brock" Type Hammer Operators, Concrete Cutting Saws.
Group 4: Yardman (Salvage Yard Only).
Group 5: Yardman, Burners, Sawyers.
Group 6: Asbestos, Lead Paint, Toxic and Hazardous Waste.
PAIN0011-007 06/01/2016
BARNSTABLE, BRISTOL, DUKES, AND NANTUCKET COUNTIES
Rates Fringes
GLAZIER..........................$ 35.58 20.15+A
FOOTNOTE:
A. PAID HOLIDAY: LABOR DAY (provided employee has worked any part of the week prior to Labor Day and any part of the week after Labor Day)
PAIN0035-004 01/01/2015
BARNSTABLE; BRISTOL; ESSEX; NANTUCKET; DUKES; COUNTIES;
REMAINDER OF NORFOLK; MIDDLESEX AND SUFFOLK COUNTIES
Painters:
NEW CONSTRUCTION:
Brush, Taper...............$ 36.26 25.95 Spray, Sandblast...........$ 37.66 25.95
REPAINT:
Brush, Taper...............$ 34.32 25.95 Spray, Sandblast...........$ 35.72 25.95
PAIN0035-013 01/01/2015
MIDDLESEX (Cambridge, Everett, Malden, Medford, Somerville) SUFFOLK COUNTY (Boston, Chelsea) NORFOLK COUNTY (Brookline)
Painters:
NEW CONSTRUCTION:
Brush, Taper...............$ 42.05 25.95 Spray, Sandblast...........$ 43.45 25.95
REPAINT:
Brush, Taper...............$ 40.11 25.95 Spray, Sandblast...........$ 41.51 25.95
PAIN0035-020 01/01/2015
ESSEX; MIDDLESEX; NORFOLK; SUFFOLK
Rates Fringes
GLAZIER..........................$ 36.26 25.95
PLAS0534-001 01/01/2016
ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 38.65 33.11
PLAS0534-004 01/01/2016
MIDDLESEX; NORFOLK AND SUFFOLK COUNTIES
Rates Fringes
PLASTERER........................$ 38.65 33.11
PLUM0004-001 09/01/2016
MIDDLESEX (Ashby, Ayer-West of Greenville branch of Boston and Maine Railroad, Ft. Devens, Groton, Shirley, Townsend)
Plumbers and Pipefitters.........$ 42.76 24.91
PLUM0012-005 09/01/2016
ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Manchester, Marblehead, Merrimac, Methuem, Middleton, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Topsfield, Wenham, West Newbury)
PLUMBER..........................$ 51.18 24.56
PLUM0012-007 09/01/2016
ESSEX (Lynn, Lynnfield, Nahant, Saugus, and Swampscott);
MIDDLESEX (Acton, Arlington, Ashford, Ayer-except west of Greenville Branch of Boston & Maine Rail Road, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlise, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliiston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Watham, Watertown, Wayland, Westford, Wilmington, Winchester and Woburn), NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Franklin, Medford, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth and Wrentham); PLYMOUTH (Hingham, Hull, Scituate);
SUFFOLK; WORCESTER (Hopedale and Southboro)
PLUMBER..........................$ 55.26 24.56
PLUM0051-004 03/01/2014
BARNSTABLE; BRISTOL; DUKES; NANTUCKET; AND NORFOLK (Avon, Holbrook, Randolph, Stoughton) COUNTIES
Plumbers and Pipefitters.........$ 35.51 27.32
PLUM0537-005 09/01/2016
ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Saugus, Swampscott,Topsfield, Wenham, West Newbury); MIDDLESEX (Acton, Arlington, Ashford, Ayer-except west of Greenville Branch of Boston & Maine Rail Road, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlise, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliiston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Watham, Watertown, Wayland, Westford, Wilmington, Winchester and Woburn), NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Franklin, Medford, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth and Wrentham); PLYMOUTH (Hingham, Hull, Scituate);
SUFFOLK; WORCHESTER (Hopedale and Southboro)
PIPEFITTER.......................$ 50.19 29.76
ROOF0033-001 08/01/2016
Rates Fringes
Roofers:
All Tear-off and/or removal of any types of roofing and all spudding, sweeping, vacuuming and/or cleanup of any and all areas of any type where a roof is to be relaid........$ 41.11 24.00
SFMA0550-001 10/01/2016
BRISTOL (Portion within 35 mile radius from Boston City Hall;
ESSEX; MIDDLESEX (Except Ashby, Townsend, and portions of Pepperell and Shirley beyond 35 mile radius from Boston City Hall); NORFOLK; PLYMOUTH (Portion within 35 mile radius of Boston City Hall); SUFFOLK
SPRINKLER FITTER.................$ 55.48 26.38
SFMA0550-002 10/01/2016
BRISTOL (Seekonk, Swansea, and Somerset)
Rates Fringes
SPRINKLER FITTER.................$ 49.93 26.38+a
a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holiday.
SFMA0669-001 04/01/2016
BARNSTABLE; BRISTOL (Beyond 35 mile radius of Boston City Hall); DUKES; MIDDLESEX (Ashby, Townsend, portions of Pepperell and Shirley beyond 35 mile radius of Boston City Hall);
NANTUCKET; PLYMOUTH (Beyond 35 mile radius of Boston City Hall)
SPRINKLER FITTER.................$ 39.01 21.35
SHEE0017-003 10/01/2015
BRISTOL (Attleboro, Berkley, Easton, Mansfield, North Attleboro, Norton, Raynham, Taunton); ESSEX; MIDDLESEX;
NORFOLK; PLYMOUTH (except except Marion, Mattapoisett, Rochester, Wareham); SUFFOLK
Sheet metal worker...............$ 35.60 30.05
SHEE0017-007 10/01/2015
BARNSTABLE; BRISTOL (Acushnet, Assonet, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, New Bedford, Rehoboth, Seeekonk, Somerset, Swansea, Westport); DUKES; AND NANTUCKET
Sheet metal worker...............$ 35.60 30.05
* TEAM0379-001 08/01/2016
Truck drivers:
Group 1.....................$ 31.98 21.96+A+B Group 2.....................$ 32.15 21.96+A+B Group 3.....................$ 32.22 21.96+A+B Group 4.....................$ 32.34 21.96+A+B Group 5.....................$ 32.44 21.96+A+B Group 6.....................$ 32.73 21.96+A+B Group 7.....................$ 33.02 21.96+A+B
POWER TRUCKS $.25 DIFFERENTIAL BY AXLE
TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE
HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM
TRUCK DRIVERS CLASSIFICATIONS
Group 1: Station wagons; panel trucks; and pickup trucks
Group 2: Two axle equipment; & forklift operator
Group 3: Three axle equipment and tireman
Group 4: Four and Five Axle equipment
Group 5: Specialized earth moving equipment under 35 tons other than conventional type trucks; low bed; vachual;
mechanics, paving restoration equipment
Group 6: Specialized earth moving equipment over 35 tons
Group 7: Trailers for earth moving equipment (double hookup)
FOOTNOTES:
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day
B. PAID VACATION: Employees with 4 months to 1 year of service receive 1/2 day's pay per month; 1 week vacation for 1 - 5 years of service; 2 weeks vacation for 5 - 10 years of service; and 3 weeks vacation for more than 10 years of service
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .