Amendment0002.pdf
PDF 22 KB Posted
- Solicitation number
- W912WJ-17-Q-0004
About this file
Amendment0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0003.pdf | ||
| SPEC_CHANGES-CONANT_BROOK_ACCESS_ROAD.docx | DOCX document | |
| Amendment0001.pdf | ||
| Specifications.pdf | ||
| Plans.pdf | ||
| W912WJ-17-Q-0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W13G8670232755
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment002 is issued to make in a change in specifications to Section 01 50 00, Paragraph 3.7; delete last sentence of this paragraph and answ er technical questions asked. Due date remains for March 22, 2017 at 5pm.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ-17-Q-0004
X 9B. DATED (SEE ITEM 11)
23-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Mar-2017
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:
SHEILA M WINSTONVINCUILLA / CONTRACT SPECIALIST
W912WJ-17-Q-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT0002
Solicitation W912WJ-17-Q-0004
Construction of a New Access Road to the Outlet Structurer and Downstream Toe at the Conant Brook, located in Monson, Massachusetts
AMENDMENT 0002
SPECIFICATION CHANGES
Section 01 50 00, Paragraph 3.7; delete last sentence of this paragraph.
QUESTIONS & ANSWERS
1. Can one individual serve as the QCM and the Site Superintendent?
Answer: Yes
2. After reviewing the contract drawings and visiting the site on Thursday, March 2 is an abbreviated Accident Prevention Plan acceptable for this limited scope project?
Answer: The Accident Prevention Plan (APP) must conform to the requirements of Section 01 35 26. An abbreviated APP as outlined in EM385-1- 1 is not acceptable for this type of project.
3. After reviewing the site on March 2, it has been determined that to minimize clearing there would be two trees which would need to be cut down(one fir and one we believe maple) near Station 0 + 00, North side to allow trucks and equipment to access the site.
Will we be required to stump these trees and remove from site or leave stumps in place to decay? The remaining area of access road into the site will require branch clearing which we will remove from site. Please advise.
Answer: Stumps that do not interfere with the proposed work may be left in place
W912WJ-17-Q-0004
4. Specifications are little conflicting especially with the EM385 requirements. How many persons are we to figure for this project? One section requires the SSHO, QCM, Site Superintendent to attend the Pre-construction meeting (which is the EM385 requirement) but spec. section 01 35 26 states the CQC can be the SSHO but not the site superintendent. Are we to figure three persons or two?
Answer: Yes, one person can serve as SSHO, QCM, and Site Superintendent. See enclosed amendment to the Specifications. Based on this we need to amend the Spec as follows: Section 01 35 26, Paragraph 1.5.1.1; Change the last sentence to read: The Contractor Quality Control Person can also be the SSHO and the Project Superintendent on this project.
5. The following items are listed as Government Required Submittals but are not applicable to this project:
Crane Critical Lift Plan Crane Operators Temporary Electrical System Please confirm. In addition spec. section 01 35 26 paragraph 1.3 refers to Crane Critical Lift Plan and Crane Operators, there again these will not be applicable to this project.
Answer: Whether these submittals are required is dependent upon how the Contractor conducts the work of this project. Assuming no cranes are used on this project then submittals of a Crane Critical Lift Plan and Crane Operators will not be necessary.
Similarly, whether a submittal for Temporary Electrical System is required is dependent on whether the Contractor proposes to bring temporary electrical service to the site.
6. The project site is located in the middle of the abandoned portion of Old Wales Road.
Each end of the road is active but dead ended by secured Government gates/barriers.
Specification requires temporary fencing to be installed as project Safety Fencing and "around the existing septic system prior to the start of other work at the site". We visited the site on Mar.2 and did not see any signs of an existing septic system. Please advise as to exactly what we should provide for Site Safety Fencing.
Answer: There is no septic system near this work site (see enclosed amendment).
Temporary safety fencing is therefore only required to protect the work site and any laydown or storage areas from access by unauthorized people.
(End of Summary of Changes)