About this file

Amendment0001

View the file

Other files

File Type Posted
Amendment0003.pdf PDF
Amendment0002.pdf PDF
SPEC_CHANGES-CONANT_BROOK_ACCESS_ROAD.docx DOCX document
Specifications.pdf PDF
Plans.pdf PDF
W912WJ-17-Q-0004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W13G8670232755

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amenment0001 is being issued to answ er technical questions, provide a change is specifications and correct spelling for name of Technical Point of Contact. The solicitation due date is extended to March 22, 2017 at 5pm.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Mar-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ-17-Q-0004

X 9B. DATED (SEE ITEM 11)

23-Feb-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Mar-2017

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:

SHEILA M WINSTONVINCUILLA / CONTRACT SPECIALIST

W912WJ-17-Q-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT0001

Solicitation W912WJ-17-Q-0004

Construction of a New Access Road to the Outlet Structurer and Downstream Toe at the Conant Brook, located in Monson, Massachusetts

AMENDMENT 0001

SPECIFICATION CHANGES

Specification Section 01 11 00 SUMMARY OF WORK, Subpart 1.16 QUANTITY SURVEYS; delete this subpart in its entirety.

QUESTIONS & ANSWERS

1. Section 01 11 00 page9, paragraph 1.1.6 states that quantity surveys will be used for payments, yet the bid is lump sum. Why is the bid not unit price?

Answer: A lump sum bid schedule was determined to be adequate since all quantities can be accurately determined from the contract documents. Spec Section 01 11 00, Subpart 1.16 is not applicable, and will be deleted from the contract documents. An amended Spec Section 01 11 00 is attached.

2. The specs call for critical lift plans, hot work plans, fall protection. Are these plans necessary?

FYI, they drive the cost up.

Answer: These plans are called for in the Specs because the Government wants to be sure that for any approach that the Contractors are going to utilize, the requirement for a written safety plan is included. This is a generic safety and submittal spec that we use for all projects. If a contractor isn't going to use a crane when he builds this road, then he can't write a critical lift plan, and therefore, there should be no additional cost for the preparation of this plan. Fall protection is the same - most likely this won't be needed on this project, but is provided just in case. A contractor shouldn't be charging to generate a fall protection plan if he is not going to need it. But if for some reason a contractor chooses to use a manlift, then the submittal language is provided. In regards to Hot Work, if a Contractor has a piece of equipment break on site, and welding is needed to repair it, then he will need a Hot Work permit."

3. Can the CAD files of the drawings be made available?

Answer: CADD files will be provided to the winning Contractor so that As-built drawings can be generated from them. However, CADD files cannot be made available to prospective bidders.

W912WJ-17-Q-0004

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 15-Mar-2017 05:00 PM to 22-Mar-2017 05:00 PM.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: Keith Beecher Email Address: Keith.W.Beecher@usace.army.mil Telephone: (978) 318-8405

(End of provision)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .