W912WJ-17-B-0021_-_Amendment_1.pdf

PDF 359 KB Posted

Attached to
Nantasket Beach, Hurricane and Storm Damage Reduction Project
Solicitation number
W912WJ-17-B-0021
Issued by

About this file

W912WJ-17-B-0021 - Amendment 1

View the file

Other files

File Type Posted
W912WJ-17-B-0021_-_Amendment_5.pdf PDF
W912WJ-17-B-0021_-_Amendment_4.pdf PDF
W912WJ-17-B-0021_-_Amendment_3.pdf PDF
W912WJ-17-B-0021_-_Amendment_2.pdf PDF
PLANS.pdf PDF
SPECS.pdf PDF
W912WJ-17-B-0021_-_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to revise the bid opening date to Thursday, 10/12/2017 @ 2:00 PM (EDT), provide changes to the specification section, provide the site visit sign in sheet and answ ers to RFI's. All other aspects of this solicitation remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Sep-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ17B0021

X 9B. DATED (SEE ITEM 11)

18-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Sep-2017

CODE

US ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA ROAD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ17B0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 19-Sep-2017 02:00 PM to 12-Oct-2017 02:00 PM.

The following have been added by full text:

AMENDMENT 1

Solicitation Revisions

Changes to the Specification section are included with this amendment.

RFI

1. Instead of 2 pieces 6’ long, could the Cut Armor Stairs be fabricated using 12’ long pieces?

Response: Cut armor stones of this size may be used if the materials are available.

2. Even after backfilling, there is going to be a substantial amount of excavated material left over. It is our understanding that no material will be removed from the project. Please provide a location for the excavated material.

Response: All excess excavated material not used as native backfill as shown on the contract drawings shall be loosely distributed between the seaward revetment crest and the limits of excavation.

3. Does average high tide come all the way up to the wall?

Response: Yes, high tide does reach the seawall.

4. In Division 01 – General Requirements Section 01 50 00 Temporary Construction Facilities and Controls, Part

2.1 Temporary Signage reads “Project identification and safety signs are not required for this project”. Division 1 General Requirements Section 01 58 00 goes into detail about a project sign. Please provide clarification if a project sign is required for this project.

Response: This project will require a Project Identification sign. However a safety sign will not be required.

Specifications Section 01 50 00 and Section 01 58 00 have been revised under AMENDMENT 0001 ‐ NARRATIVE CHANGES TO SPECIFICATIONS to clarify.

W912WJ17B0021

AMENDMENT 0001 OF SOLICITATION

1.1 NARRATIVE CHANGES TO SPECIFICATIONS

1. Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS, Subpart

2.1 TEMPORARY SIGNAGE; delete the content of this Subpart in its entirety and insert the following in its place:

"A Project Identification sign is required for this project; a safety sign is not required."

2. Section 01 58 00 PROJECT IDENTIFICATION SIGN, Subpart 1.3 GENERAL, Part "b"; delete the content of Part "b" in its entirety and insert the following in its place:

"The sign shall consist of one Project Identification sign. The sign shall be in accordance with the requirements listed herein and the example attached at the end of this section."

3. Section 01 58 00 PROJECT IDENTIFICATION SIGN, Subpart 1.4.1 "General", Part "g"; delete Part "g" in its entirety.

4. Section 01 58 00 PROJECT IDENTIFICATION SIGN, the Project Sign attachment at the end of this section; delete the third and fourth pages from the Project Sign attachment in their entireties. The third and fourth pages address Safety Sign requirements. The third page is labelled "Safety Performance Sign, Detail, Sheet 1/2". The fourth page is labelled "Individual Metal Plates, Detail, Sheet 2/2".

5. Section 35 31 19 SHORELINE REVETMENT PROTECTION, Subpart 2.2.2 "Dimensions of Cut Armor Stone"; delete the content of this Subpart in its entirety and insert the following in its place:

"Cut armor stones shall be quarried and cut to the dimensions shown on the contract drawings."

END OF AMENDMENT 0001

(End of Summary of Changes)