Solicitation.pdf

PDF 585 KB Posted

Attached to
Environmental Planning and Consulting Services
Solicitation number
W912WJ-16-R-0003
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
W912WJ-16-R-0003-0003.pdf PDF
W912WJ-16-R-0003-0002.pdf PDF
W912WJ-16-R-0003-0001.pdf PDF
Figure_5.xlsx XLSX spreadsheet
Figure_4.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 03:00 PM local time 31 Oct 2016

A X B X C

D

EX

X G F 70 - 74

75 - 81 X H 82 - 105

Alysha.Macdonald@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 105

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912WJ 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

696 Virginia Rd, Concord, MA conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

ALYSHA MACDONALD 978-318-8715

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 3

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

4 - 16 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

18 - 19

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 20 - 24 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

25 - 32

PART II - CONTRACT CLAUSES

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

978-318-8207FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

33 - 69

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

29 Sep 2016

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912WJ-16-R-0003

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 25,000,000 Job Professional Services IDIQ

FFP

Contractor shall provide all labor, materials, parts and equipment to perform Environmental Planning and Consulting Services Indefinite Delivery/ Indefinite Quantity Type Contract for Various Projects Located throughout the Northeastern United States.

FOB: Destination

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0002 5 Job

CMRA

FFP

Base year time for fulfilling the CMR requirement if included or not included in your overhead for initial CMR database set up for annual CMR reporting. The contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract to include all modifications in accordance with the Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs). See attached instructions for Contractor Manpower Reportinginformation and refer to clause 52.204-9002 FOB: Destination

MAX

NET AMT

GENERAL INFORMATION

The contract shall be for a 5 year period and the total amount of the contract shall not exceed $25,000,000.00.

After award of the base contract, work will be issued through negotiated task orders on a firm-fixed price basis.

Specific task and pricing information for work to be performed under this contract shall be included in each negotiated Task Order.

The Government is obligated to satisfy a minimum guaranteed amount of not less than $50,000.00 over the life of the contract.

Contractors are to complete and submit a Certificate of Corporate authority of the signing representative with Volume II of their proposal (see figure 7).

Contract Manpower Requirement

The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract to include all task orders and modifications (this only applies to work performed on a Army Installation) . The contractor is required to completely fill in all the information in the format described at the following web address: https://cmra.army.mil. This website address includes links to a helpdesk and a user's manual. As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. The reporting period will be from the beginning of the period of performance until 30 September of each government fiscal year, not to exceed 12 months and must be reported by 31 October of each calendar year. The awarded contract shall include A contract line item number (CLIN) for the Base period that shall cover cost if any for the initial CMR database setup and the annual requirement for CMR reporting.

Further information and frequently asked questions are located at the following website:

https:cmra.army.mil/Login.aspx . The contractor may choose to price or not separately price for this requirement.

See line items for specific CLIN information.

Section C - Descriptions and Specifications

SECTION C

DESCRIPTION/SPECIFICATION/WORK STATEMENT SPECIFICATIONS FOR:

ENVIRONMENTAL CONSULTING SERVICES FOR VARIOUS PROJECTS

LOCATED THROUGHOUT THE NORTHEASTERN UNITED STATES

AND ADJACENT WATERS

1. AUTHORIZATION

1.1 National Environmental Policy Act of 1969 (NEPA) (Public Law 91-190;

83 Stat. 852; 42 U.S.C.4331 et seq.).

1.2 Specific project authorizations will vary by project.

1.3 Corps of Engineers Regulations ER 1105-2-250 and ER 200-2-2.

1.4 Department of Army Regulations AR-200-1 and AR-200-2.

2. GENERAL INFORMATION

2.1 One Contractor will be awarded a contract with the capability to use either civil works or military funds in each separate Task Order.

2.2 The location of services to be performed under this contract shall be primarily in the Northeastern United States and adjacent waters, including but not limited to areas currently covered by the U.S. Army Corps of Engineers North Atlantic Division’s (NAD) civil and military works boundaries. Also, areas covered in strategic partnerships between NAD and other Corps of Engineers operational elements and Federal agencies as necessary to support regionally conducted business and coordinated delivery of services.

2.3 The services to be provided under this contract consist of those required to support the environmental assessment, policy, and resource management and protection responsibilities of the New England District (NAE) in cooperation with NAD, other Corps of Engineers operational elements and Federal agencies.

2.4 A list of potential tasks to be performed under this contract is presented in Section 3 below (General Statement of Services).

2.5 Representative projects currently being executed under similar contracts include:

Operational monitoring (water, sediment) for ongoing remediation and remedial investigation at the New Bedford Harbor Superfund Site; physical, chemical and biological (including bioassay and bioaccumulation) testing programs for numerous navigation projects; Dredged Material Management Plan (DMMP) development support; Disposal Area Monitoring System (DAMOS) Program support; and Environmental Impact Statements (EIS) and Environmental Assessment (EA) support for Boston Harbor and Long Island Sound dredging and other major Civil Work actions.

2.6 Projects to be executed under this Contract will be described in detail, including (as necessary) photographs, maps, specifications, and design requirements in the scope of work accompanying each individual Task Order issued hereunder.

2.7 The objectives and milestones for each Task Order are developed through negotiation between the NAE Project Manager and the Contractor to gain a clear understanding of the specific issues to be addressed and to design the most effective approach to complete the task.

As the specific problems addressed by environmental projects are often complex and as updated/new evaluation methods and analyses are continually being developed, the Contractor must maintain a state-of-the-art and multi-disciplined approach to the work.

3. GENERAL STATEMENT OF SERVICES

The Contractor shall provide services pursuant to scopes of work contained in subsequent Task Orders upon execution of the contract. Task Orders may be issued for, but are not limited to, the tasks described below. Tasks are grouped by category and then broken down into priority groupings according to the importance of the task in the evaluation of proposals under this RFP.

3.1 Environmental Studies/Reports - This category of work includes multi-component, multi-disciplinary projects where the Contractor may be tasked with performing the entire study/report or with performing one or more components of the study.

3.1.1 Primary Tasks

3.1.1.1 Prepare Environmental Reports and National Environmental Policy Act (NEPA) documents including Environmental Impact Statements, Environmental Assessments, Statements of Findings and Clean Water Act Section 404 (b) (1) Evaluations. These documents may need to incorporate physical, chemical and biological testing of materials pertinent to the proposed action, including bioassay and bioaccumulation testing of proposed dredged materials, pursuant to the “Regional Implementation Manual for the Evaluation of Dredged Material Proposed for Disposal in New England Waters” (RIM April 6, 2004) (RIM). The Contractor must have the ability to conduct the necessary field sampling and collection efforts in support of the studies identified above.

3.1.1.2 Prepare environmental documents and evaluations in compliance with the NEPA, other Federal regulations, northeastern state and local environmental policy regulations and specialized reports on specific resources, engineering, planning, or environmental issues.

3.1.1.3 Conduct environmental monitoring studies, such as air, surface water, groundwater and sediment, to determine the state of environmental contaminants at Superfund and other hazardous, toxic, and radioactive waste (HTRW) sites. These may require documentation from Work Plan and Site Safety Health Plan development through Site Investigation, Remedial Investigation, Feasibility Study and Record of Decision/Decision Document preparation under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA).

3.1.1.4 Perform water quality monitoring studies, plume tracking studies and sediment characterization studies including mapping and summary reporting.

3.1.1.5 Undertake specific field and/or laboratory studies to answer resource and impact questions. This includes DAMOS Program studies incorporating survey tools such as precision bathymetry, side-scan sonar, sediment coring and sediment profile imaging with synthesis of data into DAMOS Program and peer-reviewed contributions.

3.1.1.6 Prepare Regional Sediment Management Studies

3.1.1.7 For all of the studies/reporting noted above, use computer geographic information systems (GIS) to describe existing environmental conditions and potential environmental impacts of proposed projects. All GIS deliverables shall conform to the guidance provided in Figure 2.

3.1.2 Secondary Tasks

3.1.2.1 Design and monitor mitigation, restoration, and enhancement projects in accordance with USACE Civil Works regulations.

3.1.2.2 Conduct economic and social impact analyses and studies, watershed studies, fisheries studies, hydrologic modeling and other related Planning studies for USACE water resources projects.

3.1.2.3 Perform groundwater sampling and analysis as part of general characterization or plume tracking.

3.1.2.4 Prepare and/or provide support for Dredged Material Management Plan development.

3.1.2.5 Use computer models to describe existing environmental conditions and potential environmental impacts of proposed projects.

3.1.2.6 Prepare air emission inventories conformity analysis and related reports in support of Clean Air Act compliance.

3.1.2.7 Prepare NEPA documents for civil works and military actions within the Federal government to include: Operations support for major rehabilitation actions, Military construction, real property acquisition or disposal, and other actions.

3.1.2.8 Provide environmental, recreational planning, geographic, land use, legal, socioeconomic, archaeological, risk assessments and other studies on specific resource issues.

3.1.3 Tertiary Tasks

3.1.3.1 Perform hydro, wind and tidal electric power systems analysis.

3.1.3.2 Perform analysis on alternative Hazardous Waste Disposal and Recycling techniques.

3.1.3.3 Prepare Combined Sewer Overflow (CSO) management plans

3.2 Technical Support – This category of work includes specific support tasks that may have single or multiple elements (e.g. field, laboratory analysis, limited reporting)

3.2.1 Primary Tasks

3.2.1.1 Conduct field operations, laboratory testing, other research, and analyses to evaluate environmental conditions for projects, including physical, chemical and biological analysis of sediments to be dredged and disposed throughout the region according to the guidance set forth in the RIM and the most up to date analytical protocols. Laboratory facilities must possess National Environmental Laboratory Accreditation Program (NELAP) certification and have an approved Laboratory Quality Assurance Plan (LQAP) on file with NAE. All analytical data deliverables shall conform to the guidance provided in Figure 3.

3.2.1.2 Generate and/or maintain large scale databases for the storage and access of analytical data and geospatial data and information.

3.2.1.3 Provide laboratory and field equipment (including boats, aircraft, heavy equipment, crews, camera equipment, and sampling gear) and/or technical support personnel to conduct environmental studies and associated activities in marine, freshwater and terrestrial environments.

3.2.1.4 Delineation of jurisdictional limits of waters and wetlands, and assessment of the ecological functions and values of waters and wetlands following the criteria set forth in the current official Federal Manual for Identifying and Delineating Jurisdictional Wetlands.

3.2.1.5 Perform identification of plants, fish and wildlife, and benthic infauna from the marine, terrestrial, and freshwater environments.

3.2.1.6 Render expert opinions (written and oral).

3.2.1.7 Conduct specific investigations on hazardous toxic and radioactive waste (HTRW) sites, CERCLA sites (RI/FS through ROD), and prepare site specific Health and Safety Plans and Sampling and Analysis Plans.

3.2.2 Secondary Tasks

3.2.2.1 Design compensatory mitigation, restoration, and enhancement projects.

3.2.2.2 Review, edit and provide technical and policy comments on environmental documents prepared by others.

3.2.2.3 Undertake biological diving surveys within SCUBA ranges and perform underwater archaeological surveys. This includes preparation of SCUBA dive plans in compliance with NAE and all appropriate local, state, and Federal regulations for acceptance by the Government prior to diving operations. Maintain an updated diving safety plan with NAE's Safety Office should these services be required.

3.2.2.4 Perform archaeological surveys for identification and evaluation of pre-contact, contact, post-contact and industrial and underwater archaeological sites. Methods used and reports produced must meet the standards outlined in the Secretary of Interior's Standards and Guidelines for Archaeology and Historic Preservation (48 FR 44716 September 29, 1983) and Army Regulation 420-40 or service equivalent for all work done on military installations.

3.2.2.5 Perform surveys to identify and evaluate historic standing structures.

3.2.2.6 Preparation of National Register Nominations for standing structures, archaeological sites and districts, and multiple resource nominations.

3.2.2.7 Prepare scholarly data recovery plans and perform archaeological data recovery excavations for mitigation of impacts.

3.2.2.8 Prepare photographs with large format negatives suitable for Historic American Building Survey/Historic American Engineering Record (HABS/HAER) studies.

3.2.2.9 Provide photo editing and videographer support for the preparation of information fact sheets, web pages, and video shorts for presentation at scientific and technical meetings and for outreach to the general public.

3.2.3 Tertiary Tasks

3.2.3.1 Provide services for Potential Responsible Party (PRP) investigations for projects located throughout the Northeast. This contract may require the Contractor to furnish personnel, facilities, materials, and equipment necessary to prepare site ownership and historical site operation reports required to assist the Government in the evaluation of liability and level of responsibility based on the four liability classes outlined in the CERCLA, 42 USC 9601 et seq.

The Contractor may be requested to develop, or assist in the development of a cost allocation formula based on the results of the research conducted.

One objective of this procurement is to provide services to NAE in the investigation of the nature and extent of contamination including potential sources of the contamination and allocation of costs for investigation and cleanup of hazardous waste sites where contamination may have resulted from U.S. Government activity. The work is considered to be in preparation of actual or potential litigation and is privileged to the United States and the USACE. Services may also be requested under this contract for support in the evaluation of activities on Federal lands prior to the sale or transfer to other agencies. These sites may be located in the Geographical boundaries of the North Atlantic Division of the USACE. It is not the intent of this procurement to obtain direct representation services but to provide support to the Government in making such determinations. Deliverables will include, but will not be limited to: (a) Quality Control and Investigation Plan, and (b) a Site Ownership and Operational History Report. Additional requirements may also be established in the task orders.

The New England District shall provide the Contractor with any pertinent site data, studies, and EPA documents in its possession at the beginning of the project. The Contractor shall be responsible for identifying additional record sources and obtaining all the relevant records and data necessary to prepare the required reports. The Contractor shall request USACE New England District assistance in gaining access to PRP records as necessary. The Contractor will be required to protect the privileges or confidentially of all information acquired for this contract, according to the direction of the Government.

3.2.3.2 Prepare conventional and electronic delineation of stereoscopic aerial photography, correct scale distortions, and transfer information to base maps.

3.2.3.3 Provide deployment/servicing support for site marker buoys at dredged material disposal sites.

4. SAFETY AND HEALTH

Any field investigations conducted under the scope of this contract shall require the Contractor to prepare an Accident Prevention Plan (APP) specific to the activities being performed. All work shall be conducted in accordance with the APP, the U.S. Army Corps of Engineers Safety and Health requirements Manual (EM 385-1-1, most recent edition), and all applicable Federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at Headquarters USACE website under publications using the following link: http://www.usace.army.mil/library/.

In addition to general fieldwork, this contract may require contaminated site investigation work. The Contractor shall have an ongoing Safety and Health Program meeting the requirements of the OSHA standard, 29 CFR 1910.120, "Hazardous Waste Operations and Emergency Response". The Contractor's Safety and Health Program will be evaluated by the USACE Safety Office and must be submitted within 30 days after award of the contract. The

Contracting Officer after award of the Contract must approve this program. The Contractor shall incorporate any additions or revisions required by the Contracting Officer at no cost to the Government.

4.1 Accident Prevention Plan

The Contractor’s APP shall detail how safety and health will be managed during the project. The APP shall address the requirements of applicable Federal, state and local safety and health laws, rules, and regulations. The Contractor shall comply with Federal Acquisition Regulation Clause No. 52.236-13 for Accident Prevention, which is added by reference. Special attention shall focus on the requirements of EM 385-1-1, including all updates, specifically Section 01.A.11 through 01.A.18, Figure 1-2 AHA, and Appendix A, (Minimum Basic Outline for Accident Prevention Plan). The APP shall be developed by a qualified person. The Contractor shall be responsible for documenting the qualified person’s credentials. Work shall not proceed until the APP has been reviewed by the Government Designated Authority (GDA) and deemed acceptable for use on the project.

The Contractor’s APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific.

4.1.1 Activity Hazard Analysis. As part of the APP the Contractor shall prepare an Activity Hazard Analysis (AHA) for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. Work shall not proceed on a phase of work until the AHA has been accepted by the GDA. A preparatory meeting shall be conducted by the Contractor to discuss the AHA contents with all engaged in the activity. The preparatory meeting shall be conducted by the prime contractor and shall include all subcontractors and Government on-site representatives.

The AHA shall be continuously reviewed and revised to address changing site conditions or operations as appropriate.

4.1.2 Site Safety and Health Plan. As part of the APP the Contractor shall prepare a Site Safety and Health Plan (SSHP) whenever a site visit is to be conducted in a contaminated or potentially contaminated area. The SSHP shall cover the 14 elements identified in EM385-1-1, Section 28.A.02.b. The SSHP shall be attached to the APP as an appendix. SSHP elements adequately covered elsewhere in the APP need not be duplicated again in the SSHP.

4.2 Responsibility

The overall responsibility for the development, implementation and continued enforcement of the Contractor's Safety and Health Program and APP lies with the Contractor.

The Government considers the Prime Contractor to be the "controlling authority" for safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

4.2.1 The Contractor shall utilize the services of an experienced Certified Industrial Hygienist (CIH) to implement and oversee the Safety and Health Programs and to develop, implement and sign all SSHPs. The CIH shall be further utilized as needed to develop and implement (or assist in development and implementation) of all APPs. Any changes to the established Safety and Health Program or SSHPs shall be at the direction and approval of the CIH, with concurrence of the Government Designated Authority. Changes to established APPs shall be at the direction and approval of the Contractor’s designated qualified person, with CIH review and approval as deemed necessary. The CIH will not necessarily be required to be on site during site visits, but shall be readily available for consultation when required.

4.2.2 In addition, the Contractor shall utilize a trained, experienced Site Safety and Health Officer (SSHO) to assist and represent the CIH in the continued implementation and enforcement of the approved APP's. A SSHO shall be assigned during each site visit on a full-time basis and shall be either a Contractor employee or a subcontractor who reports to the Contractor and the CIH in matters pertaining to site safety and health. The SSHO shall have the on-site responsibility and authority to modify and/or remove personnel from the site if conditions exist which may affect on-site/off-site safety and health. The SSHO shall be the main contact for any on-site emergency situation. Except in an emergency, the SSHO may modify the approved APP only after consultation and concurrence of the CIH and the Contracting Officer.

4.3 Accident Reporting.

All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $2,000.00, shall be verbally reported to the GDA within 24 hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D.02 shall be immediately reported to the GDA. ENG Form 3394 shall be completed and submitted to the GDA within five working days of the incident.

The Contractor shall complete the “USACE Contractor Monthly Summary Record of Injuries/Illness and Work Hour Exposure” provided in Figure 4 (for prime and its subcontractors) and forward the completed form to the GDA no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the GDA shall be electronically.

5. COORDINATION AND EXECUTION OF WORK.

5.1 Throughout the duration of this contract it is essential that close coordination be maintained for the proper administration of contract services. The Contracting Officer and the Contractor will each designate, by name and position, the respective individuals to serve in those coordinating positions. The primary representative of the Contracting Officer will be known as the Program Manager (currently, the Chief of the Environmental Resources Section). Each Task Order will have a Project Manager, who will provide technical direction to the Contractor. The

Contractor will inform the Contracting Officer in writing of the name and title of their primary representative and changes to that position.

5.2 All work shall be in accordance with the written instructions furnished by the Contracting Officer.

5.3 The Contractor shall make any corrections at their own cost to the work accomplished hereunder, as may be required because of errors and omissions on the part of the Contractor.

5.4 The Contractor shall furnish to the Project Manager, monthly reports on the progress of work to date, along with the below described invoices. The Contractor and Corps Program Manager shall meet monthly at the New England District Corps of Engineers to discuss work progress and issues.

5.5 The Contractor shall submit monthly invoices and estimated accruals for work to date on each Task Order. Invoices shall reference the Contract Number and Task Order Number, the project title and the Corps project manager’s name. The Contractor shall be responsible for the accuracy of invoices. Incorrect invoices may be returned for correction. The Contractor will submit a completed ENG Form-93, with each invoice if required.

5.6 Except under very unusual circumstances, professional supplies/services categories shall include the use of basic equipment essential to work typical to that discipline in the hourly rate (e.g., a wetlands scientist will have access to waders at no additional cost to the Government, all professionals will have access to standard computer, internet and e-mail resources and business software at no additional cost to the government).

5.7 Proposals submitted by the Contractor in response to statements of work provided by the Government shall indicate, individually, the supplies/services cost estimate for each separate task, including project management, described in the scope of work.

5.8 The Contractor shall use standard field and library research methods, including search of data at local sources and government agencies.

5.9 The Contractor shall use the following supplies/services category guidelines in preparing estimates:

5.9.1 Technician level shall be used for routine, repetitive tasks such as preparation of samples, sorting benthic invertebrate samples, supervised field data collection, literature searches, and data entry.

5.9.2 Junior level shall be used for tasks involving less complex analyses such as evaluating direct impacts to resources, routine field data collections, and mob/demob of equipment.

5.9.3 Mid-level shall be used for the majority of tasks where an average level of complexity exists such as routine manipulation and analysis of data, identification of direct and secondary effects of projects, mapping of resources, routine wetland delineations, typical regulatory evaluations, and drafting of reports.

5.9.4 Senior level shall be used to direct and design programs and to perform complex analyses requiring a high level of expertise in the discipline such as analyses of environmental effects where existing data and procedures is lacking, design of sophisticated water quality monitoring programs, delineation of wetland boundaries in disturbed or problem areas, unusual identifications of fauna and flora, and preparation of synthesis sections of reports and overall report editing.

5.9.5 Expert level (i.e. a nationally recognized expert in a field with an advanced degree) shall be used for consulting tasks or expert level document review and commenting.

6. SPECIAL REQUIREMENTS.

6.1 This is an indefinite delivery indefinite quantity contract for the services specified in the each Task Order. Services shall be performed only as authorized by Task Orders issued hereunder by the New England District, Corps of Engineers, in accordance with the Special Contract Requirement entitled "ORDERING".

6.2 The investigations to be ordered in the course of this contract shall be no more than 25 million dollars over a 5 year period. The Government’s minimum obligation is $50,000 in services over the life of the contract.

6.3 All compilations of literature reports and data concerning the study area shall be delivered to the Project Manager, at the appropriate NAE office.

6.4 The Contractor shall continue working during review periods.

6.5 The Contractor's professional staff, including principals of the firm, professional and technical personnel, who will be associated with the preparation of reports must have the technical knowledge and be prepared to support the reports in case of a trial court action, and be witnesses for the Government.

6.6 The Contractor shall provide staff in all technical field positions with OSHA required training for work on hazardous and toxic waste sites and involved in a medical surveillance program.

6.7 The Contractor's laboratories must have an approved Laboratory Quality Assurance Plan (LQAP) on file with NAE to perform work under the dredged material Ocean Disposal and Inland Testing Manuals; have National Environmental Laboratory Accreditation Program (NELAP) certification; and have the ability to provide 24 hour turn-around on sample analysis if needed.

6.8 When site visits are conducted at a military installation, the Contractor shall comply with all security requirements of that installation.

6.9 The Contractor shall be familiar with the northeastern United States' environmental laws, regulations, policies and procedures, as well as Federal regulations, laws policies and procedures for the conductance of all work.

6.10 The Contractor shall submit a tally of man/hours worked on all Task Orders under this contract to the Contracting Officer on a monthly basis.

6.11 Archaeological and historical components should report the type of computer system they use to record artifacts, and the software and GIS systems or other technological support systems they use on a regular basis as well as the national systems used (Park Service, Military, etc.).

6.12 The Contractor will be connected to the Internet and provide NAE with Internet addresses for person(s) working on each Task Order.

6.13 The Contractor will use automated Critical Path scheduling systems such as Microsoft Project, Primavera and Micro Planner and will be able to provide updated electronic and paper schedules as needed.

7. PERIOD OF SERVICE. The Contractor shall complete and submit the work under each Task Order within the specified periods of service.

8. DRAFT AND FINAL REPORTS. The Contractor shall provide copies of reports for each Task Order in draft form followed by three copies in final form after NAE comments have been incorporated unless otherwise specified in the Task Order. Each project shall have an electronic deliverable consisting of all submittals, deliverables, graphics and final products as identified in the Statement of Work. These electronic deliverables will be suitable for posting on a website and final payment will not be authorized on each task order until the electronic deliverable is received and functioning on the New England District web server or data warehouse.

9. SECURITY. The Contractor shall be responsible for security and monitoring at the installations setup by the Contractor. Security at the installation shall be adequate to insure timely data collection to satisfy the provisions of this contract and so as not to endanger the general public.

10. QUALITY CONTROL. The Contractor is responsible for quality control and shall furnish a quality control plan. Although submissions required by this contract are technically reviewed by the Government, it is emphasized that the Contractor's work must be prosecuted using proper internal controls and review procedures. The letter of transmittal for each submission shall include a certification that the submission has been subjected to the Contractor's own review and coordination procedures to insure: (a) completeness for each discipline commensurate with the level of effort required for that submission; (b) elimination of conflicts, errors, and omissions;

and (c) the overall professional and technical accuracy of the submission. Documents, which are significantly deficient in any of these areas, will be returned for correction and/or upgrading at the Contractor's expense prior to the Government acceptance. Task Order submission dates will not be extended if a resubmission of draft material is required for this reason. The Contractor and associates, if any, shall have the professional competency and technical expertise necessary to accomplish this project in a satisfactory manner.

11. CONFERENCES/MEETINGS. During the progress of the work, the Contractor shall confer with the NAE Program Manager and/or the Project Manager to assure timely and accurate reporting and approval of all completed work. Meetings shall be held as indicated in individual Task Orders to ensure project progress.

12. VISITS TO THE STUDY AREA - PRIVATE AND GOVERNMENTAL AGENCIES

AND INDIVIDUALS. The Contractor shall advise the Project Manager at least two (2) days prior to each visit to the study area or to private sources and Governmental Agencies (Federal, state, and county). The Project Manager shall review the necessity for each visit and shall inform the Contractor that these contacts shall be limited to research and coordination of data pertinent to the study. The Contractor shall proceed with the visits only with prior approval of the Project Manager.

13. RELEASE OF DATA. All data, reports, and materials obtained as a result of this contract shall become the property of the U.S. Government and shall be turned over to the Contracting Officer upon completion of this contract. All discussion, use, professional and general publication of any data, techniques, information or any other reference to the execution of the work contracted herewith, shall be reviewed and approved in writing by the New England District representative of the Corps of Engineers. The ability of the Contractor to use or publish any information obtained under this contract is not implicit and will be at the discretion of the NAE Contract Program Manager. All publications (including poster sessions) regarding work from this contract shall cite a Corps of Engineers staff member and reflect their appropriate level of involvement.

14. REPORT REVISIONS/CORRECTIONS. Results of all reviews by USACE, New England District will be furnished to the Contractor in the form of written comments and edited material. The Contractor shall incorporate the written comments into the report or item within thirty days unless otherwise specified in the Task Order. Any comments due to errors or inconsistencies in the report on the part of the Contractor shall be made by the Contractor at his own expense. If changes in criteria and/or additions are, in the view of USACE, New England District, required beyond the original statement of work and services, the Contractor shall be notified in writing by the Contracting Officer and adjustment in the fee will be made to cover the additional work required. Any such additional work executed by the Contractor without the appropriate written notice is undertaken at the Contractor’s own risk.

15. RESPONSIBILITY FOR WORK. The Contractor shall be responsible for all damages to persons and property, including any Government furnished equipment, that occur as a result of actions by the Contractor's employees in connection with the prosecution of the work. The Contractor shall hold the Government free from claims and suits for damages as a result of this work. The Contractor shall provide proof of insurance with the United States Government as the named beneficiary. The Contractor shall undertake all work, including diving, following all applicable safety regulations (EM 385-1-1).

16. MATERIAL TO BE PROVIDED BY THE GOVERNMENT.

16.1 Appropriate background data, charts, sketches, and diagrams of the study area.

16.2 Required format for reports.

16.3 Corps of Engineers Safety Regulations including diving regulations (EM 385-1-1).

17. GOVERNMENT FURNISHED EQUIPMENT. Each Task Order shall list equipment necessary for the prosecution of the work, which will be furnished by the Government.

18. SUSTAINABILITY. This contract shall conform in all respects to applicable Energy Efficient and EPA-Designated standards with requirements prescribed at the Task Order level.

Section E - Inspection and Acceptance

CLAUSES INCORPORATED BY REFERENCE

52.246-4 Inspection Of Services--Fixed Price AUG 1996

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.242-15 STOP-WORK ORDER (AUG 1989)

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either--

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if--

(1) The stop-work order results in an increase in the time required for, or in the Contractor's cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage;

provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

(End of clause)

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(a) If the performance of all or any part of the work of this contract is delayed or interrupted (1) by an act of the Contracting Officer in the administration of this contract that is not expressly or impliedly authorized by this contract, or (2) by a failure of the Contracting Officer to act within the time specified in this contract, or within a reasonable time if not specified, an adjustment (excluding profit) shall be made for any increase in the cost of performance of this contract caused by the delay or interruption and the contract shall be modified in writing accordingly. Adjustment shall also be made in the delivery or performance dates and any other contractual term or condition affected by the delay or interruption. However, no adjustment shall be made under this clause for any delay or interruption to the extent that performance would have been delayed or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an adjustment is provided or excluded under any other term or condition of this contract.

(b) A claim under this clause shall not be allowed (1) for any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved, and (2) unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the delay or interruption, but not later than the day of final payment under the contract.

Section H - Special Contract Requirements

WAGE RATES

Wage Determinations will be added on the task order level, as needed.

For the purposes of this proposal, contractors shall refer to clause 52.222-49 and request wage determinations if necessary.

EQUAL OPPORTUNITY FOR VETERANS

Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222- 37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USAGE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USAGE contract. While no set aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USAGE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USAGE contractors in their outreach efforts:

Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs-VOW to Hire Heros Act http://benefits.va.gov/vow/ Army Wounded Warrior Program- http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation-Hiring Our Heros http://www.hiringourheroes.org/ Guide to Hiring Veterans - Reference Material http://www.whitehouse.gov/sites/default/files/docs/whitehousebusinesscouncilguidetohiringveteransO.

pdf

52.204-9002 REPORTING OF CONTRACTOR MANPOWER DATA ELEMENTS

(a) Scope. The following sets forth contractual requirements for reporting of contractor labor work year equivalents (also called Contractor Man-year Equivalents (CMEs)) in support of the Army, pursuant to 10 U.S.C.

129a, 10 U.S.C. 2461(g), Section 343 of P.L. 106-65, and 32 CFR 668. Reporting shall be accomplished electronically by direct contractor submission to the secure Army Web Site: https://cmra.army.mil. Information on the background, purposes, and significance of this reporting requirement, and the 32 CFR 668 Final Rule as published in the Federal Register, can be found at this Web Site. In addition, a Help Desk function, detailed instructions on what and how to report, FAQs, and a site demonstration are available. The Army’s objective is to collect as much significant CME data as possible to allow accurate reporting to Congress and for effective Army planning. The reporting data elements should not be viewed as an “all or nothing” requirement. Even partial reporting, e.g., direct labor hours, appropriation data, place of performance, Army customer, etc., will be helpful.

(b) Applicability. This reporting requirement applies to services covered by Federal Supply Class or Service codes for “Research and Development,” and “Other Services and Construction.” Report submissions shall not contain classified information. (Also see “Exemptions” at (d) below.)

(c) Requirements. The contractor is required to report the following contractor manpower information, associated with performance of this contract action in support of Army requirements, for all covered contracts, to the Office, Assistant Secretary of the Army (Manpower and Reserve Affairs) (ASA(M&RA)), using the secure Army data collection web-site at https://cmra.army.mil. (Other information requirements associated with the manpower data collection (contract and task or delivery order numbers; appropriation data and amounts; total estimated value of contract; federal supply class or service code; major Army organizational element receiving or reviewing work;

beginning and ending data for reporting period; place of performance; name, address, and point of contact for contractor; etc.) are specified and explained at the web site.)

(1) Labor Hours. Composite direct labor hours, and the value of those indirect labor hours plus compensation related costs for direct labor hours ordinarily included in the indirect pools1.

(2) Rates. Alternatively, contractors may report two distinct, relevant (annualized) composite or average indirect labor rates in lieu of raw indirect labor hours and the value of those indirect hours. Such rates shall be annualized average estimates for the reporting contractor and need not be developed for each reporting period.

Either method chosen should be consistently reported.

(d) Exemption(s). If the contractor is unable to comply with these reporting requirements without creating a whole new cost allocation system or system of records (such as a payroll accounting system), or due to similar insurmountable practical or economic reasons, the contractor may claim an exemption to at least a portion of the reporting requirement by certifying in writing to the contracting officer the clear underlying reason(s) for exemption from the specified report data element(s), and further certifying that they do not otherwise have to provide the exempted information, in any form, to the United States Government.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .