Figure_4.docx
DOCX document 256 KB Posted
- Attached to
- Environmental Planning and Consulting Services
- Solicitation number
- W912WJ-16-R-0003
About this file
Figure 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912WJ-16-R-0003-0003.pdf | ||
| W912WJ-16-R-0003-0002.pdf | ||
| W912WJ-16-R-0003-0001.pdf | ||
| Solicitation.pdf | ||
| Figure_5.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Figure 4
SAFETY TEMPLATES
WEEKLY SAFETY MEETING
| Date Held: ________________________ | |
| Time: ____________________________ |
CONTRACTOR: _________________________ Contract No. DACW33- PERSONNEL PRESENT (check): Contractor ____ Sub. ____ Government ____
SUBJECTS DISCUSSED (check items that were discussed during meeting):
USACE EM385-1-1 ______ (Specific sections: __________________________) On-site Accident Prevention Plan (or Site Safety and Health Plan) ______ Individual protective equipment (steel-toed boots, safety glasses, etc..) _____ Prevention of slips/falls _____ Back injury/safe lifting techniques _____ Fire prevention _____ First aid _____ Tripping hazards _____ Equipment inspection and maintenance _____ Hoisting equipment, winch and crane safety _____ Ropes, hooks, chains, and slings _____ Water safety _____ Boat safety _____ HAZMAT, Toxic hazards, contaminated sediments, MSDS, respiratory, ventilation _____ Biological hazards (poison ivy, ticks, wasps, mosquitoes etc) ______ Staging, ladders, concrete forms, safety nets, handrails ____ Hand tools, power tools, machinery, chain saws _____ Vehicle operation safety _____ Electrical grounding, temporary wiring, GFCI _____ Lockouts/safe clearance procedures _____ Welding, cutting _____ Excavation hazards/rescue _____ Loose rock/steep slopes _____ Explosives _____ Sanitation and waste disposal _____ Clean-up, trash _____
Other safety issues of concern specific to contract that was discussed during meeting:
All persons attending meeting the meeting must sign below or on the back of the form.
Contractor Representative Signature ____________________________ Date: _______ CE Inspector/QA (if present at meeting) __________________________ Date: ______ image1.jpeg
File details come from the government source that posted it. Updated .