Amendment_0001_attachment.pdf
PDF 35 KB Posted
- Attached to
- East Brimfield Delead and Repaint Service Bridge
- Solicitation number
- W912WJ16B0006
About this file
Amendment attachment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSummary.pdf | ||
| Amendment_0001.pdf | ||
| Solicitation_W912WJ-16-B-0006.pdf | ||
| Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Paint Service Bridge, East Brimfield Dam, Sturbridge, MA Amendment 0001
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
AMENDMENT 0001 OF SOLICITATION
1.1 CHANGES TO SPECIFICATIONS
1.1.1 Narrative Changes
1.1.2 New Specification Section
-- End of Section Table of Contents --
DOCUMENT 00 00 01 Page 1
AMENDMENT 0001 OF SOLICITATION
1.1 CHANGES TO SPECIFICATIONS
1.1.1 Narrative Changes
1. Section 01 11 00 SUMMARY OF WORK, Subpart 1.1 WORK COVERED BY CONTRACT DOCUMENTS, fifth paragraph; add the following to the end of this paragraph:
"In addition, the Contractor shall furnish and install new high density urethane weatherstripping for the exterior doors that lead into the Intake Tower."
2. Section 01 33 00 SUBMITTAL PROCEDURES, Submittal Register; delete the Submittal Register attached at the end of this section and insert a new Submittal Register, copy attached to this amendment, in its place.
1.1.2 New Specification Section
Specification Section 08 71 10 DOOR WEATHERSTRIPPING is added to the specification document. A copy of the new section accompanies this amendment.
END OF AMENDMENT 0001
DOCUMENT 00 00 01 Page 2
SECTION TABLE OF CONTENTS
DIVISION 08 - OPENINGS
SECTION 08 71 10
DOOR WEATHERSTRIPPING
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DELIVERY
PART 2 PRODUCTS
2.1 WEATHERSTRIPPING
2.1.1 Acceptable Product
PART 3 EXECUTION
3.1 DEMOLITION
3.2 INSTALLATION
-- End of Section Table of Contents --
SECTION 08 71 10 Page 1
SECTION 08 71 10
DOOR WEATHERSTRIPPING
PART 1 GENERAL
1.1 SUMMARY
This section covers the furnishment and installation of new high density urethane weatherstripping for the exterior doors that lead into the Intake Tower.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D3574 (2011) Standard Test Methods for Flexible Cellular Materials — Slab, Bonded, and Molded Urethane Foams
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Weatherstripping; G, RO
Submit manufacturer's descriptive literature for weatherstripping.
1.4 DELIVERY
Deliver weatherstripping in original containers.
PART 2 PRODUCTS
2.1 WEATHERSTRIPPING
Weatherstripping shall be a high density urethane open cell foam that exhibits closed cell characteristics when compressed. It shall have a very low compression set, good shock absorption, and low out-gassing.
Attachment to the door frame shall be by permanent acrylic adhesive.
Weatherstripping shall be 1/2-inch wide by 1/4-inch thick. Color shall be black. Product characteristics shall be as follows:
Adhesive: Permanent acrylic based pressure sensitive adhesive. Shall include s a film carrier for non-stretch characteristics.
SECTION 08 71 10 Page 2
Test Method: In accordance with ASTM D3574.
Density: 15 lb/ft3.
Compression Deflection: 4 to 8 psi.
Compression Set: (50%) 10 max.
Service Temperature: Acrylic based, -20°F to 190°F.
Flammability: FMVSS 302; UL94 HBF = 3/16.
Application Temperature Range: 65 - 100 °F.
2.1.1 Acceptable Product
An aceptable product for weatherstripping shall be "Weather Stripping and Gasket Tape, Item Code 472079", as available from Essentra Components, 7400 West Industrial Drive, Forest Park, IL 60130; Telephone 800-847-0486;
(essentracomponents.com), or approved equal.
PART 3 EXECUTION
3.1 DEMOLITION
Existing weatherstripping and related items of the door leading into the intake tower shall be removed in their entirety and the underlying surfaces shall be prepared and painted prior to the installation of new weatherstripping. After painting is completed, installation of new weatherstripping shall be performed.
3.2 INSTALLATION
Install weatherstripping in accordance with manufacturers' printed installation instructions. Provide full contact, weathertight seals that allow operation of doors without binding the weatherstripping and that are complete around all door edges including sill.
-- End of Section --
SECTION 08 71 10 Page 3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES
01 11 00 SD-01 Preconstruction Submittals
1.7.2.2 G ROInitial Project Schedule
SD-07 Certificates
1.7.2.3 G ROPeriodic Schedule Updates
1.7.1 G RORequest Application
01 33 00 SD-01 Preconstruction Submittals
1.9 G ROSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.4 G RODocumentation Requirements
01 35 26 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.5Crane Operators/Riggers
1.7.2.1 G ROStandard Lift Plan
1.7.2.2 G ROCritical Lift Plan
1.8Activity Hazard Analysis (AHA) 1.9.1Hot Work Permit 1.12.4Certificate of Compliance
License Certificates 01 45 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES
01 45 00 3.2 G ROContractor Quality Control (CQC) Plan
01 50 00 SD-01 Preconstruction Submittals
1.4 G ROConstruction Site Plan
3.8.9 G ROTemporary Electrical System
SD-03 Product Data 2.2Barricades 2.2Safety Fence 2.2Chain-Link Fence
01 57 20 SD-01 Preconstruction Submittals
1.7 G ROEnvironmental Protection Plan
01 74 19 SD-01 Preconstruction Submittals
1.5 G ROWaste Management Plan
08 71 10 SD-03 Product Data
2.1 G ROWeatherstripping
09 97 02 SD-01 Preconstruction Submittals
1.3 G ROSafety, Health, and
Environmental Requirements
1.3.1.5 G RORespiratory Protection Plan
1.3.1 G ROVentilation Assessment Plan
1.3.2.1 G ROAirborne Sampling Plan
1.3.2 G ROMedical Surveillance Plan
1.3.2.2 G ROWorker Protection Plan
1.3.3.1Waste Manifest
1.3.3.1 G ROWaste Disposal Plan
1.3.3.2 G ROContainment Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES
09 97 02 1.3.3.3 G ROVisible Emissions Monitoring Plan
1.3.3.4 G ROTSP Monitoring Plan
1.3.3.5 G ROWater Quality Plan
SD-03 Product Data Part 2 G ROManufacturer's Product Data
Sheet SD-06 Test Reports
1.3.3.4TSP Test Report 3.4Inspection Reports 1.3.2.2Medical Status Report 1.3.2.3Change in Medical Status Report
1.3.2.1 G ROAir Monitoring Test Plan
1.3.2.1Air Monitoring Test Report
SD-07 Certificates 1.5.1Certified EHS Professional 1.5.2Certified Lead Laboratory 1.5.3SSPC QP 1 Certificate 1.5.4SSPC QP 2 Certificate 1.5.5Coating Thickness Gage
Qualification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
| DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS |
| 00 00 01 - AMENDMENT 0001 OF SOLICITATION |
| 00 00 01 - AMENDMENT 0001 OF SOLICITATION |
| 1.1 CHANGES TO SPECIFICATIONS |
| 1.1.1 Narrative Changes |
| 1.1.2 New Specification Section |
| DIVISION 08 - OPENINGS |
| 08 71 10 - DOOR WEATHERSTRIPPING |
| 08 71 10 - DOOR WEATHERSTRIPPING |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 DELIVERY |
| PART 2 PRODUCTS |
| 2.1 WEATHERSTRIPPING |
| 2.1.1 Acceptable Product |
| PART 3 EXECUTION |
| 3.1 DEMOLITION |
| 3.2 INSTALLATION |
Revised Submittal Register