Amendment W912WJ-16-B-0004-0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Bid_Snapsheet_W912WJ-16-B-0004.pdf | ||
| Amendment_W912WJ-16-B-0004-0003.pdf | ||
| Amendment_W912WJ-16-B-0004-0001.pdf | ||
| Solicitation_W912WJ-16-B-0004.pdf | ||
| SPECS.pdf | ||
| PLANS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment necessary to make changes to the Specification section as w ell as to address submitted requests for information. Please see the attached Specification Change Summary for the detailed changes.
Please note that the site visit is scheduled for Thursday, June 16 2016.
All other aspects remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ-16-B-0004
X 9B. DATED (SEE ITEM 11)
02-Jun-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Jun-2016
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ-16-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUEST FOR INFORMATION
Request For Information & Government Responses
Question: Would UHP be considered, over sandblasting and chipping, for all concrete surface preparation?
Response: Contractors shall use hand tools to sound the concrete to determine sound from unsound concrete. Unsound concrete shall be removed via chipping only. Contractors can then be allowed to use Ultra‐High Pressure (UHP) water jetting methods to prepare concrete surfaces, but sandblasting must still be used to prepare rebar surfaces.
Question: For Vertical Concrete repair on abutments: Will the shotcrete process be an acceptable means of repair while providing the specified class of finish?
Response: While shotcrete will be an acceptable means of repair to vertical concrete repair on abutments, there still must be a troweled finish. As per Spec Section 03 37 13 SHOTCRETE, Paragraph
3.5.1 Ceiling repair can have a Natural Gun Finish.
Question: Sheet S‐301: Can the concrete repair and new curb be completed simultaneously?
Response: Yes, the concrete repair and new curb can be completed simultaneously.
SPECIFICATION CHANGES
CHANGES TO SPECIFICATIONS
1.1 NARRATIVE CHANGES
1. Section 01 55 26 TRAFFIC REGULATION, Subpart 1.1 SUMMARY; delete the second paragraph of this subpart in its entirety and insert the following in its place:
"The work of this project for the Avery Brook culvert shall be split into phases such that not more than one lane (or 1/2 width of roadway) shall be closed to traffic at any one time. The Contractor shall employ traffic warning and control devices to control the passage of two-way traffic for each lane restriction. Lane restrictions for this project are limited to the hours of 7:00 AM to 5:30 PM, Monday through
Friday. At the end of these hours, or at the close of work activity for each work day, the Contractor shall remove lane restrictions and restore two-way traffic.
The work of this project for the Old Route 132 Bridge shall be conducted with the road fully closed for the duration of the work. The Contractor shall employ traffic warning and control devices to prevent traffic access to the bridge. The Contractor shall post signs far in advance so that motorists have adequate warning that a closure is forthcoming."
2. Section 01 55 26 TRAFFIC REGULATION, Subpart 1.5.2 "Signs"; delete "Commonwealth of Massachusetts" and insert "the State of Vermont" in its place.
3. Section 01 57 20 ENVIRONMENTAL PROTECTION, Subpart 3.1 ENVIRONMENTAL PERMITS AND COMMITMENTS; delete the first paragraph of this subpart in its entirety and insert the following in its place:
"This Article supplements the Contractor's responsibility under the contract clause PERMITS AND RESPONSIBILITIES to the extent that the U.S. Army Corps of Engineers, New England District (USACE-NAE), has coordinated with the Vermont Department of Environmental Conservation (VT DEC) pertinent to the environmental impacts of this project, and the VT DEC has determined that Contractor compliance with the VT Stream Alternation Act would satisfy the Federal Clean Water Act (Section 404 and 401 (Water Quality Certification)) for this project. This project meets Vermont General Stream Alteration Act Permit standards for projects not requiring a specific permit. Although no permit application is required, the Contractor shall meet the requirements of Section B3 (especially Section B.3.3) of the Vermont Stream Alterations Act General Permit. The General Permit is attached at the end of this section and can be found at the following location:
http://dec.vermont.gov/sites/dec/files/wsm/rivers/docs/2014_04_10 _Stream_Alteration_GP.pdf"
4. Section 01 57 20 ENVIRONMENTAL PROTECTION; attach the "Vermont General Stream Alteration Act Permit", copy attached, to the end of this section.
END OF AMENDMENT 0001
-- End of Document --
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
Thursday, June 16 at 10:00am
(c) Participants will meet at--
Union Village Dam Project Office, located at 2 Main Street, East Thetford, VT
(End of provision)
(End of Summary of Changes)