USA ENGINEER DISTRICT, SEATTLE

DUSTIN SMITH

PH: 253-966-4384X FAX: 206-764-6817

DUSTIN.J.SMITH1@US.ARMY.MIL

SEATTLE WA

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Invitation for Bid No.: W912DW17B0010 Amendment No.: 002 Title: Replace AHU’s and Controls Building 729 Fitness Center - McChord

The purpose of this modification is to incorproate revised specifications to reflect answ ers to ProjNet inquiries, as w ell as to incorporate revised &/or supplemental draw ings.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW17B0010

X 9B. DATED (SEE ITEM 11)

04-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Aug-2017

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912DW

FACILITY CODECODE

EMAIL:TEL:

W912DW17B0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

The following items are applicable to this modification:

AMENDMENT 0002

AMENDMENT 0002

1. The purpose of Amendment 0002 to IFB Solicitation is to incorporate revised specifications and drawings to reflect answers provided to ProjNet inquiries.

The revised &/or supplemental drawings are as follows:

a. M‐203 Louver Details

b. E‐102 Rev‐1 Ref Ceiling ‐ Fans

c. E‐105 Rev‐1 Transformer Locate

2. The specifications have been revised based upon ProjNet questions and answers. Revised Specifications Table of Contents and 03 30 00 specifications provided via this amendment.

3. Contractors are to ensure that all amendments are acknowledged in their bids.

4. The due date and time remains 3:00 PM local time on 05 September 2017 for receipt of bids.

Contractors are reminded that following immediately after 3:00 p.m there will be a public opening of bids in room 343, (third floor conference room).

5. All other terms and conditions of the IFB solicitation remain unchanged.

Attachments:

Specifications Table of Contents (revised 29Aug2017) Specification 03 30 00 (revised 29Aug2017) Drawings (E‐102, E‐105, & M‐203) (revised 29Aug2017)

CE0463

19Aug201729Aug2017

SPECIFICATIONS

TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

01 11 00 STATEMENT OF WORK

01 22 00.00 10 MEASUREMENT AND PAYMENT 12-10

01 32 01.00 10 PROJECT SCHEDULE 02-15

01 33 00 SUBMITTAL PROCEDURES (w/Register)

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS 01-12

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS 08-10

01 45 00.00 10 QUALITY CONTROL 02-10

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS) 02-10

01 50 00 TEMP CONSTRUCTION FACILITIES AND CONTROLS

01 57 20.00 10 ENVIRONMENTAL PROTECTION JBLM

01 57 23 TEMP STORM WATER POLLUTION CONTROL

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS 08-11

01 78 23 OPERATION AND MAINTENANCE DATA 07-06

DIVISION 02 – EXISTING CONDITIONS

02 41 00 DEMOLITION 05-10

02 83 13.00 20 LEAD IN CONSTRUCTION

DIVISION 03 – CONCRETE

03 11 13.00 10 STRUCTURAL CONCRETE FORMING 05-14

03 15 00.00 10 CONCRETE ACCESSORES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00 CAST IN PLACE CONCRETE 05-14 REV 29Aug2017

03 35 00.00 10 CONCRETE FINISHING 05-14

DIVISION 05 – METALS

05 05 23.15 STRUCTURAL WELDING 05-14

05 12 00 STRUCTURAL STEEL 05-14

05 40 00 COLD FORM METAL FRAMING 05-15

05 50 13 MISC METAL FABRICATIONS 05-10

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 ROUGH CARPENTRY 02-12

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 22 00 ROOF AND DECK INSULATION 08-11

07 41 13 METAL ROOF PANELS 05-11

07 42 13 METAL WALL PANELS 01-08

07 51 13 BUILT-UP ASPHALT ROOFING 05-12

07 60 00 FLASHING AND SHEET METAL 08-08

07 92 00 JOINT SEALANTS 01-07

DIVISION 08 – OPENINGS

08 91 00 METAL WALL LOUVERS 08-15

DIVISION 09 – FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD 02-10

09 23 00 GYPSUM PLASTERING

09 29 00 GYPSUM BOARD 05-11

09 51 00 ACOUSTICAL CEILINGS 08-10

09 90 00 PAINTS AND COATINGS 05-11

DIVISION 10 – SPECIALITIES (Reserved) DIVISION 11 – EQUIPMENT (Reserved) DIVISION 12 – FURNISHINGS (Reserved) DIVISION 13 – SPECIAL CONSTRUCTION (Reserved) DIVISION 14 – CONVEYING EQUIPMENT (Reserved) DIVISION 21 – FIRE SUPPRESSION (Reserved)

DIVISION 22 – PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE 08-08

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRO, VENTILATION, AND EXH SYS 11-08

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS 01-07

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 11-08

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS 04-08

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS 01-08

23 09 23 DIRECT DIGITAL CONTROLS (DDC) FOR HVAC SYSTEMS 07-12

23 11 23.00 10 GAS PIPING SYSTEM 10-07

23 52 00 HEATING BOILERS 04-08

23 54 16.00 10 HEATING SYSTEM, GAS-FIRED HEATERS 04-08

23 57 10.00 10 FORCED HOT WATER HEAT SYS STEAM HEAT EXCHANGERS 04-08

23 64 26 CHILLED, HOT, AND CONDENSER WATER PIPING SYSTEMS 04-08

23 70 03.00 10 HEATING AND UTILITIES SYSTEMS, CENTRAL STEAM 01-08

23 82 01.00 10 WARM AIR HEATING SYSTEMS 04-08

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT 04-08

DIVISION 26 – ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS 07-06

26 20 00 INTERIOR DISTRIBUTION SYSTEM 08-08

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

DIVISION 27 – COMMUNICATIONS (Reserved)

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

DIVISION 31 – EARTHWORK

31 00 00 EARTHWORK 08-08

31 11 00 CLEARING AND GRUBBING 08-08

31 23 00.00 20 EXCAVATION AND FILL 02-11

DIVISION 31 – EXTERIOR IMPROVEMENTS

32 10 10 PERVIOUS BITUMINOUS CONCRETE PAVEMENT 08-08

32 11 16.16 BSE CRSE RIGID/SUBBASE CRSE FOR FLEXIBLE PAVING 11-11

32 11 24 GRADED CRUSHED AGGREGATE BSE CRSE FLEXIBLE PVMNT 11-11

32 12 10 BITUMINOUS TACK AND PRIME COATS 08-08

32 12 21 BITUMINOUS ROAD-MIX SURFACE COURSE 08-08

32 15 00 AGGREGATE SURFACE COURSE 04-08

32 16 13 CONCRETE SIDEWALKS, CURBS JBLM

32 31 13 CHAINLINK FENCES & GATES 01-08

32 92 19 SEEDING 10-06

DIVISION 33 – UTILITIES

33 05 23 TRENCHLESS UTILITY INSTALLATION 08-15 REV 19Aug2017

33 51 03.00 10 GAS DISTRIBUTION SYSTEM

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

10May2017 29Aug2017

03 30 00 – page 1 of 48

SECTION 03 30 00

CAST-IN-PLACE CONCRETE

05/14

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)

ACI 117 (2010; Errata 2011) Specifications for

Tolerances for Concrete Construction and Materials and Commentary

ACI 121R (2008) Guide for Concrete Construction

Quality Systems in Conformance with ISO 9001

ACI 211.1 (1991; R 2009) Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete

ACI 211.2 (1998; R 2004) Standard Practice for

Selecting Proportions for Structural Lightweight Concrete

ACI 213R (2014) Guide for Structural Lightweight-

Aggregate Concrete

ACI 301 (2010; ERTA 2015) Specifications for Structural Concrete

ACI 302.1R (2015) Guide for Concrete Floor and Slab

Construction

ACI 304.2R (1996; R 2008) Placing Concrete by Pumping Methods

ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete

ACI 305R (2010) Guide to Hot Weather Concreting

ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting

ACI 306R (2010) Guide to Cold Weather Concreting

ACI 308.1 (2011) Specification for Curing Concrete

03 30 00 – page 2 of 48

ACI 318 (2014; Errata 1-2 2014; Errata 3-4 2015)

Building Code Requirements for Structural Concrete and Commentary

ACI 347 (2004; Errata 2008; Errata 2012) Guide to

Formwork for Concrete

ACI SP-15 (2011) Field Reference Manual: Standard

Specifications for Structural Concrete ACI 301-05 with Selected ACI References

ACI SP-2 (2007; Abstract: 10th Edition) ACI Manual of

Concrete Inspection

ACI SP-66 (2004) ACI Detailing Manual

AMERICAN HARDBOARD ASSOCIATION (AHA)

AHA A135.4 (1995; R 2004) Basic Hardboard

AMERICAN WELDING SOCIETY (AWS)

AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel

ASTM INTERNATIONAL (ASTM)

ASTM A1064/A1064M (2015) Standard Specification for Carbon-

Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete

ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A615/A615M (2015a) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

ASTM A706/A706M (2014) Standard Specification for Low-Alloy

Steel Deformed and Plain Bars for Concrete

ASTM A767/A767M (2009) Standard Specification for Zinc-Coated

(Galvanized) Steel Bars for Concrete

ASTM A780/A780M (2009; R 2015) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

ASTM A934/A934M (2013) Standard Specification for Epoxy-

Coated Prefabricated Steel Reinforcing Bars

ASTM A955/A955M (2015) Standard Specification for Deformed

29Aug2017

03 30 00 – page 3 of 48 and Plain Stainless-Steel Bars for Concrete

ASTM A996/A996M (2015) Standard Specification for Rail-Steel and Axle-Steel Deformed Bars for Concrete

ASTM C1017/C1017M (2013; E 2015) Standard Specification for

Chemical Admixtures for Use in Producing Flowing Concrete

ASTM C1077 (2015) Standard Practice for Laboratories

Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation

ASTM C1107/C1107M (2014a) Standard Specification for Packaged

Dry, Hydraulic-Cement Grout (Nonshrink)

ASTM C1116/C1116M (2010a; R 2015) Standard Specification for

Fiber-Reinforced Concrete

ASTM C1157/C1157M (2011) Standard Specification for Hydraulic

Cement

ASTM C1240 (2014) Standard Specification for Silica Fume

Used in Cementitious Mixtures

ASTM C1260 (2014) Standard Test Method for Potential

Alkali Reactivity of Aggregates (Mortar-Bar Method)

ASTM C143/C143M (2012) Standard Test Method for Slump of

Hydraulic-Cement Concrete

ASTM C150/C150M (2015) Standard Specification for Portland

Cement

ASTM C1567 (2013) Standard Test Method for Potential

Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)

ASTM C1602/C1602M (2012) Standard Specification for Mixing

Water Used in Production of Hydraulic Cement Concrete

ASTM C172/C172M (2014a) Standard Practice for Sampling

Freshly Mixed Concrete

ASTM C173/C173M (2014) Standard Test Method for Air Content of

Freshly Mixed Concrete by the Volumetric Method

ASTM C192/C192M (2015) Standard Practice for Making and

Curing Concrete Test Specimens in the Laboratory

03 30 00 – page 4 of 48

Use in Concrete

ASTM C78/C78M (2015a) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)

ASTM C920 (2014a) Standard Specification for

Elastomeric Joint Sealants

ASTM C231/C231M (2014) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method

ASTM C260/C260M (2010a) Standard Specification for Air- Entraining Admixtures for Concrete

ASTM C295/C295M (2012) Petrographic Examination of Aggregates for Concrete

ASTM C31/C31M (2012) Standard Practice for Making and Curing Concrete Test Specimens in the Field

ASTM C311/C311M (2013) Sampling and Testing Fly Ash or Natural Pozzolans for Use as a Mineral Admixture in Portland-Cement Concrete

ASTM C33/C33M (2013) Standard Specification for Concrete Aggregates

ASTM C330/C330M (2014) Standard Specification for Lightweight Aggregates for Structural Concrete

ASTM C39/C39M (2015a) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens

ASTM C42/C42M (2013) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete

ASTM C494/C494M (2013) Standard Specification for Chemical Admixtures for Concrete

ASTM C552 (2015) Standard Specification for Cellular Glass Thermal Insulation

ASTM C578 (2015) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation

ASTM C591 (2015) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation

ASTM C595/C595M (2015; E 2015) Standard Specification for Blended Hydraulic Cements

ASTM C618 (2012a) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for

03 30 00 – page 5 of 48

ASTM C94/C94M (2015) Standard Specification for Ready-Mixed

Concrete

ASTM C989/C989M (2014) Standard Specification for Slag Cement for Use in Concrete and Mortars

ASTM D1751 (2004; E 2013; R 2013) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)

ASTM D1752 (2004a; R 2013) Standard Specification for

Preformed Sponge Rubber Cork and Recycled PVC Expansion

ASTM D412 (2006a; R 2013) Standard Test Methods for

Vulcanized Rubber and Thermoplastic Elastomers - Tension

ASTM D471 (2012a) Standard Test Method for Rubber

Property - Effect of Liquids

ASTM D5759 (2012) Characterization of Coal Fly Ash and

Clean Coal Combustion Fly Ash for Potential Uses

ASTM D6690 (2012) Standard Specification for Joint and

Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements

ASTM E1155 (2014) Standard Test Method for Determining

Floor Flatness and Floor Levelness Numbers

ASTM E1643 (2011) Standard Practice for Selection, Design, Installation, and Inspection of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs

ASTM E1745 (2011) Standard Specification for Water Vapor

Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs

ASTM E1993/E1993M (1998; R 2013; E 2013) Standard Specification for Bituminous Water Vapor Retarders Used in Contact with Soil or Granular Fill Under Concrete Slabs

ASTM E329 (2014a) Standard Specification for Agencies

Engaged in the Testing and/or Inspection of Materials Used in Construction

ASTM E96/E96M (2014) Standard Test Methods for Water Vapor

Transmission of Materials

CONCRETE REINFORCING STEEL INSTITUTE (CRSI)

29Aug2017

03 30 00 – page 6 of 48

CRSI 10MSP (2009; 28th Ed) Manual of Standard Practice

FOREST STEWARDSHIP COUNCIL (FSC)

FSC STD 01 001 (2000) Principles and Criteria for Forest Stewardship

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)

NIST PS 1 (2009) DOC Voluntary Product Standard PS 1-

07, Structural Plywood

U.S. ARMY CORPS OF ENGINEERS (USACE)

COE CRD-C 513 (1974) Corps of Engineers Specifications for Rubber Waterstops

COE CRD-C 572 (1974) Corps of Engineers Specifications for

Polyvinylchloride Waterstops

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FS SS-S-200 (Rev E; Am 1; Notice 1) Sealant, Joint, Two- Component, Jet-Blast-Resistant, Cold-Applied, for Portland Cement Concrete Pavement

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED NC (2009) Leadership in Energy and Environmental

Design(tm) New Construction Rating System

1.2 DEFINITIONS

a. "Cementitious material" as used herein must include all portland cement, pozzolan, fly ash, ground granulated blast-furnace slag, and silica fume.

b. "Exposed to public view" means situated so that it can be seen from eye level from a public location after completion of the building. A public location is accessible to persons not responsible for operation or maintenance of the building.

c. "Chemical admixtures" are materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.

d. "Supplementary cementing materials" (SCM) include coal fly ash, silica fume, granulated blast-furnace slag, natural or calcined pozzolans, and ultra-fine coal ash when used in such proportions to replace the portland cement that result in improvement to sustainability and durability and reduced cost.

e. "Design strength" (f'c) is the specified compressive strength of concrete at time(s) specified in this section to meet structural design criteria.

f. "Mass Concrete" is any concrete system that approaches a maximum temperature of 158 degrees F within the first 72 hours of placement. In

03 30 00 – page 7 of 48 addition, it includes all concrete elements with a section thickness of 3 feet or more regardless of temperature.

g. "Mixture proportioning" is the process of designing concrete mixture proportions to enable it to meet the strength, service life and constructability requirements of the project while minimizing the initial and life-cycle cost.

h. "Mixture proportions" are the masses or volumes of individual ingredients used to make a unit measure (cubic meter or cubic yard) of concrete.

i. "Pozzolan" is a siliceous or siliceous and aluminous material, which in itself possesses little or no cementitious value but will, in finely divided form and in the presence of moisture, chemically react with calcium hydroxide at ordinary temperatures to form compounds possessing cementitious properties.

j. "Workability (or consistence)" is the ability of a fresh (plastic) concrete mix to fill the form/mould properly with the desired work (vibration) and without reducing the concrete's quality. Workability depends on water content, chemical admixtures, aggregate (shape and size distribution), cementitious content and age (level of hydration).

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Concrete Curing Plan Quality

Control Plan; G

Quality Control Personnel Certifications; G

Quality Control Organizational Chart

Laboratory Accreditation; G

Form Removal Schedule; G

SD-02 Shop Drawings

Formwork Column Forms Wall Forms Floor Forms Ceiling Forms Special Construction

03 30 00 – page 8 of 48

Reinforcing Steel; G Reproductions of contract drawings are unacceptable.

Provide erection drawings for concrete Formwork that show placement of reinforcement and accessories, with reference to the contract drawings.

SD-03 Product Data The following requirement applies whenever the project design or contract allows the use of recovered content concrete and cement products, regardless of LEED credits sought. For each type of cementitious or concrete product, the Contractor shall submit manufacturer documentation indicating the type of recovered material it contains and the total percentage of such material that is recovered.

Alternately, the Contractor shall submit written justification of nonuse per Section 01 62 35 RECYCLED/RECOVERED MATERIALS.

Joint Sealants; (LEED NC) Submit manufacturer's product data, indicating VOC content.

Manufacturer's catalog data for the following items must include printed instructions for admixtures, bonding agents, epoxy-resin adhesive binders, waterstops, and liquid chemical floor hardeners.

Joint Filler; (LEED NC)

Materials for Forms

Recycled Aggregate Materials; (LEED NC)

Cementitious Materials; (LEED NC)

Vapor retarder

Concrete Curing Materials

Reinforcement; (LEED NC)

Liquid Chemical Floor

Hardener Admixtures

Synthetic Reinforcing Fibers

Mechanical Reinforcing Bar

Connectors Waterstops

Local/Regional Materials

Submit documentation indicating distance between manufacturing facility and the project site. Indicate

29Aug2017

03 30 00 – page 9 of 48 distance of raw material origin from the project site.

Indicate relative dollar value of local/regional materials to total dollar value of products included in project; (LEED NC)

Biodegradable Form Release Agent Submit manufacturer documentation indicating type and percentage of biobased content or written justification of non-use per Paragraph

2.4.12. If claiming an associated LEED credit, indicate relative dollar value of biobased content products to total dollar value of products included in the project.

SD-04 Samples

Slab Finish Sample

SD-05 Design Data

Concrete Mix

Design; G

Thirty days minimum prior to concrete placement, submit a mix design for each strength and type of concrete.

Submit a complete list of materials including type; brand;

source and amount of cement, fly ash, pozzolans, silica fume, ground slag, 29Aug2017

03 30 00 – page 10 of 48 polypropylene fibers, and admixtures; and applicable reference specifications.

Provide mix proportion data using at least three different water-cement ratios for each type of mixture, which produce a range of strength encompassing those required for each class and type of concrete required. If source material changes, resubmit mix proportion data using revised source material. Provide only materials that have been proven by trial mix studies to meet the requirements of this specification, unless otherwise approved in writing by the Contracting

Officer. Indicate clearly in the

29Aug2017

03 30 00 – page 11 of 48 submittal where each mix design is used when more than one mix design is submitted.

Submit additional data regarding concrete aggregates if the source of aggregate changes.

SD-06 Test Reports

Concrete Mix Design; G

Fly Ash

Pozzolan

Ground Granulated Blast-

Furnace Slag Aggregates

Fiber-Reinforced

Concrete; G Tolerance

Report

Compressive Strength Tests; G Unit

Weight of Structural Concrete Ion

Concentration

Air Content

Slump Tests

Water

SD-07 Certificates

Reinforcing Bars

03 30 00 – page 12 of 48

Welder Qualifications

Silica Fume Manufacturer's Representative

VOC Content for Form Release Agents, Curing Compounds, and Concrete Penetrating Sealers

Material Safety Data Sheets

Forest Stewardship Council (FSC) Certification

Field Testing Technician and Testing Agency

SD-08 Manufacturer's Instructions

Liquid Chemical Floor Hardener

Curing Compound

1.4 MODIFICATION OF REFERENCES

Accomplish work in accordance with ACI publications except as modified herein. Consider the advisory or recommended provisions to be mandatory.

Interpret reference to the "Building Official," the "Structural Engineer," and the "Architect/Engineer" to mean the Contracting Officer.

1.5 DELIVERY, STORAGE, AND HANDLING

Follow ACI 301, ACI 304R and ASTM A934/A934M requirements and recommendations. Do not deliver concrete until vapor retarder, forms, reinforcement, embedded items, and chamfer strips are in place and ready for concrete placement. Do not store concrete curing compounds or sealers with materials that have a high capacity to adsorb volatile organic compound (VOC) emissions. Do not store concrete curing compounds or sealers in occupied spaces.

1.5.1 Reinforcement

Store reinforcement of different sizes and shapes in separate piles or racks raised above the ground to avoid excessive rusting. Protect from contaminants such as grease, oil, and dirt. Ensure bar sizes can be accurately identified after bundles are broken and tags removed.

1.5.1.1 Epoxy Coated Reinforcing Steel

Record coating lot on each shipping notice and carefully identify and re-tag bar bundles from bending plant. Provide systems for handling coated bars which have padded contact areas such as, nylon slings, all free of dirt and grit. Lift bundled coated bars with strong back, multiple supports, or platform bridge to prevent sagging and abrasion. Pad bundling bands where in contact with bars. Do not drop or drag bars or bundles. Store coated bars both in shop and in field, aboveground, on wooden or padded cribbing.

Space the dunnage close enough to prevent excessive sags. Stack large quantities of straight bars with adequate protective blocking between layers. Schedule deliveries of epoxy coated bars to the job site to avoid the need for long term storage. Protect from direct sunlight and weather.

03 30 00 – page 13 of 48

Cover bars to be stored longer than 12 hours at the job site with opaque polyethylene sheeting or other suitable equivalent protective material.

1.6 QUALITY ASSURANCE

1.6.1 Design Data

1.6.1.1 Formwork Calculations

ACI 347. Include design calculations indicating arrangement of forms, sizes and grades of supports (lumber), panels, and related components. Furnish drawings and calculations of shoring and re-shoring methods proposed for floor and roof slabs, spandrel beams, and other horizontal concrete members.

Calculations must indicate concrete pressure with both live and dead loads, along with material types.

1.6.1.21.6.1.1 Concrete Mix Design

Sixty days minimum prior to concrete placement, sSubmit a mix design for each strength and type of concrete. Submit a complete list of materials including type; brand; source and amount of cement, complementary cementitious materials, polypropylene fibers, and admixtures; and applicable reference specifications. Submit mill test and all other test for cement, complementary cementitious materials, aggregates, and admixtures. Provide documentation of maximum nominal aggregate size, gradation analysis, percentage retained and passing sieve, and a graph of percentage retained verses sieve size.

Provide mix proportion data using at least three different water-cementitious material ratios for each type of mixture, which produce a range of strength encompassing those required for each type of concrete required.

If source material changes, resubmit mix proportion data using revised source material. Provide only materials that have been proven by trial mix studies to meet the requirements of this specification, unless otherwise approved in writing by the Contracting Officer. Indicate clearly in the submittal where each mix design is used when more than one mix design is submitted. Resubmit data on concrete components if the qualities or source of components changes. For previously approved concrete mix designs used within the past twelve months, the previous mix design may be re- submitted without further trial batch testing if accompanied by material test data conducted within the last six months. Obtain mix design approval from the contracting officer prior to concrete placement.

1.6.2 Shop Drawings

1.6.2.1 Formwork

Drawings showing details of formwork including, but not limited to; joints, supports, studding and shoring, and sequence of form and shoring removal.

Indicate placement schedule, construction, location and method of forming control joints. Include locations of inserts, conduit, sleeves and other embedded items. Reproductions of contract drawings are unacceptable.

Submit form removal schedule indicating element and minimum length of time for form removal.

Design, fabricate, erect, support, brace, and maintain formwork so that it is capable of supporting without failure all vertical and lateral loads that may reasonably be anticipated to be applied to the formwork.

03 30 00 – page 14 of 48

1.6.2.21.6.2.1 Reinforcing Steel

ACI SP-66. Indicate bending diagrams, assembly diagrams, splicing and laps of bars, shapes, dimensions, and details of bar reinforcing, accessories, and concrete cover. Do not scale dimensions from structural drawings to determine lengths of reinforcing bars. Reproductions of contract drawings are unacceptable.

1.6.3 Control Submittals

1.6.3.1 Concrete Curing Plan

Submit proposed materials, methods and duration for curing concrete elements in accordance with ACI 308.1.

1.6.3.21.6.3.1 Pumping Concrete

Submit proposed materials and methods for pumping concrete. Submittal must include mix designs, pumping equipment including type of pump and size and material for pipe, and maximum length and height concrete is to be pumped.

1.6.3.3 Silica Fume Manufacturer's Representative

The manufacturer's representative must be present at mix plant to ensure proper mix, including high range water reducer, and batching methods during the first 3 days of concrete mix preparation and placement. After which the manufacturer's representative must designate a representative at the concrete producer's plant to ensure the concrete mix procedures meet the silica fume manufacturer's recommendations. Representative to attend and advise at finishing of sample slab.

1.6.3.4 Finishing Plan

Submit proposed material and procedures to be used in obtaining the finish for the floors. Include qualification of person to be used for obtaining floor tolerance measurement, description of measuring equipment to be used, and a sketch showing lines and locations the measuring equipment will follow.

1.6.3.5 VOC Content for form release agents, curing compounds, and concrete penetrating sealers

Submit certification for the form release agent, curing compounds, and concrete penetrating sealers that indicate the VOC content of each product.

1.6.3.61.6.3.2 Material Safety Data Sheets

Submit Material Safety Data Sheets (MSDS) for all materials that are regulated for hazardous health effects. MSDS must be readily accessible during each work shift to employees when they are at the construction site.

1.6.4 Test Reports

1.6.4.1 Fly Ash and Pozzolan

Submit test results in accordance with ASTM C618 for fly ash and pozzolan.

29Aug2017

03 30 00 – page 15 of 48

Submit test results performed within 6 months of submittal date.

1.6.4.2 Ground Granulated Blast-Furnace Slag

Submit test results in accordance with ASTM C989/C989M for ground granulated blast-furnace slag. Submit test results performed within 6 months of submittal date.

1.6.4.3 Aggregates

ASTM C1260 for potential alkali-silica reactions, ASTM C295/C295M for petrographic analysis.

1.6.4.4 Fiber-Reinforced Concrete

Test to determine flexural toughness index I5 in accordance with ASTM C1116/C1116M.

1.6.5 Field Samples

1.6.5.1 Slab Finish Sample

Install minimum of 10 foot by 10 foot slab. Slab finish sample must not be part of the final project. Finish as required by specification. Silica fume manufacturer's representative must attend and advise.

1.6.5.2 Surface Finish Samples

Provide a minimum of three sample concrete panels for each finish for each mix design, 3 feet by 3 feet, 3 inches thick. Use the approved concrete mix design(s). Provide sample panels on-site at locations directed. Once approved, each set of panels must be representative of each of the finishes specified and of the workmanship and finish(es) required. Do not remove or destroy samples until directed by the Contracting Officer.

1.6.6 Quality Control Plan

Develop and submit for approval a concrete quality control program in accordance with the guidelines of ACI 121R and as specified herein. The plan must include approved laboratories. Provide direct oversight for the concrete qualification program inclusive of associated sampling and testing.

All quality control reports must be provided to the Contracting Officer, Quality Manager and Concrete Supplier. Maintain a copy of ACI SP-15 and CRSI 10MSP at project site.

1.6.7 Quality Control Personnel Certifications

The Contractor must submit for approval the responsibilities of the various quality control personnel, including the names and qualifications of the individuals in those positions and a quality control organizational chart defining the quality control hierarchy and the responsibility of the various positions. Quality control personnel must be employed by the Contractor.

Submit American Concrete Institute certification for the following:

a. CQC personnel responsible for inspection of concrete operations.

03 30 00 – page 16 of 48

b. Lead Foreman or Journeyman of the Concrete Placing, Finishing, and

Curing Crews.

c. Field Testing Technicians: ACI Concrete Field Testing Technician, Grade I.

1.6.7.1 Quality Manager Qualifications

The quality manager must hold a current license as a professional engineer in a U.S. state or territory with experience on at least five (5) similar projects. Evidence of extraordinary proven experience may be considered by the Contracting Officer as sufficient to act as the Quality Manager.

1.6.7.21.6.7.1 Field Testing Technician and Testing Agency

Submit data on qualifications of proposed testing agency and technicians for approval by the Contracting Officer prior to performing testing on concrete.

a. Work on concrete under this contract must be performed by an ACI

Concrete Field Testing Technician Grade 1 qualified in accordance with ACI SP-2 or equivalent. Equivalent certification programs must include requirements for written and performance examinations as stipulated in

ACI SP-2.

b. Testing agencies that perform testing services on reinforcing steel must meet the requirements of ASTM E329.

c. Testing agencies that perform testing services on concrete materials must meet the requirements of ASTM C1077.

1.6.8 Laboratory Qualifications for Concrete Qualification Testing

The concrete testing laboratory must have the necessary equipment and experience to accomplish required testing. The laboratory must meet the requirements of ASTM C1077 and be Cement and Concrete Reference Laboratory (CCRL) inspected.

1.6.9 Laboratory Accreditation

Laboratory and testing facilities must be provided by and at the expense of the Contractor. The laboratories performing the tests must be accredited in accordance with ASTM C1077, including ASTM C78/C78M and ASTM C1260. The accreditation must be current and must include the required test methods, as specified. Furthermore, the testing must comply with the following requirements:

a. Aggregate Testing and Mix Proportioning: Aggregate testing and mixture proportioning studies must be performed by an accredited laboratory and under the direction of a person who is competent in concrete materials and must sign all reports and designs.

b. Acceptance Testing: Furnish all materials, labor, and facilities required for molding, curing, testing, and protecting test specimens at the site and in the laboratory. Furnish and maintain boxes or other facilities suitable for storing and curing the specimens at the site while in the mold within the temperature range stipulated by ASTM

29Aug2017

03 30 00 – page 17 of 48

C31/C31M.

c.a. Contractor Quality Control: All sampling and testing must be performed by an approved, onsite, independent, accredited laboratory.

1.7 ENVIRONMENTAL REQUIREMENTS

Provide space ventilation according to manufacturer recommendations, at a minimum, during and following installation of concrete curing compound and sealer. Maintain one of the following ventilation conditions during the curing period or for 72 hours after installation:

a. Supply 100 percent outside air 24 hours a day.

b. Supply airflow at a rate of 6 air changes per hour, when outside temperatures are between 55 degrees F and 84 degrees F and humidity is between 30 percent and 60 percent.

c. Supply airflow at a rate of 1.5 air changes per hour, when outside air conditions are not within the range stipulated above.

1.7.1 Submittals for Environmental Performance

a. Provide data indication the percentage of post-industrial pozzolan (fly ash, blast furnace slag) cement substitution as a percentage of the full product composite by weight.

b. Provide data indicating the percentage of post-industrial and post-consumer recycled content aggregate.

c. Provide product data indicating the percentage of post-consumer recycled steel content in each type of steel reinforcement as a percentage of the full product composite by weight.

d. Provide product data stating the location where all products were manufactured

e. For projects using FSC certified formwork, provide chain-of-custody documentation for all certified wood products.

f. For projects using reusable formwork, provide data showing how formwork is reused.

g.a. Provide MSDS product information data showing that form release agents meet any environmental performance goals such as using vegetable and soy based products.

h.b. Provide MSDS product information data showing that concrete adhesives meet any environmental performance goals including low emitting, low volatile organic compound products.

1.8 SUSTAINABLE DESIGN REQUIREMENTS

1.8.1 Local/Regional Materials

03 30 00 – page 18 of 48

See Section 01 33 29 LEED(tm) DOCUMENTATION for cumulative total local material requirements. Concrete materials may be locally available.

1.8.2 Forest Stewardship Council (FSC) Certification

Use FSC-certified wood where specified. Provide letter of certification signed by lumber supplier. Indicate compliance with FSC STD 01 001 and identify certifying organization. Submit FSC certification numbers;

identify each certified product on a line-item basis. Submit copies of invoices bearing the FSC certification numbers.

1.91.8 QUALIFICATIONS FOR WELDING WORK

Welding procedures must be in accordance with AWS D1.4/D1.4M.

Verify that Welder qualifications are in accordance with AWS D1.4/D1.4M or under an equivalent qualification test approved in advance. Welders are permitted to do only the type of welding for which each is specifically qualified.

PART 2 PRODUCTS

2.1 MATERIALS FOR FORMS

Provide wood, plywood, plastic, carton, or steel. Use plywood or steel forms where a smooth form finish is required.

2.1.1 Wood Forms

Use lumber as specified in Section 06 10 00 ROUGH CARPENTRY and as follows.

Provide lumber that is square edged or tongue-and-groove boards, free of raised grain, knotholes, or other surface defects. Provide plywood that complies with NIST PS 1, B-B concrete form panels or better or AHA A135.4, hardboard for smooth form lining. Submit data verifying that composite wood products contain no urea formaldehyde resins. Virgin wood used must be FSC-certified.

2.1.1.1 Concrete Form Plywood (Standard Rough)

Provide plywood that conforms to NIST PS 1, B-B, concrete form, not less than 5/8-inch thick.

2.1.1.2 Overlaid Concrete Form Plywood (Standard Smooth)

Provide plywood that conforms to NIST PS 1, B-B, high density form overlay, not less than 5/8-inch thick.

2.1.2 Plastic Forms

Plastic lumber as specified in Section 06 10 00 ROUGH CARPENTRY. Provide plastic forms that contain a minimum of 50 percent post-consumer recycled content, or a minimum of 50 percent post-industrial recycled content.

2.1.3 Carton Forms

Moisture resistant treated paper faces, biodegradable, structurally

29Aug2017

03 30 00 – page 19 of 48 sufficient to support weight of wet concrete until initial set. Provide carton forms that contain a minimum of 5 percent post-consumer recycled content, or a minimum of 20 percent post-industrial recycled content.

2.1.4 Steel Forms

Provide steel form surfaces that do not contain irregularities, dents, or sags.

2.2 FORM TIES AND ACCESSORIES

Provide a form tie system that does not leave mild steel after break-off or removal any closer than 2 inches from the exposed surface. Do not use wire alone. Form ties and accessories must not reduce the effective cover of the reinforcement.

2.2.1 Waterstops

2.2.1.1 PVC Waterstop

Polyvinylchloride waterstops must conform to COE CRD-C 572.

2.2.1.2 Rubber Waterstop

Rubber waterstops must conform to COE CRD-C 513.

2.2.1.3 Thermoplastic Elastomeric Rubber Waterstop

Thermoplastic elastomeric rubber waterstops must conform to ASTM D471.

2.2.1.4 Hydrophilic Waterstop

Swellable strip type compound of polymer modified chloroprene rubber that swells upon contact with water must conform to ASTM D412 as follows:

Tensile strength 420 psi minimum; ultimate elongation 600 percent minimum.

Hardness must be 50 minimum on the type A durometer and the volumetric expansion ratio in distilled water at 70 degrees F must be 3 to 1 minimum.

2.2.2 Dovetail Anchor Slot

Preformed metal slot approximately 1 inch by 1 inch of not less than 22 gage galvanized steel cast in concrete. Coordinate actual size and throat opening with dovetail anchors and provide with removable filler material.

2.2.3 Perimeter Insulation

Perimeter insulation must be polystyrene conforming to ASTM C578, Type II;

polyurethane conforming to ASTM C591, Type II; or cellular glass conforming to ASTM C552, Type I or IV. Comply with EPA requirements in accordance with Section 01 33 29 SUSTAINABILITY REPORTING.

2.3 CONCRETE MIX DESIGN

2.3.1 Contractor-Furnished Mix Design

ACI 211.1, ACI 301, and ACI 318 ACI 304.2R except as otherwise specified.

Indicate the compressive strength (f'c) of the concrete for each portion of the structure(s) as specified below. Where faster set time is required, use

03 30 00 – page 20 of 48

Type III cement before using calcium chloride with approval from the contracting officer.

2.3.1.1 Mix Proportions for Normal Weight Concrete

Trial design batches, mixture proportioning studies, and testing requirements for various classes and types of concrete specified are the responsibility of the Contractor. Base mixture proportions on compressive strength as determined by test specimens fabricated in accordance with ASTM C192/C192M and tested in accordance with ASTM C39/C39M. Samples of all materials used in mixture proportioning studies must be representative of those proposed for use in the project and must be accompanied by the manufacturer's or producer's test report indicating compliance with these specifications.

Base trial mixtures having proportions, consistencies, and air content suitable for the work on methodology described in ACI 211.1. In the trial mixture, use at least three different water-cementitious material ratios for each type of mixture, which must produce a range of strength encompassing those required for each class and type of concrete required on the project.

The maximum water-cementitious material ratio allowed must be based on equivalent water-cementitious material ratio calculations as determined by the conversion from the weight ratio of water to cement plus pozzolan by weight equivalency method. Design laboratory trial mixture for maximum permitted slump and air content. Each combination of material proposed for use must have separate trial mixture, except for accelerator or retarder use can be provided without separate trial mixture. Report the temperature of concrete in each trial batch. For each water-cementitious material ratio, at least three test cylinders for each test age must be made and cured in accordance with ASTM C192/C192M and tested in accordance with ASTM C39/C39M for 7, 28, days. From these results, plot a curve showing the relationship between water-cementitious material ratio and strength for each set of trial mix studies. In addition, plot a curve showing the relationship between 7 and 28 day strengths.

2.3.1.2 Lightweight Concrete Proportion

ACI 211.2, using weight method. Provide ASTM C330/C330M aggregates for

2.3.1.3 Required Average Strength of Mix Design

The selected mixture must produce an average compressive strength exceeding the specified strength by the amount indicated in ACI 301, but may not exceed the specified strength at the same age by more than 20 percent. When a concrete production facility has a record of at least 15 consecutive tests, the standard deviation must be calculated and the required average compressive strength must be determined in accordance with ACI 301.

2.3.2 Ready-Mix Concrete

Provide concrete that meets the requirements of ASTM C94/C94M.

Ready-mixed concrete manufacturer must provide duplicate delivery tickets with each load of concrete delivered. Provide delivery tickets with the following information in addition to that required by ASTM C94/C94M:

Type and brand cement

03 30 00 – page 21 of 48

Cement and complementary cementitious materials content in 94-pound bags per cubic yard of concrete

Maximum size of aggregate

Amount and brand name of admixtures

Total water content expressed by water cementitious material ratio

2.3.3 Concrete Curing Materials

Provide concrete curing material in accordance with ACI 301 Section 5 and ACI 308.1 Section 2. Submit product data for concrete curing compounds.

Submit manufactures instructions for placement of curing compound.

2.4 MATERIALS

2.4.1 Cementitious Materials

For exposed concrete, use one manufacturer and one source for each type of cement, ground slag, fly ash, and pozzolan.

2.4.1.1 Fly Ash

ASTM C618, Class F, except that the maximum allowable loss on ignition must not exceed 6 percent. Class F fly ash for use in mitigating Alkali-Silica Reactivity must have a Calcium Oxide (CaO) content of less than 8 percent and a total equivalent alkali content less than 1.5 percent.

Add with cement. Report the chemical analysis of the fly ash in accordance with ASTM C311/C311M. Evaluate and classify fly ash in accordance with ASTM D5759.

2.4.1.2 Raw or Calcined Natural Pozzolan

Natural pozzolan must be raw or calcined and conform to ASTM C618, Class N, including the optional requirements for uniformity and effectiveness in controlling Alkali-Silica reaction and must have an ignition loss not exceeding 3 percent. Class N pozzolan for use in mitigating Alkali-Silica Reactivity must have a Calcium Oxide (CaO) content of less than 13 percent and total equivalent alkali content less than 3 percent.

2.4.1.3 Ultra Fine Fly Ash and Ultra Fine Pozzolan

Ultra Fine Fly Ash (UFFA) and Ultra Fine Pozzolan (UFP) must conform to ASTM C618, Class F or N, and the following additional requirements:

a. The strength activity index at 28 days of age must be at least 95 percent of the control specimens.

b. The average particle size must not exceed 6 microns.

c. The sum of SiO2 + Al2O3 + Fe2O3 must be greater than 77 percent.

2.4.1.4 Ground Granulated Blast-Furnace Slag

03 30 00 – page 22 of 48

ASTM C 989, grade and minimum percentage of cementitious material as described on the Delivery Order.

2.4.1.5 Silica Fume

Silica fume must conform to ASTM C1240, including the optional limits on reactivity with cement alkalis. Silica fume may be furnished as a dry, densified material or as slurry. Proper mixing is essential to accomplish proper distribution of the silica fume and avoid agglomerated silica fume which can react with the alkali in the cement resulting in premature and extensive concrete damage. Supervision at the batch plant, finishing, and curing is essential. Provide at the Contractor's expense the services of a manufacturer's technical representative, experienced in mixing, proportioning, placement procedures, and curing of concrete containing silica fume. This representative must be present on the project prior to and during at least the first 4 days of concrete production and placement using silica fume. A High Range Water Reducer (HRWR) must be used with silica fume.

2.4.1.62.4.1.1 Portland Cement

Provide cement that conforms to ASTM C150/C150M, Type I, IA, II, and IIA...

Use one brand and type of cement for formed concrete having exposed-to-view finished surfaces.

Supplier must certify that no hazardous waste is used in the fuel mix or raw materials.

2.4.1.7 Blended Cements

Blended cement must conform to ASTM C595/C595M and ASTM C1157/C1157M, Type IP or IS, including the optional requirement for mortar expansion and consist of a mixture of ASTM C150/C150M Type I, or Type II cement and a complementary cementing material. The slag added to the Type IS blend must be ASTM C989/C989M ground granulated blast-furnace slag. The pozzolan added to the Type IP blend must be ASTM C618 Class F and must be interground with the cement clinker. The manufacturer must state in writing that the amount of pozzolan in the finished cement will not vary more than plus or minus 5 mass percent of the finished cement from lot-to-lot or within a lot. The percentage and type of mineral admixture used in the blend must not change from that submitted for the aggregate evaluation and mixture proportioning.

2.4.2 Water

Water must comply with the requirements of ASTM C1602/C1602M. Minimize the amount of water in the mix. Improve workability by adjusting the grading rather than by adding water. Water must be potable; free from injurious amounts of oils, acids, alkalis, salts, organic materials, or other substances deleterious to concrete. Submit test report showing water complies with ASTM C1602/C1602M.

2.4.3 Aggregates

This is the start of the file's text. The full file is on GovTribe.