Effective: 03/01/17 Canceling: 03/01/16
M A
R C
H2017 Gas and electric underground service installation requirements
CALL PSE’S CUSTOMER CONSTRUCTION SERVICES AT 1-888-321-7779 OR VISIT PSE.COM/CUSTOMERCONSTRUCTION FOR MORE INFORMATION.
Builder/owner/developer responsibilities
PSE requires the following conditions to make the worksite construction ready ahead of scheduled service installation:
Permits
• Fuel line must be in place with an approved permit and plumbed to an approved gas meter location.
A valid permit must be indicated by either:
» A permit visible from outside the structure, or » A green Gas Service Approval sticker affixed to the fuel line.
• Electrical permit must be approved and the Department of Labor & Industries (L&I) sticker must be affixed on the electric meter base.
Meter location
• An acceptable meter location that allows for required access and clearance shall be provided.
» See Gas Meter Clearances and Service Installation Requirements (form 3885) for gas meter locations.
» See Electric Underground Service Installation Requirements (form 6080) for electric meter locations.
Trench work
• The worksite must be prepared to PSE specifications.
» The site must be at final grade or have final grade marked in the area of construction and trench line route.
» For unique site preparation requirements, contact your Project Manager.
» Installation of trench, work pits, sand for bedding and shading, and conduit must meet PSE specifications.
» Sand must be provided by the builder or developer and placed within hand-shoveling distance to the work pit or trench for bedding and shading. (See Sand Requirements for Direct-Buried Installations on page 2.)
» If either gas or electric service will not be provided by PSE, please consult with the other utility for any additional clearance requirements. Use the greater of any conflicting distances.
» Conduit for electric service lines shall be used under all paved surfaces, decks, rockeries, bulkheads, or obstacles to access the service line.
Additional information
• For additional electric service installation information, see Electric Underground Service Installation Requirements
(form 6080).
• For additional gas service installation information and meter set assembly locations and clearances, see Gas Meter Clearances and Service Installation Requirements (form 3885).
• View a video for the proper installation of natural gas piping at this site: pse.com/servicerequirementvideos
Become familiar with what can delay your project and cause it to be red-tagged:
• Construction debris or water in the trench or work pits.
• Trenches excavated to the incorrect depth.
• Failure to maintain minimum separations between utilities and drainage pipes.
• Sand and backfill material are not available, inaccessible, or inadequate.
• Requested meter location is not acceptable or fails to meet minimum clearances.
• Permits are not approved or visible.
• Conduit color and size are incorrect, or conduit is installed improperly.
Gas and electric underground service installation requirements
Canceling: 03/01/16
JOINT SERVICE LINE TRENCH DIRECT-BURIED INSTALLATIONJOINT SERVICE LINE TRENCH CONDUIT INSTALLATION
Service lines in conduit and direct-buried installations
Separation requirements to other utilities for conduit and direct-buried installations
Backfill requirements for conduit and direct-buried installations
*Check with local permitting agency for depth of cover requirements for any PSE facility installed in public right-of-way.
36" cover may be required over PSE facilities.
*Contact your TV/TEL provider about their separation requirements from power.
FINAL GRADE FINAL GRADE
24" MIN
TO
36" MAX
COVER*
24" MIN
TO
36" MAX
COVER*
BACKFILL FOR
CONDUIT FREE OF
ROCKS LARGER
THAN 8" IN
DIAMETER
FINAL BACKFILL FOR
DIRECT-BURIED FREE
OF ROCKS LARGER
THAN 8" IN DIAMETER
12" MIN
SEPARATION
12" MIN
SEPARATION
12" MIN
SEPARATION
6" MIN
SEPARATION
12" MIN
SEPARATION
12" MIN
SEPARATION
GAS SERVICE LINE
IN CONDUIT
TV & TEL ELECTRIC SERVICE
CABLE IN CONDUIT
GAS SERVICE LINE
DIRECT-BURIED
TV & TEL ELECTRIC SERVICE
CABLE DIRECT-BURIED
6" SAND SHADING
4" SAND BEDDING
32" TYPICAL
(POWER, GAS, PHONE & CABLE)
32" TYPICAL
(POWER, GAS, PHONE & CABLE)
24" MIN
(TO EXCAVATED DIRT PILE)
24" MIN
(TO EXCAVATED DIRT PILE)
INSTALLATION
HORIZONTAL SEPARATION VERTICAL SEPARATION WHEN CROSSING
GAS TO ELECTRIC GAS TO TV/TEL ELECTRIC TO TV/TEL GAS TO ELECTRIC GAS TO TV/TEL ELECTRIC TO TV/TEL
CONDUIT 12" MINIMUM 6" MINIMUM 12" MINIMUM* 6" MINIMUM 6" MINIMUM 12" MINIMUM*
DIRECT-BURIED 12" MINIMUM 12" MINIMUM 12" MINIMUM* 12" MINIMUM 6" MINIMUM 12" MINIMUM*
NOTE: STACKING UTILITIES NOT PERMITTED
INSTALLATION BEDDING SHADING BACKFILL
CONDUIT NOT REQUIRED NOT REQUIRED SOIL THAT IS FREE FROM CONSTRUCTION DEBRIS, GLASS, SHARP
ROCKS, FROZEN CLODS, AND ROCKS LARGER THAN 8"
DIRECT-BURIED 4" MINIMUM 6" MINIMUM
Sand requirements for direct-buried installations
• The customer shall provide additional clean sand meeting PSE standards in piles that are readily accessible within hand-shoveling distance of each work pit for shading and bedding.
» Sand meeting PSE specification can be found at supplier locations within the PSE service territory and is commonly referred to as “builder’s sand” (ASTM C33). Call PSE’s Customer Construction Services at 1-888-321-7779 for additional sand information.
» Bedding sand will be provided and installed by the customer to a minimum depth of 4 inches prior to the electric and gas direct-buried installations.
» Shading sand is to be installed by the PSE crew after direct-buried electric, gas, or joint service line installation.
Enough sand shall be provided so that the installation can be covered to a minimum depth of 6 inches.
(See diagrams above.)
Canceling: 03/01/16
Property line work pit and service connections
Work Pit Legend
1. 3/8" Pull Rope − For runs over 60' for electric and 100' for gas.
2. Electric Service Conduit − Customer Provided. See Conduit Requirements in Electric Underground Service Installation Requirements (form 6080).
3. 3/4 Yard Bedding and Shading Sand − Sand shall be provided on-site by the customer and placed within hand-shoveling distance to the work pit for bedding and shading of direct-buried facilities. A larger work pit may require more sand (see sand and backfill requirements on Page 2).
4. Gas Service Conduit − Customer Provided. See Conduit Requirements in Gas Meter Clearances and Service Installation Requirements (form 3885).
5. Electric Stub Marker − Utility Provided. Power stub shall be exposed on day of service connection
6. Gas Stub Marker − Utility Provided. Dig to 12" from gas stub marker. Customer shall not expose the stub. If accidentally exposed, cover with 12" of sand.
7. CATV/TEL Marker
SECTION A-A
WORK PIT DIMENSIONS
ELECTRIC AND JOINT UTILITY
ELECTRIC AND JOINT UTILITY
28" TO 32" MIN DEEP
(24" MIN COVER)
48"
(APPROX)
PIPES AND
WIRES
UTILITY INSTALLED
GAS
TEL
TV
POWER
48"
(APPROX)
FINAL GRADE
A
A
AA
ELECTRIC
SERVICE
TV &
TEL
GAS
SERVICE
TRENCH TO
BUILDING
POWER
TV & TEL
GAS
PSE TRANSFORMER
(OR PEDESTAL, HANDHOLE, OR STUBOUT)
PSE POLE
EXCAVATED DIRT
PILE AND SAND
BEDDING/SHADING
EXCAVATED DIRT
PILE AND SAND
BEDDING/SHADING
24"
MIN
24"
MIN
48" MIN
24"
MIN
48" MIN
12" MIN
12" MIN
12" MIN 12" MIN
12" MIN
WORK PIT PROFILE AT PADMOUNTED TRANSFORMERS,
PEDESTALS OR HANDHOLES
WORK PIT PROFILE AT PSE POLES
© 2017 Puget Sound Energy | 3061 03/17
Effective: 03/01/17 Canceling: 03/01/16
Meter and service connections work pit
Work Pit Legend
1. Electric Meter Base - Customer Provided, and secured to stud or structural member.
2. 3/8" Pull Rope - For runs over 60' for electric and 100' for gas.
3. Conduit Service Riser - Customer Provided.
4. Conduit Straps (2 Minimum) - Customer Provided.
5. Conduit Elbows - Customer Provided, 24 " min bend radius. See conduit requirements in Electric Underground Service Installation Requirements (form 6080).
6. Electric Service Conduit - Customer Provided. See Conduit Requirements in Electric Underground Service Installation Requirements (form 6080).
7. Gas Meter Assembly - Utility Provided.
8. Fuel Line Stub Typically Protrudes 4" to 5" - Customer Provided
9. Finish Grade - Finish grade shall be clearly marked at fuel line stubout.
10. Work Pit - Leave work pit open between gas service line conduit and proposed gas meter service riser location for gas line extension (Customer Provided).
11. 3/4 Yard Bedding and Shading Sand - Sand shall be provided on-site by the customer and placed within hand-shoveling distance to the work pit for bedding and shading of direct-buried facilities. A larger work pit may require more sand (see sand and backfill requirements on Page 2).
12. Drainage Pipe - 6 " minimum clearance should be maintained from gas service line.
13. Electric Meter - Utility Provided.
14. Gas Service Conduit - Customer Provided. See Conduit Requirements in Gas Meter Clearances and Service Installation Requirements (form 3885).
Discontinuous and Continuous-Conduit Options
METER BASE WORK PIT DIMENSIONS
ELECTRIC AND JOINT UTILITY
48" TO 60"
(APPROX)
32" TO 38"
TYPICAL
4'
MIN
2 11
WORK PIT 48" TO 60"
FROM FUEL LINE STUB
28" TO 32" DEEP
(24" MIN COVER)
FUEL LINE STUB
FINISHED WALL
DISCONTINUOUS-CONDUIT CONTINUOUS-CONDUIT
12"
MIN
32"
TYPICAL
POWER
TV & TEL
GAS
48" TO 60"
(APPROX)
ELECTRIC
METER
GAS
METER
For spacing between utilities, see Separation Requirements to Other Utilities for Conduit and Direct-Buried Installations
(Page 2).
Canceling: 03/01/16
M A
R C
H2017 Gas meter clearances and service installation requirements
CALL PSE’S CUSTOMER CONSTRUCTION SERVICES AT 1-888-321-7779 OR VISIT PSE.COM/CUSTOMERCONSTRUCTION FOR MORE INFORMATION.
• The clearances in this handout also apply to features on buildings adjacent to the building where the gas meter is located.
• Final grade of the service line route must be in place before the service line can be installed.
• If you are unable to meet the meter location requirements in this handout, contact PSE for further assistance.
• Puget Sound Energy reserves the right to designate gas meter locations so that they comply with PSE standards.
• For gas meter installations in Cle Elum and west of Cle Elum within Upper Kittitas County, see the Gas Meter Protection from Snow and Ice in Snow Country handout (form 3736).
Builder/owner/developer requirements
Gas meter locations
Measuring around a building corner
Locate gas meter on the front wall, or within the front 1/3 of the side wall, observing the corner clearance requirements detailed below.
The area 3 feet in front of and 2 feet to either side of the meter set assembly must be free of any landscaping (bushes, fences, etc.) and other structures that restrict access to the meter set assembly.
Outside corners
• The regulator relief vent (see diagram above) should be at least 12" from any outside corner.
» If the regulator relief vent is at least 12" from any outside corner, then there are no minimum clearances to features around the corner.
» If the regulator relief vent is less than 12" from any outside corner, then the minimum clearances specified in this handout must be maintained.
Measure as if using a string
Inside corners
• Clearance distances from the regulator relief vent or meter set assembly to the feature must be maintained in accordance with this handout. Measure as if using a string.
METER TYPE
A
METER WIDTH
(TYPICAL)
B
FUEL LINE
HEIGHT (TYPICAL)
METER
OUTLET
DIAMETER
250 16" 32" TO 36" 1"
425 24" 42" TO 46" 1-1/4"
630 30" 42" TO 46" 1-1/4"
1000 32" 46" 1-1/4"
GAS METER CLEARANCE TO FINISH GRADE
(250 METER SHOWN)
HOUSE/BUILDINGHOUSE/BUILDING
PLAN VIEWPLAN VIEW ELEVATION VIEWELEVATION VIEW
FUEL LINE LOCATION
(TYPICAL)
REGULATOR
TYPICAL
REGULATOR
RELIEF VENT
8" MIN
FINISH GRADE
TYPICAL PUBLIC ACCESS
DRIVEWAY
FR
ON
T 1/
OF
SI
DE
W
AL
L
FR
ON
T 1/
OF
SI
DE
W
AL
L
WALKWAY
FRONT WALL
BUILDING
FEATURE
METER
<12"
METER
PROPERTY
FEATURE
PROPERTY
FEATURE
BUILDING
FEATURE
6" MIN
B
A
Gas meter clearances and service installation requirements
Canceling: 03/01/16
Property line work pit for customer-provided trench and backfill
Service line in conduit installations
Service line direct-buried installations
1/2 YARD BEDDING AND SHADING SAND
SAND SHALL BE PROVIDED ON-SITE BY THE CUSTOMER AND PLACED WITHIN HAND-
SHOVELING DISTANCE TO THE WORK PIT FOR BEDDING AND SHADING OF DIRECT-BURIED
FACILITIES. A LARGER WORK PIT MAY REQUIRE MORE SAND (SEE BACKFILL REQUIREMENTS IN
THIS HANDOUT). SAND SHALL BE WASHED, CLEAN, AND FREE OF DEBRIS OR ROCKS LARGER
THAN 1/4 INCH.
GAS SERVICE LINE CONDUIT
CUSTOMER PROVIDES AND PLUGS
CONDUIT END.
GAS STUB MARKER
UTILITY PROVIDED
48"
(APPROX)
GAS STUB
MARKER WHEN
DIGGING WORK
PIT LEAVE 12"
OF SAND IF
ACCIDENTLY
EXPOSED
GAS STUBOUT
GAS STUB
MARKER
20" TO 24"
DEEP
24"
FINAL GRADE
GAS STUBOUT
WHEN DIGGING WORK PIT,
LEAVE 12" OF SAND
OVER GAS STUB END IF
ACCIDENTALLY EXPOSED
24" MIN
(TO EXCAVATED DIRT PILE)
24" MIN
(TO EXCAVATED DIRT PILE)
12" TYPICAL
(4" MIN*)
12" TYPICAL
FINAL
GRADE
FINAL
GRADE
GAS SERVICE
LINE
IN CONDUIT
FOR MINIMUM
GAS SERVICE
LINE DEPTH
SEE TABLE AT
RIGHT
36" MAX
COVER
BACKFILL FOR
CONDUIT
SEE
REQUIREMENTS
FOR MINIMUM
GAS SERVICE LINE
DEPTH
SEE TABLE AT RIGHT
36" MAX
COVER
FINAL BACKFILL
FOR DIRECT BURY
SEE
REQUIREMENTS
6" SAND SHADING
GAS SERVICE LINE
DIRECT-BURIED
4" SAND BEDDING
48"24"
GAS STUBOUT
DIG TO WITHIN 12" FROM GAS STUB MARKER
CUSTOMER SHALL NOT EXPOSE THE STUB. IF
ACCIDENTALLY EXPOSED, COVER GAS STUB WITH
12" OF SAND
WORK PIT DIMENSIONS
WORK PIT CROSS-SECTION
Backfill requirements for conduit installations
• Backfill for conduit: Soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 10" in diameter.
• Shading: None required above conduit.
• Bedding: None required below conduit.
GAS SERVICE LINE IN CONDUIT
INSTALLATION
GAS SERVICE LINE DEPTH TABLE FOR CONDUIT AND
DIRECT-BURIED INSTALLATIONS
*TRENCH WIDTH EXCEPTION
GAS SERVICE TYPE
GAS SERVICE
PIPE SIZE
MINIMUM DEPTH OF
COVER OVER GAS
RESIDENTIAL ANY SIZE 18"
COMMERCIAL/INDUSTRIAL 1-1/4"+ 24"
ANY SERVICE IN SNOW
COUNTRY (SEE FORM 3736)
ANY SIZE 24"
Backfill requirements for direct-buried installations
• Final backfill for direct bury: The backfill layer above the sand shading shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
» If the final layer contains rocks larger than 8" in diameter, then 12" of shading shall be placed over the gas service.
» Rocks larger than 10" in diameter are not permitted in the final backfill.
• Sand bedding: The customer shall provide and install clean sand to a depth of 4" inches prior to gas service pipe installation. See diagram at left.
• Sand shading: The customer shall provide additional clean sand in piles that are readily accessible near the trench. This shading sand is to be installed by the PSE crew after direct-buried gas line installation. Enough sand shall be provided so that the installation can be covered to a depth of 6 inches. See diagram at left.
• If customer-owned facilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
GAS SERVICE LINE
DIRECT-BURIED INSTALLATION
For separation requirements to other utilities see page 2 of the Gas and Electric Underground Service Installation Requirements handout (form 3061)
For separation requirements to other utilities see page 2 of the Gas and Electric Underground Service Installation Requirements handout (form 3061)
TR
EN
CH
T
O
BU
IL
DI
N G
24"
(APPROX)
20" TO 24" DEEP
WHEN CONVERTING EXISTING CONSTRUCTION
THE MINIMUM TRENCH WIDTH ACCEPTABLE IS 4"
Canceling: 03/01/16
SERVICE LINE CONDUIT SIZE, TYPE, & COLOR MIN. BEND RADIUS
TYPICAL RESIDENTIAL ≤185' 2" (MINIMUM) SCHEDULE 40 YELLOW OR WHITE PVC 36"
TYPICAL RESIDENTIAL SERVICES >185' AND ≤ 1000' 3" (MINIMUM) SCHEDULE 40 YELLOW OR WHITE PVC 48"
TYPICAL RESIDENTIAL > 1000' 4" (MINIMUM) SCHEDULE 40 YELLOW OR WHITE PVC 60"
TYPICAL LARGE MULTI-FAMILY & COMMERCIAL SERVICES 4" (MINIMUM) SCHEDULE 40 YELLOW OR WHITE PVC 60"
Meter and service connections work pit
Conduit requirements for gas service
Preferred trench location when the trench must pass near trees
1/2 YARD BEDDING AND SHADING SAND
SAND SHALL BE PROVIDED ON-SITE BY THE CUSTOMER AND PLACED WITHIN
HAND-SHOVELING DISTANCE TO THE WORK PIT FOR BEDDING AND SHADING OF
DIRECT-BURIED FACILITIES. A LARGER WORK PIT MAY REQUIRE MORE SAND (SEE
BACKFILL REQUIREMENTS IN THIS HANDOUT). SAND SHALL BE WASHED, CLEAN,
AND FREE OF DEBRIS OR ROCKS LARGER THAN 1/4 INCH.
24"
TYPICAL
12"
12"
GAS SERVICE LINE
CONDUIT
DRIPLINEROOT ZONE
48" TO 60"
(APPROX)
FUEL LINE STUB
36"
TYP (APPROX)
GA
S
GA
S
M
ET
ER
FI
N
IS
HE
D
W
AL
L
TV
T
EL
PO
W
ER
WORK PIT DIMENSIONSFUEL LINE STUB TYPICALLY PROTRUDES 4" TO 5”
CUSTOMER PROVIDED
GAS METER
UTILITY PROVIDED
SERVICE RISER
3/8" PULL ROPE
IF CONDUIT IS OVER 100'
SHUTOFF VALVE
WORK PIT 48" TO 60"
FROM FUEL LINE STUB
GAS SERVICE LINE CONDUIT
CUSTOMER PROVIDES AND PLUGS CONDUIT END
DRAINAGE PIPE
6" MINIMUM CLEARANCE
SHOULD BE MAINTAINED FROM
GAS SERVICE LINE
FINISH GRADE SHALL BE CLEARLY
MARKED AT FUEL LINE STUBOUT
4" TO 5"
• PSE recommends the use of conduit for all gas service installations.
• Conduit installation requirements
» Gas conduit runs over 100 feet long must have a 3/8-inch minimum diameter pull rope installed.
» Conduit bends shall be one long radius, single-piece sweeps (see table below).
» Fittings and elbows shall not be used because the joints prohibit service insertion.
» The sum total of the degrees of bends in the conduit run cannot exceed 180° .
» Conduit shall not cross in the trench.
» Yellow or white Schedule 40 PVC conduit used for gas service lines shall not be marked “water,” or any other utility.
MINIMUM
CONDUIT
BEND RADIUS
The preferred position for customer-provided trenching is as far as possible outside of the dripline of trees. If this is not possible, contact PSE’s Customer Construction Services at 1-888-321-7779 for trench location and depth requirements
20" TO 24" DEEP
Canceling: 03/01/16
CLEARANCE ZONE FROM WINDOWS, BUILDING VENTS, AND FIREPLACE CLEANOUTS
WINDOW
OPENING
ATTIC VENT
OPENING
CRAWL SPACE OR GARAGE
VENT OPENING
SOFFIT VENT
OPENING
3' 3'
3'3'
1'
Regulator relief vent clearances from building features
CLEARANCE ZONE FROM DOORS AND GARAGE DOORSCLEARANCE ZONE FROM ELECTRICAL COMPONENTS
POWER DISCONNECT
WALL SWITCH ELECTRIC OUTLET
3' 3' 3'
3'
1'
3'
3'
3'
10' 10'
10'10'
3'
3'
3'
3'3'
GARAGE DOORS
BATHROOM FAN VENTS FIREPLACE CLEANOUT
OPENING
DRYER
INTAKE/EXHAUST
FIREPLACE AIR
INTAKE/EXHAUST
FURNACE AIR
INTAKE/EXHAUST
MECHANICAL AIR
INTAKE OPENING
WINDOW-MOUNTED
AIR CONDITIONER
WALL-MOUNTED
AIR CONDITIONER
WINDOW/
WALL-MOUNTED FAN
DOORS
MECHANICAL AIR INTAKE FEATURES
AT CLEARANCE DISTANCE A (10 FEET)
APPLIANCE INTAKE AND EXHAUST FEATURES
AT CLEARANCE DISTANCE B (3 FEET)
CLEARANCE ZONES FROM WALL-MOUNTED FANS AND AIR CONDITIONERS, AND APPLIANCE VENTS AND INTAKES
CLEARANCE ZONE
CLEARANCE ZONECLEARANCE ZONE
CLEARANCE ZONE
B
A
Canceling: 03/01/16
Gas meter clearances from building features
Gas meter clearances under porches, decks, and balconies
GROUND LEVEL
CLEARANCE ZONE
PREFERRED CLEARANCE ZONE
CLEARANCE ZONE FROM OVERHEAD- OR UNDERGROUND-FED
PSE ELECTRIC METERS
PREFERRED CLEARANCE ZONE FROM WATER SPIGOTS,
AND FROM COMMUNICATIONS AND CABLE BOXES
CLEARANCES FROM PADMOUNTED AIR CONDITIONERS,
HEAT PUMPS, GENERATORS OR TRANSFORMERS CLEARANCE ZONE FROM INCINERATORS OR OPEN FLAME DEVICES
WATER SPIGOT COMMUNICATIONS BOX
MINIMUM CLEARANCE
FROM GRADE BELOW
METER TO DECK BOTTOM
MINIMUM CLEARANCE
FROM GRADE BELOW
METER TO DECK BOTTOM
GENERATOR OR
TRANSFORMER
OPEN FLAME OR
PERMANENT BBQ
INCINERATORAIR CONDITIONER OR
HEAT PUMP
GROUND LEVEL
GROUNDING ROD
ROOFLINE
NOTE: CLEARLY MARK
BURIED GROUND ROD
NOTE: A CLEARANCE
OF 36" IS REQUIRED
IN FRONT OF THE
ELECTRIC METER FACE
3'
3' 3' 3'
3'
3'
3'
3'
1'18"
2'
2'
3'
6'
3' 3'
6'
CLEARANCE ZONE UNDER BALCONIES (NO STAIRS TO GROUND LEVEL)
CLEARANCE ZONE UNDER DECKS AND PORCHES
(METER MUST NOT BE LOCATED UNDER STAIRS OR ANYWHERE
BETWEEN DOORS AND STAIRS)
CLEARANCE ZONE CLEARANCE ZONE
© 2017 Puget Sound Energy | 3885 03/17
Effective: 03/01/17 Canceling: 03/01/16
Guard post installation (PSE’s responsibility)
• To protect meter set assembly from vehicle damage, PSE will install guard posts when required.
• To avoid the need for PSE to install guard posts, choose a meter location that is away from driveways or other areas where vehicles travel.
• Guard post requirements are based on the following factors:
» Existing barriers (curbs, guard rails, steep increases in grade, ditches, rockeries, trees, shrubs, chimneys, recessed walls, etc.), which will provide adequate protection;
» Proximity of the facility to the edge of the travel lanes;
» The expected speeds in the travel lanes;
» The width of the travel lane;
» The volume of vehicle traffic;
» Existing nearby building damage or other indicators of vehicle damage that may have already occurred; and, » The type of customer (i.e., single-family residential versus commercial/industrial or multifamily).
• In cases where a meter set assembly will be installed behind a curb, observe the following:
» If the curb will be a rolled curb, and if there is less than 10 feet of space between the curb and the meter, guard posts will be installed; and, » If the curb will have a vertical face, and if there will be less than 5-1/2 feet between the curb and the meter, guard posts will be installed.
• Guard posts will be painted “caution” yellow, especially those located in commercial or industrial locations, street rights-of-way, and alleyways.
1. Guard posts shall be made from steel pipe, 6 feet long, filled with wet concrete and domed on top.
2. In this installation, the guard post can be solid concrete 9 inches in diameter.
3. At least 24 inches of the guard post shall be embedded in the base, with at least 42 inches of the post above final grade.
4. In this installation, at least 26 inches of the guard post shall be embedded in the base, with at least
42 inches of the post above final grade.
5. Additional guard posts are required if the centerline spacing between guard posts exceeds 36 inches.
The additional guard posts are typically evenly spaced between the outer two posts.
2-1/2" DIA STEEL PIPES
FILLED WITH CONCRETE
POSSIBLE DIRECTION OF
VEHICULAR TRAVEL
POSSIBLE DIRECTION OF
VEHICULAR TRAVEL
POSSIBLE DIRECTION OF
VEHICULAR TRAVEL
POSSIBLE DIRECTION
OF VEHICULAR TRAVEL
POSSIBLE DIRECTION OF
VEHICULAR TRAVEL
EDGE OF MSA
UNDERGROUND
CONCRETE BASE
42"
MIN
ABOVE
GRADE
30" 24"
EDGE OF MSA
EDGE OF MSA
BU
IL
DI
N
G W
AL
L
GAS METER
ASSEMBLY
8"
8"
8"
DO NOT INSTALL
CENTERLINE OF GUARD
POSTS IN SHADED AREA
TYPICAL SINGLE-FAMILY GUARD POST INSTALLATION
SINGLE-FAMILY RESIDENCE COMMERCIAL/INDUSTRIAL OR MULTI-FAMILY LEGAL SPEED LIMIT GREATER THAN 35 MPH
Guard Post 1 2-1/2" Dia. 4" Dia. 6" Dia.2
Concrete Base 3 8" Dia. x 30" High 15" Dia. x 30" High 30" Dia. x 42" High4
Minimum Clearance between Meter Set Assembly & Guard Post 5 8" 12" 12"
TOP VIEW EXAMPLE OF GUARD POST LOCATIONS
THAT PROVIDE PROTECTION FROM ALL POSSIBLE
DIRECTIONS OF VEHICULAR TRAVEL
DRIVEWAY OR PARKING
AREA
| Atch-4 PSE Gas Service Installation Reqmnts - Mar2017 |