D.1.1_W912UM18C0008_17_May_2018.pdf
PDF 754 KB Posted
- Solicitation number
- W912UM18R0004
About this file
Contract Award Copy W912UM18C0008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0002_to_W912UM18R0004.pdf | ||
| Amendment_0001_to_W912UM18R0004.pdf | ||
| RFP_W912UM18R0004_9_Mar_2018.pdf | ||
| Price_Proposal_Blank_Form_(Attachment_for_price_proposal).xlsx | XLSX spreadsheet | |
| Euipment_Lists_(Attachment_to_PWS).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912UM18R0004 09-Mar-2018
b. TELEPHONE NUMBER
0503-321-6089
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 06 Apr 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO. 031-464-2900
W912UM 9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
W912UM18C0008 20-May-2018
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
UN+KYONG HAN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
REF:
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
JISUN KANG / CONTRACTING OFFICER
See Schedule W453,528,000.00
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: SEE SCHEDULE
.06-Apr-2018 YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE: UNRESTRICTED OR
SMALL BUSINESS
17a.CONTRACTOR/ CODE 336AF FACILITY
OFFEROR CODE
CONTRACTING DIVISION
U.S. ARMY CORPS OF ENGINEERS
FAR EAST DISTRICT
UNIT #15546
APO AP 96205-5546
DAEWON GENERAL MANAGEMENT CO., LTD.
KIM, HONG CHUL
476 BAKDAL-RO, MANAN-GU ROOM 201
ANYANG 430802
USACE FINANCE CENTER MILLINGTON
ATTN: CEFC-AO-P
5722 INTEGRITY DRIVE
MILLINGTON TN 38054-5005
18a. PAYMENT WILL BE MADE BY CODE 964145
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE
SEE ITEM 9
15. DELIVER TO CODE WT4KCL 16. ADMINISTERED BY
Net 30 Days
12. DISCOUNT TERMS 11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
X SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAR EAST DISTRICT
KOO, DANIEL B
UNIT #15546
APO AP 96205-5546
82-2-2269-3411FAX:
TEL: 82-2-2270-7206 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$15,000,000
NAICS:
238220
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:jisun.kang@usace.army.mil
315-721-7585TEL:
31c. DATE SIGNED
17-May-2018
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF111
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912UM18C0008
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 W0.00
BASE PERIOD-HVAC
FFP
BASE PERIOD OF PERFORMANCE: 21 May 2018 - 20 May 2019
Maintenance and Repair of Commissary Refrigeration and HVAC System for the Defense Commissary Agency (DeCA) in Region-Korea Zone in accordance with Specific Task of Section C-5 and Equipment List in the Performance Work Statement (PWS).
NET AMT
0001AA 12 Months W1,853,000.00 W22,236,000.00
CAMP CARROLL - HVAC
FFP
PURCHASE REQUEST NUMBER: WT4KCL81346212
$20,977.36
0001AB 12 Months W1,853,000.00 W22,236,000.00
CP CASEY - HVAC
PURCHASE REQUEST NUMBER: WT4KCL81346216
0001AC 12 Months W2,220,000.00 W26,640,000.00
CP HUMPHREYS(NEW) - HVAC
PURCHASE REQUEST NUMBER: WT4KCL81346219
$25,132.07
0001AD 12 Months W1,853,000.00 W22,236,000.00
KUNSAN - HVAC
PURCHASE REQUEST NUMBER: WT4KCL81346220
0001AE 12 Months W1,853,000.00 W22,236,000.00
OSAN - HVAC
PURCHASE REQUEST NUMBER: WT4KCL81346221
0001AF 12 Months W1,853,000.00 W22,236,000.00
CP WALKER - HVAC
0001AG 12 Months W1,853,000.00 W22,236,000.00
YONGSAN - HVAC
0001AH 12 Months W1,853,000.00 W22,236,000.00
CP RED CLOUD - HVAC
0001AJ 12 Months W1,853,000.00 W22,236,000.00
K 16 - HVAC
0001AK 12 Months W1,853,000.00 W22,236,000.00
CHINHAE - HVAC
0002 W0.00
BASE PERIOD-REFRIGERATION
FFP
BASE PERIOD OF PERFORMANCE: 21 May 2018 - 20 May 2019
Maintenance and Repair of Commissary Refrigeration and HVAC System for the Defense Commissary Agency (DeCA) in Region-Korea Zone in accordance with
0002AA 12 Months W1,853,000.00 W22,236,000.00
CAMP CARROLL - REFRIGERATION
0002AB 12 Months W1,853,000.00 W22,236,000.00
CP CASEY - REFRIGERATION
0002AC 12 Months W2,220,000.00 W26,640,000.00
CP HUMPHREYS(NEW) - REFRIGERATION
$25,132.07
0002AD 12 Months W1,853,000.00 W22,236,000.00
KUNSAN - REFRIGERATION
PURCHASE REQUEST NUMBER: WT4KCL81346220
0002AE 12 Months W1,853,000.00 W22,236,000.00
OSAN - REFRIGERATION
PURCHASE REQUEST NUMBER: WT4KCL81346221
0002AF 12 Months W1,853,000.00 W22,236,000.00
CP WALKER - REFRIGERATION
0002AG 12 Months W1,853,000.00 W22,236,000.00
YONGSAN - REFRIGERATION
0002AH 12 Months W1,853,000.00 W22,236,000.00
CP RED CLOUD - REFRIGERATION
0002AJ 12 Months W1,853,000.00 W22,236,000.00
K 16 - REFRIGERATION
0002AK 12 Months W1,853,000.00 W22,236,000.00
CHINHAE - REFRIGERATION
0003 1 Job W0.00 TBN
BASE PERIOD-REIMBURSABLE PARTS
FFP
BASE PERIOD OF PERFORMANCE: 21 May 2018 - 20 May 2019
In accordance with Paragraph 4.3 “Government Reimbursement for Items” in the Performance Work Statement (PWS).
1001 W0.00
OPTION 1ST OPTION PERIOD-HVAC
FFP
BASE PERIOD OF PERFORMANCE: 21 May 2018 - 20 May 2019
Maintenance and Repair of Commissary Refrigeration and HVAC System for the Defense Commissary Agency (DeCA) in Region-Korea Zone in accordance with
1001AA 12 Months W1,853,000.00 W22,236,000.00
OPTION CAMP CARROLL - HVAC
1001AB 12 Months W1,853,000.00 W22,236,000.00
OPTION CP CASEY - HVAC
1001AC 12 Months W2,220,000.00 W26,640,000.00
OPTION CP HUMPHREYS(NEW) - HVAC
1001AD 12 Months W1,853,000.00 W22,236,000.00
OPTION KUNSAN - HVAC
1001AE 12 Months W1,853,000.00 W22,236,000.00
OPTION OSAN - HVAC
1001AF 12 Months W1,853,000.00 W22,236,000.00
OPTION CP WALKER - HVAC
1001AG 12 Months W1,853,000.00 W22,236,000.00
OPTION YONGSAN - HVAC
1001AH 12 Months W1,853,000.00 W22,236,000.00
OPTION CP RED CLOUD - HVAC
1001AJ 12 Months W1,853,000.00 W22,236,000.00
OPTION K 16 - HVAC
1001AK 12 Months W1,853,000.00 W22,236,000.00
OPTION CHINHAE - HVAC
1002 W0.00
OPTION 1ST OPTION PERIOD-REFRIGERATION
FFP
BASE PERIOD OF PERFORMANCE: 21 May 2018 - 20 May 2019
Maintenance and Repair of Commissary Refrigeration and HVAC System for the Defense Commissary Agency (DeCA) in Region-Korea Zone in accordance with
1002AA 12 Months W1,853,000.00 W22,236,000.00
OPTION CAMP CARROLL - REFRIGERATION
1002AB 12 Months W1,853,000.00 W22,236,000.00
OPTION CP CASEY - REFRIGERATION
1002AC 12 Months W2,220,000.00 W26,640,000.00
OPTION CP HUMPHREYS(NEW) - REFRIGERATION
1002AD 12 Months W1,853,000.00 W22,236,000.00
OPTION KUNSAN - REFRIGERATION
1002AE 12 Months W1,853,000.00 W22,236,000.00
OPTION OSAN - REFRIGERATION
1002AF 12 Months W1,853,000.00 W22,236,000.00
OPTION CP WALKER - REFRIGERATION
1002AG 12 Months W1,853,000.00 W22,236,000.00
OPTION YONGSAN - REFRIGERATION
1002AH 12 Months W1,853,000.00 W22,236,000.00
OPTION CP RED CLOUD - REFRIGERATION
1002AJ 12 Months W1,853,000.00 W22,236,000.00
OPTION K 16 - REFRIGERATION
1002AK 12 Months W1,853,000.00 W22,236,000.00
OPTION CHINHAE - REFRIGERATION
1003 1 Job W0.00 TBN
1ST OPTION PERIOD-REIMBURSABLE PARTS
FFP
1ST OPTION PERIOD OF PERFORMANCE: 21 May 2018 - 20 May 2019
2001 W0.00
OPTION 2ND OPTION PERIOD-HVAC
FFP
2ND OPTION PERIOD OF PERFORMANCE: 21 May 2020 - 20 May 2021
Maintenance and Repair of Commissary Refrigeration and HVAC System for the Defense Commissary Agency (DeCA) in Region-Korea Zone in accordance with
2001AA 12 Months W1,853,000.00 W22,236,000.00
2001AB 12 Months W1,853,000.00 W22,236,000.00
2001AC 12 Months W2,220,000.00 W26,640,000.00
2001AD 12 Months W1,853,000.00 W22,236,000.00
2001AE 12 Months W1,853,000.00 W22,236,000.00
2001AF 12 Months W1,853,000.00 W22,236,000.00
2001AG 12 Months W1,853,000.00 W22,236,000.00
2001AH 12 Months W1,853,000.00 W22,236,000.00
2001AJ 12 Months W1,853,000.00 W22,236,000.00
2001AK 12 Months W1,853,000.00 W22,236,000.00
2002 W0.00
OPTION 2ND OPTION PERIOD-REFRIGERATION
FFP
BASE PERIOD OF PERFORMANCE: 21 May 2018 - 20 May 2019
Maintenance and Repair of Commissary Refrigeration and HVAC System for the Defense Commissary Agency (DeCA) in Region-Korea Zone in accordance with
2002AA 12 Months W1,853,000.00 W22,236,000.00
2002AB 12 Months W1,853,000.00 W22,236,000.00
2002AC 12 Months W2,220,000.00 W26,640,000.00
2002AD 12 Months W1,853,000.00 W22,236,000.00
2002AE 12 Months W1,853,000.00 W22,236,000.00
2002AF 12 Months W1,853,000.00 W22,236,000.00
2002AG 12 Months W1,853,000.00 W22,236,000.00
2002AH 12 Months W1,853,000.00 W22,236,000.00
2002AJ 12 Months W1,853,000.00 W22,236,000.00
2002AK 12 Months W1,853,000.00 W22,236,000.00
2003 1 Job W0.00 TBN
2ND OPTION PERIOD-REIMBURSABLE PARTS
FFP
2ND OPTION PERIOD OF PERFORMANCE: 21 May 2020 - 20 May 2021
3001 W0.00
OPTION 3RD OPTION PERIOD-HVAC
FFP
3RD OPTION PERIOD OF PERFORMANCE: 21 May 2021 - 20 May 2022
Maintenance and Repair of Commissary Refrigeration and HVAC System for the Defense Commissary Agency (DeCA) in Region-Korea Zone in accordance with
3001AA 12 Months W1,853,000.00 W22,236,000.00
3001AB 12 Months W1,853,000.00 W22,236,000.00
3001AC 12 Months W2,220,000.00 W26,640,000.00
3001AD 12 Months W1,853,000.00 W22,236,000.00
3001AE 12 Months W1,853,000.00 W22,236,000.00
3001AF 12 Months W1,853,000.00 W22,236,000.00
3001AG 12 Months W1,853,000.00 W22,236,000.00
3001AH 12 Months W1,853,000.00 W22,236,000.00
3001AJ 12 Months W1,853,000.00 W22,236,000.00
3001AK 12 Months W1,853,000.00 W22,236,000.00
3002 W0.00
OPTION 3RD OPTION PERIOD-REFRIGERATION
FFP
BASE PERIOD OF PERFORMANCE: 21 May 2018 - 20 May 2019
Maintenance and Repair of Commissary Refrigeration and HVAC System for the Defense Commissary Agency (DeCA) in Region-Korea Zone in accordance with
3002AA 12 Months W1,853,000.00 W22,236,000.00
3002AB 12 Months W1,853,000.00 W22,236,000.00
3002AC 12 Months W2,220,000.00 W26,640,000.00
3002AD 12 Months W1,853,000.00 W22,236,000.00
3002AE 12 Months W1,853,000.00 W22,236,000.00
3002AF 12 Months W1,853,000.00 W22,236,000.00
3002AG 12 Months W1,853,000.00 W22,236,000.00
3002AH 12 Months W1,853,000.00 W22,236,000.00
3002AJ 12 Months W1,853,000.00 W22,236,000.00
3002AK 12 Months W1,853,000.00 W22,236,000.00
3003 1 Job W0.00 TBN
3RD OPTION PERIOD-REIMBURSABLE PARTS
FFP
3RD OPTION PERIOD OF PERFORMANCE: 21 May 2021 - 20 May 2022
4001 W0.00
OPTION 4TH OPTION PERIOD-HVAC
FFP
4TH OPTION PERIOD OF PERFORMANCE: 21 May 2022 - 20 May 2023
Maintenance and Repair of Commissary Refrigeration and HVAC System for the Defense Commissary Agency (DeCA) in Region-Korea Zone in accordance with
4001AA 12 Months W1,853,000.00 W22,236,000.00
4001AB 12 Months W1,853,000.00 W22,236,000.00
4001AC 12 Months W2,220,000.00 W26,640,000.00
4001AD 12 Months W1,853,000.00 W22,236,000.00
4001AE 12 Months W1,853,000.00 W22,236,000.00
4001AF 12 Months W1,853,000.00 W22,236,000.00
4001AG 12 Months W1,853,000.00 W22,236,000.00
4001AH 12 Months W1,853,000.00 W22,236,000.00
4001AJ 12 Months W1,853,000.00 W22,236,000.00
4001AK 12 Months W1,853,000.00 W22,236,000.00
4002 W0.00
OPTION 4TH OPTION PERIOD-REFRIGERATION
FFP
BASE PERIOD OF PERFORMANCE: 21 May 2018 - 20 May 2019
Maintenance and Repair of Commissary Refrigeration and HVAC System for the Defense Commissary Agency (DeCA) in Region-Korea Zone in accordance with
4002AA 12 Months W1,853,000.00 W22,236,000.00
4002AB 12 Months W1,853,000.00 W22,236,000.00
4002AC 12 Months W2,220,000.00 W26,640,000.00
4002AD 12 Months W1,853,000.00 W22,236,000.00
4002AE 12 Months W1,853,000.00 W22,236,000.00
4002AF 12 Months W1,853,000.00 W22,236,000.00
4002AG 12 Months W1,853,000.00 W22,236,000.00
4002AH 12 Months W1,853,000.00 W22,236,000.00
4002AJ 12 Months W1,853,000.00 W22,236,000.00
4002AK 12 Months W1,853,000.00 W22,236,000.00
4003 1 Job W0.00 W0.00 TBN
4TH OPTION PERIOD-REIMBURSABLE PARTS
FFP
4TH OPTION PERIOD OF PERFORMANCE: 21 May 2022 - 20 May 2023
9999 1 Each NSP Contractor Manpower Reporting (CMR) in accordance with the CMR identified in the PWS.
PRICE TABLE
Base Year Item No. Location Unit Price Months Amount
HVAC
0001AA Cp Carroll ₩1,853,000 12 ₩22,236,000
0001AB Cp Casey ₩1,853,000 12 ₩22,236,000
0001AC Cp Humphreys- New
₩2,220,000 12 ₩26,640,000
0001AD Kunsan AB ₩1,853,000 12 ₩22,236,000
0001AE Osan AB ₩1,853,000 12 ₩22,236,000
0001AF Cp Walker ₩1,853,000 12 ₩22,236,000
0001AG Yongsan ₩1,853,000 12 ₩22,236,000
0001AH Cp Red Cloud ₩1,853,000 12 ₩22,236,000
0001AJ K-16 ₩1,853,000 12 ₩22,236,000
0001AK Chinhae ₩1,853,000 12 ₩22,236,000
Total ₩226,764,000
REFRIGERATION
0002AA Cp Carroll ₩1,853,000 12 ₩22,236,000
0002AB Cp Casey ₩1,853,000 12 ₩22,236,000
0002AC Cp Humphreys- New
₩2,220,000 12 ₩26,640,000
0002AD Kunsan AB ₩1,853,000 12 ₩22,236,000
0002AE Osan AB ₩1,853,000 12 ₩22,236,000
0002AF Cp Walker ₩1,853,000 12 ₩22,236,000
0002AG Yongsan ₩1,853,000 12 ₩22,236,000
0002AH Cp Red Cloud ₩1,853,000 12 ₩22,236,000
0002AJ K-16 ₩1,853,000 12 ₩22,236,000
0002AK Chinhae ₩1,853,000 12 ₩22,236,000
Total ₩18,897,000 ₩226,764,000
0003 Reimbursable Part
Total Amount ₩453,528,000
1st Option Year
HVAC
1001AA Cp Carroll ₩1,853,000 12 ₩22,236,000
1001AB Cp Casey ₩1,853,000 12 ₩22,236,000
1001AC Cp Humphreys ₩2,220,000 12 ₩26,640,000
1001AD Kunsan AB ₩1,853,000 12 ₩22,236,000
1001AE Osan AB ₩1,853,000 12 ₩22,236,000
1001AF Cp Walker ₩1,853,000 12 ₩22,236,000
1001AG Yongsan ₩1,853,000 12 ₩22,236,000
1001AH Cp Red Cloud ₩1,853,000 12 ₩22,236,000
1001AJ K-16 ₩1,853,000 12 ₩22,236,000
1001AK Chinhae ₩1,853,000 12 ₩22,236,000
Total ₩226,764,000
REFRIGERATION
1002AA Cp Carroll ₩1,853,000 12 ₩22,236,000
1002AB Cp Casey ₩1,853,000 12 ₩22,236,000
1002AC Cp Humphreys ₩2,220,000 12 ₩26,640,000
1002AD Kunsan AB ₩1,853,000 12 ₩22,236,000
1002AE Osan AB ₩1,853,000 12 ₩22,236,000
1002AF Cp Walker ₩1,853,000 12 ₩22,236,000
1002AG Yongsan ₩1,853,000 12 ₩22,236,000
1002AH Cp Red Cloud ₩1,853,000 12 ₩22,236,000
1002AJ K-16 ₩1,853,000 12 ₩22,236,000
1002AK Chinhae ₩1,853,000 12 ₩22,236,000
Total ₩18,897,000 ₩226,764,000
1003 Reimbursable Part
Total Amount ₩453,528,000
2nd Option
2001AA Cp Carroll ₩1,853,000 12 ₩22,236,000
2001AB Cp Casey ₩1,853,000 12 ₩22,236,000
2001AC Cp Humphreys ₩2,220,000 12 ₩26,640,000
2001AD Kunsan AB ₩1,853,000 12 ₩22,236,000
2001AE Osan AB ₩1,853,000 12 ₩22,236,000
2001AF Cp Walker ₩1,853,000 12 ₩22,236,000
2001AG Yongsan ₩1,853,000 12 ₩22,236,000
2001AH Cp Red Cloud ₩1,853,000 12 ₩22,236,000
2001AJ K-16 ₩1,853,000 12 ₩22,236,000
2001AK Chinhae ₩1,853,000 12 ₩22,236,000
Total ₩18,897,000 ₩226,764,000
REFRIGERATION
2002AA Cp Carroll ₩1,853,000 12 ₩22,236,000
2002AB Cp Casey ₩1,853,000 12 ₩22,236,000
2002AC Cp Humphreys ₩2,220,000 12 ₩26,640,000
2002AD Kunsan AB ₩1,853,000 12 ₩22,236,000
2002AE Osan AB ₩1,853,000 12 ₩22,236,000
2002AF Cp Walker ₩1,853,000 12 ₩22,236,000
2002AG Yongsan ₩1,853,000 12 ₩22,236,000
2002AH Cp Red Cloud ₩1,853,000 12 ₩22,236,000
2002AJ K-16 ₩1,853,000 12 ₩22,236,000
2002AK Chinhae ₩1,853,000 12 ₩22,236,000
Total ₩18,897,000 ₩226,764,000
2003 Reimbursable Part
Total Amount ₩453,528,000
3rd Option
3001AA Cp Carroll ₩1,853,000 12 ₩22,236,000
3001AB Cp Casey ₩1,853,000 12 ₩22,236,000
3001AC Cp Humphreys ₩2,220,000 12 ₩26,640,000
3001AD Kunsan AB ₩1,853,000 12 ₩22,236,000
3001AE Osan AB ₩1,853,000 12 ₩22,236,000
3001AF Cp Walker ₩1,853,000 12 ₩22,236,000
3001AG Yongsan ₩1,853,000 12 ₩22,236,000
3001AH Cp Red Cloud ₩1,853,000 12 ₩22,236,000
3001AJ K-16 ₩1,853,000 12 ₩22,236,000
3001AK Chinhae ₩1,853,000 12 ₩22,236,000
Total ₩18,897,000 ₩226,764,000
REFRIGERATION
3002AA Cp Carroll ₩1,853,000 12 ₩22,236,000
3002AB Cp Casey ₩1,853,000 12 ₩22,236,000
3002AC Cp Humphreys ₩2,220,000 12 ₩26,640,000
3002AD Kunsan AB ₩1,853,000 12 ₩22,236,000
3002AE Osan AB ₩1,853,000 12 ₩22,236,000
3002AF Cp Walker ₩1,853,000 12 ₩22,236,000
3002AG Yongsan ₩1,853,000 12 ₩22,236,000
3002AH Cp Red Cloud ₩1,853,000 12 ₩22,236,000
3002AJ K-16 ₩1,853,000 12 ₩22,236,000
3002AK Chinhae ₩1,853,000 12 ₩22,236,000
Total ₩18,897,000 ₩226,764,000
3003 Reimbursable Part
Total Amount ₩37,794,000 ₩453,528,000
4th Option
4001AA Cp Carroll ₩1,853,000 12 ₩22,236,000
4001AB Cp Casey ₩1,853,000 12 ₩22,236,000
4001AC Cp Humphreys ₩2,220,000 12 ₩26,640,000
4001AD Kunsan AB ₩1,853,000 12 ₩22,236,000
4001AE Osan AB ₩1,853,000 12 ₩22,236,000
4001AF Cp Walker ₩1,853,000 12 ₩22,236,000
4001AG Yongsan ₩1,853,000 12 ₩22,236,000
4001AH Cp Red Cloud ₩1,853,000 12 ₩22,236,000
4001AJ K-16 ₩1,853,000 12 ₩22,236,000
4001AK Chinhae ₩1,853,000 12 ₩22,236,000
Total ₩18,897,000 ₩226,764,000
REFRIGERATION
4002AA Cp Carroll ₩1,853,000 12 ₩22,236,000
4002AB Cp Casey ₩1,853,000 12 ₩22,236,000
4002AC Cp Humphreys ₩2,220,000 12 ₩26,640,000
4002AD Kunsan AB ₩1,853,000 12 ₩22,236,000
4002AE Osan AB ₩1,853,000 12 ₩22,236,000
4002AF Cp Walker ₩1,853,000 12 ₩22,236,000
4002AG Yongsan ₩1,853,000 12 ₩22,236,000
4002AH Cp Red Cloud ₩1,853,000 12 ₩22,236,000
4002AJ K-16 ₩1,853,000 12 ₩22,236,000
4002AK Chinhae ₩1,853,000 12 ₩22,236,000
Total ₩18,897,000 ₩226,764,000
4003 Reimbursable Part
Total Amount ₩37,794,000 ₩453,528,000
Total Basic ~ 4th OY ₩2,267,640,000
Contract Period of Performance:
Base 12 months 21 May 2018 ~ 20 May 2019 1st Option 12 months 21 May 2019 ~ 20 May 2020 2nd Option 12 months 21 May 2020 ~ 20 May 2021 3rd Option 12 months 21 May 2021 ~ 20 May 2022 4th Option 12 months 21 May 2022 ~ 20 May 2023 6 Months Extension 6 months 21 May 2023 ~ 20 Nov 2023
The contract shall be for a period of one (1) year for basic year from the date of contract award, with four (4) one (1) year options, each of which, if exercised, would extend the contract by one (1) year making a total of five (5) years.
PWS
PERFORMANCE WORK STATEMENT
FOR MAINTENANCE AND REPAIR OF COMMISSARY REFRIGERATION AND HEATING,
VENTILATING, AND AIR-CONDITIONING (HVAC) SYSTEMS FOR THE WESTERN/PACIFIC REGION-
KOREA ZONE OF THE DEFENSE COMMISSARY AGENCY (DeCA)
31 January 2018
SECTION C-1
1.1 Location
The areas covered under this contract include all United States Forces Korea (USFK) Installations, bases, facilities and Republic of Contracting Korea (ROK) controlled areas in the Contracting Korean Peninsula. The DeCA facilities covered under this contract are:
Camp Carroll Camp Casey Camp Humphreys Kunsan Air Base Osan Air Base Camp Walker Yongsan Camp Red Cloud K-16 Chinhae
1.2 Authority
Includes the USFK Environmental Governing Standards (USFK Regulation 201-1), DoD Directive 4715.1 (Environmental Security), DoD Instructions 4715.5 (Management of Environmental Compliance at Overseas Installations), DoD Instruction 4715.8 (Environmental Remediation for DoD Activities Overseas), U.S.
Occupational Safety and Health Administration (OSHA) laws, applicable international agreements, and U.S. and ROK environmental laws as appropriate. Work performed under this contract shall be conducted in accordance with the manufacturer’s recommendation and/or best commercial practices to operate the systems at optimum efficiency.
The Contractor shall comply with the most recent versions of all cited authorities.
1.3 Purpose
The purpose of this contract is to provide maintenance and repair services of the DeCA Commissary Refrigeration HVAC systems at various locations in the Republic of Korea.
1.4 CONTRACTOR REQUIREMENTS. The contractor shall:
1.4.1 Perform refrigeration and HVAC periodic preventive maintenance (PPM) on a weekly basis.
1.4.2 Provide, as necessary, upon notification emergency service at any time 24 hours/day, 7 days/week and furnish one to three telephone numbers at which the contractor or his representative can be contacted 24 hours/day, 7 days/week.
1.4.3 Report to an Contracting Officer’s Representative (COR) immediately upon arrival at the commissary and notify the COR when repairs have been completed.
1.4.4 Respond to an emergency call within two (2) hours for refrigeration equipment and complete emergency repairs within 24 hours after receiving the request from the COR.
1.4.5 Respond to an emergency call by 0900 the following day for HVAC systems and complete emergency repairs within 24 hours of arrival after receiving the request from the COR.
1.4.6 Provide a complete service statement for PPM and emergency services in accordance with Section C-
5, paragraph 5.10.2, Service Statement.
1.4.7 Submit a Quality Control Plan within 30 days from receipt of the Contract Award.
1.5 CONTRACTOR QUALIFICATIONS:
1.5.1 The Contractor should possess experience in the maintenance and repair of refrigeration and HVAC systems in commercial supermarket facilities with refrigeration or HVAC systems similar to the size, type, and complexity of equipment described in this PWS.
1.5.2 The contractor shall maintain the Refrigeration Monitoring and Control System (RMCS) at Camp Humphreys. The technicians shall be craftsmen who have completed the training and certified by the RMCS manufacturer on proper installation, operation, and field service on the remote monitoring and control system. Training is available through Aztec/Danfoss PO Box 499 Darien GA, 31305 (912) 261- 2466. Personnel shall be qualified within 30 days of Contract Award. Recommend coordination be effected with Com-Trol for the required training well in advance of the scheduled award date in order to comply with contract terms.
1.5.3 The Contractor shall ensure that at least one member of the on-site crew shall be capable of oral and written communication in English at all times.
1.6 CONTRACTOR PERSONNEL. The Contractor shall employ directly adequate numbers of staff with sufficient experience, skill, and qualifications to successfully manage the contractor’s effort under the base contract, and to accomplish the required work. The Contractor is free to organize its work effort in a manner it believes will best deliver required services to the Government, and provide staff that it believes fully supports that effort.
1.7 SECURITY REQUIREMENTS:
1.7.1 The Contractor shall obtain personnel and vehicle passes for each employee by filling out and submitting the appropriate pass request forms to the Pass and Identification Section at each installation.
Contractor is required to contact to Resident Office at each installation for assistance. A copy of the contract, driver's license, individual identification number (if available), birth certificate, vehicle registration, proof of insurance, letter of authorization from the Contracting Office and may also be required in obtaining personnel and vehicle passes. The contractor is responsible for maintaining and updating passes for each of his employees. These identification media shall be surrendered to the Pass and Identification (ID) Section upon completion or termination of the contract, or upon termination of an individual's employment.
1.7.2 The rules and regulations of the installations where services are performed shall apply to the Contractor and his employees while on the premises of such installations. These regulations include, but are not limited to, presenting valid identification for installation entrance, obtaining and using vehicle passes for all Contractor-owned and/or privately-owned vehicles, obeying all posted directives, and providing strict adherence to Military Police direction to instances where Military Police have been dispatched to a particular location.
1.7.3 All Contractor personnel shall wear distinctive clothing bearing the name of the company or by wearing appropriate badges that indicates the company and employee name and shall be easily recognizable. All Contractor personnel must have an identification card issued by his or her company and shall present the card to the COR upon request.
1.8 CONTRACTOR QUALITY CONTROL. The Government will evaluate the Contractor's performance under this contract according to Technical Exhibit 1, Performance Requirements Summary. The Government will record all observations made. When an observation indicates defective performance, the COR will prepare a Contract Deficiency Report (CDR) and request the Contractor's representative initial the CDR to indicate that they are aware of the observation.
1.8.1 Performance Evaluation Meetings. The Contractor’s Team Leads shall meet monthly with the COR, and COR shall review and discuss the contractor’s performance, including a review of the contractor maintained Maintenance Log Book, CDRs, and any other issue of concern to either party.
1.9 PHYSICAL SECURITY. Contractor shall be responsible for safeguarding all Government property and facilities provided for Contractor use or access. At the close of each work period, Government facilities, equipment, and materials shall be secured. Upon arrival at the commissary, the Contractor shall request that commissary personnel unlock the doors at the mechanical rooms, allowing the contractor or his representative access to the refrigeration and HVAC equipment. The Contractor shall return to the commissary each day before his departure and request areas unlocked upon his arrival be locked and secured.
1.10 CONSERVATION OF UTILITIES. The Contractor shall instruct employees in utilities conservation practices.
The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which shall include:
1.10.1 Lights shall be used only in areas where and at the time when work is actually being performed.
1.10.2 Water faucets or valves shall be turned off after the required usage has been accomplished.
1.11 STORAGE. The Contractor is permitted to store tools, equipment, spare parts and supplies, and operation and maintenance (O&M) manuals required for PPM and emergency service of existing systems in each commissary mechanical room or other area designated by the Contracting Officer in coordination with the Commissary Officer, provided that doing so creates no safety hazards. The Contractor shall bear full responsibility for housekeeping of the storage area and securing all stored items against loss or theft. At the termination of the contract, the Contractor shall remove all Contractor-owned tools and equipment. The Contractor shall coordinate with the Contracting Officer for turnover to the Government all O&M records and residual spare parts that the Government already paid for. The O&M Records should identify when each of the equipment was worked on, if there were any major repairs that needed to be made, or if a piece of equipment was replaced. If the Contractor stores materials, tools and equipment within/or adjacent to the commissary, it is at his own risk. The Government is not responsible for theft, damage, etc., of this property.
1.12 COMMISSARY HOURS OF OPERATION. Normal commissary hours of operation are:
STORE DAYS HOURS
Camp Carroll Store: T-136
SUN 1000-1800
MON 1100-1900
TUES 1100-1900
WED CLOSED
THUR 1100-2000
FRI 1100-1900
SAT 1100-1900
Camp Casey Store: B-3003
SUN 1100-2000
MON CLOSED
TUES 1100-1900
WED 1100-1900
THUR 1100-1900
FRI 1100-2000
SAT 1100-2000
STORE AND DISTRIBUTION CENTER DAYS HOURS
Camp Humphreys Store: B-5725 Distribution Center: SPT-060
SUN 1000-1800
MON 1000-1900
TUES 1100-1900
WED CLOSED
THUR 1000-1900
FRI 1000-1900
SAT 1000-1900
Kunsan Air Base Store: B-1115
SUN 1000-1800
MON CLOSED
TUES 1100-1900
WED 1100-1900
THUR 1100-1900
SAT 1000-1800
Camp Walker Store: S-357
SUN 1000-1800
MON CLOSED
TUES 1100-1900
WED 1100-1900
THUR 1100-1900
SAT 0900-1900
Yongsan Store: B-5419 Distribution Center: B-5420
SUN 1000-1900
MON CLOSED
TUES 1000-1900
WED 1000-1900
THUR 1000-1900
FRI 1000-2000
Camp Red Cloud Store: S-410
SUN 1100-1900
MON 1100-1900
TUES CLOSED
WED 1100-1900
THUR 1100-1900
SAT 0900-1900
Osan Air Base Store: B-230 Distribution Center: B-230
SUN 1000-1900
MON CLOSED
TUES 1000-1900
WED 1000-1900
THUR 1000-2000
FRI 1000-1900
K-16:
Store: P-203
SUN 1000-1900
MON 1000-1900
TUES CLOSED
WED CLOSED
THUR 1000-1900
FRI 0900-1900
SAT 0900-2000
Chinhae:
Store: B-711
SUN 1200-1700
MON CLOSED
TUES 1100-1800
WED 1100-1800
THUR 1000-1800
FRI 1100-1800
SAT 1100-1800
1.12.1 The commissary schedules indicated above are the normal store hours and are subject to change to adapt to the each installation’s requirements. There are certain Federal holidays (New Year's Day, Martin Luther King Jr.'s Birthday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, and Christmas Day) during which some or all of these commissaries are closed. The Contractor shall take into consideration these closures and plan the PPM accordingly with the
COR and Commissary personnel. The Contractor shall coordinate with the COR regarding the hours of operation. Should the Contractor choose to work in the commissary when the commissary is closed, the Contractor shall submit a written request to the COR to obtain permission and coordinate activities with the COR five (5) working days prior to that closed day.
1.12.2 Commissary Telephone Numbers. The following are the telephone numbers of each commissary:
DSN from Local Phone Camp Carroll 765-7937 0505-765-7937
Camp Casey 730-4451 0505-730-4451
Camp Humphreys 753-6711 0505-753-6711
Camp Walker 764-5310 0505-764-5310
Kunsan Air Base 782-4144 063-470-4144 USAG Yongsan 736-3022 0505-736-3022
Camp Walker 764-5310 0505-764-5310
Camp Red Cloud 732-7649 0505-732-7649
Osan Air Base 784-4280, 784-4403 031-661-4403
K-16 741-6754 031-720-6754
Chinhae 762-5204, 762-5327 011-82-55-540-5327
1.13 SAFETY
3.10.1 The Contractor shall follow the requirements of the most current EM (Engineering Manual) 385-1-1 Safety and Health Requirements. in the execution of the periodic preventive maintenance (PPM) and emergency repair such as personal protective and safety equipment requirement; fire prevention and protection; material handling, storage and disposal and other items as applicable. Contractor shall submit safety plan needed for the proper execution of his PPM and emergency repairs within 14 calendar days from receipt of the Contract Award. Work will not be permitted to begin until the Government approves or accepts the safety documentation.
1.13.1 Work performed by contractor personnel, requiring entry into "Permit Required Confined Spaces", shall comply with 29 CFR (Code of Federal Regulation) 1910.146. A confined space as defined by OSHA (Occupational Safety and Health Administration), has a limited or restricted means of entry or exit, is large enough for an employee to enter and perform assigned work, and is not designed for continuous occupancy by the employee. Confined spaces in commissaries usually consist of utility tunnels, utility spaces between the ceiling and roof, or any other similar space where contractor personnel may occasionally be required to enter to perform work. A "Permit Required Confined Space" is one that meets the definition of a confined space and poses safety or health hazards, thereby requiring the issue of a permit for entry.
1.14 ENVIRONMENTAL REQUIREMENTS. Contractor shall conform to applicable Korea Environmental Governing Standards and all local installation’s established guidelines in the use of refrigerants. Venting of refrigerants is not permitted. The Contractor shall be responsible for proper recapturing and recovery of all refrigeration and air conditioning system refrigerants and oils used in the performance of this contract. The Contractor shall provide all equipment, including recovery cylinders, necessary to perform this work. Recovery of refrigerant shall be accomplished by utilizing equipment made specifically for refrigerant recovery operations.
Recovery of refrigerant shall be accomplished in accordance with all local and base environmental requirements and by properly trained/certified personnel. Mixing of recovered refrigerants in a cylinder will not be allowed. All recovered refrigerant cylinders shall be marked to identify the contents. All recovered contaminated refrigerants shall be properly disposed at a Korean Government authorized disposal site for industrial waste, by the Contractor.
1.15 AS-BUILT DRAWINGS. Contractor may obtain a copy of the “As Built” drawings of the refrigeration and HVAC systems of the commissary, if available, from the appropriate facilities engineer. Data and information furnished or referred to in this solicitation is for the Contractor’s information. The Government shall not be responsible for any interpretation or conclusion drawn from the data or information by the Contractor.
1.16 HOUSEKEEPING. The Contractor shall be responsible for cleanup and removal of debris resulting from the performance of this contract. All work areas shall be maintained in a clean and orderly manner. Contractor personnel shall present a neat, clean, and orderly appearance at all times to prevent possible contamination of food products.
Service technician’s tools and equipment shall be kept clean and well maintained. Special care shall be taken to avoid contaminating food products or food storage or display cases.
1.17 CLEAN UP. Debris shall be removed and transported in a manner that prevents spillage on streets or adjacent areas. Local regulations regarding hauling and disposal shall apply.
SECTION C-2
DEFINITIONS
2.1 STANDARD DEFINITIONS.
2.1.1 Defective Service. A service output that does not meet the standard of performance associated with it in the Performance Requirements Summary.
2.1.2 Lot. The total number of service outputs in a surveillance period, as defined in the Acceptable Performance column of the Performance Standards.
2.1.3 Quality Assurance. Those actions taken by the Government to assure services meet the requirements of the PWS.
2.1.4 Contracting Officer’s Representative (COR). A Government person responsible for surveillance of Contractor performance. A COR will be appointed at each facility served under this contract.
2.1.5 Quality Assurance Surveillance Plan (QASP). An organized written document used for quality assurance surveillance. The document contains specific methods to perform surveillance of the Contractor.
2.1.6 Quality Control. Those actions taken by a Contractor to control the performance of services so that they meet the requirements of the PWS.
2.2 TECHNICAL DEFINITIONS PARTICULAR TO THIS PWS.
2.2.1 Emergency. An emergency is when the entering air temperature of a refrigerated display case, a walk-in storage room temperature, reach-in storage box temperature or room environment, is not within the limits shown in Equipment List to include the situation when the commissary experiences a power failure and upon restoration of power, deficient temperatures occur as a result of equipment failing to start and commissary personnel are unable to start the equipment. An emergency also includes clogged display case drains. This may be verified by the display case exceeding the high limit by more than 2 hours or the indicator lights at the compressor system. An emergency also includes refrigeration monitoring and alarm system failures.
2.2.2 Preventive Maintenance. Periodic checking, adjusting, and service of commissary refrigeration equipment and commissary HVAC equipment.
2.2.3 HVAC Parts. Individual pieces of a larger component that performs a HVAC related function. HVAC parts may include, but are not limited to fans, ducts, pipes, valves, thermostats, diffusers, etc. Repair and replacement of HVAC parts is considered part of basic preventive maintenance as defined in this PWS.
2.2.4 HVAC Equipment. A component of an HVAC system that is typically purchased preassembled for incorporation into an HVAC system. HVAC equipment can include, but is not limited to, compressors, boilers, unit heaters, freezers, condensers, display cases, etc. HVAC equipment may be considered reimbursable items as described in Section 4.3.
2.2.5 Major Equipment. Condenser coils, heat reclaim coils, and evaporator coils.
2.2.6 Contracting Officer’s Representative (COR). Government personnel authorized by the Contracting Officer to call the Contractor for emergency work and to log the time when the Contractor was called and when the Contractor arrived for emergency service and when repairs are completed. The Contracting Office shall notify the Contractor, in writing, of the names of Contracting Officer’s Representative.
2.2.7 Mechanical Center. A component of a refrigeration system defined as a factory fabricated enclosure containing compressors, condensers, fans, wiring, bussing, piping, controls, etc.
2.2.8 Contract Deficiencies Report. Report for logging contractor’s non-performance issues.
SECTION C-3
GOVERNMENT FURNISHED PROPERTY AND SERVICES
3.1 PROPERTY.
3.1.1 Maintenance Shop. A maintenance shop will be provided to the contractor by the government at the Yongsan Commissary. This maintenance shop is approximately 750 square feet in space and is located adjacent to the mechanical mezzanine.
3.1.1.1 Utilities. The Government will provide the utilities for this space with the exception of telephone service.
3.1.2 CONDITION OF REFRIGERATION SYSTEM AND HEATING, VENTILATION AND AIR-
CONDITIONING SYSTEM (HVAC). The Government does not warrant or certify the condition of the equipment upon acceptance of this contract. The Contractor shall accept the equipment in an "as is" condition and shall be responsible for any necessary maintenance and repairs, for the equipment to achieve the relevant temperature and/or relative humidity pursuant to Technical Exhibit 3 (Quality Standards), at no additional cost to the Government, except for the ₩5,500,000 limitation for reimbursable items in accordance with paragraph 4.3 (Government Reimbursement for Items).
3.1.3 ORIGINAL DESIGN OF THE REFRIGERATION SYSTEM AND HVAC SYSTEM.
Refrigeration systems and HVAC systems shall not be changed or modified from their original size, design, and configuration without prior approval of the Contracting Officer.
3.2 SERVICES.
3.2.1 Utilities. The Government will furnish the electricity and water required in performing the services of this contract.
3.2.2 Telephone. The Contractor may use commissary’s DSN telephones for local calls pertaining to this contract. No long distance calls will be billed to the Government.
3.2.3 Military Police and Fire Protection. Phone numbers at each installation for emergency reporting are as shown below:
INSTALLATION FIRE DEPARTMENT MILITARY POLICE
Camp Carroll 0503-365-7619 0503-365-8310
Camp Casey 0503-330-2089/2090 0503-330-4417/4418
Camp Humphreys 0503-353-6176 0503-353-3111
Kunsan Air Base 0503-382-5915 0503-382-5415
Osan Air Base 0503-384-4710 0503-384-5515
Camp Walker 0503-364-4120 0503-364-4141
Yongsan 0503-336-5020 0503-336-3005
Camp Red Cloud 0503-332-5660 0503-332-6693
K-16 0503-341-6001 0505-741-6001
Chinhae 0503-362-5110 0503-362-5345
SECTION C-4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.1 GENERAL. Except for those items or services specifically stated in Section C-3, Government Furnished Property And Services, the Contractor shall furnish all labor, materials, and equipment to perform the work described in this PWS.
4.2 MATERIAL QUALITY STANDARD. All parts, materials and equipment provided under this contract shall be new. Reimbursable items, furnished by other than the original manufacturer, may be used only if the parts are equal to or better than the original and approved by the Contracting Officer. Re-manufactured parts such as compressors may be used provided the compressor is furnished by a manufacturer authorized and approved by the original equipment manufacturer (OEM) and only upon written approval of the Contracting Officer. All re-manufactured or used spare parts or equipment must have an equivalent warranty to that of brand new spare parts or equipment. The Contractor shall provide manufacturer’s certification, data, equipment list, and an equivalent warranty to that of brand new spare parts or equipment to the COR.
4.3 GOVERNMENT REIMBURSEMENT FOR ITEMS.
4.3.1 HVAC Parts Or Equipment In Excess Of Cost Limitation.
4.3.1.1 Routine PPM that requires equipment in excess of ₩5,500,000, the Contracting Officer Representative (COR) shall provide a written authorization to the contractor prior to ordering the equipment. Contractor shall submit three price quotes from major suppliers or sources for the equipment in question to the COR.
4.3.1.2 Emergency service calls that require replacement of equipment in excess of ₩5,500,000, the Contractor shall submit three price quotes within 24 hours of notification by the Contracting Officer’s Representative (COR). If the Contractor fails to complete repairs or services in the specified time, the Government has the right to complete repairs as required protecting loss of merchandise.
4.3.2 Heavy Equipment. Heavy equipment rentals such as cranes, lifts, or special equipment used to perform the work in the contract shall be included in the ₩5,500,000 cost limitation. (VAT tax is not included in the equipment). The Contractor shall submit installation guides or equipment brochures for approval of such spare parts and equipment. The Contractor shall not include handling cost, delivery or transportation cost within Korea. Transportation cost outside of Korea may be included into the ₩5,500,000 cost limitation subject to approval by the Contracting Officer. The Government may obtain such spare parts or equipment through Government supply and/or Government acquisition procedures.
Upon receipt of spare part and/or equipment, the Contractor shall coordinate the schedule of the repair with the COR and as specified in the PWS. Labor cost for installation shall not be included in the cost for spare parts or equipment that exceed cost limitation.
4.3.3 Reimbursement. To request reimbursement, Contractor shall submit to the Contracting Officer the original invoice followed by a payment request. The Government shall reimburse the Contractor’s actual total cost (cost of one item as invoiced to the Contractor plus shipping charges minus any discounts, exchanges or other credits) by payment through the bid item for "Reimbursable Parts". The failure of the contractor to seek the Contracting Officer’s approval prior to purchase or rental may result in the contractor not being reimbursed. The Government will not reimburse labor costs to install repair parts or equipment.
4.3.4 Written Approval. Contract modification for reimbursable parts will be issued within 30 days after contracting officer's approval is made of the amount.
4.3.5 Non-Availability Of Spare Parts & Equipment. The Contractor shall maintain a sufficient inventory or sources of supply of spare parts to meet the 24 hour repair time requirement. In the case of major equipment such as evaporator coils and condenser coils for HVAC and evaporator coils, heat reclaim coils and condenser coils for refrigeration equipment, the Contracting Officer may grant the Contractor a five (5) days delay to procure spare parts or equipment available in Korea. The Contractor shall justify the need for additional time in writing to the Contracting Officer within the 24-hour repair time. If a part or equipment is not available in Korea, a period of more than five (5) days may be granted by the Contracting Officer, if the delay is warranted in light of documentary evidence establishing exceptional circumstances (e.g., supplier quotations and delivery terms) submitted by the Contractor within the 24-hour time period.
4.4 SUSPENSION OF PREVENTATIVE MAINTENANCE SERVICES. DeCA will from time to time replace aging HVAC/Refrigeration equipment. During the replacement of major equipment, the contractor shall after confirming with the COR, cease preventative maintenance work on the major equipment that are being replaced.
Preventative maintenance on the newly installed equipment will not commence until the contractor has submitted a new preventative maintenance plan to the Contracting Officer (KO) and has received written approval to initiate the preventative maintenance from the Contracting Officer. Work stoppages could also occur due to facilities being closed for renovations, natural disasters, changes in mission.
4.5 DELIVERABLES.
Item Frequency Schedule Method Routine maintenance weekly During contract period of performance By contractor Emergency maintenance 3 times a year During contract period of performance By contractor
Safety Plan in accordance with the Paragraph 1.13 Safety
Once 14 days after award Email
Preventative Maintenance Plan in accordance with the Paragraph 5.5 Preventive Maintenance
Once 30 days after award Email
Newly installed equipment: will not commence until the contractor has submitted a new preventative maintenance plan to the Contracting Officer (KO) and has received written approval to initiate the preventative maintenance from the Contracting officer.
Monthly Summary Report in accordance with the Paragraph 5.12
Month 1st of the Month Email
Quality Control Plan in accordance with the Paragraph 1.8 Contractor Quality Control
Once 30 days after award Email
4.6 The Contractor shall maintain the government's Range Monitoring Control System (RMCS) computer terminal, network router, and printer at a location where the Contract Manager can access the temperature and system conditions from the RMCS only for Refrigeration Maintenance of Cp Humphreys New Commissary. The contractor shall also provide and maintain a dedicated commercial data line (IP address or commercial phone line) for the RMCS and include the cost of the monthly service in his bid price for the duration of the contract.
During the contract period, if the Contractor receives an alarm condition from the control system, the Contractor will respond as if the call was an advisory call. The Contractor shall respond to the advisory call in accordance with paragraph 5.10 ADVISORY CALLS. Contractor response to an emergency call is specified in paragraph 5.8
EMERGENCY SERVICE WORK.
SECTION C-5
SPECIFIC TASKS
5.1 GENERAL. The Contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and other items and services necessary to repair and maintain the commissary refrigeration systems and HVAC systems specified at various locations in Korea, as listed in the schedule and as defined in this PWS, except as specified in Section C-3 as Government furnished property and services.
5.2 COMMISSARY REFRIGERATION SYSTEM. The commissary refrigeration system at each installation includes all equipment (including all components/appurtenances internal or incidental to each piece of equipment required for a complete, operational system) listed in Equipment List including display cases, unit coolers, reach-in storage boxes, condensers, heat reclaim coils, hot water reclaim coils, compressor systems, condensing units, blast freezers, cooling towers, and refrigeration monitoring and alarm systems. In addition to equipment listed, the commissary refrigeration system at each installation includes defrost power wiring between compressor systems and unit coolers, and between compressor systems and display cases; control wiring between compressor systems and display cases; control wiring between compressor systems and unit coolers, between unit coolers and between compressor systems and display cases; all wiring, controls and components that are part of, in the control panels of, or internal to display cases, unit coolers, condensers, heat reclaim coils, hot water reclaim coils, compressor systems, cooling towers, and refrigeration condenser water pumps; all wiring, controls, and components of remote defrost panels and refrigeration control panels (not Heating, Ventilating, and Air-Conditioning panels); the mechanical centers and their ventilating fans and controls, power wiring and buss bars, wire ways, lighting circuits, switch light fixtures, circuit breakers, and the mechanical center main disconnect, whether mounted inside or on the exterior of the mechanical center; hot water circulating pumps for circulating water through hot water reclaim coils and also includes heat reclaim valves; all refrigeration piping including repairing piping insulation, insulating any uninsulated suction piping and headers and condensate drain piping (cold), and supports connecting compressor systems to and internal to display cases, condensers, heat reclaim coils, unit coolers, hot water reclaim coils, and interconnecting display cases, unit coolers, heat reclaim and hot water reclaim coils, heat reclaim coils and condensers, and hot water reclaim coils and condensers; the monitoring and alarm system sensor probes, wiring, control panel, annunciator panel, probe junction box, power alarms unit, communicator, telephone dialer, dialer interface, modem and internal components of each (If the monitoring system includes control, the system will be listed as a Refrigeration Monitoring and Control System in equipment list.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.