RFP_Attachment_3-_Price_Proposal_Schedule.xlsx
XLSX spreadsheet 31 KB Posted
- Solicitation number
- W912UM-17-R-0002
About this file
Price Proposal Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_Amendment_W912UM-17-R-0002-0001.pdf | ||
| RFP_W912UM-_17-R-0002.pdf | ||
| RFP_Attachment_2_PPQ.docx | DOCX document | |
| RFP_Attachment_1_Specialized_Experience.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| Atttachment 3 - Price Proposal Schedule | |||||
| Base Year | |||||
| Item No. | Supplies/Service | Unit | Qty | Unit Price (₩) | Amount |
| 0001 | Zone I Drilling Activities | ---- | |||
| 0001AA | Mobilization and Demobilization (Zone I) | EA | 10 | - 0 | |
| 0001AB | Encased Boring, Rig Type I | LM | 200 | - 0 | |
| 0001AC | Encased Boring, Rig Type II | LM | 1,400 | - 0 | |
| 0001AD | Split-Barrel Sampling and Standard Penetration Testing (SPT) | EA | 1,600 | - 0 | |
| 0001AE | Thin-Wall Shelby Tube Sampling | EA | 60 | - 0 | |
| 0001AF | Rock Core Drilling | LM | 60 | - 0 | |
| 0001AG | Grout In-Filling of Boreholes | M3 | 20 | - 0 | |
| 0001AH | In-Situ Testing – CPTu | LM | 80 | - 0 | |
| 0001AJ | In-Situ Testing – CPT Pore Pressure Dissipation Test | EA | 10 | - 0 | |
| 0001AK | In-Situ Testing – Field Vane Shear Test | EA | 10 | - 0 | |
| 0001AL | In-Situ Testing – Pressuremeter Test | EA | 5 | - 0 | |
| 0001AM | Downhole Logging – Optical Televiewer | LM | 30 | - 0 | |
| 0001AN | Downhole Logging – Acoustic Televiewer | LM | 30 | - 0 | |
| 0001AP | Downhole Logging – Caliper | LM | 30 | - 0 | |
| 0001AQ | Downhole Logging – Normal Resistivity | LM | 30 | - 0 | |
| 0001AR | Downhole Logging – Fluid Temperature/ Resistivity | LM | 30 | - 0 | |
| 0001AS | Downhole Logging – Spinner Flowmeter | LM | 30 | - 0 | |
| 0001AT | Downhole Logging – Heat Pulse Flowmeter | LM | 30 | - 0 | |
| 0001AU | Direct Push Sampling System | LM | 100 | - 0 | |
| 0001AV | Install Piezometer | LM | 50 | - 0 | |
| 0001AW | Geologist | HR | 200 | - 0 | |
| 0001AX | 0.43m3 Backhoe Excavation of Test Pit | HR | 80 | - 0 | |
| 0001AY | Compressor | HR | 40 | - 0 | |
| 0001AZ | Crane (10 ton) | HR | 40 | - 0 | |
| 0001BA | Crane (25 ton) | HR | 40 | - 0 | |
| 0001BB | Survey | HR | 32 | - 0 | |
| - 0 | |||||
| 0002 | Zone II Drilling Activities | ||||
| 0002AA | Mobilization and Demobilization (Zone II) | EA | 5 | - 0 | |
| 0002AB | Encased Boring, Rig Type I | LM | 100 | - 0 | |
| 0002AC | Encased Boring, Rig Type II | LM | 500 | - 0 | |
| 0002AD | Split-Barrel Sampling and Standard Penetration Testing (SPT) | EA | 600 | - 0 | |
| 0002AE | Thin-Wall Shelby Tube Sampling | EA | 20 | - 0 | |
| 0002AF | Rock Core Drilling | LM | 80 | - 0 | |
| 0002AG | Grout In-Filling of Boreholes | M3 | 10 | - 0 | |
| 0002AH | In-Situ Testing – CPTu | LM | 100 | - 0 | |
| 0002AJ | In-Situ Testing – CPT Pore Pressure Dissipation Test | EA | 10 | - 0 | |
| 0002AK | In-Situ Testing – Field Vane Shear Test | EA | 10 | - 0 | |
| 0002AL | In-Situ Testing – Pressuremeter Test | EA | 5 | - 0 | |
| 0002AM | Downhole Logging – Optical Televiewer | LM | 30 | - 0 | |
| 0002AN | Downhole Logging – Acoustic Televiewer | LM | 30 | - 0 | |
| 0002AP | Downhole Logging – Caliper | LM | 30 | - 0 | |
| 0002AQ | Downhole Logging – Normal Resistivity | LM | 30 | - 0 | |
| 0002AR | Downhole Logging – Fluid Temperature/ Resistivity | LM | 30 | - 0 | |
| 0002AS | Downhole Logging – Spinner Flowmeter | LM | 30 | - 0 | |
| 0002AT | Downhole Logging – Heat Pulse Flowmeter | LM | 30 | - 0 | |
| 0002AU | Direct Push Sampling System | LM | 100 | - 0 | |
| 0002AV | Install Piezometer | LM | 30 | - 0 | |
| 0002AW | Geologist | HR | 80 | - 0 | |
| 0002AX | 0.43m3 Backhoe Excavation of Test Pit | HR | 40 | - 0 | |
| 0002AY | Compressor | HR | 24 | - 0 | |
| 0002AZ | Crane (10 ton) | HR | 24 | - 0 | |
| 0002BA | Crane (25 ton) | HR | 24 | - 0 | |
| 0002BB | Survey | HR | 16 | - 0 | |
| - 0 | |||||
| 0003 | Zone III Drilling Activities | ||||
| 0003AA | Mobilization and Demobilization (Zone III) | EA | 5 | - 0 | |
| 0003AB | Encased Boring, Rig Type I | LM | 50 | - 0 | |
| 0003AC | Encased Boring, Rig Type II | LM | 500 | - 0 | |
| 0003AD | Split-Barrel Sampling and Standard Penetration Testing (SPT) | EA | 550 | - 0 | |
| 0003AE | Thin-Wall Shelby Tube Sampling | EA | 20 | - 0 | |
| 0003AF | Rock Core Drilling | LM | 80 | - 0 | |
| 0003AG | Grout In-Filling of Boreholes | M3 | 10 | - 0 | |
| 0003AH | In-Situ Testing – CPTu | LM | 50 | - 0 | |
| 0003AJ | In-Situ Testing – CPT Pore Pressure Dissipation Test | EA | 5 | - 0 | |
| 0003AK | In-Situ Testing – Field Vane Shear Test | EA | 5 | - 0 | |
| 0003AL | In-Situ Testing – Pressuremeter Test | EA | 5 | - 0 | |
| 0003AM | Downhole Logging – Optical Televiewer | LM | 30 | - 0 | |
| 0003AN | Downhole Logging – Acoustic Televiewer | LM | 30 | - 0 | |
| 0003AP | Downhole Logging – Caliper | LM | 30 | - 0 | |
| 0003AQ | Downhole Logging – Normal Resistivity | LM | 30 | - 0 | |
| 0003AR | Downhole Logging – Fluid Temperature/ Resistivity | LM | 30 | - 0 | |
| 0003AS | Downhole Logging – Spinner Flowmeter | LM | 30 | - 0 | |
| 0003AT | Downhole Logging – Heat Pulse Flowmeter | LM | 30 | - 0 | |
| 0003AU | Direct Push Sampling System | LM | 90 | - 0 | |
| 0003AV | Install Piezometer | LM | 30 | - 0 | |
| 0003AW | Geologist | HR | 80 | - 0 | |
| 0003AX | 0.43m3 Backhoe Excavation of Test Pit | HR | 40 | - 0 | |
| 0003AY | Compressor | HR | 24 | - 0 | |
| 0003AZ | Crane (10 ton) | HR | 24 | - 0 | |
| 0003BA | Crane (25 ton) | HR | 24 | - 0 | |
| 0003BB | Survey | HR | 16 | - 0 | |
| - 0 | |||||
| Base Year Total | - 0 |
FOUO
See FAR 2.101 and 3.104
Option 1
| Option 1 | |||||
| Item No. | Supplies/Service | Unit | Qty | Unit Price (₩) | Amount |
| 1001 | Zone I Drilling Activities | ---- | |||
| 1001AA | Mobilization and Demobilization (Zone I) | EA | 5 | - 0 | |
| 1001AB | Encased Boring, Rig Type I | LM | 100 | - 0 | |
| 1001AC | Encased Boring, Rig Type II | LM | 900 | - 0 | |
| 1001AD | Split-Barrel Sampling and Standard Penetration Testing (SPT) | EA | 1,000 | - 0 | |
| 1001AE | Thin-Wall Shelby Tube Sampling | EA | 60 | - 0 | |
| 1001AF | Rock Core Drilling | LM | 60 | - 0 | |
| 1001AG | Grout In-Filling of Boreholes | M3 | 20 | - 0 | |
| 1001AH | In-Situ Testing – CPTu | LM | 80 | - 0 | |
| 1001AJ | In-Situ Testing – CPT Pore Pressure Dissipation Test | EA | 10 | - 0 | |
| 1001AK | In-Situ Testing – Field Vane Shear Test | EA | 10 | - 0 | |
| 1001AL | In-Situ Testing – Pressuremeter Test | EA | 5 | - 0 | |
| 1001AM | Downhole Logging – Optical Televiewer | LM | 30 | - 0 | |
| 1001AN | Downhole Logging – Acoustic Televiewer | LM | 30 | - 0 | |
| 1001AP | Downhole Logging – Caliper | LM | 30 | - 0 | |
| 1001AQ | Downhole Logging – Normal Resistivity | LM | 30 | - 0 | |
| 1001AR | Downhole Logging – Fluid Temperature/ Resistivity | LM | 30 | - 0 | |
| 1001AS | Downhole Logging – Spinner Flowmeter | LM | 30 | - 0 | |
| 1001AT | Downhole Logging – Heat Pulse Flowmeter | LM | 30 | - 0 | |
| 1001AU | Direct Push Sampling System | LM | 50 | - 0 | |
| 1001AV | Install Piezometer | LM | 200 | - 0 | |
| 1001AW | Geologist | HR | 200 | - 0 | |
| 1001AX | 0.43m3 Backhoe Excavation of Test Pit | HR | 80 | - 0 | |
| 1001AY | Compressor | HR | 40 | - 0 | |
| 1001AZ | Crane (10 ton) | HR | 40 | - 0 | |
| 1001BA | Crane (25 ton) | HR | 40 | - 0 | |
| 1001BB | Survey | HR | 32 | - 0 | |
| - 0 | |||||
| 1002 | Zone II Drilling Activities | ||||
| 1002AA | Mobilization and Demobilization (Zone II) | EA | 3 | - 0 | |
| 1002AB | Encased Boring, Rig Type I | LM | 50 | - 0 | |
| 1002AC | Encased Boring, Rig Type II | LM | 450 | - 0 | |
| 1002AD | Split-Barrel Sampling and Standard Penetration Testing (SPT) | EA | 500 | - 0 | |
| 1002AE | Thin-Wall Shelby Tube Sampling | EA | 20 | - 0 | |
| 1002AF | Rock Core Drilling | LM | 80 | - 0 | |
| 1002AG | Grout In-Filling of Boreholes | M3 | 10 | - 0 | |
| 1002AH | In-Situ Testing – CPTu | LM | 100 | - 0 | |
| 1002AJ | In-Situ Testing – CPT Pore Pressure Dissipation Test | EA | 10 | - 0 | |
| 1002AK | In-Situ Testing – Field Vane Shear Test | EA | 10 | - 0 | |
| 1002AL | In-Situ Testing – Pressuremeter Test | EA | 5 | - 0 | |
| 1002AM | Downhole Logging – Optical Televiewer | LM | 30 | - 0 | |
| 1002AN | Downhole Logging – Acoustic Televiewer | LM | 30 | - 0 | |
| 1002AP | Downhole Logging – Caliper | LM | 30 | - 0 | |
| 1002AQ | Downhole Logging – Normal Resistivity | LM | 30 | - 0 | |
| 1002AR | Downhole Logging – Fluid Temperature/ Resistivity | LM | 30 | - 0 | |
| 1002AS | Downhole Logging – Spinner Flowmeter | LM | 30 | - 0 | |
| 1002AT | Downhole Logging – Heat Pulse Flowmeter | LM | 30 | - 0 | |
| 1002AU | Direct Push Sampling System | LM | 100 | - 0 | |
| 1002AV | Install Piezometer | LM | 30 | - 0 | |
| 1002AW | Geologist | HR | 80 | - 0 | |
| 1002AX | 0.43m3 Backhoe Excavation of Test Pit | HR | 40 | - 0 | |
| 1002AY | Compressor | HR | 24 | - 0 | |
| 1002AZ | Crane (10 ton) | HR | 24 | - 0 | |
| 1002BA | Crane (25 ton) | HR | 24 | - 0 | |
| 1002BB | Survey | HR | 16 | - 0 | |
| - 0 | |||||
| 1003 | Zone III Drilling Activities | ||||
| 1003AA | Mobilization and Demobilization (Zone III) | EA | 3 | - 0 | |
| 1003AB | Encased Boring, Rig Type I | LM | 50 | - 0 | |
| 1003AC | Encased Boring, Rig Type II | LM | 450 | - 0 | |
| 1002AD | Split-Barrel Sampling and Standard Penetration Testing (SPT) | EA | 500 | - 0 | |
| 1003AE | Thin-Wall Shelby Tube Sampling | EA | 20 | - 0 | |
| 1003AF | Rock Core Drilling | LM | 80 | - 0 | |
| 1003AG | Grout In-Filling of Boreholes | M3 | 10 | - 0 | |
| 1003AH | In-Situ Testing – CPTu | LM | 50 | - 0 | |
| 1003AJ | In-Situ Testing – CPT Pore Pressure Dissipation Test | EA | 5 | - 0 | |
| 1003AK | In-Situ Testing – Field Vane Shear Test | EA | 5 | - 0 | |
| 1003AL | In-Situ Testing – Pressuremeter Test | EA | 5 | - 0 | |
| 1003AM | Downhole Logging – Optical Televiewer | LM | 30 | - 0 | |
| 1003AN | Downhole Logging – Acoustic Televiewer | LM | 30 | - 0 | |
| 1003AP | Downhole Logging – Caliper | LM | 30 | - 0 | |
| 1003AQ | Downhole Logging – Normal Resistivity | LM | 30 | - 0 | |
| 1003AR | Downhole Logging – Fluid Temperature/ Resistivity | LM | 30 | - 0 | |
| 1003AS | Downhole Logging – Spinner Flowmeter | LM | 30 | - 0 | |
| 1003AT | Downhole Logging – Heat Pulse Flowmeter | LM | 30 | - 0 | |
| 1003AU | Direct Push Sampling System | LM | 90 | - 0 | |
| 1003AV | Install Piezometer | LM | 30 | - 0 | |
| 1003AW | Geologist | HR | 80 | - 0 | |
| 1003AX | 0.43m3 Backhoe Excavation of Test Pit | HR | 40 | - 0 | |
| 1003AY | Compressor | HR | 24 | - 0 | |
| 1003AZ | Crane (10 ton) | HR | 24 | - 0 | |
| 1003BA | Crane (25 ton) | HR | 24 | - 0 | |
| 1003BB | Survey | HR | 16 | - 0 | |
| - 0 | |||||
| Option 1 Total | - 0 |
Option 2
| Option 2 | |||||
| Item No. | Supplies/Service | Unit | Qty | Unit Price (₩) | Amount |
| 2001 | Zone I Drilling Activities | ---- | |||
| 2001AA | Mobilization and Demobilization (Zone I) | EA | 5 | - 0 | |
| 2001AB | Encased Boring, Rig Type I | LM | 100 | - 0 | |
| 2001AC | Encased Boring, Rig Type II | LM | 600 | - 0 | |
| 2001AD | Split-Barrel Sampling and Standard Penetration Testing (SPT) | EA | 700 | - 0 | |
| 2001AE | Thin-Wall Shelby Tube Sampling | EA | 50 | - 0 | |
| 2001AF | Rock Core Drilling | LM | 30 | - 0 | |
| 2001AG | Grout In-Filling of Boreholes | M3 | 20 | - 0 | |
| 2001AH | In-Situ Testing – CPTu | LM | 50 | - 0 | |
| 2001AJ | In-Situ Testing – CPT Pore Pressure Dissipation Test | EA | 5 | - 0 | |
| 2001AK | In-Situ Testing – Field Vane Shear Test | EA | 5 | - 0 | |
| 2001AL | In-Situ Testing – Pressuremeter Test | EA | 3 | - 0 | |
| 2001AM | Downhole Logging – Optical Televiewer | LM | 30 | - 0 | |
| 2001AN | Downhole Logging – Acoustic Televiewer | LM | 30 | - 0 | |
| 2001AP | Downhole Logging – Caliper | LM | 30 | - 0 | |
| 2001AQ | Downhole Logging – Normal Resistivity | LM | 30 | - 0 | |
| 2001AR | Downhole Logging – Fluid Temperature/ Resistivity | LM | 30 | - 0 | |
| 2001AS | Downhole Logging – Spinner Flowmeter | LM | 30 | - 0 | |
| 2001AT | Downhole Logging – Heat Pulse Flowmeter | LM | 30 | - 0 | |
| 2001AU | Direct Push Sampling System | LM | 50 | - 0 | |
| 2001AV | Install Piezometer | LM | 50 | - 0 | |
| 2001AW | Geologist | HR | 200 | - 0 | |
| 2001AX | 0.43m3 Backhoe Excavation of Test Pit | HR | 80 | - 0 | |
| 2001AY | Compressor | HR | 20 | - 0 | |
| 2001AZ | Crane (10 ton) | HR | 20 | - 0 | |
| 2001BA | Crane (25 ton) | HR | 20 | - 0 | |
| 2001BB | Survey | HR | 16 | - 0 | |
| - 0 | |||||
| 2002 | Zone II Drilling Activities | ||||
| 2002AA | Mobilization and Demobilization (Zone II) | EA | 3 | - 0 | |
| 2002AB | Encased Boring, Rig Type I | LM | 50 | - 0 | |
| 2002AC | Encased Boring, Rig Type II | LM | 350 | - 0 | |
| 2002AD | Split-Barrel Sampling and Standard Penetration Testing (SPT) | EA | 400 | - 0 | |
| 2002AE | Thin-Wall Shelby Tube Sampling | EA | 20 | - 0 | |
| 2002AF | Rock Core Drilling | LM | 80 | - 0 | |
| 2002AG | Grout In-Filling of Boreholes | M3 | 10 | - 0 | |
| 2002AH | In-Situ Testing – CPTu | LM | 50 | - 0 | |
| 2002AJ | In-Situ Testing – CPT Pore Pressure Dissipation Test | EA | 5 | - 0 | |
| 2002AK | In-Situ Testing – Field Vane Shear Test | EA | 5 | - 0 | |
| 2002AL | In-Situ Testing – Pressuremeter Test | EA | 5 | - 0 | |
| 2002AM | Downhole Logging – Optical Televiewer | LM | 30 | - 0 | |
| 2002AN | Downhole Logging – Acoustic Televiewer | LM | 30 | - 0 | |
| 2002AP | Downhole Logging – Caliper | LM | 30 | - 0 | |
| 2002AQ | Downhole Logging – Normal Resistivity | LM | 30 | - 0 | |
| 2002AR | Downhole Logging – Fluid Temperature/ Resistivity | LM | 30 | - 0 | |
| 2002AS | Downhole Logging – Spinner Flowmeter | LM | 30 | - 0 | |
| 2002AT | Downhole Logging – Heat Pulse Flowmeter | LM | 30 | - 0 | |
| 2002AU | Direct Push Sampling System | LM | 100 | - 0 | |
| 2002AV | Install Piezometer | LM | 30 | - 0 | |
| 2002AW | Geologist | HR | 40 | - 0 | |
| 2002AX | 0.43m3 Backhoe Excavation of Test Pit | HR | 40 | - 0 | |
| 2002AY | Compressor | HR | 24 | - 0 | |
| 2002AZ | Crane (10 ton) | HR | 24 | - 0 | |
| 2002BA | Crane (25 ton) | HR | 24 | - 0 | |
| 2002BB | Survey | HR | 16 | - 0 | |
| - 0 | |||||
| 2003 | Zone III Drilling Activities | ||||
| 2003AA | Mobilization and Demobilization (Zone III) | EA | 3 | - 0 | |
| 2003AB | Encased Boring, Rig Type I | LM | 50 | - 0 | |
| 2003AC | Encased Boring, Rig Type II | LM | 350 | - 0 | |
| 2002AD | Split-Barrel Sampling and Standard Penetration Testing (SPT) | EA | 400 | - 0 | |
| 2003AE | Thin-Wall Shelby Tube Sampling | EA | 20 | - 0 | |
| 2003AF | Rock Core Drilling | LM | 80 | - 0 | |
| 2003AG | Grout In-Filling of Boreholes | M3 | 10 | - 0 | |
| 2003AH | In-Situ Testing – CPTu | LM | 50 | - 0 | |
| 2003AJ | In-Situ Testing – CPT Pore Pressure Dissipation Test | EA | 5 | - 0 | |
| 2003AK | In-Situ Testing – Field Vane Shear Test | EA | 5 | - 0 | |
| 2003AL | In-Situ Testing – Pressuremeter Test | EA | 5 | - 0 | |
| 2003AM | Downhole Logging – Optical Televiewer | LM | 30 | - 0 | |
| 2003AN | Downhole Logging – Acoustic Televiewer | LM | 30 | - 0 | |
| 2003AP | Downhole Logging – Caliper | LM | 30 | - 0 | |
| 2003AQ | Downhole Logging – Normal Resistivity | LM | 30 | - 0 | |
| 2003AR | Downhole Logging – Fluid Temperature/ Resistivity | LM | 30 | - 0 | |
| 2003AS | Downhole Logging – Spinner Flowmeter | LM | 30 | - 0 | |
| 2003AT | Downhole Logging – Heat Pulse Flowmeter | LM | 30 | - 0 | |
| 2003AU | Direct Push Sampling System | LM | 90 | - 0 | |
| 2003AV | Install Piezometer | LM | 30 | - 0 | |
| 2003AW | Geologist | HR | 32 | - 0 | |
| 2003AX | 0.43m3 Backhoe Excavation of Test Pit | HR | 40 | - 0 | |
| 2003AY | Compressor | HR | 24 | - 0 | |
| 2003AZ | Crane (10 ton) | HR | 24 | - 0 | |
| 2003BA | Crane (25 ton) | HR | 24 | - 0 | |
| 2003BB | Survey | HR | 16 | - 0 | |
| - 0 | |||||
| Option 2 Total | - 0 |
Total
| Total Price | |
| Base Year | - 0 |
| Option 1 | - 0 |
| Option 2 | - 0 |
| - 0 |
File details come from the government source that posted it. Updated .