Price Proposal Schedule

View the file

Other files

File Type Posted
RFP_Amendment_W912UM-17-R-0002-0001.pdf PDF
RFP_W912UM-_17-R-0002.pdf PDF
RFP_Attachment_2_PPQ.docx DOCX document
RFP_Attachment_1_Specialized_Experience.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

Atttachment 3 - Price Proposal Schedule
Base Year
Item No.Supplies/ServiceUnitQtyUnit Price (₩)Amount
0001Zone I Drilling Activities----
0001AAMobilization and Demobilization (Zone I)EA10- 0
0001ABEncased Boring, Rig Type ILM200- 0
0001ACEncased Boring, Rig Type IILM1,400- 0
0001ADSplit-Barrel Sampling and Standard Penetration Testing (SPT)EA1,600- 0
0001AEThin-Wall Shelby Tube SamplingEA60- 0
0001AFRock Core DrillingLM60- 0
0001AGGrout In-Filling of BoreholesM320- 0
0001AHIn-Situ Testing – CPTuLM80- 0
0001AJIn-Situ Testing – CPT Pore Pressure Dissipation TestEA10- 0
0001AKIn-Situ Testing – Field Vane Shear TestEA10- 0
0001ALIn-Situ Testing – Pressuremeter TestEA5- 0
0001AMDownhole Logging – Optical TeleviewerLM30- 0
0001ANDownhole Logging – Acoustic TeleviewerLM30- 0
0001APDownhole Logging – CaliperLM30- 0
0001AQDownhole Logging – Normal ResistivityLM30- 0
0001ARDownhole Logging – Fluid Temperature/ ResistivityLM30- 0
0001ASDownhole Logging – Spinner FlowmeterLM30- 0
0001ATDownhole Logging – Heat Pulse FlowmeterLM30- 0
0001AUDirect Push Sampling SystemLM100- 0
0001AVInstall PiezometerLM50- 0
0001AWGeologistHR200- 0
0001AX0.43m3 Backhoe Excavation of Test PitHR80- 0
0001AYCompressorHR40- 0
0001AZCrane (10 ton)HR40- 0
0001BACrane (25 ton)HR40- 0
0001BBSurveyHR32- 0
- 0
0002Zone II Drilling Activities
0002AAMobilization and Demobilization (Zone II)EA5- 0
0002ABEncased Boring, Rig Type ILM100- 0
0002ACEncased Boring, Rig Type IILM500- 0
0002ADSplit-Barrel Sampling and Standard Penetration Testing (SPT)EA600- 0
0002AEThin-Wall Shelby Tube SamplingEA20- 0
0002AFRock Core DrillingLM80- 0
0002AGGrout In-Filling of BoreholesM310- 0
0002AHIn-Situ Testing – CPTuLM100- 0
0002AJIn-Situ Testing – CPT Pore Pressure Dissipation TestEA10- 0
0002AKIn-Situ Testing – Field Vane Shear TestEA10- 0
0002ALIn-Situ Testing – Pressuremeter TestEA5- 0
0002AMDownhole Logging – Optical TeleviewerLM30- 0
0002ANDownhole Logging – Acoustic TeleviewerLM30- 0
0002APDownhole Logging – CaliperLM30- 0
0002AQDownhole Logging – Normal ResistivityLM30- 0
0002ARDownhole Logging – Fluid Temperature/ ResistivityLM30- 0
0002ASDownhole Logging – Spinner FlowmeterLM30- 0
0002ATDownhole Logging – Heat Pulse FlowmeterLM30- 0
0002AUDirect Push Sampling SystemLM100- 0
0002AVInstall PiezometerLM30- 0
0002AWGeologistHR80- 0
0002AX0.43m3 Backhoe Excavation of Test PitHR40- 0
0002AYCompressorHR24- 0
0002AZCrane (10 ton)HR24- 0
0002BACrane (25 ton)HR24- 0
0002BBSurveyHR16- 0
- 0
0003Zone III Drilling Activities
0003AAMobilization and Demobilization (Zone III)EA5- 0
0003ABEncased Boring, Rig Type ILM50- 0
0003ACEncased Boring, Rig Type IILM500- 0
0003ADSplit-Barrel Sampling and Standard Penetration Testing (SPT)EA550- 0
0003AEThin-Wall Shelby Tube SamplingEA20- 0
0003AFRock Core DrillingLM80- 0
0003AGGrout In-Filling of BoreholesM310- 0
0003AHIn-Situ Testing – CPTuLM50- 0
0003AJIn-Situ Testing – CPT Pore Pressure Dissipation TestEA5- 0
0003AKIn-Situ Testing – Field Vane Shear TestEA5- 0
0003ALIn-Situ Testing – Pressuremeter TestEA5- 0
0003AMDownhole Logging – Optical TeleviewerLM30- 0
0003ANDownhole Logging – Acoustic TeleviewerLM30- 0
0003APDownhole Logging – CaliperLM30- 0
0003AQDownhole Logging – Normal ResistivityLM30- 0
0003ARDownhole Logging – Fluid Temperature/ ResistivityLM30- 0
0003ASDownhole Logging – Spinner FlowmeterLM30- 0
0003ATDownhole Logging – Heat Pulse FlowmeterLM30- 0
0003AUDirect Push Sampling SystemLM90- 0
0003AVInstall PiezometerLM30- 0
0003AWGeologistHR80- 0
0003AX0.43m3 Backhoe Excavation of Test PitHR40- 0
0003AYCompressorHR24- 0
0003AZCrane (10 ton)HR24- 0
0003BACrane (25 ton)HR24- 0
0003BBSurveyHR16- 0
- 0
Base Year Total- 0

FOUO

See FAR 2.101 and 3.104

Option 1

Option 1
Item No.Supplies/ServiceUnitQtyUnit Price (₩)Amount
1001Zone I Drilling Activities----
1001AAMobilization and Demobilization (Zone I)EA5- 0
1001ABEncased Boring, Rig Type ILM100- 0
1001ACEncased Boring, Rig Type IILM900- 0
1001ADSplit-Barrel Sampling and Standard Penetration Testing (SPT)EA1,000- 0
1001AEThin-Wall Shelby Tube SamplingEA60- 0
1001AFRock Core DrillingLM60- 0
1001AGGrout In-Filling of BoreholesM320- 0
1001AHIn-Situ Testing – CPTuLM80- 0
1001AJIn-Situ Testing – CPT Pore Pressure Dissipation TestEA10- 0
1001AKIn-Situ Testing – Field Vane Shear TestEA10- 0
1001ALIn-Situ Testing – Pressuremeter TestEA5- 0
1001AMDownhole Logging – Optical TeleviewerLM30- 0
1001ANDownhole Logging – Acoustic TeleviewerLM30- 0
1001APDownhole Logging – CaliperLM30- 0
1001AQDownhole Logging – Normal ResistivityLM30- 0
1001ARDownhole Logging – Fluid Temperature/ ResistivityLM30- 0
1001ASDownhole Logging – Spinner FlowmeterLM30- 0
1001ATDownhole Logging – Heat Pulse FlowmeterLM30- 0
1001AUDirect Push Sampling SystemLM50- 0
1001AVInstall PiezometerLM200- 0
1001AWGeologistHR200- 0
1001AX0.43m3 Backhoe Excavation of Test PitHR80- 0
1001AYCompressorHR40- 0
1001AZCrane (10 ton)HR40- 0
1001BACrane (25 ton)HR40- 0
1001BBSurveyHR32- 0
- 0
1002Zone II Drilling Activities
1002AAMobilization and Demobilization (Zone II)EA3- 0
1002ABEncased Boring, Rig Type ILM50- 0
1002ACEncased Boring, Rig Type IILM450- 0
1002ADSplit-Barrel Sampling and Standard Penetration Testing (SPT)EA500- 0
1002AEThin-Wall Shelby Tube SamplingEA20- 0
1002AFRock Core DrillingLM80- 0
1002AGGrout In-Filling of BoreholesM310- 0
1002AHIn-Situ Testing – CPTuLM100- 0
1002AJIn-Situ Testing – CPT Pore Pressure Dissipation TestEA10- 0
1002AKIn-Situ Testing – Field Vane Shear TestEA10- 0
1002ALIn-Situ Testing – Pressuremeter TestEA5- 0
1002AMDownhole Logging – Optical TeleviewerLM30- 0
1002ANDownhole Logging – Acoustic TeleviewerLM30- 0
1002APDownhole Logging – CaliperLM30- 0
1002AQDownhole Logging – Normal ResistivityLM30- 0
1002ARDownhole Logging – Fluid Temperature/ ResistivityLM30- 0
1002ASDownhole Logging – Spinner FlowmeterLM30- 0
1002ATDownhole Logging – Heat Pulse FlowmeterLM30- 0
1002AUDirect Push Sampling SystemLM100- 0
1002AVInstall PiezometerLM30- 0
1002AWGeologistHR80- 0
1002AX0.43m3 Backhoe Excavation of Test PitHR40- 0
1002AYCompressorHR24- 0
1002AZCrane (10 ton)HR24- 0
1002BACrane (25 ton)HR24- 0
1002BBSurveyHR16- 0
- 0
1003Zone III Drilling Activities
1003AAMobilization and Demobilization (Zone III)EA3- 0
1003ABEncased Boring, Rig Type ILM50- 0
1003ACEncased Boring, Rig Type IILM450- 0
1002ADSplit-Barrel Sampling and Standard Penetration Testing (SPT)EA500- 0
1003AEThin-Wall Shelby Tube SamplingEA20- 0
1003AFRock Core DrillingLM80- 0
1003AGGrout In-Filling of BoreholesM310- 0
1003AHIn-Situ Testing – CPTuLM50- 0
1003AJIn-Situ Testing – CPT Pore Pressure Dissipation TestEA5- 0
1003AKIn-Situ Testing – Field Vane Shear TestEA5- 0
1003ALIn-Situ Testing – Pressuremeter TestEA5- 0
1003AMDownhole Logging – Optical TeleviewerLM30- 0
1003ANDownhole Logging – Acoustic TeleviewerLM30- 0
1003APDownhole Logging – CaliperLM30- 0
1003AQDownhole Logging – Normal ResistivityLM30- 0
1003ARDownhole Logging – Fluid Temperature/ ResistivityLM30- 0
1003ASDownhole Logging – Spinner FlowmeterLM30- 0
1003ATDownhole Logging – Heat Pulse FlowmeterLM30- 0
1003AUDirect Push Sampling SystemLM90- 0
1003AVInstall PiezometerLM30- 0
1003AWGeologistHR80- 0
1003AX0.43m3 Backhoe Excavation of Test PitHR40- 0
1003AYCompressorHR24- 0
1003AZCrane (10 ton)HR24- 0
1003BACrane (25 ton)HR24- 0
1003BBSurveyHR16- 0
- 0
Option 1 Total- 0

Option 2

Option 2
Item No.Supplies/ServiceUnitQtyUnit Price (₩)Amount
2001Zone I Drilling Activities----
2001AAMobilization and Demobilization (Zone I)EA5- 0
2001ABEncased Boring, Rig Type ILM100- 0
2001ACEncased Boring, Rig Type IILM600- 0
2001ADSplit-Barrel Sampling and Standard Penetration Testing (SPT)EA700- 0
2001AEThin-Wall Shelby Tube SamplingEA50- 0
2001AFRock Core DrillingLM30- 0
2001AGGrout In-Filling of BoreholesM320- 0
2001AHIn-Situ Testing – CPTuLM50- 0
2001AJIn-Situ Testing – CPT Pore Pressure Dissipation TestEA5- 0
2001AKIn-Situ Testing – Field Vane Shear TestEA5- 0
2001ALIn-Situ Testing – Pressuremeter TestEA3- 0
2001AMDownhole Logging – Optical TeleviewerLM30- 0
2001ANDownhole Logging – Acoustic TeleviewerLM30- 0
2001APDownhole Logging – CaliperLM30- 0
2001AQDownhole Logging – Normal ResistivityLM30- 0
2001ARDownhole Logging – Fluid Temperature/ ResistivityLM30- 0
2001ASDownhole Logging – Spinner FlowmeterLM30- 0
2001ATDownhole Logging – Heat Pulse FlowmeterLM30- 0
2001AUDirect Push Sampling SystemLM50- 0
2001AVInstall PiezometerLM50- 0
2001AWGeologistHR200- 0
2001AX0.43m3 Backhoe Excavation of Test PitHR80- 0
2001AYCompressorHR20- 0
2001AZCrane (10 ton)HR20- 0
2001BACrane (25 ton)HR20- 0
2001BBSurveyHR16- 0
- 0
2002Zone II Drilling Activities
2002AAMobilization and Demobilization (Zone II)EA3- 0
2002ABEncased Boring, Rig Type ILM50- 0
2002ACEncased Boring, Rig Type IILM350- 0
2002ADSplit-Barrel Sampling and Standard Penetration Testing (SPT)EA400- 0
2002AEThin-Wall Shelby Tube SamplingEA20- 0
2002AFRock Core DrillingLM80- 0
2002AGGrout In-Filling of BoreholesM310- 0
2002AHIn-Situ Testing – CPTuLM50- 0
2002AJIn-Situ Testing – CPT Pore Pressure Dissipation TestEA5- 0
2002AKIn-Situ Testing – Field Vane Shear TestEA5- 0
2002ALIn-Situ Testing – Pressuremeter TestEA5- 0
2002AMDownhole Logging – Optical TeleviewerLM30- 0
2002ANDownhole Logging – Acoustic TeleviewerLM30- 0
2002APDownhole Logging – CaliperLM30- 0
2002AQDownhole Logging – Normal ResistivityLM30- 0
2002ARDownhole Logging – Fluid Temperature/ ResistivityLM30- 0
2002ASDownhole Logging – Spinner FlowmeterLM30- 0
2002ATDownhole Logging – Heat Pulse FlowmeterLM30- 0
2002AUDirect Push Sampling SystemLM100- 0
2002AVInstall PiezometerLM30- 0
2002AWGeologistHR40- 0
2002AX0.43m3 Backhoe Excavation of Test PitHR40- 0
2002AYCompressorHR24- 0
2002AZCrane (10 ton)HR24- 0
2002BACrane (25 ton)HR24- 0
2002BBSurveyHR16- 0
- 0
2003Zone III Drilling Activities
2003AAMobilization and Demobilization (Zone III)EA3- 0
2003ABEncased Boring, Rig Type ILM50- 0
2003ACEncased Boring, Rig Type IILM350- 0
2002ADSplit-Barrel Sampling and Standard Penetration Testing (SPT)EA400- 0
2003AEThin-Wall Shelby Tube SamplingEA20- 0
2003AFRock Core DrillingLM80- 0
2003AGGrout In-Filling of BoreholesM310- 0
2003AHIn-Situ Testing – CPTuLM50- 0
2003AJIn-Situ Testing – CPT Pore Pressure Dissipation TestEA5- 0
2003AKIn-Situ Testing – Field Vane Shear TestEA5- 0
2003ALIn-Situ Testing – Pressuremeter TestEA5- 0
2003AMDownhole Logging – Optical TeleviewerLM30- 0
2003ANDownhole Logging – Acoustic TeleviewerLM30- 0
2003APDownhole Logging – CaliperLM30- 0
2003AQDownhole Logging – Normal ResistivityLM30- 0
2003ARDownhole Logging – Fluid Temperature/ ResistivityLM30- 0
2003ASDownhole Logging – Spinner FlowmeterLM30- 0
2003ATDownhole Logging – Heat Pulse FlowmeterLM30- 0
2003AUDirect Push Sampling SystemLM90- 0
2003AVInstall PiezometerLM30- 0
2003AWGeologistHR32- 0
2003AX0.43m3 Backhoe Excavation of Test PitHR40- 0
2003AYCompressorHR24- 0
2003AZCrane (10 ton)HR24- 0
2003BACrane (25 ton)HR24- 0
2003BBSurveyHR16- 0
- 0
Option 2 Total- 0

Total

Total Price
Base Year- 0
Option 1- 0
Option 2- 0
- 0