Performance_Work_Statement_Transformer_Preventative_Maintenance.pdf

PDF 118 KB Posted

Attached to
Substation, Transformer and Switchgear Inspection and Preventative Maintenance
Solicitation number
W912TF-16-T-0507
Issued by

About this file

Performance Work Statement

View the file

Other files

File Type Posted
Inventory_attachment.docx DOCX document
RFI_answers.docx DOCX document
RFI_W912TF-16-T-0507.pdf PDF
Solicitation_Amendment_W912TF-16-T-0507-0001.pdf PDF
Electrical_Map_2013-08-21.pdf PDF
Wage_Determination_05-2339_(Rev._-19).pdf PDF
Supporting_References.pdf PDF
Solicitation_W912TF-16-T-0507.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Electrical Maintenance for Substation, Pad Mount, Transformers, & Appurtenances

02/19/2016

Version 1.0

Table of Contents Vision Statement

1 Introduction

1.1 Scope

2 General Requirements

2.1 Non‐Personal Services

2.2 Business Relations

2.3 Contract Administration and Management

2.3.1 Contract Management

2.3.2 Contract Administration

2.3.4 Contract Manpower Reporting

2.4 Subcontract Management

2.5 Contractor Personnel, Disciplines, and Specialties

2.6 Performance Period

3 Performance Requirements

4 Special Requirements

4.1 Safety and Security

4.1.1 Safety

4.1.2 Security

4.1.3 Access and General Protection/Security Policy and Procedures

4.1.4 Advanced Distributed Learning Service (ADLS) ............................ Error! Bookmark not defined.

4.1.5 AT Level I Training

4.2 Applicable Directives

4.3 Government Furnished Materials

4.4 Quality

4.4.1 Quality Control

4.4.2 Quality Assurance Surveillance Plan (QASP)

Attachment 1 ‐ Performance Requirement Summary (PRS) Schedule

Attachment 2 ‐ Performance Requirement Summary (PRS)

Appendix 1 ‐ Transformer Inventory

Performance Work Statement (PWS)

Electrical Maintenance for Substation, Pad Mount, Transformers, & Appurtenances

Vision Statement

To perform all inspection, testing, trouble shooting, repairs, upgrades, and training for base technicians to the Pease Substation and components which make up the power distribution system.

1 Introduction The New Hampshire Air National Guard has a requirement for Electrical Maintenance for Substation, Pad Mount Transformers, and Appurtenances.

1.1 Scope

The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform all inspection, testing, trouble shooting, repairs, upgrades, and training for base technicians to the Pease Substation and components which make- up the power distribution system. The Contractor shall follow life and safety codes, and take necessary actions to avoid conditions which may be hazardous to the health and safety of base personnel.

2 General Requirements This section describes the general requirements for this effort. The following sub-sections provide details of various considerations on this effort.

2.1 Non-Personal Services

The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer (KO) immediately.

2.2 Business Relations

The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.

2.3 Contract Administration and Management

The following subsections specify requirements for contract, management, and personnel administration.

2.3.1 Contract Management

The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor must maintain continuity between the support operations at USPFO-NH Joint Contracting Office and the contractor's corporate offices.

2.3.2 Contract Administration

The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The contractor shall assign work effort and maintaining proper and accurate time keeping records of personnel assigned to work on the requirement.

2.3.4 Contract Manpower Reporting The contractor shall report all labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the New Hampshire Army National Guard via a secure collection site. The contractor is required to completely fill in all required data fields using the following web address:

http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1st through September 30th. While inputs may be reported any time during the FY, all data shall be reported no later than October 31st of each calendar year, beginning with 2013. Contractor may direct questions to the help desk at help desk at: http://www.ecmra.mil.

2.4 Subcontract Management

The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Contracting Officer (KO) or Contracting Officer’s Representative (COR). Cross teaming may or may not be permitted.

2.5 Contractor Personnel, Disciplines, and Specialties

The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources. The contractor shall ensure the labor categories as defined in the Labor Categories document (see attachment), labor rates, and man-hours utilized in the performance of each Task Order (PWS line item) issued hereunder will be the minimum necessary to accomplish the task.

The Contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract.

Required Certification. The Government recommends as a minimum the Contractor supervisor to be certified to a level 4 Substation Maintainer National Certificate of Electrical Supply or a program (in-house) equal to this certification. All electrical workers shall be thoroughly familiar with the equipment in this PWS and trained in the procedures to test, inspect, and all which appertains to this work.

2.6 Performance Period

Period of Performance. This Purchase Order is structured as an option year contract in the following schedule:

Base Year: 28 June 2016 – 15 November 2016 Option Year One: 26 June 2017 – 15 November 2017 Option Year Two: 25 June 2018 – 15 November 2018

The Contractor is to notify and coordinate during duty hours of Monday – Friday from 7:30 AM – 4:00 PM with the COR to establish the times and date on which the services will be provided.

Recognized U.S. Holidays. The following are recognized US holidays. The contractor shall not perform services on these days, unless authorized by the Contracting Officer:

New Year’s Day: January 1st Martin Luther King, Jr. Day Presidents Day Memorial Day Independence Day: July 4th Labor Day Columbus Day Veterans Day: November 11th Thanksgiving Day Christmas Day

3 Performance Requirements Refer to the Performance Requirements Summary (PRS) and Schedule attached which highlights the Performance Statements, Performance Standards, and Acceptable Quality Levels for the contract

The Federal Government retains the option to provide repair and replacement parts to the Contractor, either from stock or by purchasing them from a third part vendor if the Contracting Officer, or authorized representative believes it is in the best interest of the Federal Government will be served.

4 Special Requirements This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.

4.1 Safety and Security

This section describes the security and safety for this effort. The following sub-sections provide details of various considerations on this effort.

4.1.1 Safety

Contractor Compliance. The contractor and its subcontractors shall comply with Public Law 91-596 (Occupational Safety and Health Act (OSHA)) and the Environmental, Safety, and Occupational Health (ESOH) (DODD 4715.1E). These requirements shall be incorporated into the contractors safety and health program. The Department of Defense (DoD) participates in the OSHA Voluntary Protection Program (VPP). Contractor personnel performing services on a DoD installation shall participate in the local VPP. Information on the VPP is available at http://www.osha.gov/dcsp/vpp/index.html.

Mishap Notification and Investigation. The contractor and its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government personnel and to cooperate in any resulting safety investigation. The contractor shall notify (via telephone) the cognizant contracting officer, the contracting officer’s representative, and/or other applicable members within four (4) hours of all mishaps or incidents. The Government person notified by the contractor will in-turn notify the Safety office.

Contractor notifications made after duty hours shall be reported to the appropriate installation Command Post. If requested by the cognizant KO and/or COR the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records until released by the investigating safety office. If the Government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the Government personnel until the investigation is completed.

4.1.2 Security

All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the government installation, shall abide by all security regulations of the installation.

The contractor shall supply a list of employees involved with this agreement no less than one week prior to the start of the contract using contractor access form from Pease Security. New employees will not be able to start working until a background check is complete. Each member employed under this contract will be required to be badged by Security Forces prior to the start of this contract. A valid driver’s license is required for access to the base.

4.1.3 Access and General Protection/Security Policy and Procedures

The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

4.1.4 Anti-Terrorism Training

All contractor employees, to include subcontractor employees, requiring access to Government Installations, Facilities and Controlled Access areas shall complete AT awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Proof of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Anti-terrorism Representative.

4.2 Applicable Directives

The Contractor covenants to comply with all applicable State and Federal laws, rules, and regulations including, but not limited to, those pertaining to non-discrimination, lobbying, drug free work place and the use of United States flagship.

The contractor shall comply with all documents listed below as mandatory and referenced under paragraph the Performance Requirements Summary (PRS). Compliance with documents listed as non-mandatory is the contractors’ option.

Publications and forms applicable to this Performance Work Statement (PWS) are listed below.

The contractor has coded publications as mandatory (M) or advisory (A). The contractor shall follow those publications coded as mandatory to the extent (that is, the specific procedure in a paragraph, section, chapter or volume) specified in the PWS. The contractor shall be guided by those coded advisory to the extent necessary to meet requirements in this PWS. At the start of the contract, the Government provides all publications and forms listed. The Government may issue supplements or amendments to listed publications from any organizational level during the life of the contract. The contractor shall keep all issued publications up-to-date. The contractor shall immediately implement those changes in publications that result in a decrease or no change in the contract price. Before implementing any such revision, supplement, or amendment that will result in an increase in contract price, the contractor shall submit to the contracting officer a price proposal for approval. Price proposals shall be submitted within 30 calendar days from the date the contractor receives notice of the revision, supplement, or amendment giving rise to the increase in cost of performance. The Government will consider changes in the contract price due to supplements and amendments shall be considered under the "Contract Terms and Conditions-Commercial Items" clause. The Government will continue to supply the Government forms needed for daily operations. Upon completion of the contract, the contractor shall return to the Government all issued publications and unused forms.

M - Mandatory compliance (list)

1. AFJMAN 32-1082

2. NFPA NEC 70B

3. OSHA 1910.269

4. NESC ANSI C2

A – Non-Mandatory document (list) – None.

4.3 Government Furnished Materials

The contractor shall be responsible for safeguarding all government property provided for contractor use. At the end of each work shift, all government facilities, equipment, and materials shall be secured.

Utilities. The government will provide gas, electricity, sewage, and water utilities.

Previous Reports. The government will provide past reports, as necessary, to fulfill the requirement.

4.4 Quality

This section describes the Quality Control components for this effort. The following sub-sections provide details of various considerations on this effort.

4.4.1 Quality Control

The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with the Purchase Order and this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.

4.4.2 Quality Assurance Surveillance Plan (QASP)

The Government shall monitor the Contractors performance under this Task/Delivery Order in accordance with the Governments QASP.

Attachment 1 - Performance Requirement Summary (PRS) Schedule

Performance Statements Schedule

Quantity

Performance Statement Base Year Option Yr 1 Option Yr 2

3.1.1-2 Evaluate DGA Insulating Oil All All All

3.1.3-5 Evaluate transformers 1 primary transformer 14 pad mount transformer

1 primary transformer 12 pad mount transformer

12 pad mount transformer

3.2 Evaluate and clean switches. All All All

3.3 Evaluate voltage relays. 15 relays 15 relays 15 relays

3.4 Test capacitor bank vacuum breakers

and reclosers.

- 1 breaker 1 recloser

1 breaker 1 recloser

3.5 Test transformer differential relays. All All All

3.6 Perform grounding test. 13 pad

mounts

12 pad mounts

15 pad mounts

3.7 Inspect and clean battery banks. All All All

3.8 Inspect and clean insulators. All - All

3.9 Lubricate and test breakers. 3 breakers 3 breakers 2 breakers

3.10 Produce a cost breakdown of all

identified deficiencies.

All All All

Attachment 2 - Performance Requirement Summary (PRS)

Performance Statements Overview

3 The Contractor shall perform electrical maintenance for Substation, Pad Mount, Transformers, & Appurtances

3.1 Evaluate and test transformers.

3.2 Evaluate and clean switches.

3.3 Evaluate voltage relays.

3.4 Test capacitor bank vacuum breakers and reclosers.

3.5 Test transformer differential relays.

3.6 Perform grounding test.

3.7 Inspect and clean battery banks.

3.8 Inspect and clean insulators.

3.9 Lubricate and test breakers.

3.10 Produce a cost breakdown of all identified deficiencies.

Performance Statements Performance Standards/AQLs

3.1 Evaluate and test

transformers.

3.1.1 Evaluate transformer DGA

Insulating Oil.

An industry standard evaluation of the transformers at locations listed in Appendix 1, to include an analysis of at least the following:

a) Dissolved Gas Analysis

b) Delectric Strength

c) Interfacial Tension

d) Acid Number

e) Visual Inspection

f) Color

g) Water Content

h) Oxygen Inhibitor

i) Power Factor/Dissipation Facotr

3.1.2 Produce DGA Insulating Oil

report.

An industry standard transformer DGA Insulating Oil report for all transformers evaluated in 3.1.1. to include at least the following:

a) Manufacture

b) Rating

c) Style

d) Serial Number

e) Inspector’s Name

f) Date Tested

g) Test reports with comments

h) Pass or Fail

i) Recommended service, and corrective actions.

3.1.3 Evaluate transformers. An industry standard evaluation of the transformers at locations listed in Appendix 1, to include an analysis of at least the following:

a) Windings

b) Bushings

c) Tap Changers – Load

d) Tap Changer – No Load

e) Core

f) Tanks and associated devices

g) Conservator

h) Air Drier Desiccant

i) Sudden Pressure Relay

j) Buchholz Relay

k) Cooling System

l) Heat Exchanger Radiators

m) Fans

n) Pumps

AQL: See Appendix 5 for acceptable quality level for each analysis item.

3.1.4 Test of all transformers. An industry standard transformer test of all transformers listed in Appendix 1, to include at least the following:

a) Bil Kv

b) Type KV

c) Pri Volts

d) Impedance

e) Amps

f) Sec Volts

g) Frequency

h) Oil Capacity

3.1.5 Produce report on all

transformers

An industry standard transformer report on all transformers listed in Appendix 1 based on the test conducted in 3.1.2, to include at least the following:

a) Manufacture

b) Rating

c) Style

d) Serial Number

e) Inspector’s Name

f) Date Tested

g) Weather conditions

h) Lab Reports on oil condition

i) Remarks overall condition

j) Test Reports with comments

k) Pass or Fail

l) Equipment used for testing

m) Recommended service, and corrective actions.

3.2 Evaluate and clean switches.

3.2.1 Produce an analysis report An industry standard inspection and evaluation of the transformers, of all switches. to include an analysis of at least the following:

a) Blades

b) Switch mechanism

c) Voltage

d) Current Rating

e) Air Temperature

f) Humidity

g) Gas pressure

h) Fuses

i) Terminals

j) Connection

3.2.2 Clean and remove any

contaminating materials from insulators

Switch shall be visibly clear of contaminating materials 98% of the time.

3.2.3 Recommend any required

service and corrective actions

Recommendations based on the evaluation conducted in 3.2.1 include at least the following:

1) Switch Number

2) Date Tested

3) Manufacture

4) Serial Number

5) Switch Type

6) Test Date

7) Compare historical gas pressure levels to annotate any pressure loss

8) Remarks of issue findings

9) Recommended corrective action

3.2.4 Conduct HIPOT Test Industry standard HIPOT (Dielectric Strength) test.

3.3 Evaluate voltage relays.

3.3.1 Test and produce an

analysis report of all voltage relays

An industry standard test of the voltage relays, to include an analysis of at least the following:

a) Time Overcurrent Pickup

b) Time Overcurrent Delay

c) Instantaneous Pickup

d) Trip Angle Delay

AQL: See Appendix 6 for acceptable quality levels at each voltage relay location.

3.3.2 Recommend any required

service and corrective actions

Recommendations based on the evaluation conducted in 3.3.1 include at least the following:

1) Location

2) Manufacture

3) Serial Number

4) Date Tested

5) Inspectors Name

6) Test Results

7) Remarks overall condition

8) Pass or Fail

9) Remarks for corrective action

10) Equipment Used

11) Documentation for Retest

3.4 Test capacitor bank vacuum

breakers and reclosers.

3.4.1 Test and produce an

analysis report of all capacitor bank vacuum breakers and reclosers

An industry standard evaluation of breakers and reclosers, to include an analysis of at least the following:

a) Megger

b) Ductor

c) Bushings

d) Connections

e) Oil

3.4.2 Clean and polish bushings

3.4.3 Recommend any required

service and corrective actions

Recommendations based on the evaluation conducted in 3.4.1 include at least the following:

1) Location

2) Circuit

3) Inspectors Name

4) Date Tested

5) Serial Number

6) Model

7) Manufacture

8) Test Results

9) Pass or Fail

10) Remarks overall condition

11) Remarks for corrective action

12) Documentation for Retest

3.5 Test transformer differential

relays.

3.5.1 Test transformer differential

relays at substation location 1A and 1B (see Appendix 1).

An industry standard evaluation of differential relays, to include an analysis of at least the following:

a) Relay settings

b) Multiplies of Tap (MOT)

c) Initial current injection value

d) Wet connections and expected targets

3.5.2 Recommend any required

service and corrective actions

Recommendations based on the evaluation conducted in 3.5.1, in reference to Appendix 6 and 7, to include at least the following:

1) Location (for example Transformer #1 or #2.

2) Manufacture

3) Serial Number

4) Date Tested

5) Inspectors Name

6) Test Results

7) Remarks overall condition

8) Pass or Fail

9) Corrective Action

10) Equipment Used

11) Documentation for Retest

3.6 Perform grounding test.

3.6.1 Test primary transformer

grounding grids and pad mounts for resistance and integrity testing.

An industry standard grounding test, to include an analysis of at least the following:

a) Ground system resistance

b) Ground path resistance at support structures, equipment enclosures, and neutral conductors.

3.6.2 Recommend any required

service and corrective actions

Recommendations based on the evaluation conducted in 3.6.1 include at least the following:

1) Location

2) Date Tested

3) Inspector’s Name

4) Measured results to earth and back to substation for secondary transformers.

5) Measured results to earth Primary Transformers.

6) Pass or Fail

7) Comments overall condition

8) Remarks for recommended corrective action

9) Equipment used

3.7 Inspect and clean battery

banks.

3.7.1 Evaluate battery banks. An industry standard evaluation of battery banks, to include an analysis of at least the following:

a) Battery charger operability

b) Electrolyte levels

c) Securely fastened connections

3.7.2 Perform in-service

energized reading resistance test.

An industry standard in-service energized reading resistance test, to include at least the following:

a) Ambient temperature

b) Float voltage measured at battery terminals

c) Charger output current and voltage

d) Pilot cell data

a. Cell voltage

b. Cell specific gravity and electrolyte temperature, corrected for temperature

c. Electrolyte level

e) All cell-to-cell and cell-to-terminal correction resistance

f) Infrared readings

3.7.3 Perform out-service

energized reading resistance test.

An industry standard out-service energized reading resistance test, to include at least the following:

a) Capacity load test assuring battery degradation has not gone past 85% of its life expectancy

3.7.4 Clean terminals and battery

cell.

3.7.5 Recommend any required

service and corrective actions

Recommendations based on the evaluation conducted in 3.7.1 include at least the following:

1) Batteries

a. a) Location

b. b) Last Inspection Date

c. c) Date of Inspection

d. d) Year Installed

e. e) Serial Number

f. f) Instruction Manual Used

g. g) Cell Size

h. h) Number of Cells

i. i) Ampere-Hours at Hour Rate

j. j) Nominal specific gravity at 77 degrees F1

k. k) Nominal system float voltage

l. l) Results from 18.4.1

m. m) Remarks Overall Condition

n. n) Pass or Fail

o. o) Corrective Actions

p. p) Name of Inspector

2) Battery Charger

a. a) Designation

b. b) Location

c. c) Last Inspection Date

d. d) Date of Inspection

e. e) Year Installed

f. f) Serial Number

g. g) Instruction Manual Used

h. h) Cell Size

i. i) Cell Type

j. j) Remarks overall condition

k. k) Pass or Fail

l. l) Corrective Actions

m. m) Name of Inspector

3.8 Inspect and clean insulators.

3.8.1 Inspect of insulators. An industry standard inspection of insulators, to include an analysis of at least the following:

a) Visible cracks

3.8.2 Clean exposed insulators.

3.8.3 Recommend any required

service and corrective actions.

Recommendations based on the evaluation conducted in 3.8.1 include at least the following:

1) Insulator(s) location

2) Overall condition

3) Pass or Fail

4) Recommended corrective action

3.8 Inspect substation structure, connections, joints, and supports.

3.8.1 Inspect substation

structure, connections, joints, and supports.

An industry standard inspection of substation structure, connections, joints, and supports, to include an analysis of at least the following:

a) Securely fastened hardware

b) Surface preservation

3.8.2 Tighten connections, joints, and supports.

AQL: Tighten components that are not severely rusted or require major repair.

3.8.3 Recommend any required

service and corrective actions.

Recommendations based on the evaluation conducted in 3.8.1 include at least the following:

a) List of loose items

b) List of areas needing preservation

3.9 Lubricate and test breakers.

3.9.1 Conduct HIPOT test of 15-

GMI-500-1200 breakers listed in Appendix 3.

An industry standard HIPOT test of all 15-GMI-500-1200 breakers, to include an analysis of at least the following:

a) Operating Mechanism

b) Mechanism clearance

c) Lubrication mechanism

d) Barriers

e) Condition of contacts

f) Contact alignment

g) Check Counter

h) General internal condition

i) Terminals and braids

j) Inspect control wiring

k) Racking mechanism

l) Contact resistance Phase A, B, and C

m) HIPOT test for Phase 1, 2, and 3.

3.9.2 Lubricate test breakers.

3.9.3 Recommend any required

service and corrective actions.

Recommendations based on the evaluation conducted in 3.9.1 include at least the following:

a) Circuit Number and Part Number

b) Date

c) Inspectors Name

d) Item Checked

e) Pass or Fail

f) Documentation for Retest

g) Comments of overall condition

h) Documented Problems

i) Recommended service, and corrective actions

3.10 Produce a cost breakdown

of all identified deficiencies.

Cost breakdown shall include costs for parts, materials, labor hours, labor rates, and equipment.

Appendix 1 - Transformer Inventory Trans forme r #

Location Location Name Manufacturer Primary Voltage Configuration

Secondary Voltage Configuration

Oil Storage (gallons) Serial

1 Substation - Virginia 34,500 13,800 Y 1,034 A63000A007-6600A

2 Substation - Virginia 34,500 13,800 Y 1,034 A63000A007-6600B

3 Bldg 257 Base Operations RTE Corp. 13,800 208/120 Y - 866005043

4 Bldg 256 Life Support RTE Corp. 13,800 208/120 Y - 866005193

5 Bldg 270 North Ramp Cooper 13,800 480/277 Y - 926001371

6 Bldg 253 Fuels Maintenance Hanger RTE Corp. 13,800 208/120 Y - 866005085

7 Bldg 253 High Expansion Foam Dedicated Transformer

Cooper 13,800 480/277 Y - 0750013153

8 Bldg 253 Fuels Maintenance Hanger Cooper 13,800 480/277 Y - 1399

9 Bldg 254 Aircraft Maintenance Hanger RTE Corp. 13,800 208/120 Y - 866005087

10 Bldg 254 Aircraft Maintenance Hanger RTE Corp. 13,800 208/120 Y - 866005044

11 Bldg 254 Hangar Offices Westinghouse 13,800 480/277 Y - 89J544201

12 Bldg 160 DRBS Facility Cooper 13,800 480/277 Y - 926001291

13 Bldg 100 Wing Headquarters Cooper 13,800 480/277 Y -

14 Base Water Tower

- Cooper 13,800 208/120 Y - 926001317

15 Alternate Guard Shack

- RTE Corp. 13,800 208/120 Y - 866005054

16 Bldg 156 Simulator ABB 13,800 480/277 Y - 03J729109

17 Bldg 152 Base Gym Cooper 13,800 208/120 Y - 926001471

18 Bldg 145N Communications/ROSC General Electric 13,800 480/277 Y - P189662TVC

19 Bldg 157 Vehicle Maintenance General Electric 13,800 480/277 Y - P189639TVC

20 Bldg 145S MSG/Contracting/Services General Electric 13,800 480/277 Y - Q110452-TOH

21 Flight Line Road

- Cooper 13,800 480/277 Y - 926001290

22 Bldg 146 Small Arms Range Cooper 13,800 208/120 Y - 926001293

23 Bldg 255 Medical Training Facility Cooper 13,800 208/120 Y - 926001306

24 Bldg 256 Base Supply Cooper 13,800 208/120 Y - 926001400

25 Bldg 251 Aircraft Maintenance Hangar RTE Corp. 13,800 480/277 Y - 866005047

26 Bldg 251 Aircraft Maintenance Hangar RTE Corp. 13,800 208/120 Y - 866005086

27 Bldg 252 Hangar RTE Corp. 13,800 208/120 Y - 866005089

28 Bldg 252 Hanger RTE Corp. 13,800 480/277 Y - 866005045

29 Bldg 245 Cooper 13,800 208/120 Y - 926001289

30 Bldg 244 Security/Avionics RTE Corp. 13,800 480/277 Y - 866004805

31 Bldg 247 ATC/DLA/FAA RTE Corp. 13,800 120/208 Y - 866005041

32 Bldg 258 Hazmat Pharmacy Cooper 13,800 120/208 Y - 866005088

33 Bldg 249 AGE RTE Corp. 13,800 480/277 Y - 866005048

34 Bldg 165 Base Fuelds Cooper 13,800 480/277 Y - 960012729

35 Bldg 244 Security/Avionics RTE Corp. 13,800 120/208 Y - 866005088

36 Bldg 255 Medical Training Cooper 13,800 120/208 - 926001294

37 Bldg 243 Pease Fire Station ABB 13,800 480/277 - 05J3922

38 Bldg 149 Multi-Purpose Facility Cooper 13,800 480/277 - 0550018162

39 Bldg 264 Squadron Ops Cooper 13,800 480/277 - CP1250010439