A07_W912SV-18-Q-6010_(Flag_Pole)_RFIs_8AUG18.pdf

PDF 48 KB Posted

Attached to
60' Flag Pole with Installation
Solicitation number
W912SV-18-Q-6010
Issued by

View the file

Other files

File Type Posted
A07_Provisions_and_Clauses_Amend_1.pdf PDF
A07_Base_Access_Request.pdf PDF
A07_W912SV-18-Q-6010_(Flag_Pole)_RFIs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

Solicitation Number: W912SV-18-Q-6010

PROJECT TITLE: Flag Pole

Date: 30 July 2018

RFI

NO.

DATE OF

SUBMISSION

DATE TO

REQUESTOR/TECH

POC

DATE

RESPONSE

RETURNED

RESPONSE TO RFI DATE

RETURNED

TO KTR

23 Jul 2018 25 Jul 2018 27 July 2018 See Answer Below 30 Jul 2018 I saw the posting for the flag pole installation and was wondering if there is a site visit planned before the 30th or if we are basing our quote solely on the pictures provided.

Site Visit will be on 2 August @ 1300 (1:00PM) EST. You must fill out and return a copy of the base access request if you plan on attending.

24 Jul 2018 25 Jul 2018 27 July 2018 See Answer Below 30 Jul 2018 Is the scope of work to remove the existing portion of the broken flagpole and then install the new flagpole in the same foundation?

Yes- remove old and replace with new

24 Jul 2018 25 Jul 2018 27 July 2018 See Answer Below 30 Jul 2018 Is the existing flagpole located in the circle around Sandwich Road, Lingley Ave. and Contrast Road?

No- location is on South Outer Rd, in front of B197 within the cantonment area of the 102nd.

24 Jul 2018 25 Jul 2018 27 July 2018 See Answer Below 30 Jul 2018 How close can we bring our crane up to the flagpole? You can drive directly to the location of the flag pole

26 Jul 2018 26 Jul 2018 27 July 2018 See Answer Below 30 Jul 2018 Do we submit our price directly to you? Yes, pricing is submitted via email to kirk.b.wetherbee.mil@mail.mil

3 Aug 2018 3 Aug 2018 5 Aug 2018 See Answer Below 8 Aug 2018 Please provide the applicable Davis-Bacon Wages for this project. This requirement is classified as a supply with incidental installation service.

7 3 Aug 2018 3 Aug 2018 5 Aug 2018 See Answer Below 8 Aug 2018 mailto:kirk.b.wetherbee.mil@mail.mil

Please confirm the warranty on materials can exclude the halyard line. The warranty on materials are standard to the manufacturer.

We will make no specific exclusions.

8 Aug 2018 8 Aug 2018 8 Aug 2018 See Answer Below 8 Aug 2018 In accordance with FAR 36.204, could you please indicate what the magnitude of construction range is for the Flag Pole with Installation project?

This requirement is classified as a supply with incidental installation service.

PROJECT TITLE: Flag Pole
Date: 30 July 2018