About this file
Solicitation Amendment W912SV18P5001 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B01_Abstract_Repair_Flightline_Drainage.pdf | ||
| A07_EAL_W912SV18B5001_20180906.pdf | ||
| A07_W912SV18B5001_0005.pdf | ||
| A07_RFI_Log_20180830.pdf | ||
| A07_W912SV18B5001_0004.pdf | ||
| A01_AXQD102073_SHEET_E109.pdf | ||
| A07_RFI_Log.pdf | ||
| AXQD102073_SHEET_E109.pdf | ||
| A07_IFB_W912SV18B5001_0002.pdf | ||
| A07_IFB_W912SV18B5001_0003.pdf | ||
| A07_FBO_Pre-Bid_Visit_Sign-In_2.pdf | ||
| A07_W912SV18B5001_Pre-Bid_Conference_Sign-In.pdf | ||
| A07_EAL_W912SV18B5001.pdf | ||
| A07_IFB_W912SV18B5001.pdf | ||
| A01_AXQD182173_SOW.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F6C3108158AW01 AXQD182173
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Additional Site Visit: Thursday, 9 August 2018 at 0900L. See Section 00100, paragraph 4.1.1.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912SV18B5001
X 9B. DATED (SEE ITEM 11)
26-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Aug-2018
CODE
W912SV - 104 FW//MSC
175 FALCON DR
WESTFIELD MA 01085-1482
W912SV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912SV18B5001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
SECTION 00100
SECTION 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. Description of the Project: Project Number: AXQD182743; Repair Base Electrical Service.
2. Instructions to Bidders:
2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W912SV18B5001 entitled Repair Flightline Drainage Structures, Project Number AXQD182173, at the 104th Fighter Wing, Barnes Air National Guard Base (ANGB), Westfield, Massachusetts.
2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
2.3. This solicitation is set-aside 100% for small businesses. In accordance with FAR Clause 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business concerns the HUBZone preference of 10% is applicable.
3. RESERVED
4. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:
4.1. A pre-bid conference will be conducted on 2 August 2018 at 1000 hours for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at the 104th Fighter Wing, Barnes Air National Guard Base (ANGB), Westfield, Massachusetts, Building 003. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference.
4.1.1. An additional site visit will be conducted on Thurday, 9 August 2018 at 0900 hours for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at the 104th Fighter Wing, Barnes Air National Guard Base (ANGB), Westfield, Massachusetts, Building 003.
4.2. Due to security conditions, all offerors must register to attend this conference and site visit. Return the attached Contractor Entry Authorization List (EAL) for all attendees to the following addresses:
usaf.ma.104-fw.list.fal-msc-contracting@mail.mil
4.3. This information must be provided in advance, not later than 2 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees.
Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
4.4. Visitors must pick up their passes at the Installation’s Main Entry Gate prior to arrival. You may be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
4.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
4.6. A record of the conference shall be made and furnished to all prospective bidders via posting at http://www.fbo.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
5. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
5.1. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact the AE or Engineering personnel directly. Doing so may only delay your answer. All questions must come through the Contracting Office.
Subject Line: Reference No. SOLICITATION W912SV18B5004
Email: usaf.ma.104-fw.list.fal-msc-contracting@mail.mil
PRE-BID INQUIRY FORMAT
Date of Bid Inquiry: _______________
From: ____________________________ Company Name: ______________________________
Address:_______________________________________________________________________
Phone Number: _____________________________ Fax Number:_________________________
Email address: __________________________________________________________________
Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)
5.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.
5.3. All questions and requests for information (RFI) must be received not later than the fifth working day prior to bid opening. Offerors are strongly encouraged to submit questions early in this process.
5.4. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on FBO at http://www.fbo.gov.
5.5. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.
5.6. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. Plans and specifications are locked on FBO and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See complete instructions on FBO. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system.
5.7. Amendments, if/when issued will be posted to https://www.fbo.gov/ for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.
6. BID REPOSITORY AND BID OPENING:
6.1. A bid repository is provided for hand carried bids and is located at the Contracting Office, 104th Fighter Wing, Building 054, 175 Falcon Drive, Westfield, MA, 01085-1482. Hand carried bids must be deposited in the repository prior to the time established for opening of bids. Bidders are cautioned that they will be required to sign in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions for obtain access to the base in the Site Visit instruction. Follow the same instruction for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance withFAR 14.304.
6.2. The bid opening will occur at the time and date specified in Block 13 of the SF1442, Building 054, 104th Fighter Wing, Base Contracting Office, 175 Falcon Drive, Westfield, MA, 01085-1482. All interested offerors and their major subcontractors are encouraged to attend the bid opening.
7. WAGE DETERMINATION: Construction Wage Rates are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are General Decision Number: MA180003 07/06/2018 MA3 (modification 07). Applicable wage rates can be found at http://www.wdol.gov/wdol/scafiles/davisbacon/MA.html.
8. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS: This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.
9. CLAUSES: Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
10. DISPOSITION OF UNSUCCESSFUL BIDS: In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.
11. OFFERORS QUALIFICATIONS: To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
12. RESERVED
13. RESERVED
(End of Section 00100)