A07_RFI_Log_20180830.pdf

PDF 188 KB Posted

Attached to
Repair Flightline Drainage Structures Federal contract opportunity
Solicitation number
W912SV18B5001
Issued by
Department of the Army Massachusetts Army National Guard

About this file

RFI Log 20180830

View the file

Other files for this federal contract opportunity

Other files attached to Repair Flightline Drainage Structures, newest first.
File Type Posted
B01_Abstract_Repair_Flightline_Drainage.pdf PDF
A07_W912SV18B5001_0005.pdf PDF
A07_EAL_W912SV18B5001_20180906.pdf PDF
A07_RFI_Log.pdf PDF
A07_W912SV18B5001_0004.pdf PDF
A01_AXQD102073_SHEET_E109.pdf PDF
AXQD102073_SHEET_E109.pdf PDF
A07_IFB_W912SV18B5001_0002.pdf PDF
A07_IFB_W912SV18B5001_0003.pdf PDF
A07_FBO_Pre-Bid_Visit_Sign-In_2.pdf PDF
A07_W912SV18B5001_0001.pdf PDF
A07_W912SV18B5001_Pre-Bid_Conference_Sign-In.pdf PDF
A07_IFB_W912SV18B5001.pdf PDF
A01_AXQD182173_SOW.pdf PDF
A07_EAL_W912SV18B5001.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912SV18B5001 RFI Log

30 August 2018

1. The Equipment Manufacturer has requested wiring diagrams of the actuators. Is this information available and can it be provided for their reference?

ANSWER – See file drawing [A01 AXQD102073 SHEET E109.pdf]

2. The solicitation listed part numbers for breakers, however the SOW does not clearly state that breakers are to be replaced. Are the breakers to be replaced?

ANSWER -- Yes, breakers replaced.

3. Can the existing wiring be re-used, or does the wiring need to be replaced for both power and controls?

ANSWER -- Wiring can be reused.

4. What is our responsibility regarding the existing floats. Is there any work related to the floats?

ANSWER -- No work required on floats

5. The specifications reference excavation several times. Please confirm there is no excavation required.

ANSWER -- No excavation is contemplated by the Government.

6. The solicitation references testing of the actuators. Is this testing requirement include third party testing, or simply testing and confirming operation?

ANSWER -- Just confirmation of operations.