This is a Request for Proposal (RFP) Amendment 0003 for Olmsted Access Road 53 Repairs issued by the Department of the Army, Louisville District, Corps of Engineers.
The RFP solicits price proposals from five Multiple Award Task Order Contract (MATOC) holders to repair asphalt and gravel patch areas, wingwalls, headwalls, and culvert replacement at Olmsted Locks and Dam in Olmsted, Illinois. The work includes removal of existing damaged asphalt and gravel to specified depths, surface preparation, and installation of new asphalt in accordance with attached design drawings and technical specifications. Award will be based on lowest price. The cost range is between $250,000 and $500,000. The effective Davis-Bacon wage rate is IL20260016 (Illinois Heavy and Highway, dated January 2, 2026). Proposals are due by April 17, 2026 at 1:00 PM EDT through PIEE, with a 60-calendar-day acceptance period required. Performance and Payment Bonds are required; Bid Bonds are not required. ProjNet questions must be submitted by April 12, 2026. The Notice to Proceed is estimated for May 1, 2026, but no more than 30 calendar days from contract award. Normal working hours are Monday through Thursday, 7:00 a.m. to 4:00 p.m. Eastern Time. The contractor is responsible for all equipment rental, material transportation, site cleanup, and waste disposal. A mandatory pre-proposal site visit is not required. The submittal register and price breakout schedule are included, and revised specifications and statement of work are attached reflecting multiple deletions and revisions to concrete and culvert-related specification sections.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912QR-60440629: Olmsted Access Road 53 Repairs Amendment 0003
REPLY T O
ATTENTION OF
DEPARTMENT OF THE ARMY
LOUISVILLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 59
LOUISVILLE, KENTUCKY 40201-0059
CELRL-CT 02 April 2026
Aleut Flood Management, LLC 5775 Mark Dabling BLVD Colorado Springs, CO 80919
Geiger Brothers, INC 317 Ralph St Jackson, OH 45640
Brannon Contracting & Maintenance Services, LLC 1510 Moxahala AVE Zanesville, OH 43701
MI – DE – CON, Inc.
3331 S 3rd Street Ironton, OH 45638
Massillon Construction and Supply LLC 1245 Raff RD SW Canton, OH 44710
Dear MATOC Contractors:
Reference is made to your Indefinite Delivery Indefinite Quantity Contracts, Numbers W9123723D0003 through W9123723D0007, Multiple Award Task Order Contracts (MATOCs) for Design Bid Build Land Based Construction Projects assigned to the Rivers Districts (LRH, LRL, LRN & LRP) of the U.S. Army Corps of Engineers, Great Lakes and Ohio River Division.
Request for Proposal (RFP) W912QR-60440629 for Olmsted Access Road 53 Repairs. We request that you submit a price proposal for all labor, materials, and equipment, to repair asphalt, gravel patch areas, wingwalls and headwalls, and culvert replacement at Olmsted Locks and Dam in Olmsted, Illinois in accordance with the drawings and technical specifications included below.
The basis for award for this task order will be lowest price. Please complete and return the Price Breakout Schedule with your proposal. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract. Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract.
The cost range is between $250,000 and $500,000
***** Amendment 0001 ***** The price break out schedule was omitted from the original Request for Proposal (RFP) and has been included.
***** Amendment 0001 *****
***** Amendment 0002 ***** Due to clerical error, Geiger Brothers, INC was not included in original RFP. New Due Date is 13 April 2026.
***** Amendment 0002 *****
***** Amendment 0003 ***** To clarify from previous amendment letters, Performance and Payment Bonds will be required as stated in the original RFP letter. Bid Bonds will NOT be required. ProjNet has been extended to 12 April 2026.
New due date for proposals is 17 April 2026 at 1:00 PM EDT. ProjNet questions must be submitted by 12 April 2026.
W912QR-60440629_Specs-0003
Revised Specifications and Statement of Work are attached. The Summary of Changes are as follows:
SUMMARY OF CHANGES
1. The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:
TABLE OF CONTENTS
00 10 00 PRICE BREAKOUT SCHEDULE
SUBMITTAL REGISTER
2. The following SPECIFICATION SECTIONS have been added in their entirety:
None
3. The following SPECIFICATION SECTIONS have been deleted in their entirety:
03 30 00 CAST-IN-PLACE CONCRETE
03 42 13.00 10 PLANT-RECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
35 31 19.00 06 STONE PROTECTION
4. The following PLAN SHEETS have been revised and replaced in their entirety:
G001 COVER SHEET
G003 OVERALL PHOTOGRAPHY LOCATION PLAN
G004 PHOTOGRAPHY LOCATION PLAN
G005 PHOTOGRAPHY LOCATION PLAN
G007 SITE PHOTOGRAPHY
G008 SITE PHOTOGRAPHY
VF101 OVERALL SITE SURVEY
VF102 SITE SURVEY
VF103 SITE SURVEY
VF104 SITE SURVEY
VF105 SITE SURVEY
VF106 SITE SURVEY
VF107 SITE SURVEY
CD101 OVERALL DEMOLITION
CD102 DEMOLITION PLAN
CD103 DEMOLITION PLAN
CD104 DEMOLITION PLAN
CD105 DEMOLITION PLAN
CD106 DEMOLITION PLAN
CD107 DEMOLITION PLAN
CS101 OVERALL SITE PLAN
CS102 SITE PLAN STA 0+00 – 8+50
CS103 SITE PLAN STA 8+50 – 17+25
CS104 SITE PLAN STA 17+25 – 25+50
CS105 SITE PLAN STA 25+50 – 34+25
CS106 SITE PLAN
CS107 SITE PLAN
CS501 CIVIL DETAILS
5. The following PLAN SHEETS have been added new:
None
6. The following PLAN SHEETS have been deleted in their entirety new:
CS502 CIVIL DETAILS
S-101 STA 31+15 CULVERT - ASSEMBLY ISOMETRIC VIEW
S-102 STA 31+15 CULVERT - WINGWALL ISOMETRIC VIEW
S-103 STA 31+15 CULVERT - PLAN VIEW
S-104 STA 3+75 CULVERT - ASSEMBLY ISOMETRIC VIEW
S-105 STA 3+75 CULVERT - WINGWALL ISOMETRIC VIEW
S-106 STA 3+75 CULVERT - PLAN VIEW
S-301 STA 31+15 CULVERT DETAILING
S-302 CULVERT-WINGWALL ASSEMBLY SECTIONS
S-303 WINGWALL REINFORCEMENT DETAILS
7. The following DOCUMENTS have been revised and replaced in their entirety:
STATEMENT OF WORK
*****Amendment 0003 *****
PLEASE NOTE: Wage Rates will be in effect for Construction Services and are attached to this RFP. The effective DBA Wage Rate for this requirement is IL20260016 dated 02 January 2026 Illinois - Heavy and Highway.
Please note, as stated in the Base Contract, the following clauses have been updated to reflect the specific Task Order requirements:
• FAR 52.211-10 Commencement, Prosecution, and Completion of Work.
• FAR 52.211-12 Liquidated Damages-Construction.
• FAR 52.211-13 Time Extensions.
• DFARS 252.236-7001 Contract Drawings and Specifications.
• FAR 52.236-4 Physical Data.
• FAR 52.236-1 Performance of Work by the Contractor.
Offerors shall allow for Government acceptance of proposals for 60 calendar days from the date proposals are due. Any proposal that does not allow acceptance for 60 days will not be considered and will be rejected.
Proposals are due no later than 1:00 PM Eastern Time on 17 April 2026. Submit your proposal through PIEE per the attached instructions. Proposals not received by the stated date/time will not be considered. Please acknowledge receipt of this RFP by signing below in the space provided and returning to Justin McPherson via email at justin.m.mcpherson@usace.army.mil.
Payment and Performance Bonds will be required for this project. The Notice to Proceed will be issued after receipt and approval of the bonds.
All questions regarding this Request for Proposal (RFP) must be submitted through ProjNet by 12 April 2026 by following the attached ProjNet instructions.
If an offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion. Page Numbering may not be in order.
Andrew J. Fleming Contracting Officer
Contractor’s acknowledgment:
Name:
Date:
Firm:
Signature:
LD 53 Access Road Olmsted, IL
FY26, P2 112574
Price Breakout Schedule
SECTION 00 10 00
CERTIFIED FINAL
00 10 00
PRICE BREAKOUT SCHEDULE
02/13
OFFEROR'S NAME: ___________________________________________
CONTRACT LINE ITEM SCHEDULE
Line Item No. Description Unit Amount
Amendment 0003***************************************************************
BASE PROPOSAL
0001. Construction: All work and labor required to construct the roadway surface repairs. Job $ ______________________
***************************************************************Amendment 0003 Total Base Proposal $
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.
--END OF CLIN SCHEDULE�
Amendment 0003 W912QR-60440629_Specs-0003
– Dam Rd 53 Statement of Work
STATEMENT OF WORK
Amendment 0003**********************************************************************
1. GENERAL
The contractor shall repair the asphalt and gravel patch areas per the design drawings attached to this contract. The work will begin after contract award.
The contractor shall field verify all dimensions, geometry, and fit ups prior to fabrication and installation.
Existing construction shown is based on existing construction documents and general construction practice and is not guaranteed to be true or exact.
The contractor shall field verify all existing conditions relevant to his work prior to construction. Details not specifically indicated shall be similar to details shown for similar conditions. The contractor is also responsible for the timely and proper disposal of all waste and removed materials related to their repairs from the facility.
The contractor shall remove existing damaged asphalt and or gravel on the top of roadway on Dam Rd 53 to the depth and extent specified by the design drawings. The contractor will not damage existing roadway during pavement removal. The contractor will prepare the asphalt surface for bonding and will then install new asphalt.
In case of disagreement between the statement of work and the contract task order, the contract task order supersedes the statement of work.
**********************************************************************Amendment 0003
The POC�s information is as follows:
Project Manager: Aaron Steele 600 Dr. Martin Luther King Jr Pl, RM 872
Louisville, KY 40202 Phone number: (502) 315-6372
E-mail: aaron.b.steele@usace.army.mil
Amendment 0003**********************************************************************
I. Contract Commencement and Completion Dates
a. The Notice to Proceed (NTP) for the work outlined in the base price breakout schedule (Item No.
001) is estimated to be 01 , May 2026 based on PALT, but no more than thirty (30) calendar days from the award of the contract.
b. Offsite preparations, including work related to submittals, shall commence ten (10) calendar days from receipt of the NTP for the base price breakout schedule.
c. On-site preparation is encouraged to begin as soon as possible after NTP, subject to approval of the work plan.
d. See 00750 Information Supplied by PE/A to Contracting MATOC IDIQ Contracts for construction contract duration.
e. There shall be a pre-work construction meeting between the Contractor, the Contracting Officer Representative (COR), and the Project Manager (PM) prior to the start of work.
f. Prior to start of work, the Contractor shall submit a construction plan. The contractor shall coordinate work with the COR, including schedule, site access, equipment and material storage, W912QR-60440629: Olmsted Access Road 53 Repairs disconnections, temporary utility outages, and temporary handrail removals. Coordination will be crucial part of this project due to many moving parts.
**********************************************************************Amendment 0003
Amendment 0003**********************************************************************
II. Project Stages � Work Schedule/Restrictions
After NTP Date:
Schedule: Repair work may be conducted as long as it does not or create unsafe conditions.
Normal Working Hours. Normal working hours, except as otherwise specified herein, shall be Monday through Thursday, 7:00 a.m. to 4:00 p.m. Eastern Time or as specified on the Purchase order. Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours, as specified by the Technical POC. Refer to individual sections of this specification for specific schedules of work.
Holiday Work. The eleven Federal holidays observed are:
New Year's Day (January 1st) Martin Luther King Day (3rd Monday in January)
President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Independence Day (July 4th) Juneteenth (June 19th) Labor Day (1st Monday in September)
Columbus Day (2nd Monday in October)
Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November)
Christmas Day (December 25th)
When one of the above designated holidays falls on a Sunday, the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work shall be scheduled around the above-listed Federal holidays except as specified herein or as approved by the Technical POC.
c. Inclement Weather Work. The Contractor shall maintain the schedule of services regardless of inclement weather. Exceptions may be approved by the Technical POC when severe conditions make it impractical or dangerous to perform the work. The KO will notify the Contractor, by modification to the Purchase order, of any change that extends the performance period due to inclement weather.
Contractor shall be responsible to maintain orderly project site and clean any mud, debris, or waste from their work area.
**********************************************************************Amendment 0003
Amendment 0003**********************************************************************
III. Responsibilities and Site Conditions
W912QR-60440629: Olmsted Access Road 53 Repairs
a. The Contractor shall be fully responsible for the purchase/rental, delivery, and placement of necessary equipment to complete the job without assistance from the HCF. This equipment may include but is not limited to: Manlifts, cranes, forklifts, elevators, toolboxes, scaffolding, air compressors, pumps, welders, and dumpsters.
b. The Contractor is fully responsible for the transportation of the concrete mixture and its pouring/forming appurtenant items to the worksite.
c. Fueling of equipment will follow all local, state and federal Spill Prevention and Countermeasure (SPCC) regulations. Fuel will not be provided by the government.
d. Existing break areas, offices, latrines, and showers are not available for contractor use. It is recommended that the contractor bring portable restrooms and a break room. There will be a designated laydown area and it is identified in sheet GI003.
**********************************************************************Amendment 0003
IV. Pre-proposal Site Visit
A mandatory site visit will not be conducted.
V. Payment Procedures and Additional Work
At no time should the Contractor perform additional work outside the scope of this contract without the prior authorization of the Contracting Officer, and no work shall be performed that will cause the Contractor to exceed the Contract Price. Work performed without a binding contract document authorizing such work shall result in the Contractor not being paid for that work performed. During the course of the Contract, any additional work determined to be needed may be requested by the Contracting Officer for a Contract Modification. Each interested Contractor shall examine the contract drawings, participate in pre-proposal site visit and assume the responsibility for quantities, materials, critical dimensions, and work conditions used in order to calculate a proposal.
VI. Wage Rates
The U.S. Department of Labor (DOL) wage rates apply to this work and are included. The Contractor is required to provide payroll documentation for all work performed under this Contract.
2. DESIGN GUIDANCE
I. ACI 318 Building Code Requirements for Structural Concrete and Commentary II. ACI 301 Specifications for Structural Concrete III. ACI 423.10R-16 Guide to Estimating Prestress Loss IV. AISC Steel Construction Manual, 14th Edition V. ASTM C39/C39m Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens VI. ASTM C494 Standard Specification for Chemical Admixtures for Concrete VII. AWS D1.1 Structural Welding Code VIII. EM 385-1-1, Safety and Health Requirements Manual
IX. EM 1110-2-2104
X. Markland L&D Periodic Inspection No. 12, Periodic Assessment No. 1 XI. Precast/Prestressed Concrete Institute Design Handbook 7th Ed.
XII. SSPC-SP10 Near-White Blast Cleaning
W912QR-60440629: Olmsted Access Road 53 Repairs
Amendment 0003**********************************************************************
3. REFERENCE DRAWINGS
The construction process shall conform to the attached drawings, which form a part of these specifications.
SHEET INDEX
Sheet Number
Sheet Title
GI001 COVER SHEET
GI002 SITE AREA & VICINITY
GI003 OVERALL PHOTOGRAPHY LOCATION PLAN
GI004 PHOTOGRAPHY LOCATION PLAN
GI005 PHOTOGRAPHY LOCATION PLAN
GI006 SITE PHOTOGRAPHY
GI007 SITE PHOTOGRAPHY
GI008 SITE PHOTOGRAPHY
VF101 OVERALL SITE SURVEY
VF102 SITE SURVEY
VF103 SITE SURVEY
VF104 SITE SURVEY
VF105 SITE SURVEY
VF106 SITE SURVEY
VF107 SITE SURVEY
VF401 CONTROL POINT DESCRIPTIONS
CD101 OVERALL DEMOLITION
CD102 DEMOLITION PLAN
CD103 DEMOLITION PLAN
CD104 DEMOLITION PLAN
CD105 DEMOLITION PLAN
CD106 DEMOLITION PLAN
CD107 DEMOLITION PLAN
CS101 OVERALL SITE PLAN
CS102 SITE PLAN
CS103 SITE PLAN
CS104 SITE PLAN
CS105 SITE PLAN
CS106 SITE PLAN
CS107 SITE PLAN
CS501 CIVIL DETAILS
**********************************************************************Amendment 0003
W912QR-60440629: Olmsted Access Road 53 Repairs
Amendment 0003**********************************************************************
4. OPERATIONAL AND SECURITY REQUIREMENTS
See spec 00 80 00.00 06, section 1.27 CONTRACTOR SECURITY TRAINING/FACILITY ACCESS
REQUIREMENTS
FOR ALL LOUISVILLE DISTRICT CONTRACTS:
See spec 00 80 00.00 06, section 1.27 CONTRACTOR SECURITY TRAINING/FACILITY ACCESS
REQUIREMENTS
FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC):
See spec 00 80 00.00 06, section 1.27 CONTRACTOR SECURITY TRAINING/FACILITY ACCESS
REQUIREMENTS
FOREIGN NATIONALS:
See spec 00 80 00.00 06, section 1.27 CONTRACTOR SECURITY TRAINING/FACILITY ACCESS
REQUIREMENTS
**********************************************************************Amendment 0003
Amendment 0003**********************************************************************
5. CORPS COORDINATION
I. The Contractor shall constantly be in coordination with the COR.
**********************************************************************Amendment 0003
6. SUBMITTALS
The government review period for submittals shall be 2 weeks unless noted otherwise in the Task Order contract.
Amendment 0003**********************************************************************
7. CONSTRUCTION QUALITY CONTROL MANAGER (CQC MANAGER)
See spec 01 45 04.10 06, section 3.5 CONSTRUCTION QUALITY CONTROL ORGANIZATION for CQC requirements.
**********************************************************************Amendment 0003
Amendment 0003**********************************************************************
8. SITE SAFETY AND HEALTH OFFICER (SSHO)
See spec 01 35 26.00 06, section 1.5 SITE QUALIFICATIONS, DUTIES AND MEETINGS for SSHO qualifications.
**********************************************************************Amendment 0003
Amendment 0003**********************************************************************
9. LIQUIDATED DAMAGES � CONSTRUCTION
See 00750 Information Supplied by PE/A to Contracting MATOC IDIQ Contracts for liquidated damages.
W912QR-60440629: Olmsted Access Road 53 Repairs
**********************************************************************Amendment 0003
Amendment 0003**********************************************************************
10. TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER ER 415-1-15
See spec 00 80 00.00 06, section 1.19 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER for weather days.
**********************************************************************Amendment 0003
11. SAFETY
The Contractor shall complete all work in accordance with the most current U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in addition to the current provisions of the Occupational Safety and Health Act, and all applicable Federal, State and local laws, codes and regulations. The Contractor shall submit a safety plan in writing prior to any on-site work. The safety plan may be turned in by the time of the pre-work conference.
Personal Protective Equipment (PPE) and Apparel. Protective apparel and equipment, as identified in the AHA, shall be provided to eliminate or minimize safety hazards to personnel. As a minimum, each employee shall wear a sleeved shirt, long trousers, and safety-toe shoes or boots during all contract work. Hard hats, face shields, safety glasses with side shields, or goggles, and hearing protection shall be worn by employees when required by the Safety Manual. Fire extinguisher(s) and first aid kit(s) meeting the Safety Manual standards shall also be provided and easily accessible to all employees.
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
12. ACCIDENT REPORTING
The Contractor shall maintain accurate accident records and report all accidents as prescribed by the COR.
Accidents shall be reported within twenty-four (24) hours of occurrence (not including weekends and holidays), and all serious accidents (those resulting in death or injury requiring medical attention or lost time) shall be reported immediately.
13. DAMAGE REPORTS
In all instances where Government property, equipment, natural features, landscape, or trees are damaged by contract employees, an immediate notification shall be made to the COR. A full report of the incident and extent of such damage shall be submitted to the COR within two (2) working days of occurrence, excluding weekends and holidays.
14. CONTRACT EMPLOYEES
All contract employees shall conduct themselves in a proper and courteous manner at all times. Contract employees shall comply with all provisions of Title 36, Chapter III, Part 327, CFR and obey all posted signs and regulations in the performance of work under this contract. Being under the influence of or consuming alcoholic beverages or any controlled substances by the Contractor or employees while on duty is prohibited.
Amendment 0003**********************************************************************
15. APPENDICES
None
**********************************************************************Amendment 0003
W912QR-60440629: Olmsted Access Road 53 Repairs
112574 LD 53 Access Road Olmstead, IL
PROJECT TABLE OF CONTENTS Page 1
AMENDMENT 0003
CERTIFIED FINAL
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 PRICE BREAKOUT SCHEDULE
00 80 00.00 06 04/21, CHG 1: 06/23 SPECIAL PROVISIONS
00 80 00.01 06 CONSTRUCTION PROJECT SIGNS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 32 01.00 06 10/23 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 35 26.00 06 05/24, CHG 1: 10/24 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM
CONTRACTOR MODE (RMS CM)
01 45 04.10 06 05/25 CONTRACTOR QUALITY CONTROL
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS
AND PERMITS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
DIVISION 02 – EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
Amendment 0003***************************************************************
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 9: 08/24 DELETED
03 42 13.00 10 05/16 DELETED
***************************************************************Amendment 0003
DIVISION 31 - EARTHWORK
31 00 00.00 06 05/24, CHG 1: 12/24 EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 01 16.71 11/22 COLD MILLING ASPHALT PAVING
32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE
PAVING
32 12 23 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 92 19 10/06 SEEDING
Amendment 0003***************************************************************
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
35 31 19.00 06 06/24 DELETED
***************************************************************Amendment 0003
--End of Project Table of Contents--
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 9 PAGES
112574 FY25 LD 53 ACCESS ROAD
00 80 00.00 06 SD-01 Preconstruction Submittals
1.13 G ROLocal Agency Check
1.11 G ROSF1413 Statement and
Acknowledgement
1.31 G RORadioactive Material/Equipment
SD-05 Design Data
1.36Progress Photographs
SD-07 Certificates
1.28 G ROInsurance
1.26 G ROSales and Use Tax
SD-11 Closeout Submittals
1.6.4 G ROPreliminary (Working) As-Built
Drawings
1.6.1 G ROFinal As-Built Drawings
1.6.1.2 G ROCAD Working As-Built Drawings
01 32 01.00 06 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 G ROSubmittal Register
01 35 26.00 06 SD-01 Preconstruction Submittals
1.7Accident Prevention Plan (APP)
1.7ENG Form 6293
1.7Fatigue Management Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 9 PAGES
01 35 26.00 06 1.7Bloodborne Pathogen Plan
1.7Exposure Control Plan
1.7Automatic External Defibrillator
(AED) Program
1.7Site Layout Plan
1.7Access/Haul Road Plan
1.7Hearing Conservation Program
1.7Respiratory Protection Plan
1.7Health Hazard Control Program
1.7Hazard Communication Program
1.7Process Safety Management
Plan
1.7Lead Compliance Plan &
Specifications
1.7Asbestos Abatement Plan &
Specifications
1.7Radiation Safety Program
1.7Abrasive Blasting Plan
1.7Heat Stress Monitoring Plan
1.7Cold Stress Monitoring Plan
1.7Indoor Air Quality Management
Plan
1.7Mold Remediation Plan
1.7Chromium (VI) Exposure
Evaluation
1.7Crystalline Silica Assessment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 9 PAGES
01 35 26.00 06 1.7Lighting Plan for Night Operations
1.7Traffic Control Plan
1.7Fire Prevention Plan
1.7Wild Land Fire Management Plan
1.7Arc Flash Hazard Analysis
1.7Assured Equipment Grounding
Control Program (AEGCP)
1.7Hazardous Energy Control Plan
1.7Standard Pre-Lift Plan (LHE)
1.7Critical Lift Plan - LHE
1.7Naval Architectural Analysis-LHE
(Floating)
1.7Floating Plant Inspection and
Certification
1.7Severe Weather Plan for Marine
Activities
1.7Emergency Plan for Marine
Activities
1.7Man Overboard/Abandon Ship
Procedures
1.7Float Plan for Launches, Motorboats, Skiffs
1.7Fall Protection and Prevention
Plan
1.7Demolition/Renovation Plan (to include engineering survey)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 9 PAGES
01 35 26.00 06 1.7Rope Access Work Plan
1.7Excavation/Trenching Plan
1.7Fire Prevention & Protection Plan for Underground Construction
1.7Compressed Air Plan for
Underground Construction
1.7Erection and Removal Plan for
Formwork and Shoring
1.7PreCast Concrete Plan
1.7Lift-Slab Plans
1.7Masonry Bracing Plan
1.7Steel Erection Plan
1.7Explosives Safety Site Plan
(ESSP)
1.7Blasting Plan
1.7Dive Operations Plan
1.7Safe Practices Manual for Diving
Activities
1.7Emergency Management Plan for
Diving
1.7Tree Felling/Maintenance
Program
1.7Aircraft/Airfield Construction
Safety & Phasing Plan (CSPP)
1.7Aircraft/Airfield Safety Plan
Compliance Document (SPCD)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 9 PAGES
01 35 26.00 06 1.7Site Safety and Health Plan
(HTRW)
1.7Confined Space Entry
Procedures
1.7Confined Space Program
1.8 G ROActivity Hazard Analysis (AHA)
1.5.1.1 G ROSite Safety and Health Officer
Qualifications(SSHO)
1.12.7 G ROProof of qualification for Crane
Operators
1.12.7 G ROCritical Lift Plan
SD-06 Test Reports
1.12Reports
1.12.1Accident Reports
1.12.3Monthly Exposure Reports
1.12.5Crane Reports
1.12.4Regulatory Citations and
Violations
SD-07 Certificates
1.12.8Confined Space Entry Permit
1.13Hot work permit
1.12.6Crane Certificate of Compliance
01 45 04.10 06 SD-01 Preconstruction Submittals
3.3 G ROConstruction Quality Control Plan
01 57 19.00 06 SD-01 Preconstruction Submittals
1.6.1Preconstruction Survey
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 9 PAGES
01 57 19.00 06 1.11 GSolid Waste Management Permit
1.6.2 GRegulatory Notifications
1.7 G ROEnvironmental Protection Plan
1.7.9.1 G RODirt and Dust Control Plan
1.6.5 G ROEmployee Training Records
1.6.4Environmental Manager
Qualifications
SD-06 Test Reports
Laboratory Analysis
3.2.2.2Inspection Reports
3.7.2.1 GSolid Waste Management Report
SD-07 Certificates
1.6.5 G ROEmployee Training Records
Certificate of Competency
1.6.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.2.3 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.2.4 G ROStormwater Notice of Termination
3.7.1 G ROWaste Determination
Documentation
3.7.4.5 G RODisposal Documentation for
Hazardous and Regulated Waste
1.6.5Assembled Employee Training
Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 9 PAGES
01 57 19.00 06 1.11 GSolid Waste Management Permit
3.7.2.1 GSolid Waste Management Report
3.7.4.1 GHazardous Waste/Debris
Management
1.6.2 GRegulatory Notifications
3.7.2.1Sales Documentation
As-Built Topographic Survey
01 74 19 SD-01 Preconstruction Submittals
1.5 GWaste Management Plan
SD-11 Closeout Submittals
1.6Records
02 41 00 SD-01 Preconstruction Submittals
1.2.2 G RO_Demolition Plan
Existing Conditions
SD-07 Certificates
1.7 G RONotification
SD-11 Closeout Submittals
3.1.2Receipts
31 00 00.00 06 SD-01 Preconstruction Submittals
3.1.3 G ROExcavation and Trenching Plan
3.10 G RODisposition of Surplus Materials
1.5.4 G ROPreconstruction Meeting
SD-06 Test Reports
3.11 G ROMaterial Test Report
G ROBorrow Site Testing
G ROPipe Inspection Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 9 PAGES
31 00 00.00 06 1.5.1 G ROGeotechnical Evaluation Report
1.5.1 G ROFill Placement Report
32 01 16.71 SD-01 Preconstruction Submittals
2.1 GEquipment
3.2 GProposed Techniques
3.1.1 GQuality Control Plan
1.7.1 GQualifications
SD-06 Test Reports
3.6.1QC Monitoring
3.5.3 GGrade-Conformance Tests
3.4 GTest Section Results
3.7.1 GMacrosurface Texture
Acceptance
32 11 23 SD-03 Product Data
2.4 G ROPlant, Equipment, and Tools
Waybills and Delivery Tickets
SD-06 Test Reports
2.3.1 G ROInitial Tests
3.11.1 G ROIn-Place Tests
32 12 13 SD-03 Product Data
Waybills and Delivery Tickets
2.3Local/Regional Materials
SD-06 Test Reports
3.7Sampling and Testing
32 12 16.16 SD-02 Shop Drawings
2.1 G ROPlacement Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 9 PAGES
32 12 16.16 SD-03 Product Data
2.1.5 G RODiamond Grinding Plan
2.4 G ROMix Design
3.1 G ROContractor Quality Control
SD-04 Samples
2.2Aggregates
2.3Asphalt Cement Binder
SD-06 Test Reports
2.2 G RoAggregates
3.1.3.9QC Monitoring
SD-07 Certificates
2.3 G ROAsphalt Cement Binder
1.4.11Laboratory Accreditation and
Validation
32 92 19 SD-03 Product Data
Wood cellulose fiber mulch
2.4Fertilizer
SD-06 Test Reports
2.2.3 GTopsoil composition tests
SD-07 Certificates
2.1seed
SD-08 Manufacturer’s Instructions
Erosion Control Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
| MATOC Letter |
| SUMMARY OF CHANGES |
| 00 10 00 - PRICE BREAKOUT SCHEDULE |
| STATEMENT OF WORK |
| TABLE OF CONTENTS |
| SUBMITTAL REGISTER |