This document is an Industry Day Forum presentation for the Fort McCoy Multipurpose Athletic Field Project hosted by the U.S. Army Corps of Engineers (USACE) Louisville District on October 14, 2026.
The project involves design-build-to-budget (DB2B) construction of a 54,600 square-foot multipurpose athletic facility at Fort McCoy, Wisconsin, with a fixed construction cost limitation of $14,676,000. The facility will include a 200-meter rubberized running track, artificial turf infield accommodating a 50-meter by 37-meter Army Fitness Testing area with lanes, mechanical/electrical/telecommunications space, bathrooms, water fountains, and storm water bio-retention sites. The project will be procured through a two-phase competitive process using a best-value trade-off approach where price is fixed and non-cost technical factors are evaluated. Phase I (due December 2026) requires evaluation of past performance for both prime contractors and architects/designers of record (maximum three projects each, completed within six years) and management plans. A maximum of three teams will advance to Phase II (RFP issued June 2027, proposals due August 2027), which adds evaluation of technical solutions, project schedule, and small business participation plans. Contract award is anticipated in the first quarter of fiscal year 2028. The solicitation number is W912QR27RA005, posted to SAM.gov, with technical documents available through the PIEE Solicitation Module. Final set-aside determination (unrestricted, total small business, etc.) is pending. All proposals must be submitted electronically through PIEE by the Eastern time zone deadline with no exceptions for late submissions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry Day Sign-In Sheet _Fort McCoy MPAF.xlsx | XLSX spreadsheet | |
| Industry Day Sign-In Sheet_Fort McCoy MPAF.pdf | ||
| Bldg 2113 Aerial Map.png | PNG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDUSTRY DAY FORUM
FORT MCCOY MULTIPURPOSE ATHLETIC FIELD PROJECT
Presenters:
Jason L. Cain – Project Manager Bonny Dylewski – Contract Specialist Isaias Enriquez – Project Engineer Crystal Harbin- Deputy for Small Business
Date | Time: 14 October 2026 0900 Central Time
Location: 2113 South J Street Fort McCoy, WI 54656
”The views, opinions and findings contained in this report are those of the author(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
• Safety First
• No recording
• This briefing and the attendee roster will be posted to SAM
• Please be advised that none of the information discussed today is contractually-binding
ADMINISTRATIVE ANNOUNCEMENTS
• Introduction
• Please ensure that you have signed in o In-Person: Use QR Code provided at the sign-in desk. Option also available to sign in manually using the hardcopy Sign-In Sheet.
o Virtual: Use QR Code provided at the top of the chat.
o If you’re interested in being a subcontractor, state the type of work you are interested (Electrical, Mechanical, Roofing, etc.)
ADMINISTRATIVE ANNOUNCEMENTS
• USACE Procurement Process Overview
• Army Reserve Overview
• Fort McCoy Multipurpose Athletic Field Project Overview
• Other Project Opportunities
• Q&A Session
AGENDA
USACE PROCUREMENT PROCESS OVERVIEW
Bonny Dylewski Contract Specialist
U.S. Army Corps of Engineers Louisville District
• System for Award Management (SAM) at www.SAM.gov
Solicitation Number W912QR27RA005 Solicitations for USACE-Louisville begin with W912QR Search using Keyword Search Feature (Select “Any Words” or “All Words”): McCoy Multipurpose
• View Interested Vendors List and register as an Interested Vendor.
• Register to receive notifications and updates / amendments.
• RFP Technical Information (i.e., Plans and Specs) will be available for download from the PIEE Solicitation Module at https://piee.eb.mil/sol/xhtml/unauth/index.xhtml (accessible through Solicitation Notice at www.SAM.gov)
HOW TO OBTAIN THE SOLICITATION
http://www.sam.gov/ https://piee.eb.mil/sol/xhtml/unauth/index.xhtml http://www.sam.gov/
• Pre-Solicitation Notice
– Minimum 15 days prior to Solicitation
• Advertisement
– Minimum 30 days to prepare Phase I Proposals
– Minimum 30 days to prepare Phase II Proposals
• Amendments issued to the RFP will also be posted to the PIEE Solicitation Module (accessible via www.SAM.gov)
OBTAINING THE ISSUE DOCUMENTS
http://www.sam.gov/
• Requirements to Download Technical Data Package:
Locate and access the Solicitation notice in the SAM database.
- Go to the “Attachments/Links” section to access the PIEE Module for all technical documents.
- Access to Phase II documents will be restricted to Phase II selected offerors (Prime Contractors).
Sign-Up and Sign-In to your SAM account to:
- “Follow” to receive email notifications (i.e., amendments)
- View Interested Vendors List
- Sign up as an Interested Vendor
• Requirements to Submit Proposals:
Register your business entity (you as an individual or your organization) to be able to propose on contracts as the Prime.
All proposals will be submitted through the PIEE Solicitation Module on time. Therefore, offerors must register in advance for a user ID and Password to access this system.
• This project will be Design-Build to Budget (DB2B) Request for Proposals
(RFP)
• Final Set-Aside Determination (Unrestricted, Total Small Business Set- Aside, etc.) is TBD.
• Project award will be made via a Two-Phase “Best Value Trade-Off” (BVTO) basis as described in the Evaluation Criteria.
• Proposals must be submitted on time.
The Louisville District is located within the Eastern time zone.
• The Source Selection Evaluation Board (SSEB) will evaluate offerors’ proposals based on specific factors which are defined in the RFP Package.
THE PROCUREMENT PROCESS
11DESIGN-BUILD TO BUDGET (DB2B)
DESIGN-BUILD TO BUDGET (DB2B)
The Government establishes a firm, fixed, maximum budget in the solicitation.
Offerors do not compete by lowering their price; instead, they compete by proposing the highest quality scope and the most facility enhancements they can deliver for that exact, fixed dollar amount.
Statutory & Regulatory Authority:
► Statute: 10 U.S.C. § 3241 (Two-phase DB selection).
► Regulation: FAR Subpart 36.3 and FAR 15.3 (Source Selection - specifically utilizing a tradeoff process where price is fixed and non-cost factors are evaluated).
Construction Cost Limitation (CCL): $14,676,000 (Hard contractual budget ceiling).
► Any proposal exceeding this cap will be deemed non-compliant.
DESIGN-BUILD-TO-BUDGET ROADMAP
• Source Selection Evaluation Criteria for the “Best Value Trade-Off” consists of the following elements for Phase I:
1) Volume I – Factor I: Past Performance Evaluation Project(s) submitted for both Prime Contractor and A/E Designer of Record (maximum 3 each) Relevancy - Recent projects (completed w/in 6 years), similar in size, scope, magnitude of effort & complexities Quality of performance on submitted projects Other sources of relevant past performance information (i.e., CPARS, FAPIIS, eSRS, references)
2) Volume I – Factor II: Management Plan
(Subject to Change)
PROPOSAL REQUIREMENTS
Technical Evaluation
Factors
3) Volume II – Pro Forma & Price Information Tab A: Standard Form 1442 (Price is not included in Phase I) Tab B: Joint Venture Agreements (if applicable) Tab C: Evidence of Ability to Obtain Bonding & Proof of Financial Ability Tab D: Pre-Award Information (i.e., Reps & Certs, offeror information, etc.)
• A maximum of three (3) of the most highly qualified Design-Build teams will be selected proceed to Phase II.
• Collaboration Stage:
Draft RFP issued to Phase II-selected offerors Series of confidential, proprietary 1-on-1 meetings with each offeror (Up to 3 is anticipated) Each Phase II offeror will be provided their own ProjNet Bidder Inquiry Key
(Mark RFIs as Proprietary or Nonproprietary) Government Team will review each Offeror’s preliminary design concepts, provide feedback, and course-correct misunderstandings to ensure that solutions maximize the value of the fixed budget.
• Phase II will be issued as an Amendment
• Source Selection Evaluation Criteria for the “Best Value Trade-Off” consists of the following elements for Phase II (subject to change):
1) Volume I – Factor I: Technical Solution
2) Volume I – Factor II: Project Schedule (Schedule Narrative)
3) Volume I – Factor III: Small Business Participation Plan (if Unrestricted Procurement)
Technical Evaluation
Factors
4) Volume II – Pro Forma & Price Information Tab A: Standard Form 1442 & Price Tab B: Subcontracting Plan (if Unrestricted Procurement; only
Large Businesses)
• Technical Factors listed in relative order of importance for Phase I:
o Volume I – Factor I: Past Performance 1st
Prime Contractor Equal to A/E (DOR) A/E Designer of Record (DOR) Equal to Prime o Volume I – Factor II: Management Plan 2nd
• Evaluation factors, ratings, and findings from Phase I will not be carried over into Phase II.
(Subject to change)
• Technical Factors listed in relative order of importance for Phase II:
o Volume I – Factor I: Technical Solution 1st o Volume I – Factor II: Project Schedule 2nd o Volume I – Factor III: Small Business Participation Plan 3rd
(if Unrestricted Procurement)
• All Technical Evaluation Factors are considered significantly more important than Price. (Price is fixed.)
• Instructions for submitting a Request for Information (RFI) will be included in the Solicitation.
– RFIs for these projects will be received and answered through the ProjNet system: www.ProjNet.org o Any RFIs submitted/emailed directly to the Project Team will NOT receive a response, and offerors will be directed to the ProjNet system.
– A ProjNet Bidder’s Key included in the solicitation’s Project Instructions section of the RFP, which is used to post your RFIs/questions.
– RFIs and their responses will be available for public review through ProjNet.
(Phase I only)
• A Site Visit will be held in conjunction with the 1st Proprietary Meeting.
http://www.projnet.org/
• We will utilize the Electronic Receipt of Proposal process – Instructions will be in Section 00 21 00 of the solicitation package
• Proposals are uploaded to and submitted through PIEE Solicitation Module Recommend performing a test run well in advance
• Don’t wait until the last minute to upload your proposal. Late is Late! No exceptions!
PROPOSAL SUBMISSION
Crystal Harbin Regional Small Business Director
Great Lakes and Ohio River Division
SBO-LRL@usace.army.mil mailto:SBO-LRL@usace.army.mil mailto:SBO-LRL@usace.army.mil mailto:SBO-LRL@usace.army.mil
23SMALL BUSINESS PARTICIPATION PLAN AND
SUBCONTRACTING PLAN
• The Small Business Participation Plan is a rated evaluation factor in all unrestricted procurements
• Both large and small business offerors must submit a participation plan
• The participation plan is based on total contract value
• Large Business offerors must submit a Small Business Subcontracting Plan
• Mandated by FAR 19.109
• This is not a rated element as a part of the Source Selection process; however, the offeror shall submit an acceptable plan prior to award
• The subcontracting plan is based on total subcontracted dollars
• Every option must be broken out separately.
• Failure to comply in good faith is in material breach of the contract
• Attend Industry Days, Pre-Proposal Conferences, and Site Visits
• Obtain copies of attendee listings for subcontracting opportunities
• Register as an interested Vendor on SAM
• Attend Workshops, Conferences, Trade Fairs
• Annual Louisville District Open House will be held 03 February 2027
• Review Forecast, https://www.lrd.usace.army.mil/Business-With-Us/
OBTAIN INFORMATION
https://www.lrd.usace.army.mil/Business-With-Us/ https://www.lrd.usace.army.mil/Business-With-Us/ https://www.lrd.usace.army.mil/Business-With-Us/ https://www.lrd.usace.army.mil/Business-With-Us/
• Contracting opportunities are posted in the System for Award Management (SAM) website at www.sam.gov. Use “W912QR” to search for Louisville District projects.
• Actively Respond to Sources Sought Notices (Market Surveys) posted to SAM
• Actively respond to PLA Surveys posted to SAM
• Actively Respond to Competitive Requirements posted to SAM
To view Louisville District prime contract holders, please visit https://www.lrd.usace.army.mil/Business-With-Us/
ADDITIONAL OPPORTUNITIES
http://www.fbo.gov/ https://www.lrd.usace.army.mil/Business-With-Us/ https://www.lrd.usace.army.mil/Business-With-Us/ https://www.lrd.usace.army.mil/Business-With-Us/
US ARMY RESERVE OVERVIEW
Jason L. Cain Project Manager
ARMY RESERVE PROGRAM
FORT MCCOY, WI
MULTIPURPOSE ATHLETIC FIELD
ISAIAS ENRIQUEZ
Project Architect
US Army Corps of Engineers Louisville District
JASON L. CAIN
Project Manager
US Army Corps of Engineers
The purpose of the Multipurpose Athletic Field (MPAF) is to provide a 54,600 SF facility with a 200-meter rubberized running track and an artificial turf infield to service 209 personnel at any time.
MULTIPURPOSE ATHLETIC FIELD (MPAF)
***Note: Information in this presentation is for informational purposes only and is not/will not be contractually binding.
• Army Fitness Testing (AFT)
• Mobilization Training
For Reference Only Site Concept
• No facility large enough to allow for year-round indoor AFT
CURRENT AFT AT FORT MCCOY
PROJECT REQUIREMENTS
• One story, 209-person facility
• 54,600 SF space
• 200m rubberized track
• Artificial turf infield to accommodate 50m x 37m AFT area with lanes
• Space for mechanical, electrical and telecommunications
• No vehicle parking area required
• Storm water bio-retention sites
• Bathrooms and water fountains within facility
• Utilities corridors to maximum extent possible
Project Schedule (Subject to Change) Industry Day Forum 14 OCT 2026 Market Survey Reponses Due 16 OCT 2026 Phase I RFP Posted NOV 2026 Phase I Proposals Due DEC 2026 Government Eval / Down Select Complete JAN 2027 Proprietary Meetings Kickoff FEB 2027 Proprietary Meetings Conclude MAY 2027 Phase II RFP Issued JUN 2027 Phase II Proposals Due AUG 2027 DB2B Contract Award 1st Quarter FY28
PROJECT SCHEDULE
OTHER PROJECT OPPORTUNITIES
Jason L. Cain Program Manager
Project: Equipment Concentration Site [Warehouse + AMSA + MEP lot] Location: Ft Carson, CO Acquisition: OTA - Construction Management At Risk
Construct an Equipment Concentration Site (ECS) on Fort Carson, CO. Primary facilities include an Area Maintenance Support Activity (AMSA) shop and General Purpose (GP) Warehouse. Facilities will be designed in accordance with the Army Reserve Design Guide. Supporting facilities include land clearing, general site improvements, organizational parking, non-organizational parking, concrete parking, concrete aprons, vehicle wash rack/platform, bi-level equipment loading ramp, fencing, walks, signage, curbs and gutters, storm drainage, SATS Trailer canopy, information systems, and utility connections. Supporting Facilities costs are higher than average due to special building foundations, extensive pavements, improved surfaces, site clearing, and excavation costs associated with developing the 48-acre parcel of land. Sustainability/Energy and cybersecurity measures are included.
Facilities will be designed to a minimum life of 40 years in accordance with DoW Unified Facilities Criteria 1-200-02 including energy efficiencies, building envelope and integrated building systems performance.
AERIAL VIEW OF THE PROJECT SITE
SITE LAYOUT
GENERAL PURPOSE WAREHOUSE + AREA
MAINTENANCE SUPPORT ACTIVITY FLOOR PLAN
RENDERINGS
Project: New Training Barracks Location: Ft Hunter-Liggett, CA Acquisition: OTA – Progressive Design Build
The primary scope of work delivers four (4) CTE Barracks and one (1) IPIMT Barracks to restore modern housing capabilities to the installation. The four
(4) CTE Barracks will each span approximately 46,000 square feet, utilizing open-bay configurations equipped with integrated officer sleeping rooms, team rooms, laundry facilities, restrooms, showers, storage, and janitorial closets.
Complementing these collective spaces, the single 45,000-square-foot IPIMT Barracks will provide individual sleeping quarters with private bathrooms, study/day rooms, laundry rooms, storage, and janitorial closets.
Also, part of this project is to completely demolish and dispose of the five existing legacy multi-story barracks that have exceeded their useful life. This comprehensive replacement directly resolves critical facility deficits, bringing Fort Hunter Liggett's training housing into full alignment with modern operational requirements.
40FT HUNTER-LIGGETT – NEW TRAINING
BARRACKS
Location of new CT Barracks
COA –
• Demo four CT Barracks. All barracks are three-story with load bearing masonry construction.
• Construct four 3-story CT Barracks (300 beds each).
Building Beds
Current
New Bedspaces after Construction
205 360 300 207 360 300 208 360 300 230 360 300
Total 1440 1400
Existing four CT Barracks to be demolished
41FT HUNTER-LIGGETT – NEW TRAINING
BARRACKS
Location of new IPIMT Barracks
COA –
• Demo existing 156 IPIMT
Barracks.
• Construct new 156 two or three story IPIMT Barracks.
Building Beds
Current
New Bedspaces after Construction
229 156 156
Existing IPIMT Barracks to be demolished
QUESTIONS | DISCUSSIONS
DIRECTIONS TO
SITE VISIT
FROM Building 2113
Head north toward S 8th Ave
Go past McCoy’s Community Center and Commissary
Turn right onto E Eaton Rd
Destination will be on the left PT Track (park on street)
| INDUSTRY DAY FORUM�Fort McCoy MULTIPURPOSE ATHLETIC FIELD PROJECT |
| ADMINISTRATIVE ANNOUNCEMENTS |
| ADMINISTRATIVE ANNOUNCEMENTS |
| AGENDA |
| USACE PROCUREMENT PROCESS OVERVIEW |
| HOW TO OBTAIN THE SOLICITATION� |
| � OBTAINING THE ISSUE DOCUMENTS� |
| � OBTAINING THE ISSUE DOCUMENTS� |
| � OBTAINING THE ISSUE DOCUMENTS� |
| THE PROCUREMENT PROCESS� |
| DESIGN-BUILD TO BUDGET (DB2B) |
| Design-build-to-budget roadmap |
| PROPOSAL REQUIREMENTS� |
| PROPOSAL REQUIREMENTS� |
| PROPOSAL REQUIREMENTS� |
| PROPOSAL REQUIREMENTS� |
| PROPOSAL REQUIREMENTS� |
| PROPOSAL REQUIREMENTS� |
| PROPOSAL REQUIREMENTS� |
| PROPOSAL REQUIREMENTS |
| PROPOSAL SUBMISSION� |
| Slide Number 22 |
| Small Business Participation Plan and Subcontracting Plan |
| Obtain Information |
| Additional Opportunities |
| US Army Reserve OVERVIEW |
| Army reserve program |
| Fort McCoy, WI�MULTIPURPOSE ATHLETIC FIELD� |
| Multipurpose athletic field (mPaf)� |
| Current aft at fort McCoy |
| PROJECT requirements |
| PROJECT SCHEDULE |
| Other PROJECT OPPORTUNITIES |
| Slide Number 34 |
| Aerial View of the Project Site |
| Site Layout |
| General purpose warehouse + Area Maintenance support activity floor plan |
| Renderings |
| Slide Number 39 |
| Ft Hunter-Liggett – New Training Barracks |
| Ft Hunter-Liggett – New Training Barracks |
| QUESTIONS | DISCUSSIONS |
| Directions to SITE VISIT |