W912QR26RA035_Plans-0000.pdf

PDF 3 MB Posted

Attached to
Repair AMSA/ECS- Arden Hills Army Reserve Center, Minnesota
Solicitation number
W912QR26RA035
Issued by

About this file

This is a Phase 1 Advertisement for a federal construction project issued by the US Army Corps of Engineers, Louisville District for the Arden Hills, Minnesota Arden Hills ARC AMSA/ECS facility (Solicitation No. W912QR26RA035, dated 17 April 2026). The project involves comprehensive renovation and modernization of an existing vehicle maintenance facility located at the intersection of Highway 96 W and Lexington Ave N in Arden Hills, Minnesota.

The scope of work includes extensive demolition, structural modifications, and facility upgrades. Demolition activities encompass removal of the existing roof system (membrane, insulation, flashing, coping, gutters, and downspouts), interior and exterior windows and doors including overhead bay doors, all applied floor finishes (carpet, tile, VCT), ACT and gypsum board ceilings, and all fixtures, furniture, and equipment. Structural work requires demolition of structural beams, joists, and metal roof deck in the raised roof area (gridlines 1-3) to accommodate installation of a 10-ton crane. Site improvements include exterior work such as 6-foot chain link fence with barbed wire replacement, concrete panel replacements, dumpster pad installation with wood fence enclosure, fire hydrant service installation, bollard repairs, new bi-level concrete loading ramp construction, and seal coat asphalt repairs. Interior scope includes new metal roof installation with standing seam panels, roof access hatches with stair ladders, exterior brick masonry cleaning with mortar repointing and weep hole restoration, and relocation of MEP (mechanical, electrical, plumbing) and other equipment as necessary to execute the work. The architectural and civil plans provided are conceptual in nature and do not represent full design or layout requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HWY 96 W

LE

XI

N G

TO

N

A

VE

N

I-694

I-3 5W

US-10

MOUNDS VIEW BLVD

PROJECT SITE

SN

EL

LI

N

G A

VE N HWY 96 W

LE

XI

N G

TO

N

A

VE

N

PROJECT SITE

N

IN

NE

R

LO

OP

RD

TOMLYN AVE

SECURE PERIMETER

ENTRY/EXIT POINT

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

NOT FOR

CONSTRUCTIO

N

Au to de sk

D oc s:

//M

R

AR

A M

SA

A rd en

H ills

3/

.0 4-

A- Ar de n

H ills

A R

C A

M

SA

EC

S_

R

.rv t

1/

/2

:4 5:

A

M

G-001

C O

VE

R

S H

EE

T

AR

D

EN

H

IL

LS

, M

IN

N

ES

O

TA

LO

U

IS

VI

LL

E

D

IS

TR

IC

T P.

O . B

O X

L

O U

IS

VI

LL

E, K Y

1-

J.

KO

LS

H

O R

N

H .G

R

AD

Y

T.

FI

N N

EY

S.

D

EG

AR

O

PH

AS

E

AR

D

EN

H

IL

LS

A R

C A

M

SA

/E C

S

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

VOLUME:

M

AR

K D

ES

C

R

IP

TI

O

N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

NOT FOR

CONSTRUCTIO

N

Au to de sk

D oc s:

//M

R

AR

A M

SA

A rd en

H ills

3/

.0 4-

A- Ar de n

H ills

A R

C A

M

SA

EC

S_

R

.rv t

1/

/2

:4 5:

A

M

G-001

C O

VE

R

S H

EE

T

AR

D

EN

H

IL

LS

, M

IN

N

ES

O

TA

LO

U

IS

VI

LL

E

D

IS

TR

IC

T P.

O . B

O X

L

O U

IS

VI

LL

E, K Y

1-

J.

KO

LS

H

O R

N

H .G

R

AD

Y

T.

FI

N N

EY

S.

D

EG

AR

O

AR

D

EN

H

IL

LS

A R

C A

M

SA

/E C

S

LOUISVILLE DISTRICT

ARDEN HILLS, MINNESOTA

ARDEN HILLS ARC AMSA/ECS

PHASE 1

ARCHITECTURE

AD101 DEMOLITION FLOOR PLAN WEST

AD102 DEMOLITION FLOOR PLAN EAST

AD103 DEMOLITION ROOF PLAN WEST

AD104 DEMOLITION ROOF PLAN EAST

A-101 FLOOR PLAN WEST

A-102 FLOOR PLAN EAST

A-103 ROOF PLAN WEST

A-104 ROOF PLAN EAST

CIVIL

V-101 EXISTING CONDITIONS PLAN

C-101 CIVIL LAYOUT PLAN

GENERAL

G-001 COVER SHEET

SCALE: NTS

F1 AREA MAP

SCALE: NTS

F8 VICINITY MAP

PH

AS

E

AD

VE

R

TI

SE

M

EN

T

PHASE 1 ADVERTISEMENT

W

2Q R

R

A0

_P la ns -0

17 April 2026

W912QR26RA035

SITE BM#100

SITE BM#101

SITE BM#102

SITE BM#103

SITE BM#104

P

E E

G

C.O.

E

E

AC

P

DL=

0.2

METAL STORAGE CABINETS

16' OD

16' OD

16' OD

16' OD

METAL

STORAGE

CABINETS

SOLAR PANEL (TYP.)

SOLAR CONTROL BOX

(TYP.)

SOLAR PANEL FOUNDATION

(TYP.)

5 94

3 94

4 94

950951

9932933

946 945

943 941 925

932934

925 92

930933

923 91

8 91 3 91

948948

946945

0 939 93

92692

945949

5 95

HIGHWAY 96 W

LE

XI

N G

TO

N

A

VE

N

LE

XI

N G

TO

N

A

VE

N

METAL STORAGE CABINET

SD

SD SD

SD

SD

SD

SD

SD SD SD SD

SD SD

SD

SD

SD

SD

SD

SD

E E

E E

E E

E E

E E

E E

E

E E

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

AMSA BUILDING

WAREHOUSE BUILDING

GATE

GATE

24" CONC. C&G

24" CONC. C&G

24" CONC. C&G

24" CONC. C&G

24" CONC. C&G

" C

ONC. C

&G

" C

ONC. C

&G

6' CHAIN LINK FENCE W/ BARBED WIRE

6' CHAIN LINK FENCE W/ BARBED WIRE

6' CHAIN LINK FENCE W/ BARBED WIRE

6' C

H

AI

N L

IN

K

FE

N

C E

W / B

AR

BE

D W

IR

E

6' C

H

AI

N L

IN

K

FE

N

C E

W / B

AR

BE

D W

IR

E

16' OD

2x3' DOOR

' O

D

3' D

O O

R

' O

D

' O

D

' O

D

' O

D

3' D

O O

R

2x 3'

D O

O R

3' D

O O

R

' O

D

' O

D

' O

D

3' D

O O

R

2x3' DOOR

3' D

O O

R

' O

D

' O

D

3' D

O O

R

3' D

O O

R

2x 3'

D O

O R

3' D

O O

R

3' D

O O

R

' O

D

' O

D

' O

D

' O

D

' O

D

3' D

O O

R

2x3' DOOR 2x3' DOOR

2x3' DOOR3' D

O O

R

2x 3'

DOOR16

' O

D

16' OD

16' OD

16' OD

16' OD

16' OD

2x3' DOOR

3' DOOR16' OD16' OD

16' OD3' DOOR

' O

D 2x

3'

DOOR

2x 3'

DOOR

2x

3'

DOOR

2x 3'

DOOR

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SD

W

W

W

W

W

W

W

W

W

W

W W W W W W W W W W

W

W

WWW

SAN

SAN

SAN

SAN

SA

N

SA

N

W W

' O

D

O

VH

G

O

VH

G

OVHG

OVHG

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

G R

AS

S

W

AS

H P

LA

TF

O R

M D

R

AI

N S

24" CONC. C&G

24" CONC. C&G

RIP RAP

RIP RAP

" C

O N

C . C

&G

SD

W

G R

AS

S

G R

AS

S

1 STORY BRICK BLDG.

1 STORY BRICK BLDG.

CB

W W

W

W W W W W W W W W W

W W

W W

W W

W

W W

W W

W W

W W

6'

CHAI

N LI

NK

FE

NCE

W / B

AR

BE

D W

IR

E

6' CHAIN LINK

FENCE W/

BARBED WIRE

6' CHAIN LINK FENCE W/ BARBED WIRE

AVG. FINISH FLOOR = 945.69

AVG. FINISH FLOOR = 949.67

M

EP

P

AR

KI

N

G

6' C

H

AI

N L

IN

K

FE

N

C E

W / B

AR

BE

D W

IR

E

WOODSWOODS

WOODS

WOODS

GRASS

6' CHAIN LINK FENCE W/ BARBED WIRE

SD

24" CONC. C&G

GRASS

GRASS

CB

CB CB

CB CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

6 5

4 3

CB

S

S S

S

S

G

AT

E

PAINT STRIPING (TYP.)

M

EP

P

AR

KI

N

G

M

EP

P

AR

KI

N

G M

EP

P

AR

KI

N G

M

EP

P

AR

KI

N

G M

EP

P

AR

KI

N G

M

EP

P

AR

KI

N

G

PAINT STRIPING (TYP.)

M

EP

P

AR

KI

N G

M

EP

P

AR

KI

N

G

M

EP

P

AR

KI

N

G M

EP

P

AR

KI

N G

M

EP

P

AR

KI

N

G M

EP

P

AR

KI

N G

M

EP

P

AR

KI

N

G

M

EP

P

AR

KI

N

G

M

EP

P

AR

KI

N

G

M

EP

P

AR

KI

N

G

MEP PARKING

MEP PARKING

SI

D

EW

AL

K

EXISTING ARC SIGN

EXISTING ARC SIGN

EXISTING ARC SIGN

SIDEWALK

PEDESTRIAN GATE

PEDESTRIAN GATE

EXISTING LEGEND

CO

C

E

E

G

G

S

D

U

U

ASPHALT

PIV

FDC

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

837.50

CONCRETE PAVEMENT

GAS

E E E E UNDERGROUND ELECTRIC

ES ES ES ES SECONDARY UNDERGROUND ELECTRIC

FENCE

SAN SAN SANITARY SEWER

SD SD STORM DRAIN

W W W W WATER MAIN

W

CB

SURVEYOR NOTES - (SURVEY PERFORMED BY SPALDING DeDECKER)

1. THIS TOPOGRAPHICAL MAP IS BASED UPON A FIELD SURVEY PERFORMED BY

SPALDING DEDECKER DURING NOVEMBER OF 2025.

2. NO BOUNDARY SURVEYING WORK WAS PERFORMED FOR THIS PROJECT AND

NO PROPERTY LINES ARE SHOWN ON THIS TOPOGRAPHICAL SURVEY FOR THE

SUBJECT LANDS. A COMPLETE PROPERTY LINE ANALYSIS IS NOT PART OF THE

SCOPE OF SERVICES AND PROPERTY CORNERS HAVE NOT BEEN SET IN THE

FIELD.

3. THIS SURVEY HAS BEEN PREPARED WITHOUT THE BENEFIT OF A CURRENT

TITLE SEARCH THAT WOULD IDENTIFY ANY RECORDED EASEMENTS THAT

ENCUMBER THIS PROPERTY. THEREFORE, THIS PROPERTY MAY BE SUBJECT

TO EASEMENTS, RIGHT-OF-WAY TAKINGS AND RESTRICTIVE COVENANTS THAT

ARE NOT SHOWN.

4. THE BASIS OF BEARINGS AND THE COORDINATE SYSTEM FOR THIS SURVEY IS

BASED UPON THE STATE PLANE COORDINATE SYSTEM, MINNESOTA SOUTH

ZONE, BASED ON NAD83 (NSRS2011). UNITS ARE US SURVEY FOOT.

COORDINATES WERE ESTABLISHED USING A DATA LINK TO THE MNDOT

CONTINUOUSLY OPERATING REFERENCE STATIONS (CORS).

5. THE VERTICAL DATUM OF THIS SURVEY IS BASED UPON THE NORTH AMERICAN

VERTICAL DATUM OF 1988 (NAVD'88) AS ESTABLISHED WITH RTK GPS

MEASUREMENTS USING A DATA LINK TO THE MNDOT CONTINUOUSLY

OPERATING REFERENCE STATIONS (CORS).

6. THE PAINT STRIPING SHOWN ON THIS SURVEY IS APPROXIMATE. DIMENSIONAL

AND/OR ORIENTATION VARIATIONS MAY EXIST. THIS DRAWING SHOULD NOT BE

USED FOR A PARKING SPACE COUNT.

7. THE UTILITY INFORMATION SHOWN ON THIS SURVEY IS BASED UPON A

COMBINATION OF RECORD INFORMATION AND FIELD MEASUREMENTS. A MISS

DIG DESIGN TICKET NUMBER OF MN253180587, REQUESTED ON 11-14-2025, HAS

BEEN REFERENCED TO THIS PROJECT AND A UTILITY PROVIDER CHART IS

SHOWN ON THIS DRAWING. THERE ARE NO ASSURANCES THAT ALL PROVIDERS

HAVE RESPONDED AND THE SURVEYOR DOES NOT GUARANTEE THAT ALL

UNDERGROUND UTILITIES ARE SHOWN AND/OR POSITIONED PROPERLY ON

THIS DRAWING DUE TO AMBIGUOUS PLANS AND RECORDS PROVIDED TO US.

THE INFORMATION SHOWN ON THIS DRAWING IS INTENDED TO BE USED AS A

GUIDE FOR POSSIBLE UNDERGROUND UTILITY CONFLICTS. IT IS THE

RESPONSIBILITY OF OTHERS TO RESOLVE THE ACTUAL LOCATION OF ANY

UNDERGROUND UTILITY THROUGH THE GOPHER STATE ONE CALL SYSTEM

PRIOR TO ANY SITE EXCAVATION. CALL 811 OR 800-252-1166.

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

PL

AN

60' 120'

SCALE: 1 INCH = 60 FEET

30'60' 0'A1 EXISTING CONDITIONS PLAN

SCALE: 1" = 60'

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S:

\3

7\

6\

3\

_C

AD

\C

IV

L\

PL

O

T\

3_ V-

1.

dw g

1/

/2

3:

:1

PM

AR

D

EN

H

IL

LS

, M

IN

N

ES

O

TA

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

K

IN

G

J R

P L

LO

U

IS

VI

LL

E, K Y

S.

S

C H

U

LT

Z

A.

W

EB

ER

T.

F

IN

N

EY

S.

S

C H

U

LT

Z

JA

N

U

AR

Y

C H

AR

R

ET

TE

VE

H

IC

LE

M

AI

N

TE

N

AN

C E

FA

C

IL

IT

Y

V-101

PH

AS

E

AD

VE

R

TI

SE

M

EN

T

W

2Q R

R

A0

_P la ns -0

SITE BM#100

SITE BM#101

SITE BM#102

SITE BM#103

SITE BM#104

P

G

C.O.

E

E

AC

P

DL=

0.2

METAL STORAGE CABINETS

16' OD

16' OD

16' OD

16' OD

METAL

STORAGE

CABINETS

SOLAR PANEL (TYP.)

SOLAR CONTROL BOX

(TYP.)

SOLAR PANEL FOUNDATION

(TYP.)

5 94

3 94

4 94

950951

9932933

946 945

943 941 925

932934

925 92

930933

923 91

8 91 3 91

948948

946945

0 939 93

92692

945949

5 95

HIGHWAY 96 W

LE

XI

N G

TO

N

A

VE

N

LE

XI

N G

TO

N

A

VE

N

METAL STORAGE CABINET

SD

SD SD

SD

SD

SD

SD

SD SD SD SD

SD SD

SD

SD

SD

SD

SD

SD

E E

E E

E E

E E

E E

E E

E

E E

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

AMSA BUILDING

WAREHOUSE BUILDING

24" CONC. C&G

24" CONC. C&G

24" CONC. C&G

24" CONC. C&G

24" CONC. C&G

" C

ONC. C

&G

" C

ONC. C

&G

16' OD

2x3' DOOR

' O

D

3' D

O O

R

' O

D

' O

D

' O

D

' O

D

3' D

O O

R

2x 3'

D O

O R

3' D

O O

R

' O

D

' O

D

' O

D

3' D

O O

R

2x3' DOOR

3' D

O O

R

' O

D

' O

D

3' D

O O

R

3' D

O O

R

2x 3'

D O

O R

3' D

O O

R

3' D

O O

R

' O

D

' O

D

' O

D

' O

D

' O

D

3' D

O O

R

2x3' DOOR 2x3' DOOR

2x3' DOOR3' D

O O

R

2x 3'

DOOR16

' O

D

16' OD

16' OD

16' OD

16' OD

16' OD

2x3' DOOR

3' DOOR16' OD16' OD

16' OD3' DOOR

' O

D 2x

3'

DOOR

2x 3'

DOOR

2x

3'

DOOR

2x 3'

DOOR

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SD

W

W

W

W

W

W

W

W

W

W

W W W W W W W W W W

W

W

WWW

SAN

SAN

SAN

SAN

SA

N

SA

N

W W

' O

D

O

VH

G

O

VH

G

OVHG

OVHG

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

G R

AS

S

W

AS

H P

LA

TF

O R

M D

R

AI

N S

24" CONC. C&G

24" CONC. C&G

RIP RAP

RIP RAP

" C

O N

C . C

&G

SD

W

G R

AS

S

G R

AS

S

1 STORY BRICK BLDG.

1 STORY BRICK BLDG.

CB

W W

W

W W W W W W W W W W

W W

W W

W W

W

W W

W W

W W

W W

6'

CHAI

N LI

NK

FE

NCE

W / B

AR

BE

D W

IR

E

AVG. FINISH FLOOR = 945.69

AVG. FINISH FLOOR = 949.67

M

EP

P

AR

KI

N

G

WOODSWOODS

WOODS

WOODS

GRASS

SD

24" CONC. C&G

GRASS

GRASS

CB

CB CB

CB CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

6 5

4 3

CB

S

S S

S

S

G

AT

E

PAINT STRIPING (TYP.)

M

EP

P

AR

KI

N

G

M

EP

P

AR

KI

N

G M

EP

P

AR

KI

N G

M

EP

P

AR

KI

N

G M

EP

P

AR

KI

N G

M

EP

P

AR

KI

N

G

PAINT STRIPING (TYP.)

M

EP

P

AR

KI

N G

M

EP

P

AR

KI

N

G

M

EP

P

AR

KI

N

G M

EP

P

AR

KI

N G

M

EP

P

AR

KI

N

G M

EP

P

AR

KI

N G

M

EP

P

AR

KI

N

G

M

EP

P

AR

KI

N

G

M

EP

P

AR

KI

N

G

M

EP

P

AR

KI

N

G

MEP PARKING

MEP PARKING

SI

D

EW

AL

K

SIDEWALK

xxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxx x x x x

W W

W

WWWWWWW

W

W W

WW

W W W

PROPOSED LEGEND

PROPOSED CONCRETE PANEL

REPLACEMENT (SEE DETAIL M1/C-503)

SITE KEYNOTES

PEDESTRIAN GATE (SEE DETAIL A1/C-502)

FE6-TR-84 CHAINLINK SECURITY FENCE REPLACEMENT (7'

FABRIC HEIGHT) AND 3' WIDE GRAVEL MOW STRIP. PROVIDE 10'

CLEAR SPACE ON EACH SIDE OF FENCE AND KEEP CLEAR OF

ALL TREES, POLES, AND OTHER OBSTRUCTIONS. (SEE DETAILS

A1/C-501 AND M1/C-503)

REPLACE CONCRETE PANEL (SEE DETAIL M1/C-503)

8" HDPE STORM PIPE AND DOWNSPOUT BOOT

VEHICLE ROLLING GATE (SEE DETAIL A/1 C-503)

VEHICLE SWING GATE (SEE DETAIL A1/C-502)

NEW BI-LEVEL CONCRETE LOADING RAMP (SEE DETAILS ON

SHEET C-506)

REPAIR CONCRETE DOME AND NEW YELLOW PLASTIC SLEEVE

ON BOLLARD

6" FIRE HYDRANT WATER SERVICE

FIRE HYDRANT AND VALVE (SEE DETAIL A8/C-504)

15' X 20' DUMPSTER PAD WITH SLATTED WOOD FENCE

ENCLOSURE. PROVIDE 10' CONCRETE APRON IN FRONT. (SEE

DETAIL M6/C-503)

NEW ARMY RESERVE METAL SIGN

NEW ARMY RESERVE MONUMENT SIGN

GENERAL NOTES

1. CONTRACTOR TO REPLACE ANY PAVEMENT MARKINGS REMOVED

DURING INSTALLATION OF SIDEWALK, CURB AND GUTTER, AND

PAVEMENT.

2. ALL BOLD ITEMS ARE PROPOSED UNLESS NOTED OTHERWISE.

3. UNDERGROUND UTILITIES WERE LOCATED USING EXISTING DRAWINGS,

GIS DATA, AND FIELD MARKINGS. UTILITY LOCATIONS SHALL BE

VERIFIED PRIOR TO CONSTRUCTION.

4. RESTORE PAVEMENT AND REPAIR TRENCHES TO PRE-CONSTRUCTION

CONDITION OR BETTER ONCE CONSTRUCTION IS COMPLETE.

5. REPAIR ANY DAMAGES CAUSED BY CONSTRUCTION ACTIVITY.

x PROPOSED FENCE REPLACEMENT

PROPOSED SEAL COAT ASPHALT REPAIR

PROPOSED 6" FIRE HYDRANT SERVICE

PROPOSED FIRE HYDRANT

W

BOLLARD REPAIR (TYPICAL ALL BOLLARDS

AROUND AMSA BUILDING)

C

IV

IL

L

AY

O

U T

PL

AN

60' 120'

SCALE: 1 INCH = 60 FEET

30'60' 0'A1 CIVIL LAYOUT PLAN

SCALE: 1" = 60'

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S:

\3

7\

6\

3\

_C

AD

\C

IV

L\

PL

O

T\

3_ C

-1

.d w g 1/

/2

3:

:0

PM

AR

D

EN

H

IL

LS

, M

IN

N

ES

O

TA

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

K

IN

G

J R

P L

LO

U

IS

VI

LL

E, K Y

S.

S

C H

U

LT

Z

A.

W

EB

ER

T.

F

IN

N

EY

S.

S

C H

U

LT

Z

JA

N

U

AR

Y

C H

AR

R

ET

TE

VE

H

IC

LE

M

AI

N

TE

N

AN

C E

FA

C

IL

IT

Y

C-101

3 TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

9 9

10'

10' CLEAR SPACE

10' CLEAR SPACE

15'15'

CONNECT NEW

FENCE TO EXISTING

GATE

REPLACE FENCE 2'

INSIDE EXISTING

FENCE TO KEEP

SECURITY DURING

CONSTRUCTION

REPLACE FENCE 2' INSIDE EXISTING

FENCE (OR ALONG THE SAME

ALIGNMENT WITH TEMPORARY

SECURITY FENCE) TO MAINTAIN

SECURITY DURING CONSTRUCTION

RECONNECT NEW

FENCE TO OLD FENCE

TO ENCLOSE PROPERTY

TO THE NORTH

REPLACE FENCE ALONG THE SAME

ALIGNMENT WITH TEMPORARY

SECURITY FENCE TO MAINTAIN

SECURITY DURING CONSTRUCTION

PH

AS

E

AD

VE

R

TI

SE

M

EN

T

W

2Q R

R

A0

_P la ns -0

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

PAINT BOOTH

SMALL ARMS REPAIR

AR

M

S

VA

U

LT

ELEC

CLST

WELDING ROOM

TOOLS

PARTS

CAGE

TOOLS

PARTS

CAGE

TOOLS

PARTS

CAGE

TOOLS

PARTS

CAGE

AMSA

WORKBAY

AMSA

WORKBAY

AMSA

WORKBAY

AMSA

WORKBAY

AMSA

WORKBAY

AMSA

WORKBAY

AMSA

WORKBAY

AMSA

WORKBAY

AMSA

WORKBAY

AMSA

WORKBAY

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

DEMOLITION PLAN IS CONCEPTUAL AND FOR REFERENCE ONLY. IT DOES NOT

REPRESENT FULL DEMOLITION REQUIREMENTS OF FINAL DESIGN OR LAYOUT.

RELOCATION OF MEP AND OTHER EQUIPMENT AS NECESSARY TO EXECUTE THE

SCOPE OF WORK SHALL BE CONSIDERED INCLUDED WORK IN ANY BID

SUBMITTAL, UNO.

REFER TO A-101 AND A-102 TO COORDINATE EXTENTS OF DEMOLITION WITH

PROPOSED NEW CONSTRUCTION.

ROOM NUMBERS INDICATED ARE FOR COORDINATION ONLY.

DASHED LINES INDICATE EXTENTS OF WORK TO BE DEMOLISHED.

EXISTING ROOF SYSTEM, INCLUDING ROOF MEMBRANE, INSULATION, FLASHING,

COPING, GUTTER AND DOWNSPOUTS, TO BE REMOVED IN ITS ENTIRETY DOWN

TO METAL ROOF DECK.

AREA OF RAISED ROOF FROM GRIDLINES 1-3 REQUIRE DEMOLITION OF

STRUCTURAL BEAMS, JOISTS, AND METAL ROOF DECK IN ORDER TO INSTALL 10-

TON CRANE.

ALL INTERIOR AND EXTERIOR WINDOWS AND DOORS ARE TO BE REMOVED,

INCLUDING OVERHEAD BAY DOORS.

ALL APPLIED FLOOR FINISHES INCLUDING CARPET, TILE AND VCT, ARE TO BE

REMOVED.

ALL ACT AND GYP BD CEILINGS ARE TO BE REMOVED.

ALL FIXTURES, FURNITURE & EQUIPMENT (FF&E) INCLUDING CAGING, LIGHT

FIXTURES, ETC. ARE TO BE REMOVED.

DEMOLITION GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

NOT FOR

CONSTRUCTIO

N

Au to de sk

D oc s:

//M

R

AR

A M

SA

A rd en

H ills

3/

.0 4-

A- Ar de n

H ills

A R

C A

M

SA

EC

S_

R

.rv t

1/ 7/

2:

:1

PM

AD101

D

EM

O

LI

TI

O

N F

LO

O

R P

LA

N

W

ES

T

AR

D

EN

H

IL

LS

, M

IN

N

ES

O

TA

LO

U

IS

VI

LL

E

D

IS

TR

IC

T P.

O . B

O X

L

O U

IS

VI

LL

E, K Y

1-

J.

K

O

LS

H O

R N

H . G

R

AD

Y

T.

F

IN

N

EY

S.

D

EG

AR

O

C H

AR

R

ET

TE

AR

D

EN

H

IL

LS

A R

C A

M

SA

EC

S

Pr oj ec t N um be r

SCALE: 3/32" = 1'-0"

A1 DEMOLITION FLOOR PLAN WEST

PLAN NORTH

0 4' 8' 16'FIRST FLOOR KEY PLAN

PH

AS

E

AD

VE

R

TI

SE

M

EN

T

W

2Q R

R

A0

_P la ns -0

11 12 13 14 15 16 17 18 19 20

B

C

D

E

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

ELEC. FLAM .

STOR.

FLAM .

STOR.

FLAM .

STOR.

MECH.

TELE.

JAN.

BATTERY

STORAGE

BATTERY

STORAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

UNIT

CAGE

OFFICE OFFICE

OFFICEOFFICEOFFICEOFFICEOFFICEOFFICEOFFICE

OFFICE

OFFICEOFFICELIBRARYLIBRARY

OFFICE

COMMON

OFFICE

COMMON

ELEC.

CLST.

VMS

WORKBAY

VMS

WORKBAY

VMS

WORKBAY

VMS

WORKBAY

VMS

WORKBAY

VEST.

ELEC.

CLST.

MEN'S

RR

WOMEN'S

RR

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

DEMOLITION PLAN IS CONCEPTUAL AND FOR REFERENCE ONLY. IT DOES NOT

REPRESENT FULL DEMOLITION REQUIREMENTS OF FINAL DESIGN OR LAYOUT.

RELOCATION OF MEP AND OTHER EQUIPMENT AS NECESSARY TO EXECUTE THE

SCOPE OF WORK SHALL BE CONSIDERED INCLUDED WORK IN ANY BID

SUBMITTAL, UNO.

REFER TO A-101 AND A-102 TO COORDINATE EXTENTS OF DEMOLITION WITH

PROPOSED NEW CONSTRUCTION.

ROOM NUMBERS INDICATED ARE FOR COORDINATION ONLY.

DASHED LINES INDICATE EXTENTS OF WORK TO BE DEMOLISHED.

EXISTING ROOF SYSTEM, INCLUDING ROOF MEMBRANE, INSULATION, FLASHING,

COPING, GUTTER AND DOWNSPOUTS, TO BE REMOVED IN ITS ENTIRETY DOWN

TO METAL ROOF DECK.

AREA OF RAISED ROOF FROM GRIDLINES 1-3 REQUIRE DEMOLITION OF

STRUCTURAL BEAMS, JOISTS, AND METAL ROOF DECK IN ORDER TO INSTALL 10-

TON CRANE.

ALL INTERIOR AND EXTERIOR WINDOWS AND DOORS ARE TO BE REMOVED,

INCLUDING OVERHEAD BAY DOORS.

ALL APPLIED FLOOR FINISHES INCLUDING CARPET, TILE AND VCT, ARE TO BE

REMOVED.

ALL ACT AND GYP BD CEILINGS ARE TO BE REMOVED.

ALL FIXTURES, FURNITURE & EQUIPMENT (FF&E) INCLUDING CAGING, LIGHT

FIXTURES, ETC. ARE TO BE REMOVED.

DEMOLITION GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

NOT FOR

CONSTRUCTIO

N

Au to de sk

D oc s:

//M

R

AR

A M

SA

A rd en

H ills

3/

.0 4-

A- Ar de n

H ills

A R

C A

M

SA

EC

S_

R

.rv t

1/ 7/

2:

:1

PM

AD102

D

EM

O

LI

TI

O

N F

LO

O

R P

LA

N

E

AS

T

AR

D

EN

H

IL

LS

, M

IN

N

ES

O

TA

LO

U

IS

VI

LL

E

D

IS

TR

IC

T P.

O . B

O X

L

O U

IS

VI

LL

E, K Y

1-

J.

K

O

LS

H O

R N

H . G

R

AD

Y

T.

F

IN

N

EY

S.

D

EG

AR

O

C H

AR

R

ET

TE

AR

D

EN

H

IL

LS

A R

C A

M

SA

EC

S

Pr oj ec t N um be r

SCALE: 3/32" = 1'-0"

A1 DEMOLITION FLOOR PLAN EAST

PLAN NORTH

0 4' 8' 16'FIRST FLOOR KEY PLAN

PH

AS

E

AD

VE

R

TI

SE

M

EN

T

W

2Q R

R

A0

_P la ns -0

B

C

D

E

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

DEMOLITION PLAN IS CONCEPTUAL AND FOR REFERENCE ONLY. IT DOES NOT

REPRESENT FULL DEMOLITION REQUIREMENTS OF FINAL DESIGN OR LAYOUT.

RELOCATION OF MEP AND OTHER EQUIPMENT AS NECESSARY TO EXECUTE THE

SCOPE OF WORK SHALL BE CONSIDERED INCLUDED WORK IN ANY BID

SUBMITTAL, UNO.

REFER TO A-101 AND A-102 TO COORDINATE EXTENTS OF DEMOLITION WITH

PROPOSED NEW CONSTRUCTION.

ROOM NUMBERS INDICATED ARE FOR COORDINATION ONLY.

DASHED LINES INDICATE EXTENTS OF WORK TO BE DEMOLISHED.

EXISTING ROOF SYSTEM, INCLUDING ROOF MEMBRANE, INSULATION, FLASHING,

COPING, GUTTER AND DOWNSPOUTS, TO BE REMOVED IN ITS ENTIRETY DOWN

TO METAL ROOF DECK.

AREA OF RAISED ROOF FROM GRIDLINES 1-3 REQUIRE DEMOLITION OF

STRUCTURAL BEAMS, JOISTS, AND METAL ROOF DECK IN ORDER TO INSTALL 10-

TON CRANE.

ALL INTERIOR AND EXTERIOR WINDOWS AND DOORS ARE TO BE REMOVED,

INCLUDING OVERHEAD BAY DOORS.

ALL APPLIED FLOOR FINISHES INCLUDING CARPET, TILE AND VCT, ARE TO BE

REMOVED.

ALL ACT AND GYP BD CEILINGS ARE TO BE REMOVED.

ALL FIXTURES, FURNITURE & EQUIPMENT (FF&E) INCLUDING CAGING, LIGHT

FIXTURES, ETC. ARE TO BE REMOVED.

DEMOLITION GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

NOT FOR

CONSTRUCTIO

N

Au to de sk

D oc s:

//M

R

AR

A M

SA

A rd en

H ills

3/

.0 4-

A- Ar de n

H ills

A R

C A

M

SA

EC

S_

R

.rv t

1/ 7/

2:

:1

PM

AD103

D

EM

O

LI

TI

O

N R

O O

F

PL

AN

W

ES

T

AR

D

EN

H

IL

LS

, M

IN

N

ES

O

TA

LO

U

IS

VI

LL

E

D

IS

TR

IC

T P.

O . B

O X

L

O U

IS

VI

LL

E, K Y

1-

J.

K

O

LS

H O

R N

H . G

R

AD

Y

T.

F

IN

N

EY

S.

D

EG

AR

O

C H

AR

R

ET

TE

AR

D

EN

H

IL

LS

A R

C A

M

SA

EC

S

Pr oj ec t N um be r

SCALE: 3/32" = 1'-0"

A1 DEMOLITION ROOF PLAN WEST

PLAN NORTH

0 4' 8' 16'FIRST FLOOR KEY PLAN

PH

AS

E

AD

VE

R

TI

SE

M

EN

T

W

2Q R

R

A0

_P la ns -0

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

DEMOLITION PLAN IS CONCEPTUAL AND FOR REFERENCE ONLY. IT DOES NOT

REPRESENT FULL DEMOLITION REQUIREMENTS OF FINAL DESIGN OR LAYOUT.

RELOCATION OF MEP AND OTHER EQUIPMENT AS NECESSARY TO EXECUTE THE

SCOPE OF WORK SHALL BE CONSIDERED INCLUDED WORK IN ANY BID

SUBMITTAL, UNO.

REFER TO A-101 AND A-102 TO COORDINATE EXTENTS OF DEMOLITION WITH

PROPOSED NEW CONSTRUCTION.

ROOM NUMBERS INDICATED ARE FOR COORDINATION ONLY.

DASHED LINES INDICATE EXTENTS OF WORK TO BE DEMOLISHED.

EXISTING ROOF SYSTEM, INCLUDING ROOF MEMBRANE, INSULATION, FLASHING,

COPING, GUTTER AND DOWNSPOUTS, TO BE REMOVED IN ITS ENTIRETY DOWN

TO METAL ROOF DECK.

AREA OF RAISED ROOF FROM GRIDLINES 1-3 REQUIRE DEMOLITION OF

STRUCTURAL BEAMS, JOISTS, AND METAL ROOF DECK IN ORDER TO INSTALL 10-

TON CRANE.

ALL INTERIOR AND EXTERIOR WINDOWS AND DOORS ARE TO BE REMOVED,

INCLUDING OVERHEAD BAY DOORS.

ALL APPLIED FLOOR FINISHES INCLUDING CARPET, TILE AND VCT, ARE TO BE

REMOVED.

ALL ACT AND GYP BD CEILINGS ARE TO BE REMOVED.

ALL FIXTURES, FURNITURE & EQUIPMENT (FF&E) INCLUDING CAGING, LIGHT

FIXTURES, ETC. ARE TO BE REMOVED.

DEMOLITION GENERAL NOTES

10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

NOT FOR

CONSTRUCTIO

N

Au to de sk

D oc s:

//M

R

AR

A M

SA

A rd en

H ills

3/

.0 4-

A- Ar de n

H ills

A R

C A

M

SA

EC

S_

R

.rv t

1/ 7/

2:

:1

PM

AD104

D

EM

O

LI

TI

O

N R

O O

F

PL

AN

E

AS

T

AR

D

EN

H

IL

LS

, M

IN

N

ES

O

TA

LO

U

IS

VI

LL

E

D

IS

TR

IC

T P.

O . B

O X

L

O U

IS

VI

LL

E, K Y

1-

J.

K

O

LS

H O

R N

H . G

R

AD

Y

T.

F

IN

N

EY

S.

D

EG

AR

O

C H

AR

R

ET

TE

AR

D

EN

H

IL

LS

A R

C A

M

SA

EC

S

Pr oj ec t N um be r

PLAN NORTH

0 4' 8' 16'FIRST FLOOR KEY PLAN

SCALE: 3/32" = 1'-0"

A1 DEMOLITION ROOF PLAN EAST

PH

AS

E

AD

VE

R

TI

SE

M

EN

T

W

2Q R

R

A0

_P la ns -0

B

C

D

E

AR

M

S

SH

O P

AR

M

S

VA

U

LT

2A

EL

EC

S H

O P

COMSEC

AMSA TOOLS

AMSA PARTS

PO

L

PO

L

PO

L

PO

L

PO

L

PO

L

PO

L

PO

L

PO

L

PO

L

PO

L

PO

L

PO

L

PO

L

STOR.

AMSA WORKBAYS

108AMSA WORKBAY

WORKBAY

BAY 1

WORKBAY

BAY 2

WORKBAY

BAY 3

WORKBAY

BAY 4

WORKBAY

BAY 5

WORKBAY

BAY 6

WORKBAY

BAY 12

WORKBAY

BAY 11

WORKBAY

BAY 10

WORKBAY

BAY 9

WORKBAY

BAY 8

WORKBAY

BAY 7

AL

C

O

VE

AL

C

O

VE

1.

2.

3.

4.

5.

6.

7.

8.

PLAN IS CONCEPTUAL AND FOR REFERENCE ONLY. IT DOES NOT REPRESENT

FULL REQUIREMENTS OF FINAL DESIGN OR LAYOUT.

RELOCATION OF MEP AND OTHER EQUIPMENT AS NECESSARY TO EXECUTE THE

SCOPE OF WORK SHALL BE CONSIDERED INCLUDED WORK IN ANY BID

SUBMITTAL, UNO.

REFER TO A-101 AND A-102 TO COORDINATE EXTENTS OF DEMOLITION WITH

PROPOSED NEW CONSTRUCTION.

ROOM NUMBERS INDICATED ARE FOR COORDINATION ONLY.

ALL EXTERIOR BRICK MASONRY SURFACES WILL BE CLEANED. ANY BROKEN OR

LOOSE MASONRY OR MORTAR WILL BE REPAIRED OR REPLACED, AND THE

JOINTS WILL BE REPOINTED. WEEPS WILL BE CLEANED OR OTHERWISE

REPLACED TO ENSURE PROPER DRAINAGE.

COVER EXISTING SKYLIGHTS WITH STANDING SEAM ROOF PANELS.

INSTALL RAISED ROOF FROM GRIDLINES 1-3 IN ORDER TO INSTALL 10-TON

CRANE.

INSTALL TWO NEW ROOF ACCESS HATCHES WITH STAIR LADDERS.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

NOT FOR

CONSTRUCTIO

N

Au to de sk

D oc s:

//M

R

AR

A M

SA

A rd en

H ills

3/

.0 4-

A- Ar de n

H ills

A R

C A

M

SA

EC

S_

R

.rv t

1/ 7/

2:

:1

PM

A-101

FL

O

O R

P

LA

N W

ES

T

AR

D

EN

H

IL

LS

, M

IN

N

ES

O

TA

LO

U

IS

VI

LL

E

D

IS

TR

IC

T P.

O . B

O X

L

O U

IS

VI

LL

E, K Y

1-

J.

K

O

LS

H O

R N

H . G

R

AD

Y

T.

F

IN

N

EY

S.

D

EG

AR

O

C H

AR

R

ET

TE

AR

D

EN

H

IL

LS

A R

C A

M

SA

EC

S

Pr oj ec t N um be r

PLAN NORTH

0 4' 8' 16'SCALE: 3/32" = 1'-0"

A1 FIRST FLOOR PLAN WEST

FIRST FLOOR KEY PLAN

PH

AS

E

AD

VE

R

TI

SE

M

EN

T

W

2Q R

R

A0

_P la ns -0

B

C

D

E

ELEC.

STOR.

FLAM. STOR.

FLUID DIST.

MECH.

BREAKRM

104 CLASSROOM

JAN.

SHOP OFFICE

LIB.

107B

SPLY SGT

101E

ARA FTUS

101D

1SG TPU

101C

COMMON

CO. COMM. TPU

101F

SHOP OFFICE

VMS TR

M

AI

N T.

O

FF

4B

M

AI

N T.

O

FF

4C

M RR

M SHWRS

119B

W RR

W SHWRS

120B

FT MAINT ADMIN

124D

PO

L

W LCKRS

120A

M LCKRS

119A

322 T&P

VMS T&P

STOR.

124E

M O

TO

R

S G

T

1B

M

AI

N T.

O

FF

1A

PO

L

PO

L

PO

L

PO

L

STOR.

VEST.

STOR.

103A

STOR.

104A

STOR.

124A

VMS WORKBAYS

WORKBAY

BAY 5

WORKBAY

BAY 4

WORKBAY

BAY 3

WORKBAY

BAY 2

WORKBAY

BAY 1

C O

N T.

W

AS

TE

S

TO

R

VEST.

108A

VEST.

122A

BATT.

AMSA TELE.

SHOP SUP

107A

AL

C

O

VE

1.

2.

3.

4.

5.

6.

7.

8.

PLAN IS CONCEPTUAL AND FOR REFERENCE ONLY. IT DOES NOT REPRESENT

FULL REQUIREMENTS OF FINAL DESIGN OR LAYOUT.

RELOCATION OF MEP AND OTHER EQUIPMENT AS NECESSARY TO EXECUTE THE

SCOPE OF WORK SHALL BE CONSIDERED INCLUDED WORK IN ANY BID

SUBMITTAL, UNO.

REFER TO A-101 AND A-102 TO COORDINATE EXTENTS OF DEMOLITION WITH

PROPOSED NEW CONSTRUCTION.

ROOM NUMBERS INDICATED ARE FOR COORDINATION ONLY.

ALL EXTERIOR BRICK MASONRY SURFACES WILL BE CLEANED. ANY BROKEN OR

LOOSE MASONRY OR MORTAR WILL BE REPAIRED OR REPLACED, AND THE

JOINTS WILL BE REPOINTED. WEEPS WILL BE CLEANED OR OTHERWISE

REPLACED TO ENSURE PROPER DRAINAGE.

COVER EXISTING SKYLIGHTS WITH STANDING SEAM ROOF PANELS.

INSTALL RAISED ROOF FROM GRIDLINES 1-3 IN ORDER TO INSTALL 10-TON

CRANE.

INSTALL TWO NEW ROOF ACCESS HATCHES WITH STAIR LADDERS.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

NOT FOR

CONSTRUCTIO

N

Au to de sk

D oc s:

//M

R

AR

A M

SA

A rd en

H ills

3/

.0 4-

A- Ar de n

H ills

A R

C A

M

SA

EC

S_

R

.rv t

1/ 7/

2:

:2

PM

A-102

FL

O

O R

P

LA

N E

AS

T

AR

D

EN

H

IL

LS

, M

IN

N

ES

O

TA

LO

U

IS

VI

LL

E

D

IS

TR

IC

T P.

O . B

O X

L

O U

IS

VI

LL

E, K Y

1-

J.

K

O

LS

H O

R N

H . G

R

AD

Y

T.

F

IN

N

EY

S.

D

EG

AR

O

C H

AR

R

ET

TE

AR

D

EN

H

IL

LS

A R

C A

M

SA

EC

S

Pr oj ec t N um be r

SCALE: 3/32" = 1'-0"

A1 FIRST FLOOR PLAN EAST

PLAN NORTH

0 4' 8' 16'FIRST FLOOR KEY PLAN

PH

AS

E

AD

VE

R

TI

SE

M

EN

T

W

2Q R

R

A0

_P la ns -0

B

C

D

E

1.

2.

3.

4.

5.

6.

7.

8.

PLAN IS CONCEPTUAL AND FOR REFERENCE ONLY. IT DOES NOT REPRESENT

FULL REQUIREMENTS OF FINAL DESIGN OR LAYOUT.

RELOCATION OF MEP AND OTHER EQUIPMENT AS NECESSARY TO EXECUTE THE

SCOPE OF WORK SHALL BE CONSIDERED INCLUDED WORK IN ANY BID

SUBMITTAL, UNO.

REFER TO A-101 AND A-102 TO COORDINATE EXTENTS OF DEMOLITION WITH

PROPOSED NEW CONSTRUCTION.

ROOM NUMBERS INDICATED ARE FOR COORDINATION ONLY.

ALL EXTERIOR BRICK MASONRY SURFACES WILL BE CLEANED. ANY BROKEN OR

LOOSE MASONRY OR MORTAR WILL BE REPAIRED OR REPLACED, AND THE

JOINTS WILL BE REPOINTED. WEEPS WILL BE CLEANED OR OTHERWISE

REPLACED TO ENSURE PROPER DRAINAGE.

COVER EXISTING SKYLIGHTS WITH STANDING SEAM ROOF PANELS.

INSTALL RAISED ROOF FROM GRIDLINES 1-3 IN ORDER TO INSTALL 10-TON

CRANE.

INSTALL TWO NEW ROOF ACCESS HATCHES WITH STAIR LADDERS.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

NOT FOR

CONSTRUCTIO

N

Au to de sk

D oc s:

//M

R

AR

A M

SA

A rd en

H ills

3/

.0 4-

A- Ar de n

H ills

A R

C A

M

SA

EC

S_

R

.rv t

1/ 7/

2:

:2

PM

A-103

R O

O F

PL

AN

W

ES

T

AR

D

EN

H

IL

LS

, M

IN

N

ES

O

TA

LO

U

IS

VI

LL

E

D

IS

TR

IC

T P.

O . B

O X

L

O U

IS

VI

LL

E, K Y

1-

J.

K

O

LS

H O

R N

H . G

R

AD

Y

T.

F

IN

N

EY

S.

D

EG

AR

O

C H

AR

R

ET

TE

AR

D

EN

H

IL

LS

A R

C A

M

SA

EC

S

Pr oj ec t N um be r

PLAN NORTH

0 4' 8' 16'FIRST FLOOR KEY PLAN

SCALE: 3/32" = 1'-0"

A1 ROOF PLAN WEST

PH

AS

E

AD

VE

R

TI

SE

M

EN

T

W

2Q R

R

A0

_P la ns -0

B

C

D

E

1.

2.

3.

4.

5.

6.

7.

8.

PLAN IS CONCEPTUAL AND FOR REFERENCE ONLY. IT DOES NOT REPRESENT

FULL REQUIREMENTS OF FINAL DESIGN OR LAYOUT.

RELOCATION OF MEP AND OTHER EQUIPMENT AS NECESSARY TO EXECUTE THE

SCOPE OF WORK SHALL BE CONSIDERED INCLUDED WORK IN ANY BID

SUBMITTAL, UNO.

REFER TO A-101 AND A-102 TO COORDINATE EXTENTS OF DEMOLITION WITH

PROPOSED NEW CONSTRUCTION.

ROOM NUMBERS INDICATED ARE FOR COORDINATION ONLY.

ALL EXTERIOR BRICK MASONRY SURFACES WILL BE CLEANED. ANY BROKEN OR

LOOSE MASONRY OR MORTAR WILL BE REPAIRED OR REPLACED, AND THE

JOINTS WILL BE REPOINTED. WEEPS WILL BE CLEANED OR OTHERWISE

REPLACED TO ENSURE PROPER DRAINAGE.

COVER EXISTING SKYLIGHTS WITH STANDING SEAM ROOF PANELS.

INSTALL RAISED ROOF FROM GRIDLINES 1-3 IN ORDER TO INSTALL 10-TON

CRANE.

INSTALL TWO NEW ROOF ACCESS HATCHES WITH STAIR LADDERS.

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

Fi le

P at h:

Pl ot D at e:

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

NOT FOR

CONSTRUCTIO

N

Au to de sk

D oc s:

//M

R

AR

A M

SA

A rd en

H ills

3/

.0 4-

A- Ar de n

H ills

A R

C A

M

SA

EC

S_

R

.rv t

1/ 7/

2:

:2

PM

A-104

R O

O F

PL

AN

E

AS

T

AR

D

EN

H

IL

LS

, M

IN

N

ES

O

TA

LO

U

IS

VI

LL

E

D

IS

TR

IC

T P.

O . B

O X

L

O U

IS

VI

LL

E, K Y

1-

J.

K

O

LS

H O

R N

H . G

R

AD

Y

T.

F

IN

N

EY

S.

D

EG

AR

O

C H

AR

R

ET

TE

AR

D

EN

H

IL

LS

A R

C A

M

SA

EC

S

Pr oj ec t N um be r

PLAN NORTH

0 4' 8' 16'FIRST FLOOR KEY PLAN

SCALE: 3/32" = 1'-0"

A1 ROOF PLAN EAST

PH

AS

E

AD

VE

R

TI

SE

M

EN

T

W

2Q R

R

A0

_P la ns -0

G-001 - COVER SHEET
V-101 - EXISTING CONDITIONS PLAN
C-101 - CIVIL LAYOUT PLAN
AD101 - DEMOLITION FLOOR PLAN WEST
AD102 - DEMOLITION FLOOR PLAN EAST
AD103 - DEMOLITION ROOF PLAN WEST
AD104 - DEMOLITION ROOF PLAN EAST
A-101 - FLOOR PLAN WEST
A-102 - FLOOR PLAN EAST
A-103 - ROOF PLAN WEST
A-104 - ROOF PLAN EAST

File details come from the government source that posted it. Updated .