Solicitation Amendment W912QR26RA0330002 SF 30.pdf
PDF 4 MB Posted
- Solicitation number
- W912QR26RA033
About this file
This is Amendment 0002 to Contract W912QR26RA033 for the Anniston Army Depot (ANAD) Power Generation and Microgrid Project, issued by the U.S. Army Corps of Engineers (W072 Endist Louisville, KO Contracting Division) on June 15, 2026.
The amendment extends the contract duration from 724 calendar days to 952 calendar days, requiring the contractor to commence work within 10 days of receiving the notice to proceed and complete all work within 952 calendar days. The amendment replaces 43 engineering plan sheets and drawings in their entirety, primarily affecting the Eulaton Substation (electrical schematics, control panel layouts, breaker diagrams, and wiring diagrams for 12.47KV equipment) and Demil Substation (plan views, elevations, three-line diagrams, and instrument panel layouts). Additional replacements include one-line diagrams for the Nichols Substation and East Area Site Distribution, power floor plans, transformer provisions, automatic transfer switch details, black start backup power system requirements, panelboard schedules, switchgear diagrams, and load bank details. The amendment updates the wage determination from AL20260105 dated 01/02/2026 to AL20260105 dated 05/18/2026 for Calhoun County, Alabama, requiring compliance with Construction Wage Rate Requirements (Davis-Bacon Act). Section 7.4.1 of the Procedures for Submittal of Offers document is amended to require submission information for each joint venture member. The amendment provides a list of attendees and photographs from the site visit conducted on June 3, 2026. All other terms and conditions of the contract remain unchanged.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
W912QR26RA033 - Anniston Army Depot Block 14 (Description of Amendment/Modification):
(ANAD) Power Generation and Microgrid Project has been amended as follows:
1. The contract duration has changed from 724 calendar days to 952 calendar days.
2. The following PLAN SHEETS have been replaced in their entirety:
E-100 - Nichols Substation Plan View Modification E-110 - Eulaton Substation Plan View Modification E-112 - Eulaton Substation One-line Diagram Modification E-114 - Eulaton Substation Recloser 501 Wiring E-116 - Eulaton Substation AC Distribution E-117 - Eulaton Substation AC Distribution Terminal Box Diagram E-121 - Eulaton Substation-12.47KV Main Breaker #1 Close & Trip Schematic Diagram E-122 - Eulaton Substation-12.47KV Main Breaker #1 Control Panel Layout - Demolition/New E-124 - Eulaton Substation - 12.47KV Main Breaker #1 Three Line Diagram E-125-2 - Eulaton Substation-12.47KV Main Breaker #1 Wiring Diagram Modification E-132 - Eulaton Substation - 12.47KV Breaker 301 Control panel Layout - Demolition/New E-141 - Eulaton Substation - 12.47KV Breaker 302 Close & trip Schematic Diagram E-142 - Eulaton Substation - 12.47KV Breaker 302 Control Panel Layout - Demolition/New E-152 - Eulaton substation - 12.147KV Breaker 305 Control Panel Layout - Demolition/New E-162 - Eulaton Substation - 12.47KV Main Breaker #2 Control Panel Layout - Demolition/New E-164 - Eulaton Substation - 12.47KV Main Breaker #2 Three Line Diagram E-165-2 - Eulaton Substation-12.47KV Main Breaker #2 Wiring Diagram Modification E-171 - Eulaton Substation - 12.47KV Breaker 303 Close & trip Schematic Diagram E-172 - Eulaton Substation - 12.47KV Breaker 303 Control Panel Layout - Demolition/New E-175-2 - Eulaton Substation-12.47KV Breaker 303 Wiring Diagram Modification E-181 - Eulaton Substation-12.47KV Main Breaker 304 Close & Trip Schematic E-182 - Eulaton Substation - 12.47KV Breaker 304 Control Panel Layout - Demolition E-185-2 - Eulaton Substation-12.47KV Breaker 304 Wiring Diagram Modification E-202 - Demil Substation Plan View 12.47KV Modification E-203 - Demil Substation Elevations Modification Details E-205 - Demil Substation Three Line Diagram Modification E-206 - Demil Substation Plan View 12.47KV Layout E-208 - Demil Substation PT Distribution Diagram E-222 - Demil Substation - 12.47KV Breaker 401 Instrument Panel Layout Demolition/New E-232 - Demil Substation - 12.47KV Breaker 402 Instrument Panel layout Demolition/New E-237-2 - Demil Substation - 12.47KV Breaker 402 Wiring Diagram E-242 - Demil Substation - 12.47KV Main Breaker Instrument Panel Layout Demolition/New E-247-2 - Demil Substation - 12.47KV Main Breaker Wiring Diagram ES608 - Nichols Substation & Switching Main Trunk One-Line Diagram ES611 - East Area Site Distribution (CKT-201) One-Line Diagram EP201 - Power Floor Plan
W912QR26RA0330002=
EP404 - Padmounted Transformer Provisions EP502 - Typical Automatic Transfer Switch Details EP503 - Black Start Backup Power System Requirements EP701 - Panelboard Schedules EP803 - Typical Power Plant Load Bank Detail EP901 - Switchgear Single Line Bus Diagram
2. Updated Wage Determinations AL20260105 dtd 05/18/2026 has replaced AL20260105 dtd 01 /02/2026
3. Section 7.4.1 of the "Procedures for Submittal of Offers" document is amended to require submission information for each joint venture member.
4. A list of attendees and photographs from the site visit on 03 June is provided.
5. All other terms and conditions remain unchanged.
Section 00 01 15 - List of Drawing Sheets
The attachments table has changed from:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 Procedures for Submittal of Offers
Specification 14 May
Attach ment
No
0002 Price Breakout Schedule
Statement of Work 14 May
Attach ment
No
0003 Wage Rates_2 0260105_Calh oun County
Wage Determination 14 May
Attach ment
No
To:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0001 Procedures Specification 14 May Attach No
W912QR26RA0330002=
For Submittal of Offers_v2
2026 ment
0002 Price Breakout Schedule
Statement of Work 14 May
Attach ment
No
0003 Wage Rates_A L20260105 dtd 05-18- 2026_Calhoun County
Wage Determination 15 Jun 2026 Attach ment
No
The following contract documents were added:
Procedures For Submittal of Offers_v2 Wage Rates_AL20260105 dtd 05-18-2026_Calhoun County
The following contract documents were deleted:
Procedures for Submittal of Offers Wage Rates_20260105_Calhoun County
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
Procedures For Submittal of Offers_v2 none
Wage Rates_AL20260105 dtd 05-18-2026_Calhoun County none
Section 00 73 00 - Supplementary Conditions
Miscellaneous text in this section has been modified to:
Commencement, Prosecution, and Completion of Work - Construction (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within calendar10 days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 952 calendar days after receiving notice to proceed. The time stated for completion shall include final cleanup of the premises.
W912QR26RA0330002=
(End of condition)
Section 01 00 00 - General Requirements
Miscellaneous text in this section has been modified to:
WAGE RATES - Please see wage determinations below. The contractor shall ensure compliance with the applicable labor laws for each wage determination, including proper worker classification and payment of minimum wages and fringe benefits as prescribed.
Construction Wage Rate Determination:
The decision of the Secretary of Labor, covering rates of wages, including fringe benefits to be paid laborers and mechanics performing work under this contract, is attached to this solicitation.
The payment for all classes of laborers and mechanics actually employed to perform work under the contract will be specified in the following clauses in Section 00 70 00: 52.222-4 "Contract Work Hours and Safety Standards -- Overtime Compensation"; 52.222-6 "Construction Wage Rate Requirements" (formerly named "Davis-Bacon Act"); and 52.222-10 "Compliance with Copeland Act Requirements."
Wage decision included: AL20260105 dtd 05/18/2026
The work to be performed is located in Calhoun County in Alabama
W912QR26RA033000
2 Page 5 of 5
| IDCode: J |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0002 |
| EffDate: 15 JUN 2026 |
| ReqNo: |
| ProjNo: 100945 |
| IssCode: W912QR |
| AdmCode: |
| IssuedBy: W072 ENDIST LOUISVILLE |
KO CONTRACTING DIVISION, 220 W MAIN STREET 3RD FLOOR
LOUISVILLE, KY 40202-2230
UNITED STATES
LESA SYLVE, EMAIL: LESA.B.SYLVE@USACE.ARMY.MIL TELEPHONE: 502-315-6784
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912QR26RA033 |
| SolDate: 15 MAY 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: TRAVIS DUNN |
| ContDate: |
| CODate: 15 JUN 2026 |
File details come from the government source that posted it. Updated .