Price Breakout Schedule.pdf
PDF 169 KB Posted
- Solicitation number
- W912QR26RA033
About this file
This is a pricing template for the Anniston Army Depot Microgrid project located in Anniston, Alabama. The template requires offerors to provide unit costs and line-item totals across five categories of work with a cumulative total price calculation.
The five line items are: (0001) Primary Facility demolition and construction work including regulatory permitting and survey work within ten feet outside the fenced site boundary; (0002) Primary Facility Generator(s) equipment purchase for four 2.5MW generators with manufacturer price quotes and applicable markups; (0003) Primary Facility Switchgear equipment including breakers, transformers, and controls for one unit with manufacturer price quotes and markups; (0004) Site Work covering demolition and construction beyond ten feet outside the fenced site boundary; and (0005) Electrical Utility work performed by Alabama Power Company (APCO) at a fixed cost of $296,307 with no markups allowed and payment based on proof of payment. Offerors must insert prices on each numbered item; failure to do so may result in proposal disqualification. The contractor is responsible for coordinating and paying APCO directly for utility services and material installation. The offeror's company name must be clearly indicated on the pricing schedule to prevent misplacement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: Anniston Army Depot Microgrid Location: Anniston, AL Offeror’s Name:____________________________________
ITEM DESCRIPTION UNIT OF
MEASURE
UNIT COST QUANTITY ITEM TOTAL
0001 Primary Facility Job $ 1 $
0002 Primary Facility
– Generator(s)
Each $ 4 $
0003 Primary Facility
– Switchgear (including breakers, transformers, and controls)
Each $ 1 $
0004 Site Work Job $ 1 $
0005 Electrical Utility
Job $296,307 1 $296,307
TOTAL PRICE (CUMULATIVE TOTAL OF ITEM TOTALS 0001-0005) $
NOTES FOR PRICE BREAKOUT SCHEDULE
1. The company name shall be indicated on the face of the Price Breakout Schedule to preclude being misplaced.
2. Proposers must insert a price on each numbered items of the Price Breakout Schedule. Failure to do so may disqualify the proposal.
3. Description of Proposal Items - The general outline of the principal features of each item as listed below does not in any way limit the responsibility of the proposer for making a thorough investigation of the drawings and the specifications to determine the scope of work including each item of the proposal form.
4. It is the responsibility and duty of the contractor to coordinate and pay the privatized utility provider, Alabama Power Company (APCO), for their services and the installation of materials.
DESCRIPTION OF PROPOSAL ITEMS
a. Line Item No. 0001 “Primary Facility” includes all demolition and construction work, and all applicable regulatory permitting and survey work and fees required within a line ten feet outside of the fenced site boundary, except that work covered by Item No. 0002, Item No. 0003, Item. No. 0004, and Item No.
0005.
b. Line Item No. 0002 “Primary Facility – Generator(s)” – Includes the equipment purchase of each 2.5MW Generator(s) as specified by this project. The Contractor shall include the manufacturer price quote and identify applicable markups.
c. Line Item No. 0003 “Primary Facility – Switchgear (including breakers, transformers, and controls)” – Includes the equipment purchase of each Switchgear and all devices necessary for operation of switchgears as specified by this project. The Contractor shall include the manufacturer price quote and identify applicable markups.
d. Line Item No. 0004 “Site Work” includes all demolition and construction work required beyond a line ten feet outside the fenced site boundary, except that work covered by Item No. 0005.
e. Line Item No. 0005 “Electrical Utility” – Includes all work performed by the privatized utility provider.
No mark-ups will be allowed in this line item. The Contractor will be paid on the basis of proof of payment.
File details come from the government source that posted it. Updated .