This document is an exhibit package containing site maps, a quality control plan sample, and an accident prevention plan outline for a federal herbicide and broadleaf application contract at CJ Brown Dam.
Exhibit A provides detailed aerial site maps identifying five geographic locations requiring treatment: the upstream dam slope (herbicide application), downstream dam slope (broadleaf application), spillway (herbicide application), tailwater area including bridge abutments (herbicide application), and lake view shoreline (herbicide application). Each location is visually marked on Google Earth imagery with yellow arrows indicating the precise treatment areas. Exhibit B presents a Quality Control Plan Sample establishing contractor requirements for employee training, task completion accountability, and quality inspections. The plan mandates designation of a Quality Control Inspector (QCI) who must perform inspections immediately upon work completion, with 100% inspection of unusual or highly visible items and zero allowable reject levels. Daily Quality Control Inspection Reports documenting completed work, inspected facilities, inspection times, and any deficiencies must be submitted to the Corps of Engineers the same day or by 9:00 a.m. the next morning via email, fax, or in person. Contractors must immediately address any deficiencies and respond to Contract Discrepancy Reports within one day of receipt. Exhibit C references EM 385-1-1 safety standards and directs contractors to complete an Accident Prevention Plan using ENG Form 6293, available through the U.S. Army Corps of Engineers publications portal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Rates.pdf | ||
| SOW.pdf | ||
| PROJNET INSTRUCTIONS.pdf | ||
| Solicitation - W912QR26QA041 Professional Appearance.pdf | ||
| PIEE Directions.pdf | ||
| Price Breakout Schedule.pdf | ||
| Special Instructions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A Site Map
Upstream Dam Slope Location – Herbicide Application
Downstream Dam Slope Location – Broadleaf Application
Dam Herbicide Application
Dam Broadleaf Application
Spillway – Herbicide Application
Tailwater – Herbicide Application
Spillway Herbicide Application
Tailwater Herbicide Application -includes bridge abutments
Lake View – Herbicide Application
Lake View Herbicide Application
Exhibit B
Quality Control Plan Sample
Prior to beginning work, each employee will be trained to perform the task he or she has been hired to perform.
This training will consist of a review and thorough explanation of the contract specifications and requirements, followed by ‘on-the-job’ training to ensure that the contract requirements are understood. All members of a crew will be cross-trained, so that they understand all aspects of a particular type of work. Following training, each employee will be provided with a checklist of work that they are required to perform, which will serve to ensure that all aspects of a particular job are completed on time. The employee will mark each item as it is completed (with completion time), and will sign and date each sheet to ensure accountability for completed work.
Prior to start of the contract, the Contractor will designate a Quality Control Inspector (QCI) in writing. The designated QCI will perform inspections of completed work as soon as possible to ensure that the work meets contract specifications. The inspection schedule will depend on the type of work being completed; items of a routine nature will be inspected based on a random or planned sampling schedule. 100% of unusual items, items which are more important, or highly visible items will be inspected. Allowable reject levels for all items of work will be zero.
Upon discovery of any deficiency, corrective action will be initiated immediately. The QCI will immediately either correct the deficiency personally, direct another employee to correct the deficiency, or direct the employee who marked the item as ‘complete’ to correct the deficiency. The QCI will meet with the employee who was responsible for initial completion of the work and review contract specifications for the work which was inadequately performed. The QCI will determine what actions caused the inadequate work and take immediate steps to ensure that the work is correctly performed the next time it is scheduled.
A Quality Control Inspection Report will be completed by the QCI for each day’s work. This report will document what work was completed, what facilities were inspected, the time the inspections were performed, and the results of these inspections. This report will also document any deficiencies noted during inspections and corrective actions taken on deficiencies. This report will be provided to the Corps of Engineers the same day the work is scheduled, or the next morning prior to 9:00 a.m. by e-mail, fax, or in person.
If a Contract Discrepancy Report (CDR) is issued by the government, the Contractor will review the CDR with the QCI within one day of receipt of the CDR, and will meet with the Corps of Engineers representative as soon as possible. Prior to meeting with the Corps representative, the Contractor will meet with the QCI and the individual/crew responsible for completing the work to determine the cause of the contract discrepancy and what actions will be required to prevent any reoccurrence. The Contractor will document these actions on the CDR for submittal to the government. The contractor will modify these procedures as required to ensure that contract specifications are met.
Exhibit C
Accident Prevention Plan Outline
Reference EM 385-1-1; 2-7.b
An Accident prevention Plan should be completed using the ENG Form 6293 found at this Link:
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_Aug%202024%20-%20FINAL.pdf