These are detailed engineering design plans for a 750 kWdc Microgrid system to be constructed at the Conroe Army Reserve Center in Conroe, Texas. The project includes multiple key components: solar photovoltaic (PV) carport structures, generator units, interconnection switchgear, electrical distribution systems, and associated infrastructure. Specific planned elements include:
The microgrid design encompasses eight PV carport structures with varying power outputs ranging from 61 kW to 102.48 kW, two generator units (one 340 kW prime-rated generator), a microgrid control system, electrical interconnection switchgear, and modifications to the existing electrical distribution system. The project aims to provide energy resiliency and security for critical operations by establishing a microgrid network capable of operating in grid-connected, islanded, and blackout conditions. The design incorporates advanced power management capabilities, including automatic transitions between power modes, load balancing, and the ability to integrate renewable and traditional power generation sources.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR25RA023_Specs-0002.pdf | ||
| W912QR25RA023-0001.pdf | ||
| W912QR25RA023_Specs_V1-0000.pdf | ||
| W912QR25RA023_Specs_V2-0000.pdf | ||
| W912QR25RA023_Plans-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
TE
D
BY
C H
E C
K
ED
BY
D R
A W
N
BY
D
ES
IG
N
E D
BY
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
IS
S
U E
D
AT
E:
S
IZ
E:
SHEET ID
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
05/06/25
M
A Y
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
RS
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
LU
TH
ER
KI
N G
JR
PL
LO
U
IS
VI
LL
E, KY
M
IC
H
AE
L
BA
KE
R
IN
TE
R N
AT
IO
N
AL
,I N
C
AI
R
SI
D
E D
R
IV
E M
O O
N
TO
W N
SH
IP
,P A
A N
S
ID
C O
N R
O E
A R
M Y
R E
S E
R V
E C
EN
TE
R ,C
O N
R O
E, TE
XA
S
M
IC
R O
G R
ID
D
E S
IG
N
S, 0K W
D C
C
ER
TI
FI
ED
FI
N
AL
Fi le
P at h:
P lo tD at e:
C :\p ro je ct s\ da ta so ur ce -1
\c om m on
\d
9\
1_ G
-0
.d w g 2/
/2
1:
:4
PM
US Army Corps of Engineers
GENERAL NOTES
OR CL
OR PL
SQUARE
DIAMETER OR ROUND
CENTERLINE
PROPERTY LINE
OPENING OR DEPRESSION IN SLAB OR WALL
OPENING WITH GRATING COVER (PLAN)
ROUGHENED CONSTRUCTION JOINT
CONSTRUCTION JOINT (KEYWAY)
CONSTRUCTION JOINT (KEYWAY) WITH WATERSTOP
MASONRY CONTROL JOINT (IN PLAN)
MASONRY EXPANSION JOINT (IN PLAN)
GUARDRAIL/HANDRAIL
ROUGHENED CONSTRUCTION JOINT WITH WATERSTOP
OPENING WITH CHECKERED PLATE COVER (PLAN)
SP
AN
SAND, CMU, PLASTER
ROCK
EARTH
CRUSHED ROCK
CONCRETE
GRANULAR FILL
GENERAL MATERIALS LEGEND
DIMENSIONS AND SCALE
VIEW MARKERS GENERAL SYMBOLS
EL 100'-0"
REVISION IDENTIFICATION SYMBOL:
THE NUMBER IN THE TRIANGLE INDICATES THE REVISION
NUMBER IDENTIFIED. THE LETTER "A" IMMEDIATELY TO THE
RIGHT OF THE TRIANGLE INDICATES THE REVISION IS PART OF
A CONTRACT ADDENDUM. WHEN REVISIONS INVOLVE LESS THAN
ENTIRE DRAWING, PRINCIPAL ASPECTS OF REVISIONS ARE "CLOUDED".
COLUMN IDENTIFICATION:
SUBSTITUTE LETTER OR NUMBER FOR ASTERISK
OUTLINE OF FUTURE OBJECT
OUTLINE OF NEW OR RELOCATED OBJECT
EXISTING OBJECT TO BE REMOVED OR RELOCATED
EXISTING OBJECT LINE
MATCH LINE
MATERIAL BREAK LINE
SURFACE BREAK LINE
HIDDEN LINE
CENTER LINE
ELEVATION DESIGNATION
REINFORCING BARS IN CONCRETE
WELDED WIRE FABRIC
NON-FERROUS METAL
GLASS (ELEVATION)
STEEL (IN SECTION)
BATT INSULATION
RIGID INSULATION
PLYWOOD
ROUGH WOOD (IN SECTION)
BRICK IN SECTION
1 A
DIMENSIONS AND/OR ELEVATIONS MARKED THUS ( ) ARE APPROXIMATE. OBTAIN FINAL DIMENSIONS FOR
CONSTRUCTION FROM THE CONTRACTING OFFICER.
DIMENSIONS AND/OR ELEVATIONS MARKED THUS ( ) ARE ASSUMED AND SHALL BE VERIFIED OR MODIFIED AS REQUIRED BY THE CONTRACTOR TO SUIT EQUIPMENT FURNISHED. FINAL DIMENSIONS ARE SUBJECT TO THE
REVIEW OF THE CONTRACTING OFFICER.
DIMENSIONS AND/OR ELEVATIONS MARKED THUS (+/-) MUST BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
DIMENSIONS ARE GENERALLY TO SCALE, BUT SHOULD NOT BE SCALED. USE DIMENSIONS SHOWN. NTS (NOT
TO SCALE) IS SHOWN ONLY WHERE DIMENSION IS OBVIOUSLY OUT OF SCALE.
NUMERIC SCALE VALUES (1/4"=1'-0", ETC) APPLY ONLY AT FULL SIZE.
1. ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS LEGEND MAY NOT APPEAR ON
THIS SET OF DRAWINGS.
2. WORK MUST COMPLY WITH USACE EM 385-1-1 SAFETY AND HEALTH REQUIREMENTS.
XX
X101
XX
X101
XX
X101
DESIGNATES LOCATION
OF DETAIL
DESIGNATES DIRECTION FROM WHICH
PLAN OR ELEVATION IS VIEWED
DESIGNATES CUTTING
PLANE OF SECTION
DRAWING NUMBER(S)
ON WHICH VIEW IS
CALLED OUT
VIEW IDENTIFICATION
NUMBER
1. CONTRACTOR MUST RETAIN SERVICES OF A REGISTERED PROFESSIONAL ENGINEER
(DELEGATE ENGINEER) TO DESIGN AND PROVIDE DRAWINGS AND CALCULATIONS FOR THE
COMPONENTS DELEGATED BY THE STRUCTURAL ENGINEER OF RECORD.
2. WHERE NOTED ON CONSTRUCTION DOCUMENTS AND AS INDICATED BELOW, CONTRACTOR
MUST RETAIN SERVICES OF A DELEGATED ENGINEER TO PROVIDE SPECIALTY ENGINEERING
SERVICES FOR STRUCTURAL BUILDING COMPONENTS. COMPONENTS INCLUDE, BUT ARE NOT
LIMITED TO FOLLOWING:
A. CARPORT PV STRUCTURES AND ANCHORAGE.
B. CONNECTIONS FOR STRUCTURAL AND SUPPLEMENTAL STEEL NOT DETAILED ON THESE
DRAWINGS.
C. SWITCHGEAR ENCLOSURE, AND ASSOCIATED STAIRS, PLATFORMS, LADDERS AND
ANCHORAGE.
D. ENGINE-GENERATOR ENCLOSURE, SUPPORTS AND ANCHORAGE.
E. EQUIPMENT AND UTILITY SUPPORTS AND ANCHORS
F. STEEL HANDRAIL AND GUARDRAIL
G. TEMPORARY SHEETING, SHORING, SUPPORTS, SOIL RETENTION SYSTEMS AND
DEWATERING SYSTEMS
H. DRILLED PIER FOUNDATIONS (IF CARPORT PV COLUMN BASE LOADS EXCEED DRILLED PIER
DESIGN LOADS INDICATED ON DRAWINGS).
J. LIGHTNING PROTECTION SYSTEM.
3. DELEGATE ENGINEER MUST BE A REGISTERED PROFESSIONAL ENGINEER LICENSED IN THE
STATE OF TEXAS WITH A MINIMUM OF FIVE (5) YEARS OF EXPERIENCE IN DESIGN FOR SPECIFIC
COMPONENT.
4. DELEGATE ENGINEER MUST BE THE ENGINEER OF RECORD FOR THE DELEGATED COMPONENTS
AND MUST SUBMIT SIGNED AND SEALED CALCULATIONS AND DRAWINGS FOR REVIEW BY THE
RESIDENT OFFICE.
5. CALCULATIONS AND DRAWINGS SUBMITTED BY THE DELEGATE ENGINEER FOR REVIEW MUST
INCLUDE CLEARLY DEFINED DESIGN CRITERIA, DESIGN CALCULATIONS, CODE COMPLIANCE,
DETAILS AND LAYOUTS, AND FABRICATION DRAWINGS AND PROCEDURES.
6. REVIEW OF CALCULATIONS AND DRAWINGS SUBMITTED BY THE DELEGATE ENGINEER TO THE
RESIDENT OFFICE WILL BE LIMITED TO THE VERIFICATION THAT THE DELEGATE ENGINEER HAS UTILIZED THE DESIGN CRITERIA SPECIFIED AND HAS UNDERSTOOD THE INTENT OF THE DESIGN.
THE RESIDENT OFFICE WILL NOT MAKE A DETAILED CHECK OF THE CALCULATIONS AND DESIGN
PROCESSES UTILIZED BY THE DELEGATE ENGINEER. THE DELEGATE ENGINEER MUST BE
RESPONSIBLE FOR THE STRUCTURAL INTEGRITY OF THE SPECIALTY COMPONENTS AND
ATTACHMENT TO STRUCTURES AND FOUNDATIONS.
7. FABRICATION OF DELEGATED COMPONENTS MUST NOT COMMENCE UNTIL RESIDENT OFFICE
HAS REVIEWED AND RETURNS SUBMITTAL BACK TO CONTRACTOR, AND SUBMITTAL IS MARKED
"APPROVED".
8. REFER TO SECTION 01 33 00 FOR ADDITIONAL INFORMATION REGARDING SUBMITTAL
PROCEDURES AND REQUIREMENTS.
DELEGATED DESIGN REQUIREMENTS
AND SUBMITTALS
A
M E
N D
M E
N T
/0
6/
C .G
R U
E
TZ
M A
C H
ER
J.
R
O G
E R
S
M .W
A G
N
ER
C .D
R U
M M
O N
D
LE
G
EN
D
G
EN
ER
AL
N O
TE
S
G
EN
ER
AL
G-002
W
2Q R
R
A0
_P la ns -0
SCALE: 1/2" = 1'-0"
MICROGRID INTERCONNECTION SWITCHGEAR ENCLOSURE LIFE SAFETY PLANA1 0 2' 4'1'
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
TE
D
BY
C H
E C
K
ED
BY
D R
A W
N
BY
D
ES
IG
N
E D
BY
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
IS
S
U E
D
AT
E:
S
IZ
E:
SHEET ID
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
05/06/25
M
A Y
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
RS
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
LU
TH
ER
KI
N G
JR
PL
LO
U
IS
VI
LL
E, KY
M
IC
H
AE
L
BA
KE
R
IN
TE
R N
AT
IO
N
AL
,I N
C
AI
R
SI
D
E D
R
IV
E M
O O
N
TO
W N
SH
IP
,P A
A N
S
ID
C O
N R
O E
A R
M Y
R E
S E
R V
E C
EN
TE
R ,C
O N
R O
E, TE
XA
S
M
IC
R O
G R
ID
D
E S
IG
N
S, 0K W
D C
C
ER
TI
FI
ED
FI
N
AL
Fi le
P at h:
P lo tD at e:
C :\p ro je ct s\ da ta so ur ce -1
\c om m on
\d
9\
1_ G
-1
.d w g 2/
/2
1:
:4
PM
US Army Corps of Engineers
NOTES:
1. EXIT SIGNS AND FIRE EXTINGUISHER LOCATIONS ARE
SHOWN FOR INFORMATION ONLY. REFER TO
ELECTRICAL AND ARCHITECTURAL DRAWINGS FOR
EXACT LOCATIONS.
1. PROJECT NAME
MICROGRID DESIGN, 750KWDC CONROE ARMY RESERVE CENTER, CONROE, TEXAS.
LEGEND:
EXIT SIGN
FIRE EXTINGUISHER
OCCUPANCY LOAD
OCCUPANCY LOAD FACTOR
EXIT NUMBER
TRAVEL DISTANCE
OCCUPANCY CLASSIFICATION
[X/Y]
PERSON/SQUARE FEET
E-0
0'
XX
IBC NFPA 101
UTILITY AND MISCELLANEOUS GROUP U
(CHAPTER 312)
SPECIAL-PURPOSE INDUSTRIAL
(CHAPTER 40)
6. CONSTRUCTION TYPE (IBC CHAPTER 6 AND NFPA 101)
CONSTRUCTION TYPE: IIB / II (000)
12. MEANS OF EGRESS (NFPA 101, NFPA 1)
THE SWITCHGEAR BUILDING WILL BE DESIGNED TO MEET APPLICABLE LIFE SAFETY
CODE REQUIREMENTS FOR OCCUPANT SAFETY AND EGRESS.
EXITS MUST COMPLY WITH THE REQUIREMENTS OF NFPA 101 SECTION 7.3.3. ALL
DOORS MUST BE SIZED AT 0.2 INCHES PER OCCUPANT, NOT LESS THAN 32 INCHES,
USING THE EXIT.
EGRESS LIMITATIONS WILL BE SUBJECT TO THE REQUIREMENTS OF NFPA 101 TABLE
A.7.6. EXITS MUST BE PROVIDED SUCH THAT EXITS ARE AT LEAST ONE-HALF THE
DIAGONAL DISTANCE OF THE BUILDING APART FORM NFPA 101 SECTION 7.5.1.3.2.
13.OCCUPANT LOAD AND EGRESS CAPACITY CALCULATION
BASED ON AN OCCUPANT LOAD OF 2 PERSONS AND A COMMON PATH OF TRAVEL OF
LESS THAN 50 FEET, ONE EXIT HAVING A MINIMUM CLEAR WIDTH OF 32 INCHES IS
REQUIRED FOR THE SWITCHGEAR BUILDING PER NFPA 101 SECTIONS 40.2.4. TWO
EXITS EACH WITH A CLEAR WIDTH OF 40 INCHES ARE PROVIDED FROM THE
SWITCHGEAR BUILDING.
14.PORTABLE FIRE EXTINGUISHERS (NFPA 10, NFPA 101)
IN ACCORDANCE WITH UFC 3-600-01 SECTION 9-17 AND NFPA 101 SECTION 40.3.5, FIRE
EXTINGUISHERS ARE NOT REQUIRED FOR THE SWITCHGEAR BUILDING. HOWEVER, AS
A BEST PRACTICE, FIRE EXTINGUISHERS WILL BE PROVIDED IN THE SWITCHGEAR
BUILDING IN ACCORDANCE WITH NFPA 10.
15.DISCHARGE FROM EXITS (NFPA 101)
EXIT DISCHARGE MUST BE IN ACCORDANCE WITH SECTION 7.7. EXITS MUST
TERMINATE DIRECTLY AT A PUBLIC WAY OR AT AN EXTERIOR EXIT DISCHARGE. EXITS
ARE PERMITTED TO DISCHARGE INTO OPEN COURTS OR YARDS.
16.ILLUMINATION OF MEANS OF EGRESS (NFPA 101)
MEANS OF EGRESS MUST BE ILLUMINATED IN ACCORDANCE WITH SECTION 7.8.
17.EMERGENCY LIGHTING (NFPA 101)
IN ACCORDANCE WITH NFPA 101 SECTION 40.2.9, EMERGENCY LIGHTING IS ONLY
REQUIRED FOR NORMALLY OCCUPIED STRUCTURES. HOWEVER, AS A BEST
PRACTICE, EMERGENCY LIGHTING WILL BE PROVIDED IN ACCORDANCE WITH SECTION
7.9.
18.MARKINGS OF MEANS OF EGRESS (NFPA 101)
MEANS OF EGRESS, OTHER THAN MAIN EXTERIOR EXIT DOORS THAT OBVIOUSLY AND
CLEARLY ARE IDENTIFIABLE AS EXITS, MUST HAVE SIGNS AT EXITS THAT ARE READILY
VISIBLE FROM ANY DIRECTION OF EXIT ACCESS IN ACCORDANCE WITH NFPA 101
SECTION 7.10. EXIT ACCESS MUST BE MARKED IN ALL CASES WHERE THE EXIT OR WAY
TO REACH THE EXIT IS NOT READILY APPARENT.
19. ROOF ACCESS (UFC 3-600-01, SECTION 10-4)
FIRE DEPARTMENT ROOF ACCESS IS NOT REQUIRED FOR THE SWITCHGEAR
BUILDING AS THE BUILDINGS IS LESS THAN FOUR STORIES.
20. FIRE DEPARTMENT ACCESS (UFC 3-600-01)
PER UFC 3-600-01 SECTION 9-1.1, ALL-WEATHER GROUND ACCESS IS NOT
REQUIRED FOR BUILDINGS THAT ARE LESS THAN 5,000 SQUARE FEET OR LESS
THAN 2 STORIES IN HEIGHT. THEREFORE, ALL-WEATHER GROUND ACCESS IS
NOT REQUIRED FOR THE SWITCHGEAR BUILDING.
21. FIRE PROTECTION SYSTEMS (UFC 3-600-01)
IN ACCORDANCE WITH UFC 3-600-01 SECTION 9-7.2.1.1, AUTOMATIC SPRINKLER
SYSTEMS ARE PERMITTED TO BE OMITTED FROM SINGLE-STORY, TYPE II
CONSTRUCTION FACILITIES LESS THAN 15,000 FT2. THEREFORE, THE
SWITCHGEAR BUILDING IS NOT REQUIRED TO BE PROTECTED WITH AN
AUTOMATIC SPRINKLER SYSTEM.
22. FIRE ALARM SYSTEM (UFC 3-600-01, NFPA 101)
IN ACCORDANCE WITH UFC 3-600-01 SECTION 9-18 AND NFPA 101 SECTION
40.3.4, FIRE ALARM AND DETECTION SYSTEMS ARE NOT REQUIRED FOR
INDUSTRIAL OCCUPANCIES WITH A TOTAL OCCUPANT LOAD OF LESS THAN 100
PERSONS. THEREFORE, THE SWITCHGEAR BUILDING IS NOT REQUIRED TO BE
PROTECTED BY A FIRE ALARM AND DETECTION SYSTEM. HOWEVER, AT THE
REQUEST OF THE CLIENT, A FIRE ALARM SYSTEM IS REQUIRED FOR THE
SWITCHGEAR BUILDING. PROVIDE IN ACCORDANCE WITH FA SERIES
DRAWINGS.
23. GENERATOR ENCLOSURE (UFC 3-600-01, NFPA 37)
IN ACCORDANCE WITH NFPA 37 SECTION 4.1.1 AND 4.1.4, THE NATURAL GAS
FUEL FIRED ENGINES SHALL BE SITUATED SO THAT THEY ARE READILY
ACCESSIBLE FOR MAINTENANCE, REPAIR, AND FIREFIGHTING, AND THEY MUST
BE LOCATED A MINIMUM 5 FT FROM ANY OPENINGS IN THE WALLS OF
STRUCTURES. A FIRE ALARM AND FIRE SUPPRESSION SYSTEM ARE NOT
REQUIRED FOR PROTECTION OF THE ENGINE GENERATOR ENCLOSURES.
ALLOWABLE AREA AND HEIGHT CALCULATIONS SWITCHGEAR BUILDING:
NON-SPRINKLERED TYPE IIB CONSTRUCTION (IBC TABLES 504.3, 504.4, & 506.2)
OCCUPANCY
CLASSIFICATION
ALLOWABLE
AREA
(SQ. FT.)
ALLOWABLE
HEIGHT (FT.)
ALLOWABLE
NUMBER OF
STORIES
ACTUAL AREA,
HEIGHT, & STORIES
UTILITY AND
MISCELLANEOUS
GROUP U
8,500 55 2 504 SQ.FT.
12FT / 1 STORY
INTERIOR FINISH CLASSIFICATION: NFPA 101, TABLE A.10.2.2
OCCUPANCY EXIT ENCLOSURE EXIT ACCESS
CORRIDORS
OTHER ROOMS AND
ENCLOSED SPACES
INDUSTRIAL
CLASS A OR B CLASS A, B, OR C CLASS A, B, OR C
CLASS I OR II CLASS I OR II N/A
SWITCHGEAR BUILDING OCCUPANCY LOAD: UFC 3-600-01 TABLE 10-1 AND NFPA 101
TABLE 7.3.1.2
USE
OCCUPANT LOAD
FACTOR (FT²/PERSON) AREA (FT²) OCCUPANT LOAD
UTILITY 500 540 2
EGRESS LIMITATIONS NON-SPRINKLERED BUILDING: NFPA 101 TABLE A.7.6
OCCUPANCY COMMON PATH (FT.) DEAD END (FT.) TRAVEL DISTANCE (FT.)
SPECIAL PURPOSE
INDUSTRIAL 50 50 300
SWITCHGEAR BUILDING EXIT CAPACITY: NFPA 101, 7.2.1.2.3
EXIT NUMBER
REQUIRED
WIDTH (INCHES)
ACTUAL CLEAR
WIDTH (INCHES)
OCCUPANT
CAPACITY
ACTUAL
CAPACITY
E-1 32 40 200 1
E-2 32 40 200 1
36'
2[1/500]
U
FE
EXIT SIGN/EMERGENCY
LIGHTING UNIT (TYP)
HVAC
UNIT 1
HVAC
UNIT 2
POWER
PANEL LP-1
AUX.
XFMR
T-AUX
POWER
PANEL PP-1
FE
4. APPLICABLE CODES
· UFC 1-200-01, DOD BUILDING CODE, 1 SEPTEMBER 2022
· UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES, 8 AUGUST 2016 WITH
CHANGE 6, 6 MAY 2021
· NFPA 1, FIRE CODE, 2021 EDITION
· NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2022 EDITION
· NFPA 37, STANDARD FOR THE INSTALLATION AND USE OF STATIONARY COMBUSTION
ENGINES AND GAS TURBINES 2021 EDITION
· NFPA 70, NATIONAL ELECTRIC CODE, 2020 EDITION
· NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2022 EDITION
· NFPA 101, LIFE SAFETY CODE, 2021 EDITION
· INTERNATIONAL BUILDING CODE (IBC), 2021 EDITION
2. PROJECT DESCRIPTION
THE PROJECT INCLUDES THE INSTALLATION OF NATURAL GAS (NG) GENERATORS AS AN
ON-SITE GENERATION RESOURCE, MICROGRID CONTROL SYSTEM, ELECTRICAL
INTERCONNECTION SWITCHGEAR, INTERCONNECTION CIRCUIT WIRINGS, AND MODIFICATION
TO THE EXISTING ELECTRICAL DISTRIBUTION SYSTEM AS NECESSARY TO ESTABLISH
HUNTER ARMY AIRFIELD'S MICROGRID NETWORK. THE MICROGRID WILL PROVIDE ENERGY
RESILIENCY AND SECURITY FOR CRITICAL OPERATIONS IN THE EVENT OF AN INTERRUPTION
TO THE PRIMARY POWER GRID.
3. CODE ANALYSIS
THE SWITCHGEAR BUILDING HAS BEEN ANALYZED FOR LIFE SAFETY AND FIRE PROTECTION
REQUIREMENTS USING THE CODES AND STANDARDS LISTED BELOW. THE UNIFIED
FACILITIES CRITERIA (UFC) APPLY TO THE MILITARY DEPARTMENTS, THE DEFENSE
AGENCIES, AND THE DOD FIELD ACTIVITIES WHICH PROVIDES TECHNICAL CRITERIA FOR
NEW AND RENOVATED MILITARY CONSTRUCTION. BASED ON UFC 1-200-01 CHAPTER 2 -
MODIFICATIONS TO THE INTERNATIONAL BUILDING CODE (IBC) AND UFC 3-600-01, THE IBC
WILL BE USED FOR FIRE RESISTANCE REQUIREMENTS, ALLOWABLE FLOOR AREA, BUILDING
HEIGHT LIMITATIONS, BUILDING SEPARATION DISTANCE REQUIREMENTS, BUILDING
CONSTRUCTION TYPE, AND OCCUPANCY SEPARATION REQUIREMENTS EXCEPT AS MODIFIED
BY UFC 3-600-01. NFPA 101 WILL BE USED FOR BUILDING CONSTRUCTION RELATED TO
EGRESS AND SAFETY TO LIFE AS WELL AS FIRE RESISTANCE RATINGS OF NON-BEARING
PARTITIONS. OCCUPANCY LOAD WILL BE IN ACCORDANCE WITH NFPA 101 EXCEPT AS
MODIFIED BY THE SUPPLEMENTAL AND MAXIMUM OCCUPANT LOAD FACTORS OF UFC
3-600-01 SECTION 10-3. IF ANY CONFLICTS OCCUR BETWEEN NFPA 101 AND IBC, RELATED TO
FIRE RESISTANCE RATING, NFPA 101 WILL TAKE PRECEDENCE AND APPLICABLE CRITERIA
CONTAINED IN UFC 3-600-01. THE ENGINE GENERATORS ARE CONTAINED WITHIN
PURPOSE-DESIGNED WEATHERPROOF HOUSINGS. IN ACCORDANCE WITH NFPA 37 SECTION
A.3.3.3, THE WEATHERPROOF HOUSINGS ARE NOT CONSIDERED A BUILDING OR STRUCTURE,
AND THEREFORE THEY ARE NOT SUBJECT TO THE BUILDING CODE AND LIFE SAFETY
REQUIREMENTS OF IBC AND NFPA 101.
5. OCCUPANCY CLASSIFICATION (IBC AND NFPA)
NOTE:
THE SWITCHGEAR BUILDING IS NOT CONSIDERED NORMALLY OCCUPIED SPACE.
9. HAZARDOUS AREA PROTECTION (NFPA 101, IBC)
NO HAZARDOUS AREAS SEPARATION REQUIREMENTS ARE APPLICABLE TO THE SWITCHGEAR
BUILDING - NO FIRE BARRIER OR SMOKE PARTITON SEPARATIONS WILL BE REQUIRED.
THEREFORE, THE REQUIREMENTS OF NFPA 101 AND IBC FOR FIRE BARRIER AND SMOKE
PARTITION PENETRATIONS, FIRE AND SMOKE DAMPERS, AND WALL IDENTIFICATION ARE NOT
APPLICABLE TO THE SWITCHGEAR BUILDING.
7. ALLOWABLE AREA AND HEIGHT (IBC CHAPTER 5)
NOTE:
A CALCULATED FRONTAGE INCREASE ALLOWANCE IS NOT REQUIRED FOR THE SWITCHGEAR
BUILDING.
8. FIRE-RESISTIVE REQUIREMENTS FOR CONSTRUCTION TYPE IIB (IBC TABLE 601 AND 705.5)
· PRIMARY STRUCTURAL FRAME 0-HOUR RATING
· EXTERIOR BEARING WALLS 1-HOUR RATING*
· INTERIOR BEARING WALLS 0-HOUR RATING
· EXTERIOR NONBEARING WALLS AND PARTITIONS 1-HOUR RATING*
· INTERIOR NONBEARING WALLS AND PARTITIONS 0-HOUR RATING
· FLOOR CONSTRUCTION AND SECONDARY MEMBERS 0-HOUR RATING
· ROOF CONSTRUCTION AND SECONDARY MEMBERS 0-HOUR RATING
*TAKES INTO ACCOUNT THE FIRE SEPARATION DISTANCE REQUIREMENT OF IBC TABLE
705.5. THE FIRE SEPARATION DISTANCE IS LESS THAN 10 FEET.
THE EXISTING BUILDING ADJACENT TO THE SWITCHGEAR ENCLOSURE IS
CONSTRUCTION TYPE IIB, AND THE EXTERIOR WALLS FACING THE SWITCHGEAR
ENCLOSURE ARE RATED FOR 0-HOUR. THEREFORE, A MINIMUM 1-HOUR FIRE RATING IS
REQUIRED FOR THE EXTERIOR WALLS OF THE SWITCHGEAR ENCLOSURE TO MAINTAIN
COMPLIANCE WITH IBC TABLE 705.5.
N/A: NOT APPLICABLE
10. INSULATION REQUIREMENTS (UFC 3-600-01)
IN ACCORDANCE WITH UFC 3-600-01 SECTION 8-3, THERMAL AND ACOUSTICAL INSULATION
WITH A FLAME SPREAD (FS) RATING NOT HIGHER THAN 75, AND A SMOKE DEVELOPED (SD)
RATING NOT HIGHER THAN 150 WHEN TESTED IN ACCORDANCE WITH ASTM E84 (NFPA 255)
SHALL BE USED UNLESS THE EXCEPTIONS OF SECTION 8-3.2 ARE MET.
11. INTERIOR FINISH CLASSIFICATION (NFPA 101)
A
M E
N D
M E
N T
/0
6/
J.
R
O G
E R
S
K .K
YE
S
C .D
R U
M M
O N
D
LI
FE
SA
FE
TY
PL
AN
G
EN
ER
AL
G-106
PLAN
NORTH
WEN AO LTM H
M O
O FC
REGISTERED
P RO FE SS I O N A L
ENGINEER
No.
PE090970
MICHAEL C ZELLERS
5/ 6/
W
2Q R
R
A0
_P la ns -0
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
SHEET ID
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
S.
TR
AT
E
A.
D
IV
EN
K.
KN
O
TH
J
AN
U
AR
Y
C .D
R U
M M
O N
D
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
K
IN
G
J R
P L, LO
U
IS
VI
LL
E, K Y
M
IC
H
AE
L
BA
KE
R
IN
TE
R N
AT
IO
N
AL
, I N
C
AI
R
SI
D
E D
R
IV
E M
O O
N T
O W
N
SH
IP
, P
A
AN
SI
D
C O
N R
O E
AR
M
Y R
ES
ER
VE
C
EN
TE
R , C
O N
R O
E, T
EX
AS
M
IC
R O
G R
ID
D
ES
IG
N S, KW
D
C
C
ER
TI
FI
ED
F
IN
AL
Fi le
P at h:
Pl ot D at e:
\\m oo np a1 cl 1.
bk r.m ba ke rc or p.
co m \V
O L2
\P ro je ct s\
C on ro e
AR
C
M ic ro gr id \0
5_ D el iv er ab le s\
D ra w in gs \0
C
_C iv il\ Sh ee t F ile s\
_G
0.
dw g
/3
0/
0:
:2
AM
US Army Corps of Engineers
B-100
G
EO
TE
C
H N
IC
AL
B O
R
IN
G P
LA
N
SCALE:
25' 50' 100'
1" = 50'
N
SEE SHEET BB100
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
5/
6/
5/6/2025
W
2Q R
R
A0
_P la ns -0
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
TE
D
BY
C H
E C
K
ED
BY
D R
A W
N
BY
D
ES
IG
N
E D
BY
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
IS
S
U E
D
AT
E:
S
IZ
E:
SHEET ID
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
05/06/25
M
A Y
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
RS
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
LU
TH
ER
KI
N G
JR
PL
LO
U
IS
VI
LL
E, KY
M
IC
H
AE
L
BA
KE
R
IN
TE
R N
AT
IO
N
AL
,I N
C
AI
R
SI
D
E D
R
IV
E M
O O
N
TO
W N
SH
IP
,P A
A N
S
ID
C O
N R
O E
A R
M Y
R E
S E
R V
E C
EN
TE
R ,C
O N
R O
E, TE
XA
S
M
IC
R O
G R
ID
D
E S
IG
N
S, 0K W
D C
C
ER
TI
FI
ED
FI
N
AL
Fi le
P at h:
P lo tD at e:
C :\p ro je ct s\ da ta so ur ce -1
\c om m on
\d
9\
1_ E-
5.
dw g
2/
/2
1:
:4
PM
US Army Corps of Engineers
LOSS OF INCOMING UTILITY SOURCE
1. THE MICROGRID CONTROL SYSTEM (MGCS) AUTOMATICALLY ISOLATES ARC MICROGRID FROM THE
UTILITY GRID (OPEN POI BREAKER(S) - ISLANDED MODE.
2. INITIATE GENERATOR UNIT(S) START AND SYNCHRONIZE THE GENERATOR UNIT(S) ON TO THE MICROGRID
AND OPERATE IN PARALLEL WITH THE AVAILABLE DER ON THE MICROGRID.
3. SOLAR PV SYSTEM REMAIN CONNECTED AND IN OPERATION PROVIDING ENERGY INTO THE MICROGRID
SYSTEM.
4. CONROE ARC FACILITIES REMAIN IN OPERATION IN ISLAND MODE
RETURN OF NORMAL UTILITY SUPPLY SOURCE
1. THE MGCS DETECTS THE RETURN OF HEALTHY UTILITY SERVICE SOURCE.
2. DISCONNECT AND DEENERGIZE ALL ONSITE GENERATION RESOURCE (GENERATOR AND PV).
3. MANUALLY CLOSE POI BREAKER TO THE HEALTHY UTILITY SOURCE.
INTENTIONAL ISLANDING OPERATION FROM GRID CONNECTED MODE
1. INITIATE START OF ALL GENERATOR UNITS AND BRING THE GENERATOR UNITS ONLINE TO OPERATE IN
PARALLEL WITH THE UTILITY GRID AND PV.
2. DISPATCH DER (GENERATORS/PV) TO PICK UP ALL THE LOAD WHERE POWER FLOW IS NEAR ZERO
(SLIGHTLY EXPORTING POWER) ACROSS POI.
3. OPEN POI BREAKER(S) TO ISOLATE ARC MICROGRID FROM THE UTILITY GRID FOR “SEAMLESS
TRANSITION” TO ISLAND MODE.
THE MICROGRID CONTROL SYSTEM (MGCS) SHALL MANAGE THE OPERATION OF INTERCONNECTION SWITCHGEAR, DER, AND LOAD BALANCING FOR ALL MODES OF OPERATION WHEN THE MICROGRID CONTROL
SYSTEM IS SET TO AUTOMATIC OPERATION.
MODE OF OPERATIONS
THERE ARE THREE STATES/MODES OF OPERATION FOR THE MICROGRID POWER SYSTEM: GRID CONNECTED, ISLANDED, AND BLACKOUT CONDITIONS. THE GRID CONNECTED AND THE ISLANDED MODES ARE THE TWO WORKING MODES OF OPERATIONS WHERE THE MICROGRID POWER SYSTEM IS ENERGIZED. IN BLACKOUT CONDITION, THE POWER SYSTEM IS COMPLETELY DEENERGIZED. SEE MICROGRID'S MODE OF OPERATION DIAGRAM BELOW FOR THE GRAPHICAL REPRESENTATION OF THE MICROGRID'S MODE OF OPERATION AND THE
ASSOCIATED TRANSITION BETWEEN MODES OF OPERATION.
MICROGRID MODE OF OPERATION DIAGRAM
MICROGRID OPERATIONAL DESCRIPTION
BLACKOUT CONDITION
IT IS POSSIBLE FOR THE MICROGRID POWER SYSTEM TO EXPERIENCE A COMPLETE BLACKOUT
CONDITION AS A RESULT OF SEVERE FAULT ON THE POWER SYSTEM, MIS-OPERATION OR FAILURE
OF THE MICROGRID CONTROL SYSTEM AND/OR PROTECTIVE RELAY SYSTEM. IN SUCH BLACKOUT
EVENT, THE MICROGRID CONTROL SYSTEM WILL ISOLATE THE UTILITY GRID AND ALL OF THE
DISTRIBUTED ENERGY RESOURCES FROM THE MICROGRID POWER SYSTEM. THE MICROGRID WILL
HAVE THE CAPABILITY TO START ITS DER UNITS FROM THE DE-ENERGIZED STATE. THE MICROGRID
POWER SYSTEM CAN BE BROUGHT BACK INTO SERVICE MANUALLY OR SEMI-AUTOMATICALLY
AFTER THE POWER SYSTEM IS DEEMED IN SAFE CONDITION FOR REENERGIZATION.
WHEN THE MICROGRID IS IN A BLACKOUT STATE, THE MGCS COMMANDS THE DERS TO
DISCONNECT FROM THE MICROGRID POWER SYSTEM. THE DERS REMAIN DISCONNECTED UNTIL A
BLACK-START SEQUENCE IS INITIATED, OR THE MICROGRID IS RECONNECTED TO THE UTILITY GRID
(SEE THE FOLLOWING TRANSITIONS SUBSECTION).
TRANSITIONAL STATES BETWEEN MODE OF OPERATION:
PLANNED DISCONNECT FROM THE UTILITY GRID
PLANNED INTENTIONAL ISLANDING INVOLVES CONTROLLING THE ENERGY FLOW AT THE POINT
OF INTERCONNECTION(POI) TO NEAR ZERO AND SEPARATING FROM THE GRID. DURING
PLANNED INTENTIONAL ISLANDING A MICROGRID DISCONNECTS FROM THE AREA ELECTRIC
POWER SYSTEM (EPS) IN A PLANNED MANNER WHEN THE EPS IS GRID-CONNECTED AND IN A
NORMAL OPERATING MODE. THE TRANSITION TO ISLAND MODE IS BASED ON A REASONABLE
WARNING PERIOD.
FOR THE PLANNED DISCONNECT FROM THE UTILITY GRID, THE MICROGRID SYSTEM
OPERATOR WILL INITIATE GOTO ISLAND MODE. THE MGCS WILL RESPOND TO A COMMAND TO
DISCONNECT THE MICROGRID FROM THE UTILITY BY DISPATCHING THE DERS AND OPENING
THE MICROGRID POI. PRIOR TO OPENING THE POI, THE MGCS WILL EXECUTE CONTROL
ACTIONS TO PREPARE THE MICROGRID FOR A SUCCESSFUL TRANSITION TO ISLAND
OPERATION AND TO MITIGATE THE NEED TO SHED LOAD.
THE MGCS WILL PERFORM THE FOLLOWING FUNCTIONS DURING A PLANNED SEAMLESS
DISCONNECT:
1. VERIFIES PERMISSIVE CONDITIONS OF THE MICROGRID POWER SYSTEM TO INITIATE
GOTO ISLAND MODE (DISCONNECT FROM THE UTILITY GRID) PROCESS.
2. STARTS BOTH STANDBY GENERATOR UNITS TO PROVIDE ADDITIONAL SPINNING
RESERVE AND INERTIA ON THE MICROGRID.
3. ADJUSTS RENEWABLE DER POWER OUTPUTS FOR ISLAND OPERATION
4. DISPATCHES GENERATORS TO REDUCE POWER FLOW (REAL AND REACTIVE) ACROSS
THE MICROGRID POI
5. OPENS THE POI BREAKER WHEN THE REAL AND REACTIVE POWER FLOWS ARE WITHIN
DISCONNECTS LIMITS. [THE REAL AND REACTIVE POWER FLOWS SHOULD BE NEAR
ZERO, BUT SLIGHTLY IMPORTING REAL AND REACTIVE POWER.]
6. AUTOMATICALLY CHANGES ONE DER (GENERATOR UNIT) TO ISOCHRONOUS MODE
7. THE SOLAR PHOTOVOLTAIC SYSTEM WILL AUTOMATICALLY DISCONNECT ITSELF
FORM THE MICROGRID THROUGH THE INVERTER WHEN IT SENSE MICROGRID
INSTABILITY (VOLTAGE AND/OR FREQUENCE ARE OUTSIDE OF ACCEPTABLE LIMITS)
DURING THE TRANSITION OR WHEN THERE IS INSUFFICIENT SUNLIGHT ENERGY
AVAILABLE TO PRODUCE POWER. THE SOLAR PHOTOVOLTAIC SYSTEM WILL
AUTOMATICALLY SWITCH MODE OF OPERATION FROM ISLAND MODE TO GRID
CONNECTED MODE. THE PV SYSTEM WILL AUTOMATICALLY RECONNECT ITSELF TO
THE MICROGRID WHEN THE MICROGRID POWER SYSTEM IS HEALTHY AND STABLE (AT
NORMAL OPERATING VOLTAGE AND FREQUENCY) AND WHEN SUNLIGHT IS AVAILABLE
TO PRODUCE POWER AND INJECT TO POWER INTO THE MICROGRID.
UNPLANNED DISCONNECT FROM THE UTILITY GRID (NON-SEAMLESS)
UNPLANNED ISLANDING WILL OCCUR WHEN THE MICROGRID PROTECTIVE RELAY SYSTEM
DETECTS THE SUDDEN LOSS OF UTILITY VOLTAGE OR ABNORMAL UTILITY VOLTAGE, CURRENT
AND/OR FREQUENCY BEYOND ACCEPTABLE LIMITS. THE DETECTION OF UTILITY SOURCE
ABNORMAL CONDITIONS WILL INITIATE THE MGCS TO TRANSITION TO ISLANDED MODE BY
DISPATCHING THE DERS AND OPENING THE MICROGRID POI. THE MGCS WILL PERFORM THE
FOLLOWING FUNCTIONS IN RESPONSE TO DETECTION OF UNACCEPTABLE UTILITY SOURCE
ABNORMAL CONDITION:
1. POI RELAY OPENS THE POI BREAKER
2. THE SOLAR PHOTOVOLTAIC SYSTEM WILL AUTOMATICALLY DISCONNECT ITSELF
FORM THE MICROGRID THROUGH THE INVERTER WHEN IT SENSE MICROGRID
INSTABILITY (VOLTAGE AND/OR FREQUENCE ARE OUTSIDE OF ACCEPTABLE LIMITS)
DURING THE TRANSITION OR WHEN THERE IS INSUFFICIENT SUNLIGHT ENERGY
AVAILABLE TO PRODUCE POWER.
3. OPEN ALL LOAD BREAKERS ON ARC MAIN DISTRIBUTION PANEL POWER PANEL PP-1
LOADS TO UNLOAD SYSTEM FOR RESTART.
4. START STANDBY GENERATOR UNITS
5. THE PV SYSTEM WILL AUTOMATICALLY RECONNECT ITSELF TO THE MICROGRID WHEN
THE MICROGRID POWER SYSTEM IS HEALTHY AND STABLE (AT NORMAL OPERATING
VOLTAGE AND FREQUENCY) AND WHEN SUNLIGHT IS AVAILABLE TO PRODUCE POWER
AND INJECT TO POWER INTO THE MICROGRID.
6. CLOSE ARC BUILDING FEEDER BREAKERS ONE BY ONE TO ENERGIZE FACILITY LOADS.
THERE ARE SCENARIOS WHERE THE MICROGRID PROTECTIVE SYSTEM MAY NOT ONLY TRIP
THE POI BREAKER(S), BUT ALSO TRIP THE DERS RESULTING IN MICROGRID BLACKOUT
CONDITION. IF SUCH AN EVENT OCCURRED, THE MGCS WILL DISCONNECT ALL DERS FROM
THE DEAD MICROGRID POWER SYSTEM. THE MGCS WILL ALSO RESET THE DER'S SETPOINTS
PARAMETERS TO PREPARE FOR A MANUAL OR AUTOMATIC BLACK-START OPERATION. THE
MICROGRID CONTROL SYSTEM WILL BE POWERED FROM THE UNINTERRUPTIBLE POWER
SUPPLY (UPS) SOURCES. ONCE THE MICROGRID IS BLACKED OUT CONDITION, THE MICROGRID
WILL HAVE THE ABILITY TO BE RE-ENERGIZED BY ONE OF THE FOLLOWING METHODS:
1. FOR MOMENTARY OUTAGE (LESS THAN ONE MINUTE):
a. THE SOLAR PHOTOVOLTAIC SYSTEM WILL AUTOMATICALLY DISCONNECT ITSELF
FORM THE MICROGRID THROUGH THE INVERTER WHEN IT SENSE MICROGRID
INSTABILITY (VOLTAGE AND/OR FREQUENCY ARE OUTSIDE OF ACCEPTABLE
LIMITS) DURING THE TRANSITION OR WHEN THERE IS INSUFFICIENT SUNLIGHT
ENERGY AVAILABLE TO PRODUCE POWER. THE SOLAR PHOTOVOLTAIC SYSTEM
WILL AUTOMATICALLY SWITCH MODE OF OPERATION FROM ISLAND MODE TO
GRID CONNECTED MODE.
b. THE PV SYSTEM WILL AUTOMATICALLY RECONNECT ITSELF TO THE MICROGRID
WHEN THE MICROGRID POWER SYSTEM IS HEALTHY AND STABLE (AT NORMAL
OPERATING VOLTAGE AND FREQUENCY) AND WHEN SUNLIGHT IS AVAILABLE TO
PRODUCE POWER AND INJECT TO POWER INTO THE MICROGRID.
c. FACILITY LOADS RETURN ONCE UTILITY RETURNS TO NORMAL POWER.
2. FOR TEMPORARY OR LONGER DURATION OF UTILITY POWER OUTAGE, THE ON-SITE
GENERATOR UNITS ARE BROUGHT ONLINE TO PROVIDE ELECTRICAL POWER TO THE
MICROGRID SYSTEM TO SERVE THE CAMPUS LOADS IN ISLAND MODE UNTIL THE
NORMAL UTILITY POWER SOURCE BECOME AVAILABLE. THE PV SYSTEM WILL
AUTOMATICALLY DISCONNECT AND RECONNECT ITSELF AS DESCRIBED IN ITEM 1. THE
OPERATOR MAY RE-ENERGIZE THE MICROGRID BY INITIATING THE MGCS
BLACK-START SEQUENCE.
A QUALIFIED SYSTEM OPERATOR NEEDS TO INVESTIGATE AND EXAMINE THE STATE OF
CONDITIONS OF THE MICROGRID POWER SYSTEM BEFORE RE-ENERGIZATION OF THE
MICROGRID POWER SYSTEM AFTER A BLACKOUT EVENT. THIS IS TO ENSURE THAT ANY
DANGEROUS CONDITIONS ARE IDENTIFIED, AND THE SYSTEM IS PLACED BACK IN A SAFE
CONDITION FOR RE-ENERGIZATION.
RECONNECT THE DEAD MICROGRID TO THE UTILITY GRID
(BLACKOUT STATE TO GRID CONNECTED MODE)
THE MICROGRID SYSTEM OPERATOR INITIATES GOTO GRID CONNECTED MODE FROM THE
MGCS'S HMI(S) OR THE AUTOMATIC RECONNECT FUNCTION OF THE MGCS. THE MGCS WILL
PERFORM THE FOLLOWING FUNCTIONS TO RECONNECT THE LIVE MICROGRID TO THE UTILITY
GRID:
1. CONFIRM HEALTHY UTILITY SOURCE (VOLTAGE AND FREQUENCY ARE WITHIN
ACCEPTABLE AND STABLE LIMITS)
2. DISCONNECT AND DEENERGIZE ALL ONSITE GENERATION RESOURCE (GENERATOR
AND PV)
3. CLOSE THE MICROGRID POI BREAKER
NOTE: THIS IS THE FASTEST WAY TO RESTORE POWER TO THE MICROGRID AND TO RESTORE
ELECTRICAL SUPPLY SOURCE TO THE CAMPUS AFTER A BLACKOUT. THE DERS CAN REMAIN
OFF-LINE ALLOWING THE SYSTEM OPERATOR TIME TO ACCESS THE CONDITION OF DERS
AFTER A BLACKOUT BEFORE BRINGING THEM BACK ON-LINE.
BLACK START MICROGRID
THE MICROGRID SYSTEM OPERATOR INITIATES BLACKSTART FROM THE MGCS'S HMI(S). THE
MGCS WILL INITIATE BLACK START SEQUENCE UNDER ITS OWN POWER USING AVAILABLE
DERS. THIS METHOD WILL ALLOW THE MICROGRID TO BE RESTORED AND OPERATED DURING
A UTILITY OUTAGE. THE MGCS WILL PERFORM THE FOLLOWING FUNCTIONS TO BLACK START
MICROGRID POWER SYSTEM:
1. CONFIRM THAT THE MICROGRID POWER SYSTEM IS DEAD (SYSTEM VOLTAGE IS
BELOW THE MICROGRID DEAD THRESHOLD).
2. CONFIRM THAT THE POI BREAKER IS OPENED AND ISOLATED FROM THE UTILITY GRID
AND ALL DERS ARE DISCONNECTED FROM THE MICROGRID ISLAND.
3. OPEN FACILITY LOAD FEEDER BREAKERS AT THE ARC MAIN DISTRIBUTION PANEL AND
POWER PANEL PP-1 LOADS.
4. STARTS BOTH STANDBY GENERATOR UNITS
5. ENERGIZE THE MAIN UTILITY SERVICE SWITCHGEAR BY CLOSING THE GENERATOR
UNIT TIE BREAKER(S)
6. ENERGIZE DISTRIBUTION ARC MAIN DISTRIBUTION PANEL AND POWER PANEL PP-1
LOADS BY CLOSING BREAKERS ONE AT A TIME.
7. THE PV SYSTEM WILL AUTOMATICALLY RECONNECT ITSELF TO THE MICROGRID WHEN
THE MICROGRID POWER SYSTEM IS HEALTHY AND STABLE (AT NORMAL OPERATING
VOLTAGE AND FREQUENCY) AND WHEN SUNLIGHT IS AVAILABLE TO PRODUCE POWER
AND INJECT TO POWER INTO THE MICROGRID.
NOTE THAT THIS IS THE FASTEST WAY TO RESTORE POWER TO THE MICROGRID AND TO
RESTORE POWER TO THE CAMPUS AFTER A BLACKOUT. THE DERS CAN REMAIN OFF-LINE
ALLOWING THE SYSTEM OPERATOR TIME TO ASSESS THE CONDITION OF DERS AFTER A
BLACKOUT BEFORE BRINGING THEM BACK ON-LINE.
PV INVERTER OPERATION DESCRIPTION
A. MANUAL POWER ON/OFF - NORMALLY, IT IS NOT NECESSARY TO TURN OFF THE INVERTER, BUT
IT CAN BE SHUT DOWN MANUALLY IF REGULATION SETTING OR MAINTENANCE IS REQUIRED.
RESTARTING THE INVERTER IS REQUIRED AFTER REGULATION SETTING OR MANUAL (FAULT)
SHUTDOWN. THE INVERTER WILL START UP AND OPERATE NORMALLY IF THE START-UP
CONDITIONS ARE MET. OTHERWISE, THE INVERTER WILL GO TO STAND-BY MODE.
B. AUTOMATIC TURN ON/OFF - THE INVERTER WILL START UP AUTOMATICALLY WHEN THE OUTPUT
VOLTAGE AND POWER OF PV ARRAYS MEET THE SET VALUE, AC POWER GRID IS NORMAL, AND
THE AMBIENT TEMPERATURE IS WITHIN ALLOWABLE OPERATING RANGE. THE INVERTER WILL BE
SHUT DOWN AUTOMATICALLY WHEN THE OUTPUT VOLTAGE AND POWER OF PV MODULES ARE
LOWER THAN THE SET VALUE, THE AC POWER GRID FAILS, OR THE AMBIENT TEMPERATURE
EXCEEDS THE NORMAL RANGE
C. OPERATION MODES - THERE ARE 4 OPERATION MODES: LOGO/START-UP, NORMAL OPERATION, STANDBY AND FAULT MODES.
1. START-UP MODE IS WHEN THE INVERTER IS CHECKING IF CONDITIONS ARE MET FOR
CONNECTION AFTER A MANUAL START-UP OF THE INVERTER.
2. NORMAL OPERATION MODE IS THE DEFAULT INDICATION INTERFACE FOR NORMAL
OPERATION. IN THIS MODE, THE INVERTER IS CONVERTING THE DC POWER FROM THE
ARRAY TO AC POWER, FEEDING IT CONTINUOUSLY TO THE GRID.
3. STANDBY MODE IS ACTIVE WHEN THE OUTPUT VOLTAGE AND POWER OF PV MODULES
DO NOT MEET THE STARTUP CONDITIONS OR PV VOLTAGE AND INPUT POWER ARE
LOWER THAN THE SET VALUE. THE INVERTER WILL CHECK AUTOMATICALLY WHETHER
IT MEETS THE STARTUP CONDITIONS IN THIS MODE UNTIL IT TURNS BACK TO NORMAL
OPERATION MODE.
4. FAULT MODE IS DISPLAYED WHEN THE INVERTER DISCONNECTS FROM THE GRID DUE
TO A FAULT IN THE INVERTER OR GRID.
D. GRID-TIED POWER GENERATION -THE INVERTERS WILL HAVE AN AUTOMATIC GRID-TIED POWER
GENERATION PROCESS, WHICH WILL CHECK CONSTANTLY WHETHER AC POWER GRID MEETS
THE CONDITIONS FOR GRID-TIED POWER GENERATION, AND TEST WHETHER THE PV ARRAY HAS
ADEQUATE ENERGY. AFTER ALL CONDITIONS ARE MET, THE INVERTER WILL ENTER NORMAL
OPERATION MODE AND ENTER NET METERING WITH THE GRID. WHILE GENERATING POWER,
THE INVERTER CAN DETECT THE POWER GRID AT ALL TIMES, SUPPLY CURRENT, MATCHING
VOLTAGE AND FREQUENCY OF THE GRID AND KEEP THE PHOTOVOLTAIC ARRAY OUTPUT AT THE
MAXIMUM POWER POINT.
STANDBY GENERATOR UNIT SYNCHRONIZATION CABILITY
A. EACH OF THE STANDBY GENERATOR UNIT SHALL HAVE THE CAPABILITY TO SYNCHRONIZE TO
THE MICROGRID ACROSS THEIR RESPECTIVE GENERATOR TIE BREAKER, OR AT THE UTILITY POI
BREAKER.
B. EACH OF THE STANDBY DIESEL GENERATOR UNIT SHALL HAVE THE CAPABILITY TO OPERATE IN
THE “MICROGRID CONTROL MODE” OR IN THE “LOCAL CONTROL MODE” WHICH IS SELECTED BY
LOCAL CONTROL SELECTOR SWITCH LOCATED ON THE RESPECTIVE GENERATOR CONTROL
CUBICLE ON THE MV SWITCHGEAR.
C. EACH GENERATOR UNIT SHALL HAVE ITS OWN DEDICATED AUTO-SYNCHRONIZER AND CAN
OPERATE INDEPENDENTLY FROM THE MICROGRID CONTROLLER WHEN PLACED IN THE “LOCAL
CONTROL MODE”. THE LOCAL GENERATOR CONTROL/AUTO-SYNCHRONIZER WILL PERFORM THE
GENERATOR UNIT STARTER/STOP COMMANDS, AVR RAISE/LOWER COMMAND, GOVERNOR
CONTROL, SYNCHRONIZATION, SYNCH SOURCE SELECTION AND APPROPRIATE BREAKER
CLOSE/OPEN/TRIP COMMANDS. THE MICROGRID CONTROLLER SHALL EXECUTE THE CONTROL
AND MONITORING FUNCTIONS THROUGH THE LOCAL GENERATOR
CONTROL/AUTO-SYNCHRONIZER.
D. IN THE “MICROGRID CONTROL MODE”, THE MICROGRID CONTROLLER EXECUTES THE
AUTOMATIC GENERATOR STARTER/STOP COMMANDS, SYNCHRONIZATION, SYNCH SOURCE
SELECTION AND APPROPRIATE BREAKER CLOSE/OPEN/TRIP COMMANDS BASED ON
PROGRAMMED SEQUENCE OF OPERATION.
E. IN THE “LOCAL CONTROL MODE”, THE OPERATOR WILL NEED TO MANUALLY INITIATE THE
GENERATOR STARTER/STOP COMMANDS, SYNCH SOURCE SELECTION VIA SOURCE SELECTOR
SWITCH (GEN BREAKER/POI BREAKER), SYNCHRONIZATION, AND BREAKER CLOSE COMMANDS
BASED ON ESTABLISHED SEQUENCE OF MANUAL GENERATOR SYNCHRONIZATION OPERATION.
GRID CONNECTED MODE (NORMAL MODE OF OPERATION)
IN GRID CONNECTED MODE OPERATION, THE MICROGRID POWER SYSTEM IS CONNECTED IN PARALLEL TO THE UTILITY GRID INTERCONNECTION APPLICATION WILL BE FOR NET METERING. THE REAL AND REACTIVE POWER FLOW THROUGH THE POINT OF INTERCONNECTION (POI) WITH THE UTILITY COMPANY WITHIN OPERATING LIMITS.
THE GRID CONNECTED MODE INCLUDES ACTIVE POWER LIMITS, REACTIVE POWER LIMITS, AND VOLTAGE LIMITS AT THE POI. THE MICROGRID CONTROL SYSTEM (MGCS) MANAGES THE AVAILABLE DISTRIBUTED ENERGY RESOURCES (DER) WHILE MAINTAINING THE OPERATING CONSTRAINTS OF THE MICROGRID POWER SYSTEM.
THE SOLAR PHOTOVOLTAIC SYSTEM GENERATES POWER WHEN SUNLIGHT IS AVAILABLE PROVIDING SUPPLEMENTAL POWER TO THE MICROGRID NETWORK. THE ON-SITE GENERATOR UNITS ARE NORMALLY OFF-LINE ON STANDBY. THE GENERATOR UNIT(S) WILL OPERATE WHEN REQUIRED DURING UTILITY POWER
OUTAGE OR DURING THE DEMAND MANAGEMENT OR PEAK SHAVING PERIOD IF DESIRED.
ISLANDED MODE (CONTINGENCY MODE OF OPERATION)
THE MICROGRID POWER SYSTEM WILL AUTOMATICALLY TRANSITION FROM GRID CONNECTED MODE TO ISLAND MODE IN EVENT OF THE UTILITY GRID POWER OUTAGE. THE MICROGRID POWER SYSTEM WILL HAVE THE CAPABILITY TO TRANSITION FROM THE GRID CONNECTED MODE TO ISLAND MODE IN ANTICIPATION OF POTENTIAL OR PLANNED UTILITY POWER OUTAGE EVENTS SUCH AS SCHEDULED ROLLING BLACK, IMMINENT SEVERE WEATHER EVENTS, WILDFIRE EVENTS, ETC. THIS ACTION IS MANUALLY INITIATED BY THE SYSTEM OPERATOR VIA
MGCS'S HMI.
IN ISLANDED MODE OF OPERATION, THE MICROGRID POWER SYSTEM UTILIZES THE AVAILABLE DERS ON THE
CAMPUS SITE TO PROVIDE ELECTRICAL POWER TO THE CAMPUS FACILITIES.
THE SOLAR PHOTOVOLTAIC SYSTEM GENERATES POWER WHEN SUNLIGHT IS AVAILABLE PROVIDING POWER TO THE MICROGRID POWER SYSTEM. WHEN THE MICROGRID IS IN AN ISLANDED STATE, THE MGCS PROVIDES
FREQUENCY CONTROL OR VOLTAGE CONTROL MODES:
· FREQUENCY CONTROL/REAL POWER SHARING -- THE MGCS WILL COMMAND ONE OF THE DERS TO OPERATE IN ISOCHRONOUS MODE TO MAINTAIN THE MICROGRID SYSTEM FREQUENCY AT THE NOMINAL VALUE (60 HZ). THE MGCS WILL COMMAND THE REMAINING DERS TO OPERATE IN DROOP MODE. THE MGCS WILL ADJUST THE POWER OUTPUT SETPOINTS OF THESE DERS TO SHARE THE MICROGRID LOAD AND TO ENSURE THE
ISOCHRONOUS DER HAS ENOUGH OPERATING MARGIN TO RESPOND TO FREQUENCY DEVIATIONS.
· VOLTAGE CONTROL/REACTIVE POWER SHARING -- THE MGCS WILL COMMAND TWO GENERATORS TO OPERATE IN VOLTAGE DROOP MODE TO REGULATE THEIR TERMINAL VOLTAGES ACCORDING TO THEIR DROOP LINE. THE MGCS WILL ADJUST THE VOLTAGE SETPOINTS OF THESE DERS TO ENSURE THAT THEIR TERMINAL VOLTAGES DO NOT EXCEED PRESET LIMITS. THE MGCS WILL COMMAND THE REMAINING DERS TO OPERATE IN CONSTANT REACTIVE POWER MODE. THE MGCS WILL ADJUST THE REACTIVE POWER OUTPUT SETPOINTS OF THESE DERS TO ENSURE THAT THEIR TERMINAL VOLTAGES DO NOT EXCEED PRESET LIMITS. THE MGCS WILL ADJUST THE VOLTAGE SETPOINTS AND REACTIVE POWER SETPOINTS OF THE DERS TO SHARE THE MICROGRID REACTIVE
POWER REQUIREMENT TO MAINTAIN SYSTEM VOLTAGE AT THE CONFIGURED VOLTAGE SETPOINT.
CLIN NOTES:
CLIN 0004: ADD PV/CARPORT #4 (61KW)
CLIN 0005: ADD PV/CARPORT #5 (63.44KW)
CLIN 0006: ADD PV/CARPORT #6 (102.48KW)
CLIN 0007: ADD PV/CARPORT #7 (94.85KW)
CLIN 0008: ADD PV/CARPORT #8 (101.87KW)
CLIN 0009: ADD ELECTRICAL SERVICE FROM POWER PANEL PP-1 TO
EXISTING FIRE HOUSE MAIN SERVICE ENTRANCE RATED
DISCONNECT.
CLIN 0003: ADD GEN2 340KW (AT .8PF) PRIME RATED GENERATOR.
UNPLANNED DISCONNECT FROM UTILITY
(UNSUCCESSFUL ISLANDING)
BLACKOUT
CONDITION
SYSTEM OUTAGE EVENT
DURING ISLAND
OPERATION
UNPLANNED DISCONNECT
FROM UTILITY
(SUCCESSFUL ISLANDING)
PLANNED DISCONNECT
FROM UTILITY
(SEAMLESS ISLANDING)
BLACK START
INTO ISLAND MODEISLANDED
RECONNECT TO
UTILITY GRID
GRID CONNECTED
RECONNECT TO
UTILITY GRID
BLACKOUT
CONDITION
RECONNECT TO
UTILITY GRID FROM
ISLAND MODE
PLANNED DISCONNECT
FROM UTILITY
(SEAMLESS ISLANDING)
UNPLANNED DISCONNECT
FROM UTILITY
(SEAMLESS ISLANDING)
BLACK START CAMPUS
INTO ISLAND MODE
SYSTEM OUTAGE
EVENT DURING
ISLAND OPERATION
UNPLANNED DISCONNECT FROM UTILITY
(UNSUCCESSFUL ISLANDING)
RECONNECT TO UTILITY GRID FROM
CAMPUS BLACKOUT CONDITION
GRID CONNECTED
A
M E
N D
M E
N T
/0
6/
M .S
M
IT
H
J.
R
O G
E R
S
M .W
A G
N
ER
C .D
R U
M M
O N
D M
IC
R
O G
R
ID
O
PE
R
AT
IO
N
D
ES
C R
IP
TI
O N
EL
EC
TR
IC
AL
E-005
LOAD BANK TESTING SEQUENCE:
A. CONNECT PORTABLE STEPPED LOAD BANK TO OPEN LOAD BANK DISCONNECT.
TRANSFER ALL LOADS OFF OF SWITCHGEAR BUS 2 AND OPEN BREAKERS CB-F1A, CBF2A,
AND TIE BREAKER.
B. CLOSE BREAKER CB-F4 AND LOAD BREAK DISCONNECT SWITCH.
C. CLOSE BREAKER CB-G1 AND TURN ON GENERATOR 1.
D. STEP PORTABLE LOAD BANK UP SEQUENTIALLY UP TO FULL LOAD THEN REDUCE LOAD
STEPPING BACK DOWN TO NO LOAD.
E. TURN GENERATOR 1 OFF AND OPEN BREAKER CB-G1.
F. REPEAT STEPS C THROUGH E WITH GENERATOR 2 IF CLIN0003 IS SELECTED.
G. OPEN BREAKER CB-F4 AND LOAD BREAK DISCONNECT SWITCH.
H. CLOSE TIE BREAKERS AND RETURN BREAKERS CB-F1A AND CB-F2A BACK TO PREVIOUS
POSITION.
I. DISCONNECT AND REMOVE PORTABLE LOAD BANK.
NOTE THAT FOR THIS PROJECT UNPLANNED SEAMLESS TRANSITION IS NOT POSSIBLE WITHOUT A BATTERY
ENERGY STORAGE SYSTEM.
CLIN 0003: ADD GEN2 340KW (AT .8PF) PRIME RATED GENERATOR.
CLIN 0004: ADD PV/CARPORT #4 (61KW)
CLIN 0005: ADD PV/CARPORT #5 (63.44KW)
CLIN 0006: ADD PV/CARPORT #6 (102.48KW)
CLIN 0007: ADD PV/CARPORT #7 (94.85KW)
CLIN 0008: ADD PV/CARPORT #8 (101.87KW)
CLIN 0009: ADD ELECTRICAL SERVICE FROM POWER PANEL PP-1 TO
EXISTING FIRE HOUSE MAIN SERVICE ENTRANCE RATED
DISCONNECT.
W
2Q R
R
A0
_P la ns -0
G
G
SDSDSDSD
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
XXXXXX
X
XX
X
XXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F F
F F
F F
F F
F F
F F
F
F
G G G
CTRL
CTRL
CTRL CTRL
CTRL CTRL CTRL CTRL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
TE
D
BY
C H
E C
K
ED
BY
D R
A W
N
BY
D
ES
IG
N
E D
BY
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
IS
S
U E
D
AT
E:
S
IZ
E:
SHEET ID
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
05/06/25
M
A Y
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
RS
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
LU
TH
ER
KI
N G
JR
PL
LO
U
IS
VI
LL
E, KY
M
IC
H
AE
L
BA
KE
R
IN
TE
R N
AT
IO
N
AL
,I N
C
AI
R
SI
D
E D
R
IV
E M
O O
N
TO
W N
SH
IP
,P A
A N
S
ID
C O
N R
O E
A R
M Y
R E
S E
R V
E C
EN
TE
R ,C
O N
R O
E, TE
XA
S
M
IC
R O
G R
ID
D
E S
IG
N
S, 0K W
D C
C
ER
TI
FI
ED
FI
N
AL
Fi le
P at h:
P lo tD at e:
C :\p ro je ct s\ da ta so ur ce -1
\c om m on
\d
9\
1_
ES
0.
dw g
2/
/2
1:
:4
PM
US Army Corps of Engineers
'-0
'-0
10'-0"20'-105 8"
MH-8
TYPE 1
MH-6
TYPE 3
0 8'4' 16'
GENERATOR
GEN1
GENERATOR
GEN2
20'-105 8"
DB-12
8X4"C 2X4
DB-8
12X4"C 3X4
DB-9
4X4"C 2X2
DB-10
2X4"C 1X2
DB-11
2X4"C 1X2
7' -6
CLIN0003: ADD GEN2
340KW (AT .8PF) PRIME
RATED GENERATOR
20'-2"
FROM
UTILITY
FEED
DBC-12
2X2"C
DBC-11
4X2"C
HH
DB-13
2X2"C
A
M E
N D
M E
N T
/0
6/
M .S
M
IT
H
J.
R
O G
E R
S
M .W
A G
N
ER
C .D
R U
M M
O N
D
SH
EE
T
EN
LA
R
G
ED
PL
AN
S
EL
EC
TR
IC
AL
ES400
KEYNOTES:
1. PROVIDE 3000A, 480Y/277V, 65 KAIC, NEMA 3R LOAD BREAK
DISCONNECT AND METER. ELECTRICAL EQUIPMENT AND
INSTALLATION MUST COMPLY WITH ENTERGY DISTRIBUTED ENERGY
RESOURCE STANDARDS FOR DISTRIBUTION INTERCONNECTION AND
CUSTOMER INSTALLATION STANDARDS FOR ELECTRIC SERVICE
MANUAL.
NOTES:
1. REFER TO SHEET E-005 FOR CLIN DESCRIPTIONS.
2. REFER TO SHEET E-600 FOR FEEDER CONDUCTOR SIZE, CONDUIT
SIZE, AND RACEWAY ROUTING.
3. REFER TO STRUCTURAL SHEETS FOR EQUIPMENT PAD DETAILS.
SEE MECHANICAL
SHEET M-100 FOR
CONTINUATION
TO MH-7
(SEE DETAIL K15
ON SHEET ES401)
LOAD BREAK
DISCONNECT
3000A, 480Y/277V, 65KAIC, NEMA 3R
METERING
SEE DETAIL A4 ON
SHEET ES401 FOR
CONTINUATION
TO TERMINATION BOX
(SEE DETAIL K15 ON
SHEET ES401)
TO EXISTING 1500KVA
UTILITY TRANSFORMER
(SEE DETAIL K15 ON
SHEET ES401)
DB-13
8X4"C 2X4
SCALE: 1/8" = 1'-0"
ELECTRICAL DISTRIBUTION SITE PLANA1
PLAN
NORTH
W
2Q R
R
A0
_P la ns -0
SD
SD
SD
SD
SD
SD
SDSDSDSD
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
NPW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
WWWWWWWWWWWW
WWWWWWWWWWWW
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
F F
F F
F F
F F
F F
F F
F F
F F
F F
F
F F
F F
F
F
FU
T
8" W
L
C
TR
L C
TR
L
C
TR
L C
TR
L
CTRL
CTRL
CTRL
CTRL
G
SCALE: 1/8" = 1'-0"
SWITCHGEAR AREAA4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
TE
D
BY
C H
E C
K
ED
BY
D R
A W
N
BY
D
ES
IG
N
E D
BY
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
IS
S
U E
D
AT
E:
S
IZ
E:
SHEET ID
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
05/06/25
M
A Y
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
RS
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
LU
TH
ER
KI
N G
JR
PL
LO
U
IS
VI
LL
E, KY
M
IC
H
AE
L
BA
KE
R
IN
TE
R N
AT
IO
N
AL
,I N
C
AI
R
SI
D
E D
R
IV
E M
O O
N
TO
W N
SH
IP
,P A
A N
S
ID
C O
N R
O E
A R
M Y
R E
S E
R V
E C
EN
TE
R ,C
O N
R O
E, TE
XA
S
M
IC
R O
G R
ID
D
E S
IG
N
S, 0K W
D C
C
ER
TI
FI
ED
FI
N
AL
Fi le
P at h:
P lo tD at e:
C :\p ro je ct s\ da ta so ur ce -1
\c om m on
\d
9\
1_
ES
1.
dw g
2/
/2
1:
:4
PM
US Army Corps of Engineers
SWITCHGEAR
PDC
8' -0
'-0
9' -0
10'-43 4" 14'-0" 6'-0"
MH-6
TYPE 3
0 8'4' 16'
SCALE: 1/8" = 1'-0"
SERVICE FEEDER INTERCEPT PLANK15 0 8'4' 16'
MH-7
TYPE 3
MH-5
DB-2
6X4"C 2X3
DB-1
6X4"C 2X3
DB-12
8X4"C 2X4
DB-12
8X4"C 2X4
DB-9
4X4"C 2X2
DB-8
12X4"C 3X4
CLIN0007: ELECTRICAL
SERVICE FROM POWER
PANEL PP-1 TO EXISTING
FIRE HOUSE MAIN
SERVICE ENTRANCE
RATED DISCONNECT
DB-14
2X4"C 1X2
DBC-11
4X2"C
DBC-14
1X2"C
HH
800A, 480V, 3P, NEMA 4X,
GENERATOR LOAD BANK
DISCONNECT SWITCH
A
M E
N D
M E
N T
/0
6/
M .S
M
IT
H
J.
R
O G
E R
S
M .W
A G
N
ER
C .D
R U
M M
O N
D
SH
EE
T
EN
LA
R
G
ED
PL
AN
S
EL
EC
TR
IC
AL
ES401
SERVICE TRANSFORMER
SITE ELECTRICAL DISTRIBUTION PLAN
TO UTILITY
GENERATORS
(SEE DETAIL A9
ON SHEET ES400)
TO MH-8
(SEE DETAIL A9
ON SHEET ES400)
TO MH-7 (SEE DETAIL
K15 THIS SHEET)
TO FIREHOUSE
(SEE DETAIL A5
ON SHEET ES402)
TO MH-4
(SEE DETAIL A5
ON SHEET ES402)
NOTES:
1. REFER TO SHEET E-005 FOR CLIN DESCRIPTIONS.
2. REFER TO SHEET E-600 FOR FEEDER CONDUCTOR SIZE, CONDUIT
SIZE, AND RACEWAY ROUTING.
3. REFER TO STRUCTURAL SHEETS FOR EQUIPMENT PAD DETAILS.
4. PROVIDE TEMPORARY POWER AS REQUIRED TO MAINTAIN ARC
BUILDING OPERATIONS THROUGHOUT CONSTRUCTION.
5. ROUTE 2" CONDUIT ALONG SIDE OF BUILDING, AVOIDING
INTERFERENCES ALONG THE NORTH SIDE OF THE BUILDING. FOR
CONTINUATION SEE ES402.
TO MH-6
(SEE DETAIL A4
ON SHEET ES401)
ARC BUILDING
EXISTING PULL BOX
DB-13
8X4"C 2X4
TO
SWITCHGEAR
PDC
SUGGESTED CONSTRUCTION
PHASING:
1. PHASE 1:
a. COORDINATE WITH OWNER AND ENTERGY PRIOR TO ANY
SHUTDOWNS. FIELD VERIFY EXISTING CONDITIONS AND LOCATE
UTILITIES PRIOR TO BEGINNING WORK. FINAL LOCATION OF
ELECTRICAL EQUIPMENT SHALL BE FIELD LOCATED.
b. INTERCEPT SECONDARY FEED FROM EXISTING 1500kVA
TRANSFORMER TO ARC BUILDING PULLBOX.
c. PROVIDE NEW MANHOLE AND 3000A, 600V, 3P, 4W, NEMA 3R
PAD-MOUNTED SECONDARY TERMINATION ENCLOSURE.
PAD-MOUNTED SECONDARY TERMINATION ENCLOSURE MUST BE
LOCATED IN LINE WITH INTERCEPTED ARC BUILDING FEEDER.
d. PROVIDE NEW CONDUCTORS, CONDUIT, AND DUCTBANK FROM
TRANSFORMER SECONDARY THROUGH MANHOLE AND TERMINATE
INSIDE PAD-MOUNTED SECONDARY TERMINATION ENCLOSURE.
TERMINATE INTERCEPTED ARC BUILDING FEEDER INSIDE
PAD-MOUNTED SECONDARY TERMINATION ENCLOSURE.
2. PHASE 2:
a. PROVIDE CONDUCTORS, CONDUIT, AND DUCTBANK FROM
TRANSFORMER SECONDARY TO MICROGRID SWITCHGEAR
BREAKER M1-POI.
b. PROVIDE CONDUCTORS, CONDUIT, AND DUCTBANK FROM
MICROGRID SWITCHGEAR BREAKER CB-F1 TO PAD-MOUNTED
SECONDARY TERMINATION ENCLOSURE.
c. REMOVE CONDUCTORS FROM TRANSFORMER SECONDARY TO
PAD-MOUNTED SECONDARY TERMINATION ENCLOSURE.
d. TRANSITION POWER TO PAD-MOUNTED SECONDARY TERMINATION
ENCLOSURE FROM TRANSFORMER TO MICROGRID SWITCHGEAR.
1c 2c1d
2d2b
2d2a
1a
1c
DB-7
8X4"C 2X4
1b
DB-13
8X4"C 2X4
DB-13
8X4"C 2X4
TO PAD-MOUNTED
TERMINATION ENCLOSURE
(SEE DETAIL K15 THIS
SHEET)
NOTE 5
PAD-MOUNTED
SECONDARY
TERMINATION
ENCLOSURE
PLAN
NORTH
PLAN
NORTH
L4 S-501
W
2Q R
R
A0
_P la ns -0
MILITARY DRIVE
N O
R
TH
PA
R
KW
AY
FIRE LANE
FIRE
LANE
FI
R
E
LA
N E
FIRE LANE
FI
R
E
LA
N E
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSDSD
SD
SD
SD
SD
SD
SD
SDSD
X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXX
X
XXXXXXXXXXXXXXX
X X X X X X X
XXXXXXXXXXXXX
NPW NPW NPW NPW NPW NPW NPW NPW NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
W N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
NPW
NPW
NPW
NPW
NPW
WWWWWWWWWWWWW
WWWWWWWWWWWWW
W W
W W
W W
W W
W W
W
S
AN
S
AN
S
AN
S
AN
S
AN
S
AN
SAN
S
AN
S
AN
S
AN
S
AN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
F F
F F
F F
F F
F F
F F
F
F F
F F
F F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F F F F
F
F
F
F
F
F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F
F
F F F F F F F F F F
F U
T 8"
W L
F U
T 8"
W L
P15
P39
N O
R
TH
PA
R
KW
AY
FIRE LANE
FIRE
LANE
FI
R
E
LA
N E
FIRE LANE
FI
R
E
LA
N E
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSDSD
SD
SD
SD
SD
SD
SD
SDSD
X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXX
X
XXXXXXXXXXXXXXX
X X X X X X X
XXXXXXXXXXXXX
NPW NPW NPW NPW NPW NPW NPW NPW NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
NPW
NPW
NPW
NPW
NPW
WWWWWWWWWWWWW
WWWWWWWWWWWWW
W
W W
W W
W W
W W
W W
S
AN
S
AN
S
AN
S
AN
S
AN
S
AN
SAN
S
AN
S
AN
S
AN
S
AN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
F F
F F
F F
F F
F F
F F
F
F F
F F
F F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F F F F
F
F
F
F
F
F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F
F F F F F F F F F F
F U
T 8"
W L
F U
T 8"
W L
P15
P39
CTRLCTRL CTRL
C
TR
L C
TR
L
C
TR
L C
TR
L
C
TR
L C
TR
L
C
TR
L C
TR
L
C
TR
L C
TR
L
C
TR
L C
TR
L
C
TR
L C
TR
L
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
CTRL
C
TR
L C
TR
L
C
TR
L C
TR
L
C
TR
L C
TR
L
C
TR
L C
TR
L
CTRL CTRL CTRL
CTRL
CTRL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
TE
D
BY
C H
E C
K
ED
BY
D R
A W
N
BY
D
ES
IG
N
E D
BY
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
IS
S
U E
D
AT
E:
S
IZ
E:
SHEET ID
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
05/06/25
M
A Y
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
RS
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
LU
TH
ER
KI
N G
JR
PL
LO
U
IS
VI
LL
E, KY
M
IC
H
AE
L
BA
KE
R
IN
TE
R N
AT
IO
N
AL
,I N
C
AI
R
SI
D
E D
R
IV
E M
O O
N
TO
W N
SH
IP
,P A
A N
S
ID
C O
N R
O E
A R
M Y
R E
S E
R V
E C
EN
TE
R ,C
O N
R O
E, TE
XA
S
M
IC
R O
G R
ID
D
E S
IG
N
S, 0K W
D C
C
ER
TI
FI
ED
FI
N
AL
Fi le
P at h:
P lo tD at e:
C :\p ro je ct s\ da ta so ur ce -1
\c om m on
\d
9\
1_
ES
2.
dw g
2/
/2
1:
:4
PM
US Army Corps of Engineers
SCALE: 1" = 30'-0"
CARPORT PV SYSTEM PLANA15 30' 60'0
(3
)P V
PA
N
E L
M O
D U
LE
S
(4
)P V
PA
N
E L
M O
D U
LE
S
(3
)P V
PA
N
E L
M O
D U
LE
S
(2
)P V
PA
N
E L
M O
D U
LE
S
(2
)P V
PA
N
E L
M O
D U
LE
S
66"
(3
)P V
PA
N
E L
M O
D U
LE
S
(334) PV PANEL MODULES
(2
)P V
PA
N
E L
M O
D U
LE
S
MAIN SERVICE
TRANSFORMER, SEE
ONE-LINE DIAGRAM
DRAWING E-600
C
LI
N
C
A R
PO
R
T #6
C
LI
N
C
A R
PO
R
T #5
C
LI
N
C
A R
PO
R
T #7
C
LI
N
C
A R
PO
R
T #1
C
LI
N
C
A R
PO
R
T #2
C
LI
N
C
A R
PO
R
T #3
C
LI
N
C
A R
PO
R
T #4
CLIN0008 CARPORT #8
(TYP)
(T
YP
INVERTER 6-1
AC COMBINER
PANEL PV-1
INVERTER 5-1
INVERTER 6-2
H
AN
D H
O
LE
INVERTER 7-1
INVERTER 8-2
INVERTER 8-1
IN
V
E R
TE
R
7-
IN
V
E R
TE
R
1-
IN
V
E R
TE
R
2-
IN
V
E R
TE
R
3-
IN
V
E R
TE
R
1-
IN
V
E R
TE
R
2-
IN
V
E R
TE
R
3-
1 INVERTER 4-1
DB-3
4X4"C
2X2DB-14
2X4"C 1X2
SEE SHEET ES403
FOR CONTINUATION
CLIN0007: ELECTRICAL
SERVICE FROM POWER
PANEL PP-1 TO EXISTING
FIRE HOUSE MAIN
SERVICE ENTRANCE
RATED DISCONNECT
SCALE: 1" = 30'-0"
CARPORT PV AREAA5 30' 60'0
MH-6
TYPE 3
MH-5
TYPE 3
MH-4
TYPE 3
HH
HH
HH
HH
HH
HH HH
HH
DBC-3
3X2"C
DBC-2
1X2"C
DBC-10
1X2"C
HH
HH
DBC-9
1X2"C
DBC-8
1X2"C
DBC-7
1X2"C
DBC-6
2X2"C
DBC-1
2X2"C
DBC-14
2X2"C
A
M E
N D
M E
N T
/0
6/
M .S
M
IT
H
J.
R
O G
E R
S
M .W
A G
N
ER
C .D
R U
M M
O N
D
SH
EE
T
EN
LA
R
G
ED
PL
AN
S
EL
EC
TR
IC
AL
ES402
NOTES:
1. REFER TO SHEET E-005 FOR CLIN DESCRIPTIONS.
2. REFER TO SHEET E-600 FOR FEEDER CONDUCTOR
SIZE, CONDUIT SIZE, AND RACEWAY ROUTING.
3. REFER TO STRUCTURAL SHEETS FOR EQUIPMENT
PAD DETAILS.
4. OUTDOOR: ROUTE CONDUIT ALONG EXTERIOR OF
BUILDING, AVOIDING EXISTING OBSTRUCTIONS.
PENETRATE WALL THROUGH WAREHOUSE
PORTION OF BUILDING, COORDINATE WITH
OWNER ON PENETRATION LOCATION BEFORE
DOING ANY WORK.
INDOOR: SHOWN IS APPROXIMATED CONDUIT
ROUTING THROUGH EXISTING BUILDING. FIBER
OPTIC CABLE MUST BE ROUTED THROUGH
EXISTING TRAYS TO THE GREATEST EXTENT
POSSIBLE. ROUTE FIBER OPTIC INSIDE 1" NMT
TUBING INSIDE EXISTING TRAY.
SITE ELECTRICAL DISTRIBUTION PLAN
KEYNOTES:
1. BID OPTIONS: PV CARPORTS 4, 5, 6, 7 AND 8 ARE BID
OPTIONS. OPTIONS INCLUDE FOLLOWING FOR PV
CARPORTS 4, 5, 6, 7 AND 8:
· PV PANELS, INVERTERS, CONDUCTORS, AND
RACEWAY
· CARPORT STRUCTURES AND ANCHORS
· DRILLED PIER FOUNDATIONS
1 1
MH-7
TYPE 3
NOTE 4
PLAN
NORTH
PLAN
NORTH
NOTES:
1. ALL STRING CABLES AND HOMERUNS MUST BE
LABLED ON BOTH ENDS OC CONNECTION WITH
STRING NUMBER, INVERTER NUMBER, AND
POLARITY. ALL CONDUCTORS MUST BE LABELED
PER NFPA 70 ARTICLE 690 WIRING METHODS.
2. PROVIDE DC CONDUCTORS IN FREE AIR
ATTACHED TO PV RACKING STRUCTURE. PROVIDE
ONE 2" CONDUIT FROM EACH INVERTER TO THE
AC COMBINER BOX. REFER TO ONE-LINE FOR
CONDUIT AND CONDUCTOR SIZES.
3. FIELD VERIFY AND ADJUST CONDUIT,
CONDUCTOR, AND DUCT BANK LAYOUT AND
QUANTITIES BASED ON FINAL PV EQUIPMENT
SELECTED AND MANUFACTURER REQUIREMENTS.
PROVIDE CALCULATIONS FOR ALTERATIONS.
DB-1
4X4"C
DB-2
4X4"C
INV5-1
2"C
DB-2
4X4"C
INV7-1
INV7-2
2X2"C 1X2
6X2"C 3X21
INV1-1
INV1-2
2X2"C 1X2
INV2-1
INV2-2
2X2"C 1X2
INV3-1
INV3-2
2X2"C 1X2
INV4-1
2"C 1X2
INV8-1
INV8-2
2X2"C 1X2
L4 S-501
W
2Q R
R
A0
_P la ns -0
MILITARY DRIVE
N O
R
TH
PA
R
KW
AY
FIRE LANE
FIRE
LANE
FI
R
E
LA
N E
FIRE LANE
FI
R
E
LA
N E
G
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSDSDSDSDSD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSDSD
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXX
X
XXXXXX
XX
XXXXXXXXXXXXXXXXX
X X X X X X X X X X X
X
XXXXXXXXXXXXXXXXXXXX
NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
N
PW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
NPW
WWWWWWWWWWWWWWWWWWWWWW
WWWWWWWWWWWWWWWWWWWWWW
W W
W W
W W
W W
W W
W W
W W
W W
W W
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F
F F
F F
F F
F F
F F
F F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F F F F F F F
F
F
F
F
F
F
F
F
F
F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F F
F
F
F
F F F F F F F F F F F F F F F F
F U
T 8"
W L
F
F U
T 8"
W L
W
W
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A A A A A A A A
A
A
A
A
A
A
A
A
A
A
A
A
A
AAA
A A
AA
A A
AA
A A
AA
AA
A A
A
A
A
A
A
A
AA
A A
AA
A A
AA
A A
AA
A A
AA
AA
W
W
W
HH
X X
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXXX
X
XX
X
XXXXXXXXXXXXXXX
NPW
NPW
N
PW
N
PW
SA
N
SA
N
SA
N
F
F
F
F
F
F
F F
F F
F F
F
G G G
SCALE: 1" = 30'-0"
CARPORT LIGHTING PLANA1 30' 60'0
PP-1, 5
PP-1, 7
PP-1, 9
PP-1, 11
PP-1, 15PP-1, 13PP-1, 1
PP-1, 3
KEYNOTES:
1. RELOCATE SALVAGED STREET LIGHT, POLE, AND CIRCUIT HERE.
ROTATE FIXTURE 90° AND EXTEND…