Solicitation Amendment W912QR25RA0170001 SF 30.pdf

PDF 3 MB Posted

Attached to
Scott AFB ORC SATOC
Solicitation number
W912QR25RA017
Issued by

About this file

This document is a Solicitation Amendment (SF 30) for the W912QR25RA017 contract, modifying the existing solicitation for the Scott Air Force Base (AFB) Optimized Remediation Contract (ORC) Single Award Task Order Contract (SATOC). The amendment adds multiple attachments, including environmental monitoring reports for Scott AFB sites (such as Final Monitored Natural Attenuation Reports, Annual Groundwater Monitoring Reports, and Remedial Action Objective Reports), along with supporting documentation like labor category qualifications, Chemistry Data Quality Fact Sheet, and guidance documents on materials disposal.

The amendment updates the List of Attachments section, adding nine new document entries with reference dates of 18 March 2025 and 08 April 2025, which expand the contract's supporting documentation. These additions appear to provide technical and procedural details for environmental remediation services, specifically targeting contamination at Scott AFB, including potential Per-and Polyfluoroalkyl Substances (PFAS), chlorinated solvents, petroleum products, and explosives constituents. The amendment maintains the original contract's structure as a Firm-Fixed-Price (FFP) SATOC set aside for Small Businesses, with a 10-year ordering period.

View the file

Other files

File Type Posted
W912QR25RA017 Amendmenr 0003 - Scott ORC SATOC.zip ZIP file
Schedule A_rev1.pdf PDF
AR 1777 LF01 Final OM Manual June 2014.pdf PDF
Scott AFB FY25_Final Sub-CLIN Structure_Price Breakout Schedule_AMD0001.xlsx XLSX spreadsheet
Scott Draft Final LF01 GW ROD.pdf PDF
Data Tables Draft_LF001_OES Effectivesness Report (002).pdf PDF
Enclosure 6_Draft CIP Update PWS and Outline v4.2.pdf PDF
SS025A_TM_for_MW_Replacement.pdf PDF
Data Tables SS025A_Annual_GWMR_2024 DRAFT (002).pdf PDF
Scott AFB (FY25) ORC PWS_Rev05_Rev01_042525.pdf PDF
Past Performance Questionnaire.pdf PDF
Data Tables SAFB_SS006_Draft_2023-2024 Annual GW Rpt (002).pdf PDF
Att 1 COMBINED Summary Lab Reports - FINAL Soil Removal Report CCVN Scott AFB.pdf PDF
NPDES Pretreatment Permit for PFAS RI No. 2023-EA-67823.pdf PDF
Solicitation Amendment W912QR25RA0170002 SF 30.pdf PDF
Data Report - SS016 2024 ZB23018 Report_Complete_REV01 (002).pdf PDF
Site Visit Registration.xlsx XLSX spreadsheet
3. Draft Final Monitored Natural Attenuation Report, Site OT007, Scott AFB.pdf PDF
7. Draft Final_SAFB_SS005_2024 Annual GW Monitor Rpt with AF RTCs.pdf PDF
5. Final 2024_Annual_GW_Monitoring_Report_SA026 (RPM needs to add to AR).pdf PDF
9. Final 2023 Annual RAO and Groundwater Monitoring Report, Site SS014.pdf PDF
4. Final 2023 Monitored Natural Attenuation Report, Site OT007, Scott AFB, Feb 2024.pdf PDF
6. Final_2023_Annual_GW_Monitoring_Report_SA026 (RPM needs to add to AR).pdf PDF
2. UK510_Scott AFB_DF_Proposed Plan_Mar2025.pdf PDF
1. UK510_Scott AFB_Final RI Addendum (RPM needs to add to AR).pdf PDF
Attachment L1_Labor Category Qualifications_v1.3.pdf PDF
Scott ORC SATOC.zip ZIP file
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following documents are hereby added as Block 14 (Description of Amendment/Modification):

attachments:

1. UK510_Scott AFB_Final RI Addendum (RPM needs to add to AR)

2. UK510_Scott AFB_DF_Proposed Plan_Mar2025

3. Draft Final Monitored Natural Attenuation Report, Site OT007, Scott AFB

4. Final 2023 Monitored Natural Attenuation Report, Site OT007, Scott AFB, Feb 2024 (RPM needs to add to AR)

5. Final 2024_Annual_GW_Monitoring_Report_SA026 (RPM needs to add to AR)

6. Final_2023_Annual_GW_Monitoring_Report_SA026 (RPM needs to add to AR)

7. Draft Final_SAFB_SS005_2024 Annual GW Monitor Rpt with AF RTCs

8. Final 2022 Annual RAO and Groundwater Monitoring Report, Site SS014 (RPM needs to add to AR)

9. Final 2023 Annual RAO and Groundwater Monitoring Report, Site SS014 (RPM needs to add to AR) Attachment L1_Labor Category Qualifications_v1.3.2_20250124 1

Section J - List of Attachments

The attachments table has changed from:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

Electronic Proposal Submission

Electronic Proposal Submission 18 Mar 2025 Attachment No

Optimization Examples

Optimization Examples 18 Mar 2025 Attachment No

Draft CPSMR Template

Draft CPSMR Template 18 Mar 2025 Attachment No

AFCEC Chemistry Data Quality Fact Sheet April 2020

Chemistry data 18 Mar 2025 Attachment No

Interim_Guidance_o n_Destruction_or_D isposal_of_Materials _Containing_PFAS

Interim Guidance on Destruction or Disposal of Materials

18 Mar 2025 Attachment No

DOD Memorandum-for-Incineration- Prohibition-Policy- Update

Guidance on Incineration of Materials 18 Mar 2025 Attachment No

ORC PMP

Guidance v5.

0_20240701

ORC PMP Guidance 18 Mar 2025 Attachment No

Wage Rates 2015- 5075 - 23Dec

Wage Determination 18 Mar 2025 Attachment No

0017 Projnet instructions ProjNet Instructions 24 Mar 2025 Attachment No

0018 Evaluation Criteria Evluation Criteria 24 Mar 2025 Attachment No

0003 Schedule A Schedule A 18 Mar 2025 Attachment No

Scott AFB FY25_Final Sub-

CLIN

Structure_Price Breakout Schedule

Price Breakout - ORC 18 Mar 2025 Attachment No

0001 SATOC SOW Statement of Work 18 Mar 2025 Attachment No

0002 ORC PWS Performance Work Statement 18 Mar 2025 Attachment No

0006 Enclosure 1 Enclosure 1 18 Mar 2025 Attachment No

W912QR25RA0170001

0007 Enclosure 2 Enclosure 2 18 Mar 2025 Attachment No

0008 Enclosure 3 Enclosure 3 18 Mar 2025 Attachment No

To:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

Electronic Proposal Submission

Electronic Proposal Submission 18 Mar 2025 Attachment No

Optimization Examples

Optimization Examples 18 Mar 2025 Attachment No

Draft CPSMR Template

Draft CPSMR Template 18 Mar 2025 Attachment No

AFCEC Chemistry Data Quality Fact Sheet April 2020

Chemistry data 18 Mar 2025 Attachment No

Interim_Guidance_o n_Destruction_or_D isposal_of_Materials _Containing_PFAS

Interim Guidance on Destruction or Disposal of Materials

18 Mar 2025 Attachment No

DOD Memorandum-for-Incineration- Prohibition-Policy- Update

Guidance on Incineration of Materials 18 Mar 2025 Attachment No

ORC PMP

Guidance v5.

0_20240701

ORC PMP Guidance 18 Mar 2025 Attachment No

Wage Rates 2015- 5075 - 23Dec

Wage Determination 18 Mar 2025 Attachment No

0017 Projnet instructions ProjNet Instructions 24 Mar 2025 Attachment No

0018 Evaluation Criteria Evluation Criteria 24 Mar 2025 Attachment No

1. UK510_Scott AFB_Final RI Addendum (RPM needs to add to AR)

1. UK510_Scott AFB_Final RI Addendum (RPM needs to add to AR)

08 Apr 2025 Attachment No

2. UK510_Scott AFB_DF_Proposed Plan_Mar2025

2. UK510_Scott AFB_DF_Proposed Plan_Mar2025

08 Apr 2025 Attachment No

0003 Schedule A Schedule A 18 Mar 2025 Attachment No

3. Draft Final Monitored Natural Attenuation Report, Site OT007, Scott

AFB

3. Draft Final Monitored Natural Attenuation Report, Site OT007, Scott

AFB

08 Apr 2025 Attachment No

4. Final 2023 Monitored Natural Attenuation Report, Site OT007, Scott AFB, Feb 2024

4. Final 2023 Monitored Natural Attenuation Report, Site OT007, Scott AFB, Feb 2024 (RPM needs to add to

AR)

08 Apr 2025 Attachment No

5. Final 2024_Annu al_GW_Monitoring _Report_SA026 (RPM needs to add to AR)

5. Final 2024_Annual_GW_Monitoring_ Report_SA026 (RPM needs to add to

AR)

08 Apr 2025 Attachment No

6. Final_2023_Annu al_GW_Monitoring _Report_SA026 (RPM needs to add to AR)

6. Final_2023_Annual_GW_Monitoring _Report_SA026 (RPM needs to add to

AR)

08 Apr 2025 Attachment No

7. Draft Final_SAFB

_SS005_2024

Annual GW Monitor Rpt with AF RTCs

7. Draft Final_SAFB_SS005_2024 Annual GW Monitor Rpt with AF RTCs

08 Apr 2025 Attachment No

8. Final 2022 Annual RAO and Groundwater Monitoring Report, Site SS014

8. Final 2022 Annual RAO and Groundwater Monitoring Report, Site

SS014

08 Apr 2025 Attachment No

9. Final 2023 Annual RAO and Groundwater Monitoring Report, Site SS014

9. Final 2023 Annual RAO and Groundwater Monitoring Report, Site

SS014

08 Apr 2025 Attachment No

Attachment L1_Labor Category Qualifications_v1.3

Attachment L1_Labor Category Qualifications_v1.3

08 Apr 2025 Attachment No

Scott AFB FY25_Final Sub-

0004 CLIN

Structure_Price Breakout Schedule

Price Breakout - ORC 18 Mar 2025 Attachment No

0001 SATOC SOW Statement of Work 18 Mar 2025 Attachment No

0002 ORC PWS Performance Work Statement 18 Mar 2025 Attachment No

0006 Enclosure 1 Enclosure 1 18 Mar 2025 Attachment No

0007 Enclosure 2 Enclosure 2 18 Mar 2025 Attachment No

0008 Enclosure 3 Enclosure 3 18 Mar 2025 Attachment No

The following contract documents were added:

1. UK510_Scott AFB_Final RI Addendum (RPM needs to add to AR)

2. UK510_Scott AFB_DF_Proposed Plan_Mar2025

3. Draft Final Monitored Natural Attenuation Report, Site OT007, Scott AFB

4. Final 2023 Monitored Natural Attenuation Report, Site OT007, Scott AFB, Feb 2024

5. Final 2024_Annual_GW_Monitoring_Report_SA026 (RPM needs to add to AR)

6. Final_2023_Annual_GW_Monitoring_Report_SA026 (RPM needs to add to AR)

7. Draft Final_SAFB_SS005_2024 Annual GW Monitor Rpt with AF RTCs

8. Final 2022 Annual RAO and Groundwater Monitoring Report, Site SS014

9. Final 2023 Annual RAO and Groundwater Monitoring Report, Site SS014 Attachment L1_Labor Category Qualifications_v1.3

IDCode: J
Page: 1
Pages: 4
AmendNo: 0001
EffDate: 09 APR 2025
ReqNo:
ProjNo:
IssCode: W912QR
AdmCode:
IssuedBy: W072 ENDIST LOUISVILLE

KO CONTRACTING DIVISION, 600 DR MARTIN LUTHER KING JR PL

LOUISVILLE, KY 40202-2230

UNITED STATES

KARI ROGERS, EMAIL: KARI.A.ROGERS@USACE.ARMY.MIL TELEPHONE: (502) 315-7028

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912QR25RA017
SolDate: 02 APR 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: SEE SCHEDULE
ContNameTitle:
CoNameTitle:
ContDate:
CODate:

File details come from the government source that posted it. Updated .