This is Amendment 0003 to solicitation W912QR25R0010 for the Design-Bid-Build Construction of the Area Maintenance Support Activity facility in San Tan Valley, Arizona. The amendment replaces several plan sheets in their entirety, including: Overall Site Plan (CS101), Annotated Floor Plan (AE102), Reflected Ceiling Plan (AE121), Air Barrier Details (AE803), Exterior Elevations for North/South (A-201) and East/West (A-202), Exterior Details (A-530), and Finish Material Legend/Room Finish Schedule (I-601).
The modified drawings provide updated details for the AMSA facility construction, including site layout, floor plans showing work bays, offices, storage areas and support spaces, ceiling specifications, air barrier installation requirements, building elevations and exterior finishing details. The amendment retains the original solicitation date of October 22, 2024 and has an effective date of December 6, 2024. Contractors must acknowledge receipt of all amendments. The project is being managed by the U.S. Army Corps of Engineers Louisville District.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation No. W912QR25R0010 for the Design-Bid-Build Construction of the Area Maintenance Support Activity at San Tan Valley, AZ is hereby modified as follows:
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR25R0010
X 9B. DATED (SEE ITEM 11)
22-Oct-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Dec-2024
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
X 1
W912QR25R0010_Plans-0003
W912QR25R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
SUMMARY OF CHANGES – Amendment 0003
1. The following Plan Sheets have been replaced in their entirety:
CS101 Overall Site Plan AE102 Annotated Floor Plan AE121 Reflected Ceiling Plan AE803 Air Barrier Details A-201 Exterior Elevations - North and South A-202 Exterior Elevations – East and West A-530 Exterior Details I-601 Finish Material Legend / Room Finish Schedule
2. Offerors must acknowledge all amendments.
3. All other terms and conditions remain unchanged.
(End of Summary of Changes)
W912QR25R0010_Plans-0003
T
MP
Cxu Cxu Cxu Cxu Cxu Cxu Cxu Cxu Cxu Cxu Cxu Cxu Cxu C
RWRWRWRWRWRWRWRWRWRWRWRWRWRWRWRW
RW
RW
RW
RW
RW
RW
RW
RW
RW
C x u
C x u
C x u
C x u
C x u
C x u
C x u
IRR
IRR
IRR
IRR
IRR
IRR
Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u
G x
G x
G x
G x
G x
G x
G x
G x
Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx Gx
G x
G x
G x
G x
G x
G x
G x
C x u
C x u
C x u
C x u
C x u
C x u
C x u
Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u Cx u
OHE
OH
E
OHE
Ex u
C x u
C x u
C x u
C x u
C x u
C x u
C x u
C x u
Ex u Ex u Ex u Ex u Ex u Ex u Ex u Ex u Ex u Ex u Ex u Ex u Ex u
Ex uEx u W x W x W x W x W x W x W x W x W x W x W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
X X
X X
X X
X
X X X X
X X
X X
X X
X
III IT TE
M
M
LS LS LS LS LS LS LS LSI
I I
T T
EE
E E E
TIE
W
IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR
IRR
WV
WV
WV
GV
WVWV
WV
GV
EXISTING GRAVEL /
DIRT ROAD
PROPERTY BOUNDARY
E. OCOTILLIO ROAD
N.SCHNEPF ROAD
120' QUEEN CREEK
IRRIGATION DISTRICT
EASEMENT
40' CITY OF GILBERT
RAW WATER EASEMENT
40' CITY OF GILBERT TEMPORARY
CONSTRUCTION EASEMENT80' QUEEN CREEK
IRRIGATION DISTRICT
EASEMENT
30' CITY OF GILBERT
RAW WATER EASEMENT
40' CITY OF GILBERT TEMPORARY
CONSTRUCTION EASEMENT
X X
X X
XXXXX
X X
X
X
X
VAN
MEP ACCESS
RESTRICTED TO RIGHT IN /
RIGHT OUT / LEFT IN PER
PINAL COUNTY
DUMPSTER
ENCLOSURE
MEP SWING GATES
(REFER TO NOTE #9)
MEP SLIDING GATE
(REFER TO NOTE #9))
MEP FENCE
FUTURE MEP
EXPANSION
AREA
AREA
MAINTENANCE
SUPPORT
ACTIVITY (AMSA)
BUILDING
MILITARY
EQUIPMENT
PARKING (MEP)
33' UNOBSTRUCTED
SPACE ATFP SETBACK
50' MIN. ATFP
STANDOFF DISTANCE
STORMWATER
MANAGEMENT
AREA
26'
CLEAR ZONE
10' CLEAR ZONE
10' CLEAR ZONE
156'
10' CLEAR ZONE
UNSIGNALIZED
INTERSECTION
75' RIGHT OF WAY DEDICATION
/ RESERVATION FOR PINAL
COUNTY FUTURE 6 LANE
PRINCIPAL ARTERIAL
75' RIGHT OF WAY DEDICATION /
RESERVATION FOR PINAL COUNTY
FUTURE 6 LANE PRINCIPAL
ARTERIAL
CLEAR ZONE
ROADWAY IMPROVMENTS BY
OTHERS - SHOWN FOR
REFERENCE ONLY
VEHICULAR
BARRIER
403'
240'
342'
CONSTRUCTION
LIMITS, TYP
1108.6' 236.4'
US Army Corps of Engineers ®
SHEET ID
AR
EA
M
AI
N
TE
N
AN
C E
SU
PP
O R
T
AC
TI
VI
TY
(A
M
SA
) F
AC
IL
IT
Y U
S
AR
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E
KE
N
TU
C
KY
JA
C
O
BS
H ig hl an ds P la za
D riv e W
S ui te
St
. L ou is , M
O
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
A.
PE
TT
Y
A.
PE
TT
Y
D .E
VE
R
ET
T
D .C
U R
R Y
A
U G
U
ST
IS
SU
E
D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E
SA
N
T
AN
V
AL
LE
Y, A R
IZ
O
N A
M
AR
K D
ES
C
R
IP
TI
O
N
Z:
\P ro jec ts Fo lde r-Z eb ulo n\2
2\2
2-
9 R itte nh ou se A
MS
A
- P ho en ix, A Z\
Pl an s\C on str uc tio n D ra wi ng s\S he ets
\C S1
O
VE
RA
LL
S
IT
E
PL
AN
.dw g
/6/
:43
:33 A
M Fi le P at h:
Pl ot
D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
R
EV
IS
ED
IN
A C
C O
R D
AN
C
E W
IT
H
A M
EN
D
M
EN
T
CERTIFIED FINAL DESIGN SUBMISSION
A1
CS101
OVERALL SITE PLAN
1"=60'
GENERAL NOTES
NOTES APPLY TO ALL PLANS IN SAME SERIES (CS). REFER TO PARTIALS FOR
MORE DETAILED INFORMATION
1. ALL DIMENSIONS SHALL BE IN FEET AND TO FACE OF CURB OR EDGE OF
PAVEMENT UNLESS OTHERWISE NOTED. ALL RADII TO BE 5-FT UNLESS
OTHERWISE NOTED.
2. ALL SITE ELEMENTS ARE PERPENDICULAR TO ONE ANOTHER UNLESS
OTHERWISE NOTED.
3. ANY SAW CUTTING OF EXISTING PAVEMENT SHALL BE DONE BY SAW
CUTTING FULL DEPTH. SAW CUTS SHALL BE NEAT AND STRAIGHT.
4. ALL NEW ASPHALT SHALL BE TRANSITION TO EXISTING ASPHALT WITH A
BUTT TYPE JOINT WITH A SMOOTH TRANSITION.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AN
ACCEPTABLE KNOX BOX LOCATION WITH THE LOCAL FIRE DEPARTMENT.
6. THE MEP AREA IS NOT TO BE STRIPED. THE OUTLINES SHOWN ARE FOR
ILLUSTRATION ONLY.
7. ALL CURBING SHALL CONFIRM TO PINAL COUNTY STANDARDS.
8. REFER TO ARCHITECTURE PLANS FOR BOLLARDS AT BUILDING DOORS AND
CORNERS.
9. SECURITY GATES SHALL HAVE THE FOLLOWING REQUIREMENTS:
A. SECURITY GATES EQUIPPED WITH ELECTRONIC CONTROL DEVICES
SHALL HAVE AN APPROVED FIRE DEPARTMENT OVERRIDE KEY
SWITCH AND LOCK BOX, AND SHALL ALLOW OPERATION OF THE
GATE DURING POWER OUTAGES. ALL GATES SHALL HAVE AN
EMERGENCY KEY BOX MOUNTED NEAR THE GATE LOCKING
MECHANISM.
B. MANUAL LOCKING MECHANISMS, SUCH AS PADLOCKS, SHALL BE
SOURCED FROM ONE MANUFACTURE (APPROVAL MUST COME FROM
CONTRACTING OFFICER). ALL GATES SHALL HAVE AN EMERGENCY
KEY BOX MOUNTED NEAR THE GATE LOCKING MECHANISM.
C. ALL MANUALLY OPERATED GATES SHALL REMAIN IN THE OPEN
POSITION WHEN LEFT UNATTENDED. ACTIVATION OF AN APPROVED
KEY SWITCH FOR ELECTRONICALLY CONTROLLED GATE SHALL
OPEN THE GATE AND CAUSE IT TO REMAIN IN THE OPEN POSITION
UNTIL RESET BY THE EMERGENCY RESPONSE PERSONNEL.
D. WHEN OPEN, GATES SHALL NOT OBSTRUCT ANY PORTION OF THE
REQUIRED WIDTH OF THE DRIVEWAY OR ACCESS ROAD, SHALL BE
ADEQUATELY SUPPORTED TO PREVENT DRAGGING, AND SHALL BE
OPERABLE BY ONE PERSON. SLIDING GATES SHALL SLIDE
PARALLEL TO THE SECURITY FENCE. SWING STYLE GATES SHALL
OPEN A FULL 90 DEGREES (MINIMUM) AND MAY SWING IN EITHER
DIRECTION.
E. GATE COMPONENTS SHALL BE MAINTAINED IN AN OPERATIVE
CONDITION AT ALL TIMES AND BE REPLACE OR REPAIRED WHEN
DEFECTIVE.
102 SHEETS
103 SHEETS105 SHEETS
104 SHEETS106 SHEETS
107 SHEETS
SHEET KEY PLANN
NORTH
(NAD 83)
0 120'30' 180'60'
1" = 60'-0"
1391 QUANTITIES
MEP PARKING AREA
(INCLUDING CIRCULATION) 11,475 SY
MEP APRONS 1,060 SY
TOTAL ORGANIZATIONAL PARKING = 12,535 SY
MEP / POV ACCESS ROAD 1,008 SY
MEP FENCE 1,460 LF
POV PARKING AREA 685 SY
O
VE
R
AL
L
SI
TE
P
LA
N
CS101
QUANTITIES SHOWN HERE ARE FOR ILLUSTRATION OF
COMPLIANCE WITH 1391 GUIDELINES ONLY. CONTRACTOR IS
RESPONSIBLE FOR HIS/HER OWN ALL BID QUANTITIES.
W
2Q R
R
_P la ns -0
01_LEVEL
0' - 0"
A1
A-301
A8
A-310
C CB
10.01
10.01
10.01
26.03
26.02
04.04
03 - TOP OF CMU
36' - 0"
02_TOP OF CMU
19' - 4"
05.02
05.04
1 2
04.04
05.03
26.04
26.01
26.01
26.04
26.02
26.01
05.03
L3 L3
18' - 0" 2' - 0"
05.02
07.05
10.17
2' - 0" 19' - 4"
A L
IG
N
A L
IG
N
2' - 0" 24' - 0" 24' - 0" 24' - 0" 24' - 0" 2' - 0"
A L
IG
N
01_LEVEL
0' - 0"
A1
A-301
A
26.01
10.02
10.01
26.03
10.01
04.04
03 - TOP OF CMU
36' - 0"
04.04
05.03
26.04
08.06 26.04
18' - 0"2' - 0" 2' - 0"18' - 0"
A L
IG
N
A L
IG
N
01.01
01.01
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S O
L
IC
IT
A
T
IO
N N
O
L .V ie rr e th e r
B
IM
/U
S A
Z T
B D
A rm y R e s e rv e A
M S
A P h o e n ix
/A M
S A
-P h o e n ix
A
I.
rv t
/6
/2
:1
:1
A
M
A-201
E X
T E
R
IO
R E
L E
V A
T
IO
N S
N
O R
T H
A N
D S
O U
T H
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
J A
C O
B S
H ig h la n d s P la z a D ri v e W
S u it e
S t.
L o u is
M
O
A T e s ta
L .V ie rr e th e r
J .C o rs o n
A
U G
U S
T
CERTIFIED FINAL DESIGN SUBMISSION
A R
E A
M A
IN
T
E N
A N
C E
S U
P P
O R
T A
C T
IV
IT
Y
A M
S A
F
A C
IL
IT
Y
S A
N T
A N
V A
L L E
Y A
R
IZ
O N
A
1/8" = 1'-0"
AE102
G1
SOUTH ELEVATION
1/8" = 1'-0"
AE102
A1
NORTH ELEVATION
GRAPHIC SCALE(S)
1/16" = 1'-0" 0 16' 32' 48'8'
01.01 BID OPTION C
04.04 4" FACE BRICK
05.02 METAL COPING
05.03 SCUPPER OVERFLOW THROUGH PARAPET OUTLET
05.04 SCUPPER AND DOWNSPOUT TO CONCRETE SPLASHBLOCK
07.05 BRICK EXPANSION JOINT
08.06 SECTIONAL VERTICAL LIFT OVERHEAD DOOR
10.01 CANOPY SYSTEM WITH INTEGRAL LED LIGHT RATED FOR WET LOCATIONS
(WHERE SHOWN)
10.02 BOLLARD
10.17 EXTERIOR SIGNAGE. REFER TO IN101 AND I-611 FOR SIGNAGE PLANS AND
SCHEDULE
26.01 MECHANICAL EQUIPMENT; REFER TO MECHANICAL
26.02 ELECTRICAL EQUIPMENT; REFER TO ELECTRICAL
26.03 ROOF AIR TERMINAL RODS; REFER TO ELECTRICAL
26.04 WALL MOUNTED LIGHT - REFER TO ELECTRICAL
KEYED NOTES#ELEVATION
KEYED NOTE PRODUCT FINISH COLOR
8.03 TRANSLUCENT FIBERGLASS PANEL PREFINISHED WHITE
8.04 GLAZED ALUMINUM STOREFRONT PREFINISHED YKK : DURANAR CHARCOAL
8.05 HOLLOW METAL DOOR AND FRAME FIELD PAINTED PT-5 OR SIMILAR
8.06 VERTICAL LIFT OVERHEAD DOOR PREFINISHED PT-5 OR SIMILAR
10.01 CANOPY PREFINISHED - -
10.02 BOLLARD FIELD PAINTED SAFETY YELLOW
26.02 WALL MOUNTED LIGHT FIXTURE. REFER TO ELECTRICAL. PREFINISHED - -
ELEVATION
KEYED NOTE PRODUCT FINISH COLOR
4.01 CONCRETE MASONRY UNIT, ACCENT PREFINISHED GROUND FACE, ADOBE
4.02 CONCRETE MASONRY UNIT, FIELD PREFINISHED SPLIT FACE, TERRA COTTA
5.01 DOWNSPOUT PREFINISHED MATCH CMU
5.02 PREFINISHED METAL COPING PREFINISHED MATCH CMU
5.03 SCUPPER PREFINISHED MATCH CMU
8.01 LOUVER PREFINISHED MATCH CMU
8.02 OVERHEAD COILING DOOR PREFINISHED PT-5 OR SIMILAR
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/5
/2
W
2Q R
R
_P la ns -0
01_LEVEL
0' - 0"
K1
A-301
F1
A-301
A A
26.03
04.04
08.02
10.0110.01 05.02
26.01
26.03
03 - TOP OF CMU
36' - 0"
02_TOP OF CMU
19' - 4"
04.0408.06 08.06
ABC
26.01
05.04
05.01
26.02
26.04
05.01
10.01
26.04 L2L1
10.17
2' - 0"
A L
IG
N
A L
IG
N
A L
IG
N
A L
IG
N
A L
IG
N
A L
IG
N
20' - 0" 1' - 4"
01.01
01.01
01_LEVEL
0' - 0"
K1
A-301
F1
A-301
A A
C
10.0110.01
08.06 10.02
10.01 05.02
26.01
26.03
26.03
04.04 04.04
03 - TOP OF CMU
36' - 0"
02_TOP OF CMU
19' - 4"
08.06
A B C
05.01
26.01 26.01
26.04 26.02
26.01
05.04
L3 L1
10.17
1' - 4"
B17
A-310
2' - 0"
A L
IG
N
A L
IG
N
A L
IG
N
A L
IG
N
A L
IG
N
A L
IG
N
A L
IG
N
01.01
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S O
L
IC
IT
A
T
IO
N N
O
L .V ie rr e th e r
B
IM
/U
S A
Z T
B D
A rm y R e s e rv e A
M S
A P h o e n ix
/A M
S A
-P h o e n ix
A
I.
rv t
/6
/2
:1
:1
A
M
A-202
E X
T E
R
IO
R E
L E
V A
T
IO
N S
E
A S
T A
N D
W E
S T
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
J A
C O
B S
H ig h la n d s P la z a D ri v e W
S u it e
S t.
L o u is
M
O
A T e s ta
L .V ie rr e th e r
J .C o rs o n
A
U G
U S
T
CERTIFIED FINAL DESIGN SUBMISSION
A R
E A
M A
IN
T
E N
A N
C E
S U
P P
O R
T A
C T
IV
IT
Y
A M
S A
F
A C
IL
IT
Y
S A
N T
A N
V A
L L E
Y A
R
IZ
O N
A
1/8" = 1'-0"
AE102
G1
EAST ELEVATION
1/8" = 1'-0"
AE102
A1
WEST ELEVATION
GRAPHIC SCALE(S)
1/16" = 1'-0" 0 16' 32' 48'8'
01.01 BID OPTION C
04.04 4" FACE BRICK
05.01 SCUPPER AND DOWNSPOUT WITH DOWNSPOUT BOOT TO DRAIN TO
UNDERGROUND STORM SEWER; REFER TO PLUMBING SHEETS.
05.02 METAL COPING
05.04 SCUPPER AND DOWNSPOUT TO CONCRETE SPLASHBLOCK
08.02 OVERHEAD ROLLING DOOR
08.06 SECTIONAL VERTICAL LIFT OVERHEAD DOOR
10.01 CANOPY SYSTEM WITH INTEGRAL LED LIGHT RATED FOR WET LOCATIONS
(WHERE SHOWN)
10.02 BOLLARD
10.17 EXTERIOR SIGNAGE. REFER TO IN101 AND I-611 FOR SIGNAGE PLANS AND
SCHEDULE
26.01 MECHANICAL EQUIPMENT; REFER TO MECHANICAL
26.02 ELECTRICAL EQUIPMENT; REFER TO ELECTRICAL
26.03 ROOF AIR TERMINAL RODS; REFER TO ELECTRICAL
26.04 WALL MOUNTED LIGHT - REFER TO ELECTRICAL
KEYED NOTES#ELEVATION
KEYED NOTE PRODUCT FINISH COLOR
8.03 TRANSLUCENT FIBERGLASS PANEL PREFINISHED WHITE
8.04 GLAZED ALUMINUM STOREFRONT PREFINISHED YKK : DURANAR CHARCOAL
8.05 HOLLOW METAL DOOR AND FRAME FIELD PAINTED PT-5 OR SIMILAR
8.06 VERTICAL LIFT OVERHEAD DOOR PREFINISHED PT-5 OR SIMILAR
10.01 CANOPY PREFINISHED - -
10.02 BOLLARD FIELD PAINTED SAFETY YELLOW
26.02 WALL MOUNTED LIGHT FIXTURE. REFER TO ELECTRICAL. PREFINISHED - -
ELEVATION
KEYED NOTE PRODUCT FINISH COLOR
4.01 CONCRETE MASONRY UNIT, ACCENT PREFINISHED GROUND FACE, ADOBE
4.02 CONCRETE MASONRY UNIT, FIELD PREFINISHED SPLIT FACE, TERRA COTTA
5.01 DOWNSPOUT PREFINISHED MATCH CMU
5.02 PREFINISHED METAL COPING PREFINISHED MATCH CMU
5.03 SCUPPER PREFINISHED MATCH CMU
8.01 LOUVER PREFINISHED MATCH CMU
8.02 OVERHEAD COILING DOOR PREFINISHED PT-5 OR SIMILAR
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/5
/2
W
2Q R
R
_P la ns -0
GALV. METAL FLASHING;
PAINT TO MATCH
ADJACENT CMU WALL
FRPT WOOD BLOCKING
CMU WALL
6"
1"
EPDM ROOFING - TURN UP
WALL AS INDICATED -
REFER TO DETAIL E1/A-530
FOR ADDITIONAL
INFORMATION
CONTINUOUS LAP SEALANT
CMU
THERMAL INSULATION
3 5/8" BRICK
COPING
EPDM
AIR BARRIER
REINFORCED CORNER PER
MANUFACTURERS STANDARD
EXPANSION FASTENER
5/8" GYPSUM BOARD
CMU WALL
1 5/8" METAL STUD
FOOTING PER
STRUCTURAL SHEETS
CONCRETE
FOUNDATION - REFER
TO STRUCTURAL
ISOLATION JOINT
CONCRETE SLAB PER
STRUCTURAL
FLASHING WITH WEEPS
MORTAR MESH
GROUT BEHIND BRICK
VENEER SOLID - ALL
COURSES BELOW
FLASHING
CMU WALL
AIR TERMINAL
MANUFACTURER'S STANDARD
BASE FASTENED TO PARAPET PER
MANUFACTURER'S
RECOMMENDATIONS. PROVIDE
NEOPRENE WASHERS AT EACH
BOLT CONNECTION. COORDINATE
PENETRATION OF ROOF
MEMBRANE WITH ROOFING
CONTRACTOR.
CABLE
NOTE: DO NOT ATTACH AIR
TERMINAL OR CABLE TO SHEET
METAL COPING
SHEET METAL COPING
EXTERIOR WALL ASSEMBLY
6"
OPEN END AWAY FROM
BUILDING/WALL
3" x 4" SQUARE
GALVANIZED STEEL
DOWNSPOUT ABOVE
PRECAST CONCRETE
SPLASH BLOCK
4" 2 1/
2"
1/
2"
1'
4"
4" 8"
4"
2" 1'
0"
2"
1' - 8"
FACE OF BUILDING
DOWNSPOUT
SUPPORT
3"
DOWNSPOUT
PRECAST CONCRETE SPLASH
BLOCK AT DOWNSPOUTS
WHERE NOTED REFER TO
E16/A-530
GRADE
4"
STOREFRONT SYSTEM
METAL ANGLE
CMU WALL
1 5/8" METAL STUD
5/8" GYPSUM BOARD
AIR/VAPOR BARRIER
INSULATION
BRICK
ANCHOR BOLT
PRE-MANUFACTURED
AWNING
CONTINUOUS SEALANT
CONTINUOUS FLASHING WITH
TERMINATION BAR - PROVIDE
EXPANSION ANCHORS AT 6"
O.C. -3" MIN EMBEDMENT
INTO CMU
COUNTER FLASHING
BLOCKING OR STEEL PER
MANUFACTURER
CANOPY SYSTEM
EL: 9' - 4"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S O
L
IC
IT
A
T
IO
N N
O
L .V ie rr e th e r
B
IM
/U
S A
Z T
B D
A rm y R e s e rv e A
M S
A P h o e n ix
/A M
S A
-P h o e n ix
A
I.
rv t
/6
/2
:1
:2
A
M
A-530
E X
T E
R
IO
R D
E T
A
IL
S
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
J A
C O
B S
H ig h la n d s P la z a D ri v e W
S u it e
S t.
L o u is
M
O
A T e s ta
L .V ie rr e th e r
J .C o rs o n
A
U G
U S
T
CERTIFIED FINAL DESIGN SUBMISSION
A R
E A
M A
IN
T
E N
A N
C E
S U
P P
O R
T A
C T
IV
IT
Y
A M
S A
F
A C
IL
IT
Y
S A
N T
A N
V A
L L E
Y A
R
IZ
O N
A
1 1/2" = 1'-0"
A-310
A1
COPING DETAIL
GRAPHIC SCALE(S)
3" = 1'-0" 0 3" 6" 1'
1 1/2" = 1'-0" 0 6" 1' 2'3"
3" = 1'-0"
A-310
E12
ROOF EDGE @ CMU
1 1/2" = 1'-0"
A-310
A8
CEILING @ CMU
1 1/2" = 1'-0"
A-310
A12
CMU/BRICK VENEER FOOTING 1" = 1'-0"
0 1' 2' 3'6"
1 1/2" = 1'-0"E4
AIR TERMINAL DETAIL AT PARAPET
1 1/2" = 1'-0"E16
SPLASH BLOCK DETAIL
1 1/2" = 1'-0"K16
SPLASH BLOCK ELEVATION
1 1/2" = 1'-0"
A-310
J1
CANOPY @ STOREFRONT
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/5
/2
W
2Q R
R
_P la ns -0
F.E.C.
F.E.C.
A-201
G1
A-202
G1
A-201
A1
A-202
A1
A1
A-301
K1
A-301
F1
A-301
A8
A-310
A-402
J8
A
B
C
A-603
E1 B17
A-310
EQUIPMENT
ALCOVE
WORK BAYS
SHOP OFFICE
SUPERVISOR
ELEC
MEN
MECHANICAL
TER
BREAK
CONTROLLED
WASTE
PARTS & TOOL
ROOMS
FLUID
DISTRIBUTION
MEN SHOWER
WOMEN SHOWER
WOMEN
JAN
BAY SAFE AISLE
EF
CIRC
FLAMMABLE
STORAGE
BATTERY
ROOM
115A
118 116 108
101B
101A
A
123B
121B
B
110A
105A
105C
200C
200D
202A 202B
200B
200A
ENTRY
VESTIBULE
115B
PUMP ROOM
VESTIBULE
106A 106B
0B
1C 2C 2C
2C
2C
2C
1C
1C
1B 0B
0B
0A
0B 0F
0D0D
0D
0D
0D
0D
0D
0F C
201A
B A A
0B
LACT
22.03
22.02
22.02
22.04
05.01
201B
11.01
22.05
0D
0G 0G 0G 0G
0G 0G
0G
0G
120B 122B
A
0C
22.05
22.05
22.05
22.05
200E
A
A
A
A
B
2C
10.02
10.16
10.0910.09
ALIGN
ALIGN
LOCATION
TYP. OF 5
10.02
05.06
110B
CAGED STORAGE
10.19
TYP
OF 3
10.19
TYP
OF 7
10.18
TYP
OF 16
10.20
TYP
OF 6
08.06
01.01
01.01 01.01
04.05
TYP. OF 4
EACH SIDE
1 HOUR FIRE RATED PARTITION
2 HOUR FIRE RATED PARTITION
**INTERIOR OF SHOP OFFICE 101 AND CIRC 104 TO BE THE FURRED, GYPSUM
BOARD SIDE OF THE PARTITION TYPES TAGGED**
2' - 0
2' - 0
2' - 6 " 4' - 0"4' - 0"
4' - 0"
S
H E
LF
7'
0" M
A X
SOLID
BACK
PANEL
EXPOSED
BRACING
BEYOND
10.18 CLOSED
STEEL SHELVING
10.19 OPEN
STEEL SHELVING
10.20 OPEN
STEEL SHELVING
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S O
L
IC
IT
A
T
IO
N N
O
L .V ie rr e th e r
B
IM
/U
S A
Z T
B D
A rm y R e s e rv e A
M S
A P h o e n ix
/A M
S A
-P h o e n ix
A
I.
rv t
/6
/2
:1
:2
A
M
AE102
A N
N O
T A
T E
D F
L O
O R
P L A
N
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
J A
C O
B S
H ig h la n d s P la z a D ri v e W
S u it e
S t.
L o u is
M
O
D e s ig n e r
A u th o r
C h e c k e r
A
U G
U S
T
CERTIFIED FINAL DESIGN SUBMISSION
A R
E A
M A
IN
T
E N
A N
C E
S U
P P
O R
T A
C T
IV
IT
Y
A M
S A
F
A C
IL
IT
Y
S A
N T
A N
V A
L L E
Y A
R
IZ
O N
A
1/8" = 1'-0"A1
FIRST FLOOR PLAN
LEGEND
NORTH
GRAPHIC SCALE(S)
01.01 BID OPTION C
04.05 CRANE SUPPORT PILASTER - REF TO STRUCTURAL
05.01 SCUPPER AND DOWNSPOUT WITH DOWNSPOUT BOOT TO DRAIN TO
UNDERGROUND STORM SEWER; REFER TO PLUMBING SHEETS.
05.06 ROOF ACCESS LADDER AND HATCH
08.06 SECTIONAL VERTICAL LIFT OVERHEAD DOOR
09.05 METAL FLOOR GRATE. REFER TO FINISH SCHEDULE AND STRUCTURAL
10.02 BOLLARD
10.09 CORNER GUARD
10.16 AUTOMATIC EXTERNAL DEFIBRILLATOR BY GOVERNMENT. SUPPLY
BLOCKING WHERE REQUIRED. REFER TO E1 / A-540
10.18 48"W X 24"D X 73"H CLOSED STEEL SHELVING
10.19 48"W X 24"D X 73"H OPEN STEEL SHELVING
10.20 48"W X 30"D X 73"H OPEN STEEL SHELVING
11.01 OVERHEAD BRIDGE CRANE
22.02 MOP SINK
22.03 EMERGENCY EYE WASH STATION
22.04 DOUBLE WATER COOLER WITH BOTTLE FILL STATION
22.05 TRENCH DRAIN WITH SAND INTERCEPTOR. SLOPE SLAB IN DIRECTION OF
DRAIN. REFER TO PLUMBING AND STRUCTURAL
KEYED NOTES#
1/8" = 1'-0" 0 8' 16' 24'4'
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/5
/2
1/4" = 1'-0"L12
SHELVING TYPES
W
2Q R
R
_P la ns -0
OS
OS
O S
OS
OS OS OS
OS
OS OS
OS
OS
PE
PE
M
M
M M
M
M
M
MM
M
M
M
M
M
M
M
PARTS & TOOL
ROOMS
SHOP OFFICE
CONTROLLED
WASTE
FLAMMABLE
STORAGE
BATTERY
ROOM
ELEC
JAN
TER
EF
BREAK
CIRC
WOMEN
MEN
WOMEN SHOWER
123MEN SHOWER
VESTIBULE
PUMP ROOM
ENTRY
VESTIBULE
MECHANICAL
FLUID
DISTRIBUTION
SUPERVISOR
LACT
WORK BAYS
EQUIPMENT
ALCOVE
BAY SAFE AISLE
A-402
H1
11.01
10.01
10.01
10.01
10.01
10.01
09.03
09.03
09.0309.0309.03
09.03
A
B
C
5' - 8 3/4"
1/ 2"
B17
A-310
26.05
26.05
OPP
HAND
01.01
11' - 6"1
24" X 24" SUSPENDED
ACOUSTICAL CEILING PANELS
GYPSUM
EXPOSED STRUCTURE
LIGHT FIXTURE
PENDANT LIGHT FIXTURE
PENDANT LIGHT FIXTURE
PENDANT LIGHT FIXTURE W/ BATTERY POWER
RECESSED CAN LIGHT FIXTURE
RECESSED CAN LIGHT FIXTURE W/ BATTERY POWER
LIGHT FIXTURE W/ BATTERY POWER
CEILING FAN
1. REFER TO PLUMBING, MECHANICAL, FIRE SUPRESSION, FIRE ALARM,
AND TELECOMMUNICATION DRAWINGS FOR VENTS, SPRINKLER
HEADS, GRILLES, REGISTERS, DIFFUSERS, DUCTS, LIGHTS,
DETECTORS, ETC. AND COORDINATE SAME AS REQUIRED.
2. EXTEND PARTITIONS TO BOTTOM OF FLOOR OR ROOF DECK
(TYPICAL) UNLESS OTHERWISE NOTED.
3. REFER TO ROOM FINISH SCHEDULE FOR CEILING MATERIALS AND
FINISHES.
4. CEILING MOUNTED OR RECESSED ITEMS SHOWN OR NOT, ON
REFLECTED CEILING PLANS, SUCH AS SPRINKLER HEADS, SPEAKER,
GRILLES, LIGHTS, ETC. MUST BE CENTERED IN THE LAY-IN PANELS. AT
GYPSUM BOARD CEILINGS, INSTALL IN A CONSISTENT PATTERNS.
REFER TO A-541 FOR TYPICAL CEILING DETAILS AND FIXTURE
LAYOUTS.
5. NOTIFY COR OF ITEMS NOT SHOWN ON REFLECTED CEILINGS PLANS
AND LOCATE PER COR.
6. CEILING ELEVATIONS ARE 9'-0" AFF UNLESS OTHERWISE NOTED.
7. WHERE CONFLICT IN CEILING DEVICES OCCURS, COORDINATE WITH
THE COR.
8. GRID LAYOUT AND LOCATION OF LIGHT FIXTURES AND DIFFUSERS ON
THE REFLECTED CEILING PLANS GOVERN OVER ELECTRICAL AND
MECHANICAL DRAWINGS.
9. SPRINKLER HEAD LOCATIONS, IF SHOWN, ARE INDICATED FOR
PATTERN ONLY. REQUIRED HEADS ARE NOT NECESSARILY
INDICATED. PROVIDE HEADS REQUIRED BY CODE. SPRINKLER HEADS
THAT DEVIATE FROM LOCATIONS INDICATED ON CEILING PLANS MUST
BE APPROVED BY THE COR PRIOR TO INSTALLATION.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S O
L
IC
IT
A
T
IO
N N
O
L .V ie rr e th e r
B
IM
/U
S A
Z T
B D
A rm y R e s e rv e A
M S
A P h o e n ix
/A M
S A
-P h o e n ix
A
I.
rv t
/6
/2
:1
:3
A
M
AE121
R E
F L E
C T
E D
C E
IL
IN
G P
L A
N
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
J A
C O
B S
H ig h la n d s P la z a D ri v e W
S u it e
S t.
L o u is
M
O
A
T e s ta
L .V ie rr e th e r
J .C o rs o n
A
U G
U S
T
CERTIFIED FINAL DESIGN SUBMISSION
A R
E A
M A
IN
T
E N
A N
C E
S U
P P
O R
T A
C T
IV
IT
Y
A M
S A
F
A C
IL
IT
Y
S A
N T
A N
V A
L L
E Y
A
R
IZ
O N
A
1/8" = 1'-0"A1
FIRST FLOOR REFLECTED CEILING PLAN
REFLECTED CEILING PLAN
NORTH
GRAPHIC SCALE(S)
1/8" = 1'-0" 0 8' 16' 24'4'
01.01 BID OPTION C
09.03 OPEN TO STRUCTURE ABOVE; EXPOSED STRUCTURE
10.01 CANOPY SYSTEM WITH INTEGRAL LED LIGHT RATED FOR WET LOCATIONS
(WHERE SHOWN)
11.01 OVERHEAD BRIDGE CRANE
26.05 TROUGH LIGHT - REFER TO L17/A-542 AND ELECTRICAL
KEYED NOTES#
GENERAL SHEET NOTES
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/5
/2
W
2Q R
R
_P la ns -0
04.01
03.01
03.02
07.03
07.07
07.06
07.08
03 - TOP OF CMU
36' - 0"
04.01
07.06
07.07
07.07
LOCATION OF AIR BARRIER
TYPICAL
04.01
04.04
07.07
07.06
07.04
07.11
07.09
04.01
07.06
04.04
07.07
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S O
L
IC
IT
A
T
IO
N N
O
L .V ie rr e th e r
B
IM
/U
S A
Z T
B D
A rm y R e s e rv e A
M S
A P h o e n ix
/A M
S A
-P h o e n ix
A
I.
rv t
/6
/2
:1
:3
A
M
AE803
A
IR
B A
R R
IE
R
D E
T A
IL
S
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
J A
C O
B S
H ig h la n d s P la z a D ri v e W
S u it e
S t.
L o u is
M
O
D e s ig n e r
A u th o r
C h e c k e r
A
U G
U S
T
CERTIFIED FINAL DESIGN SUBMISSION
A R
E A
M A
IN
T
E N
A N
C E
S U
P P
O R
T A
C T
IV
IT
Y
A M
S A
F
A C
IL
IT
Y
S A
N T
A N
V A
L L
E Y
A
R
IZ
O N
A
1 1/2" = 1'-0"A1
AIR BARRIER AT FOUNDATION
03.01 FOOTING
04.01 CMU
04.04 4" FACE BRICK
07.03 ISOLATION JOINT AND SEALANT
07.04 SEALANT AND BACKER ROD BETWEEN FRAME AND CMU
07.06 THERMAL INSULATION
07.07 AIR BARRIER
07.08 FLASHING
07.09 SPRAY POLYURETHANE FOAM SEALANT OR ROCK
WOOL/MINERAL WOOL FOR AIR BARRIER TRANSITION TO
WINDOW FRAME
07.11 SEALANT AND BACKER ROD
1 1/2" = 1'-0"H1
AIR BARRIER AT ROOF
GENERAL SHEET NOTES
LEGEND
1. FOR AIR BARRIER SYSTEM REQUIREMENTS, SEE SPEC SECTION 07 05 23
AND 07 27 10 AND 07 27 19
2. CONTRACTOR'S OPTION: INLIEU OF SEALING THE METAL DECT TO PERFORM
AS AN AIR BARRIER ELEMENT AS SHOWN, THE CONTRACTOR MAY INCLUDE
A 1/4" THICK GLASS MAT ROOF SHEATHING OVER THE ENTIRE ROOF DECK
WITH A SELF -ADHERING RUBBERIZED ASPHALT SHEET MEMBRANE
UNDERLAYMENT. THE UNDERLAYMENT SHALL WRAP AROUND THE RAKES
AND BACK TO THE CONCRETE WALL. AT THE GUTTER EAVES, THE
SHEATHING AND UNDERLAYMENT SHALL EXTEND TO THE ROOF EDGES,
CONTRACTOR SHALL SUBMIT ALL DETAILS ANF MANUFACTURER'S
INFORMATION PRIOR TO IMPLEMENTING THIS OPTION
KEYED NOTES#
1 1/2" = 1'-0"A12
AIR BARRIER AT OPENING JAMB
1 1/2" = 1'-0"F12
AIR BARRIER AT WALL CORNER
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/5
/2
W
2Q R
R
_P la ns -0
1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH
LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO
LIMIT THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL
PRODUCTS.
2. ALL FINISHES ARE TO BE INSTALLED/ APPLIED IN ACCORDANCE WITH
THE MANUFACTURER'S WRITTEN INSTRUCTIONS.
3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH
MATERIALS.
4. ALL FLOORING TRANSITIONS ARE TO OCCUR AT THE CENTERLINEOF
THE DOOR, DOORWAY, OR CEILING UON.
5. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE
PEELTEXTURE.
6. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH
UON.
7. PAINTED GYPSUM BOARD CEILINGS ARE TO HAVE A FLAT FINISH UON.
8. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI
GLOSS FINISH UON.
9. RUBBER REDUCER STRIPS/ TRANSITIONS WHERE SPECIFIED ARE TO
MATCH ADJACENT RESILIENT BASE COLOR.
10. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM
PIECES; I.E. INSIDE AND OUTSIDE CORNERS AND EDGES. LEAVE NO
EXPOSED TILE EDGES.
11. REFER TO ARCHITECTURE DRAWINGS FOR EXTERIOR FINISHES.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
S O
L
IC
IT
A
T
IO
N N
O
L .V ie rr e th e r
B
IM
/U
S A
Z T
B D
A rm y R e s e rv e A
M S
A P h o e n ix
/A M
S A
-P h o e n ix
A
I.
rv t
/6
/2
:4
:3
A
M
I-601
F
IN
IS
H
M A
T E
R
IA
L L
E G
E N
D /R
O O
M F
IN
IS
H S
C H
E D
U L
E
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
J A
C O
B S
H ig h la n d s P la z a D ri v e W
S u it e
S t.
L o u is
M
O
J .B o g e n s c h u tz
E .D a v is
M .W a rr in e r
A
U G
U S
T
CERTIFIED FINAL DESIGN SUBMISSION
A R
E A
M A
IN
T
E N
A N
C E
S U
P P
O R
T A
C T
IV
IT
Y
A M
S A
F
A C
IL
IT
Y
S A
N T
A N
V A
L L E
Y A
R
IZ
O N
A
FINISH SCHEDULE
ROOM NO ROOM NAME
WALL FINISH BASE FINISH FLOOR CEILING
NOTES & REMARKS (SEE NOTES)NORTH EAST SOUTH WEST NORTH EAST SOUTH WEST MAT FIN
100 SUPERVISOR PT-1 PT-1 PT-3 PT-1 RB-1 RB-1 RB-1 RB-1 RBF-1 ACT-1
101 SHOP OFFICE PT-1 PT-4 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 RBF-1 ACT-1
102 BREAK PT-1 PT-1 PT-2 PT-1 RB-1 RB-1 RB-1 RB-1 LVT-1,2,3 ACT-1
103 LACT PT-1 PT-1 PT-1 PT-4 RB-1 RB-1 RB-1 RB-1 LVT-2 ACT-1
104 CIRC PT-1 PT-1 PT-3 PT-1 RB-1 RB-1 RB-1 RB-1 RBF-1 ACT-1
105 PARTS & TOOL ROOMS PT-1 PT-1 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 SC-1 GYP-1 PT-6
106 ENTRY VESTIBULE PT-1 PT-1 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 WM-1 ACT-1
107 VESTIBULE PT-1 PT-1 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 WM-1 ACT-1
108 BATTERY ROOM PT-1 PT-1 PT-1 PT-1 --- --- --- --- SC-1 OTS-1 CEILING STRUCTURE TO BE PAINTED PT-6
109 FLAMMABLE STORAGE PT-1 PT-1 PT-1 PT-1 --- --- --- --- EP-2 / LMG-1 OTS-1 CEILING STRUCTURE TO BE PAINTED PT-6
110 CONTROLLED WASTE PT-1 PT-1 PT-1 PT-1 --- --- --- --- EP-2 / LMG-1 OTS-1 CEILING STRUCTURE TO BE PAINTED PT-6
111 FLUID DISTRIBUTION PT-1 PT-1 PT-1 PT-1 --- --- --- --- EP-2 / LMG-1 OTS-1 CEILING STRUCTURE TO BE PAINTED PT-6
112 CAGED STORAGE SC-1 GYP-1 PT-6
114 JAN PT-1 PT-1 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 SC-1 OTS-1 WALLS TO RECIEVE EPOXY PAINT
115 MECHANICAL PT-1 PT-1 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 SC-1 OTS-1 CEILING STRUCTURE TO BE PAINTED PT-6
116 ELEC PT-1 PT-1 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 SC-1 OTS-1 CEILING STRUCTURE TO BE PAINTED PT-6
117 TER PT-1 PT-1 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 EP-1 OTS-1 CEILING STRUCTURE TO BE PAINTED PT-6
118 EF PT-1 PT-1 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 EP-1 OTS-1 CEILING STRUCTURE TO BE PAINTED PT-6
119 PUMP ROOM PT-1 PT-1 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 SC-1 OTS-1 CEILING STRUCTURE TO BE PAINTED PT-6
120 MEN CTW-1,2/PT-1 CTW-1,2/PT-1 CTW-1,2/PT-1 CTW-1,2/PT-1 CTB-1 CTB-1 CTB-1 CTB-1 CT-1 GYP-1/PT-6 CWT TO 6'3" AFF, PAINT ABOVE
121 MEN SHOWER CTW-1 CTW-1 CTW-1 CTW-1 CTB-1 CTB-1 CTB-1 CTB-1 CT-1 GYP-1/PT-6 WALLS TO RECIEVE EPOXY PAINT
122 WOMEN CTW-1,2/PT-1 CTW-1,2/PT-1 CTW-1,2/PT-1 CTW-1,2/PT-1 CTB-1 CTB-1 CTB-1 CTB-1 CT-1 GYP-1/PT-6 CWT TO 6'3" AFF, PAINT ABOVE
123 WOMEN SHOWER CTW-1 CTW-1 CTW-1 CTW-1 CTB-1 CTB-1 CTB-1 CTB-1 CT-1 GYP-1/PT-6 WALLS TO RECIEVE EPOXY PAINT
200 WORK BAYS PT-1 PT-1 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 SC-1 OTS-1 CEILING STRUCTURE TO BE PAINTED PT-6
201 BAY SAFE AISLE PT-1 PT-1 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 SC-1 OTS-1 CEILING STRUCTURE TO BE PAINTED PT-6
202 EQUIPMENT ALCOVE PT-1 PT-1 PT-1 PT-1 RB-1 RB-1 RB-1 RB-1 SC-1 OTS-1 CEILING STRUCTURE TO BE PAINTED PT-6
FINISH LEGEND
SURFACE
ITEM
CODE DESCRIPTION
BASIS OF DESIGN (OR
EQUAL) MODEL COLOR SIZE NOTES
CEILING ACT-1 ACOUSTICAL CEILING TILE ARMSTRONG OPTIMA OPEN PLAN WHITE TILE/WHITE GRID 15/16" TEGULAR, PRELUDE
SUSPENSION SYSTEM
CEILING PT-6 PAINT BENJAMIN MOORE OC-29 FLORAL WHITE CEILING, FLAT
FLOOR CT-1 CERAMIC TILE DALTILE FABRIQUE P689 NOIR LINEN 12' x 12"
FLOOR CTB-1 CERAMIC TILE BASE DALTILE FABRIQUE P689 NOIR LINEN 3" X12" BULLNOSE
FLOOR EP-1 ESD EPOXY FLOORING DUR-A-FLEX DUR-A-GARD ESD MEDIUM GREY
FLOOR EP-2 CATALYZED EPOXY FLOORING SHERWIN WILLIAMS TILE-CLAD HIGH SOLIDS (HS) BLACK CUSTOM
FLOOR LMG-1 LINEAR BELOW METAL GRATE
FLOOR LVT-1 LUXURY VINYL TILE MOHAWK GROUP CHROMASCOPE 230 SUMMER SUEDE 12" x 24" REFER TO DETAIL A13/IN101 FOR BREAL ROOM FLOORING PATTERN
FLOOR LVT-2 LUXURY VINYL TILE MOHAWK GROUP CHROMASCOPE 860 CABIN FEVER 12" x 24" REFER TO DETAIL A13/IN101 FOR BREAL ROOM FLOORING PATTERN
FLOOR LVT-3 LUXURY VINYL TILE MOHAWK GROUP CHROMASCOPE 672 TOTALLY TEAL 12" x 24" REFER TO DETAIL A13/IN101 FOR BREAL ROOM FLOORING PATTERN
FLOOR RB-1 RUBBER BASE TARLETT/JOHNSONITE WALL COVE BASE 283 TOAST 4"H
FLOOR RBF-1 RUBBER FLOORING TARKETT DEFIANT OIL AND GREASE
TILE
GRHRTSP 729 THICKET 24" x24" TILE
FLOOR SC-1 SEALED CONCRETE SURECRETE DURA-KOTE COLOR TEK 4000WB DOVE GRAY
FLOOR WM-1 WALK-OFF MAT C S CONSTRUCTION SPECIALTIES PEDIMAT M2 9325 GRAPHITE REFER TO MAN. INSTALLING DETAILS FOR SLAB RECESS REQUIREMENTS FOR THIS APPLICATION
MILLWORK PL-1 PLASTIC LAMINATE LAMINART 3071-VT SILVER ASH
MILLWORK SS-1 SOLID SURFACE WILSONART 9203CE DUSK ICE 1/2" THICK COUNTERTOPS, 3/4" THICK
WINDOW SILLS
9' x 2' AT WORKBAY WORKBENCH TOPS
MISC GT-1 GROUT LATICRETE PERMACOLOR 40 LATTE WALL GROUT
MISC GT-2 GROUT LATICRETE PERMACOLOR 45 RAVEN FLOOR GROUT
MISC TP-1 TOILET PARTITION GENERAL PARTITIONS SOLID PHENOLIC, LAMINATE
FACE
4990-60 FLAX LINEN ABS EDGE BANDING TO MATCH LAMINATE
MISC WT-1 WINDOW TREATMENT MECHOSHADE ECOVEIL SCREEN 1350 SERIES, BLACK/BROWN 5% OPENNESS
WALL CG-1 CORNER GUARD ACROVYN VA SERIES 1436 SEMI-SWEET
WALL CTW-1 CERAMIC TILE WALL DALTILE COLOR WHEEL CLASSIC 0161 URBAN PUTTY 3" x 6"
WALL CTW-2 CERAMIC TILE WALL DALTILE COLOR WHEEL CLASSIC 0144 ARTISAN BROWN 3" x 6"
WALL CTW-3 CERAMIC TILE WALL DALTILE COLOR WHEEL CLASSIC 0148 SPA 4" x 4"
WALL PT-1 PAINT BENJAMIN MOORE HC-26 MONROE BISQUE EGGSHELL
WALL PT-2 PAINT BENJAMIN MOORE 704 DEL MAR BLUE EGGSHELL
WALL PT-3 PAINT BENJAMIN MOORE HC-43 TYLER TAUPE EGGSHELL
WALL PT-4 PAINT BENJAMIN MOORE 2136-70 WHISPERING SPRING EGGSHELL
WALL PT-5 PAINT BENJAMIN MOORE HC-85 FAIRVIEW TAUPE HOLLOW METAL DOORS, FRAMES, AND TRIM, SEMI GLOSS
GENERAL SHEET NOTES
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
/5
/2
W
2Q R
R
_P la ns -0
| SF 30 |
| SUMMARY OF CHANGES |
| W912QR25R0010_Plans-0003.pdf |
| Sheets |
| CS101 OVERALL SITE PLAN |
| Sheets |
| A-201 - EXTERIOR ELEVATIONS - NORTH AND SOUTH |
| A-202 - EXTERIOR ELEVATIONS - EAST AND WEST |
| A-530 - EXTERIOR DETAILS |
| AE102 - ANNOTATED FLOOR PLAN |
| AE121 - REFLECTED CEILING PLAN |
| AE803 - AIR BARRIER DETAILS |
| Sheets |
| I-601 - FINISH MATERIAL LEGEND/ROOM FINISH SCHEDULE |