W912QR25R0010-0001.pdf
PDF 1 MB Posted
- Solicitation number
- W912QR25R0010
About this file
This document is Amendment 0001 to the solicitation for the Design-Bid-Build Construction of the Area Maintenance Support Activity at San Tan Valley, Arizona (Solicitation No. W912QR25R0010). The key details are:
The solicitation has been amended as follows: 1) The ProjNet Bidder Inquiry Key has been updated. 2) Wage Determination AZ20240019 (Heavy) dated 10/25/2024 has been incorporated. 3) Offerors must acknowledge all amendments. 4) All other terms and conditions remain unchanged. The solicitation requires electronic proposal submission through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module by the due date. The government agency is the U.S. Army Engineer District, Louisville.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation No. W912QR25R0010 for the Design-Bid-Build Construction of the Area Maintenance Support Activity at San Tan Valley, AZ is hereby modified as follow s:
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR25R0010
X 9B. DATED (SEE ITEM 11)
22-Oct-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Nov-2024
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR25R0010-0001
W912QR25R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001
Summary of Changes – Amendment 0001
1. The ProjNet Bidder Inquiry Key under section 00 21 00 “ProjNet Instructions” has been updated
Project: W912QR25R0010
ProjNet Bidder Key: MVN3QP-CI6BGH
2. Wage Determination – AZ20240019 (Heavy) was published on 10/25/2024 and is hereby incorporated in its entirety.
3. Offerors must acknowledge all amendments.
4. All other terms and conditions remain unchanged.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
PROJNET INSTRUCTIONS
OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet.
Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Number is:
W912QR25R0010
The Bidder Inquiry Key is:
MVN3QP-CI6BGH
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create oneusing the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question , Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point onto access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled ten (10) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within five (5) calendar days prior to the closing date stated in the solicitation.
ELECTRONIC PROPOSAL SUBMISSION
Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED
ELECTRONICALLY THROUGH THE PROCUREMENT INTEGRATED ENTERPRISE ENVIRONMENT
(PIEE) SOLICITATION MODULE. No paper copies, CD-ROMs or facsimile submissions will be accepted.
Electronic Proposal Submission is required through the PIEE-SOLICITATION MODULE (https://piee.eb.mil/).
Instructions for uploading proposals are as follows:
1. Register in PIEE:
a. Navigate to https://piee.eb.mil/
b. Select Register [top right]
c. Select Vendor
d. Create a User ID and Password and follow the prompts [next]
e. Create Security Questions [next]
f. Complete your User Profile Information [next]
g. Complete your Supervisor or Approving Official Information [next]
h. Complete Roles
i. Step 1. Select SOL-Solicitation
ii. Step 2. Select Proposal Manager
iii. Step 3. Click Add Roles
iv. Step 4. Fill in our Location Code (CAGE Code) [next]
i. Provide a justification for your registration [next]
j. Follow the remaining prompts to submit your registration
2. Log into PIEE and select the Solicitation Icon.
3. Enter search criteria to find the solicitation. (Search Criteria can be the complete solicitation number, Solicitation Open Date, Response Due Date, Product or Service Code, NAICS, Set Aside code, Place of Performance Zip Code, Contracting Office DODAAC, or Status)
4. The search results display. Select the Solicitation Number link to open the solicitation.
5. The solicitation displays. The information is view only.
6. Scroll down to see the Contract Information and Attachments. The Attachments can be viewed by selecting the File link. Scroll back up to the top of the screen and click the Offer tab.
7. Click the Offer tab to Add and review current offers on the Solicitation. Click the Ad d button to add an offer to the solicitation.
8. Select the applicable Cage Code for which submitting the proposal for. The list is prefiltered based on the Cage in the Proposal Manager’s profile.
9. It is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
a. W912QR25R0010-FIRMNAME-VOLUME I
b. W912QR25R0010-FIRMNAME-VOLUME II
Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.
Please see examples above.
File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 11 or larger. Pages shall be letter sized (larger page sizes (such as 11 x17 foldouts, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor.
Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion delivery time & date recorded within PIEE-Solicitation. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.
Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked). Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Nov 2021),” subparagraph (e), which is found in 00 21 00 Instructions of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United Sta tes law and regulations.
10. Upload the attachments that comprise the proposal by selecting Choose Files link.
11. After entering all necessary information enter a Signature Date an Click the Signature button.
12. The Sign Document pop-up will be displayed requiring the user to enter a Digital Pin and One Time Password (OTP). Click the Sign and Submit button to continue.
13. After successfully adding the Proposal a success message of the submission will be displayed and the proposal displayed collapsed. Users may expand and view all their proposals on a Solicitation. The Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling telephone number 866-618-5988 for assistance.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE RATES
"General Decision Number: AZ20240019 10/25/2024
Superseded General Decision Number: AZ20230019
State: Arizona
Construction Type: Heavy HEAVY CONSTRUCTION, Includes Water and Sewer Lines, Heavy Construction on Treatment Plant Sites, and Pipeline Construction
County: Pinal County in Arizona.
HEAVY CONSTRUCTION PROJECTS (DOES NOT INCLUDE DAM CONSTRUCTION)
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 01/19/2024 2 07/12/2024 3 07/19/2024 4 08/30/2024 5 10/04/2024 6 10/25/2024
BOIL0627-004 01/01/2023
Rates Fringes
BOILERMAKER......................$ 36.49 32.42
BRAZ0003-010 07/01/2023
Rates Fringes
BRICKLAYER.......................$ 32.74 9.52
ZONE PAY:
(Radius miles from the intersection of Central Ave. and Washington St., Phoenix, AZ)
Zone A: 0-60 miles- Base Rate Zone B: 61-75 miles- Base Rate plus $2.00 per hour Zone C: 75-100 miles- Base Rate plus $3.00 per hour Zone D: 101-200 miles- Base Rate plus $3.50 per hour Zone E: Over 200 miles- Base Rate plus $6.50 per hour
ELEC0518-008 08/01/2024
(North of the line, ""First Standard Parallel South"", and East of the line, ""Second Guide Meridian East"".)
Rates Fringes
ELECTRICIAN......................$ 34.50 9.75+13.25%
* ELEC0570-008 06/01/2024
PINAL (Southern Part)
Rates Fringes
ELECTRICIAN......................$ 32.00 21.33%+6.00
ZONE DEFINITIONS-
Zone A: the area within a thirty-nine (39) mile radius from a base point at the Tucson Town Hall.
Zone B: 40 to 74 mile radius from the town hall in Tucson- an additional $ 3.50 per hour Zone C: 75 mile radius from the town hall in Tucson to the outer limits of the geographic jurisdiction- an additional $ 7.50 per hour
ELEC0640-007 07/01/2024
(Area North and West of the boundary line beginning at a point where Papago Indian Reservation Road No. 15 crosses the Pima-Pinal County line, then Northeasterly on Road No. 15 to the intersection with Highway FAS-267, extending North on FAS-267 to the intersection with Florence Canal, North & East on Florence Canal to the intersection of the line ""Second Guide Meridian East"" then North to the Maricopa-Pinal County Lines)
ELECTRICIAN......................$ 36.56 15.16
ELEC0769-002 08/05/2024
Rates Fringes
Line Construction:
Lineman.....................$ 59.69 21.5%+8.89
ENGI0428-007 06/01/2023
POWER EQUIPMENT OPERATOR
Group 1.....................$ 31.69 13.52 Group 2.....................$ 34.96 13.52 Group 3.....................$ 36.04 13.52 Group 4.....................$ 37.07 13.52
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Small Self-Propelled Compactor (with blade), Front End Loader (3 cy & less), Bobcat/Skidsteer/Skid Loader, Oiler
GROUP 2: Backhoe (less than 1 cy), Self-Propelled Compactor (with blade),Grader/Blade (rough),Front End Loader 3cy-less than 6 cy), Scraper, Tractor Operator, Crane (less than 15 tons)
GROUP 3: Backhoe, up to 10 cu yd;
Excavator/Trackhoe,Grade/Blader(finish), Front End Loader Operator (6 cy-10cy), Crawler-Type Tractor Operator, Crane (over 15 tons & less than 100 ton), Tower Crane
GROUP 4: Backhoe ( 10 cu yd and over),Front End Loader (10 cy and over), Crane (100 ton)
ENGI0428-015 06/01/2023
Rates Fringes
POWER EQUIPMENT OPERATOR:
(PIPELINE)
Group 1.....................$ 31.69 13.52 Group 3.....................$ 36.04 13.52
Group 1: Backhoe, Boring Machine, Boom Operator, Bulldozer, Trackhoe
Group 3: Oiler
IRON0075-009 08/01/2024
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 33.00 18.91
Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50
PAIN0086-002 04/01/2024
PAINTER (Brush Only).............$ 25.47 8.00
PLUM0469-008 07/01/2019
Rates Fringes
PLUMBER..........................$ 44.00 17.15
TEAM0104-003 07/01/2024
Rates Fringes
TRUCK DRIVER
Pick-up Truck GROUP 1....................$ 24.12 1.65+a
FOOTNOTE:
a. Health & Welfare $1,330.26 per month. as of September 1,
* SUAZ2012-008 05/17/2012
Rates Fringes
CARPENTER (Form Work Only).......$ 20.86 4.00
CARPENTER, Excludes Form Work....$ 21.97 5.41
CEMENT MASON/CONCRETE FINISHER...$ 18.76 2.12
INSTALLER - SIGN.................$ 25.42 0.00
IRONWORKER, REINFORCING..........$ 20.66 13.59
LABORER: Asphalt Raker/Shoveler/Spreader..........$ 15.76 ** 4.42
LABORER: Common or General......$ 14.35 ** 3.97
LABORER: Concrete Saw (Hand Held/Walk Behind)................$ 17.00 ** 4.55
LABORER: Fence Erection.........$ 10.32 ** 2.24
LABORER: Grade Checker..........$ 18.14 4.55
LABORER: Landscape & Irrigation.......................$ 11.01 ** 0.37
LABORER: Mason Tender - Brick...$ 14.55 ** 4.20
LABORER: Mason Tender -
Cement/Concrete..................$ 15.34 ** 4.20
LABORER: Pipelayer..............$ 14.94 ** 3.50
LABORER: Power Tool Operator....$ 16.57 ** 4.20
LABORER: Railroad Construction Laborer.............$ 16.80 ** 4.20
MILLWRIGHT.......................$ 19.50 4.85
OPERATOR: Bulldozer.............$ 20.57 6.16
OPERATOR: Drill.................$ 20.57 4.78
OPERATOR: Forklift..............$ 20.38 4.75
OPERATOR: Grade Checker.........$ 21.68 6.31
OPERATOR: Mechanic..............$ 22.23 5.78
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 17.07 ** 3.20
OPERATOR: Roller................$ 21.34 8.36
OPERATOR: Rotomill..............$ 21.88 6.39
OPERATOR: Screed................$ 16.82 ** 2.52
OPERATOR: Trencher..............$ 14.21 ** 0.94
OPERATOR: Broom/Sweeper..........$ 15.40 ** 2.45
PAINTER: Pavement Marking/Parking Lot Striping.....$ 19.94 4.10
PAINTER: Roller and Spray.......$ 20.65 4.45
PIPEFITTER.......................$ 23.97 6.78
TRUCK DRIVER: 3 Axle Truck......$ 27.53 1.16
TRUCK DRIVER: Dump Truck........$ 14.37 ** 1.16
TRUCK DRIVER: Flatbed Truck.....$ 12.50 ** 1.48
TRUCK DRIVER: Hydroseeder.......$ 17.32 0.00
TRUCK DRIVER: Water Truck.......$ 16.46 ** 3.42
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
State Adopted Rate Identifiers
Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R §1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
"General Decision Number: AZ20240041 08/30/2024
Superseded General Decision Number: AZ20230041
State: Arizona
Construction Type: Building
County: Pinal County in Arizona.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |· Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |· The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|· Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |· The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours performing on that | | | contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 01/19/2024 2 05/17/2024 3 07/19/2024 4 08/16/2024 5 08/30/2024
BRAZ0003-001 07/01/2023
Rates Fringes
BRICKLAYER.......................$ 32.74 9.52
ELEC0640-002 07/01/2024
Rates Fringes
ELECTRICIAN......................$ 36.56 15.16
ENGI0428-016 06/01/2023
Rates Fringes
POWER EQUIPMENT OPERATOR
Bulldozer...................$ 31.69 13.52 Crane.......................$ 36.04 13.52
* IRON0075-012 08/01/2024
Rates Fringes
IRONWORKER.......................$ 33.00 18.91
PLUM0469-010 07/01/2024
Rates Fringes
PIPEFITTER.......................$ 48.40 15.75
PLUMBER..........................$ 48.40 19.50
SHEE0359-001 07/01/2024
Rates Fringes
SHEET METAL WORKER...............$ 46.81 19.52
* SUAZ2019-004 06/12/2023
CARPENTER........................$ 21.74 0.00
CEMENT MASON/CONCRETE FINISHER...$ 22.41 0.00
DRYWALL HANGER...................$ 20.02 0.00
LABORER: Common or General......$ 17.48 3.97
LABORER: Mason Tender - Cement/Concrete..................$ 17.00 ** 3.64
LABORER: Pipelayer..............$ 16.77 ** 1.05
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 24.61 3.42
OPERATOR: Loader................$ 17.53 5.08
OPERATOR: Roller................$ 23.62 6.44
PAINTER..........................$ 23.00 3.64
TILE SETTER......................$ 21.50 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
State Adopted Rate Identifiers
Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R §1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)
| SF 30 |
| SUMMARY OF CHANGES |
| 00 21 00 |
| 00 73 00 |
| General Decision Number: AZ20240019 10/25/2024 |
| General Decision Number: AZ20240041 08/30/2024 |
File details come from the government source that posted it. Updated .