W912QR25R0005 0002.pdf

PDF 1 MB Posted

Attached to
Professional Services IDIQ MATOC Solicitation
Solicitation number
W912QR25R0005
Issued by

About this file

This is Amendment 0002 to solicitation W912QR25R0005, issued by the U.S. Army Engineer District, Louisville for professional services. The amendment makes two key changes: (1) removes Paragraph 13 from the Statement of Work which had required testing prototypes and beta versions of Army Reserve test plans, and (2) removes Paragraph 2.11 from the AT/OPSEC Requirements which had required the prime contractor to have a Facility Clearance (FCL) prior to contract start.

The amendment extends the proposal due date from January 9, 2025 to January 15, 2025 at 2:00 PM Eastern Time. The underlying solicitation seeks professional services including program management support, master planning, real estate planning, project management, environmental management support, modular design support, BIM support, quality assurance, facility planning, construction planning, and database management support for Army Reserve installations across the U.S. and Puerto Rico. Key work locations include Ft McCoy, WI; Joint Base McGuire Dix Lakehurst, NJ; Ft Liberty, NC; Ft Belvoir, VA; Columbia, SC; and Mountain View, CA.

View the file

Other files

File Type Posted
W912QR25R0005 0001.pdf PDF
W912QR25R0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR25R0005 for Professional Services for Program Management Support, Master Planning, Real Estate Planning, Project Management Support, Program Management Support Assistance, Environmental Management Support, Modular Design Support, Building Information Management Support, Quality Assurance, Facility Planning, Construction Planning, Database Management Support, and Support for the Army Reserve Installation Management Directorate (ARIMD), Office of the Chief Army Reserves (OCAR), United States Army Reserve Command (USARC) in their work on various Military programs and Regional Divisions (RD’s) within the United States and Puerto Rico is hereby amended as follows:

See Continuation Page.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR25R0005

X 9B. DATED (SEE ITEM 11)

05-Dec-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0002

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jan-2025

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR25R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMDT 0002 CONTINUATION PAGE

a) The Statement of Work has been revised to remove the following:

- Paragraph 13 has been removed in its entirety.

“13. Test prototypes and “beta” versions of Army Reserve test plans.”

b) PART 2 AT/OPSEC Requirements have been revised to remove the following:

- Paragraph 2.11 has been removed in its entirety.

“2.11 The Prime Contractor Company must have a Facility Clearance (FCL) at the appropriate level (IAW the NISPOM DOD 5220.22-M and AR 380-49) prior to the start of the contract awarded period of performance. Contractor personnel performing work under this contract must have the required security clearance, per AR 380-67, at the appropriate level at the start of the period of performance. Security Clearances and FCL requirements are required to be maintained for the life of the contract IAW the DD Form 254 attached to the contract. If no FCL, the supporting Government Contracting Activity will sponsor the prime contract company in obtaining the FCL.”

c) Proposal due date revised from 09 January 2025 to 15 January 2025 @ 2:00 PM Eastern Time.

d) All other terms and conditions remain unchanged.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 09-Jan-2025 02:00 PM to 15-Jan-2025 02:00 PM.

(End of Summary of Changes)

Statement of Work

Indefinite Delivery Contract for Professional Services Within the Great Lakes and Ohio River Division Mission Boundaries

Within the United States and Puerto Rico

Professional Services for Program Management Support, Master Planning, Real Estate Planning, Project Management Support, Program Management Support Assistance, Environmental Management Support, Modular Design Support, Building Information Management Support, Quality Assurance, Facility Planning, Construction Planning, Database Management Support, and Support for the Army Reserve Installation Management Directorate (ARIMD), Office of the Chief Army Reserves (OCAR), United States Army Reserve Command (USARC) in their work on various Military programs and Regional Divisions (RD’s) within the United States and Puerto Rico.

The professional services may consist of, but not be limited to, the following skills and services:

1. Knowledge of Army Reserve Regulations and Policies

2. Master Planning for Real Property Management Support

3. Master Planning for Army Reserve Project Development

4. MILCON Program Managers

5. Analyze Engineering and Base Operations functions

6. Program Management Support

7. Project Management Support

8. Preparation of real estate profiles

9. Environmental Impact Analysis (NEPA documentation), threatened and endangered species surveys; cultural resources analysis; and hazardous toxic and radiological waste

10. Capable of operating in a CADD/BIM environment using MicroStation

11. Capable of operating and evaluating construction cost estimating using Parametric Cost

Estimating System (PACES)

12. Capable of learning additional design and cost estimating software

************************************Amendment 0002************************************

13. Test prototypes and “beta” versions of Army Reserve test plans

************************************Amendment 0002************************************

14. Analysis of Space Utilization by Army Reserve units

15. Engineer Technical support

16. Facility database analysis/correlation support

17. Monitor Facility Reduction Program

18. IT support for data management

19. Condition analysis evaluations of existing Army Reserve Centers

20. Quality Assurance of construction activity

21. Review contract drawings and specifications

22. Construction Planning support

23. Capable of preparing construction cost estimates

24. Technology Information Manager

For each task order proposed personnel shall be experienced and trained for the type(s) of work to be performed. Typical position qualifications include but are not limited to: 5 years of experience in the position, bachelor’s degree related to the position, and/or a certification related to the position.

Prices submitted for this solicitation should be good for anywhere in the Army Reserve Nationwide mission. Key areas include: Ft McCoy, Wisconsin; Joint Base McGuire Dix Lakehurst, New Jersey; Ft Liberty, North Carolina; Ft Belvoir, Virginia; Columbia, South Carolina; and Mountain View, California.

The task order solicitations for Professional Services work may be on fairly short notice and length of appointments will vary. Contractor transportation will be required when traveling during duty hours is necessary. Travel per mile and travel per diem rates will be reimbursed at GSA/Joint Travel Regulation rates.

STAFFING. The individual(s) selected to perform these respective tasks must be an experienced professional and satisfy the requirements of the individual task orders. The selected individual must possess excellent verbal and written communication skills and be comfortable in meeting and dealing with individuals at all levels. Any changes or substitutions of personnel must be approved in advance by the Louisville District Contracting Officer. Resumes for prospective changes in personnel will be submitted to the Louisville District Point of Contact for review, who will obtain Contracting Officer approval. A letter will be issued to the contractor for notification or approval or rejection of any changes or substitutions in personnel. Failure to obtain prior concurrence for the substitution of personnel may result in non-payment of submitted invoices.

Successful offerors will be responsible for the management and supervision of all employees performing services under MATOC task orders. No government employee will maintain relatively continuous supervision or control of contractor employees, and no employer/employee relationship will be created between government personnel and contractor employees under MATOC task orders.

**************************************** Amendment 0001 **************************************

**************************************** Amendment 0001 **************************************

PART 2

AT/OPSEC Requirements

2.1 All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html ; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.

2.2 All contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.".

2.3 The contractor and all sub-contractors employees will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures;

or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an interim CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

2.4 The contractor and all associated sub-contractors shall receive a brief/training (provided by the Resident Architect (RA)) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Contracting Officer’s Representative (COR) NLT 5 calendar days after the completion of the training.

2.5 All contractor employees with access to a government info system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter in accordance with personnel security standards listed in AR 25-2 (Information Assurance) an appropriate background investigation will be conducted prior to accessing the government information systems.

2.6 All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.

2.7 All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment.

2.8 All contractor employees supporting IA/IT functions shall be appropriately certified upon contract IAW DoD 8570.01-M, DFARS 252.239-7001 and AR 25-2. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.

2.9 Contractor shall comply with AR 380-67 (Personnel Security Program) and Homeland Security Presidential Directive 12 (Policy for a Common Identification Standard for Federal Employees and Contractors) as well as FAR 52.204-2, Security Requirements. Additionally, Contractors must comply with

- (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor. For classified contracts, the DD Form 254 will be attached with the contract."

2.10 All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

************************************Amendment 0002************************************

2.11 The Prime Contractor Company must have a Facility Clearance (FCL) at the appropriate level (IAW the NISPOM DOD 5220.22-M and AR 380-49) prior to the start of the contract awarded period of performance. Contractor personnel performing work under this contract must have the required security clearance, per AR 380-67, at the appropriate level at the start of the period of performance. Security Clearances and FCL requirements are required to be maintained for the life of the contract IAW the DD Form 254 attached to the contract. If no FCL, the supporting Government Contracting Activity will sponsor the prime contract company in obtaining the FCL.

************************************Amendment 0002************************************

2.12 The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative.This Form will be provided to the Contracting Officer and shall become part of the official contract file.

2.13 All new contractor employees will complete annual Threat Awareness and Reporting Program (TARP) Training provided by a Counterintelligence Agent, IAW AR 381-12 . The contractor shall submit certificates of completion for each affected contractor and subcontractor employee(s) or a memorandum for the record, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. Authorized webbased TARP training for CAC card holders is available at the following website: https://www.us.army.mil/suite/page/655474

File details come from the government source that posted it. Updated .