Site Visit - (Sign-In Sheet).pdf

PDF 2 MB Posted

Attached to
DBB - Construct Addition and Renovation AGE Facility B820, Minneapolis-St. Paul ARS, MN
Solicitation number
W912QR25BA019
Issued by

About this file

This document is a site visit sign-in sheet and contractor questions document for MSP AGE B820 project, dated 12 Aug 2025. The first page contains a detailed sign-in log with 17 attendees from various companies including Kraft Mechanical, Doyon, Viking Air Sprinkler, BBTM, Ramsey Companies, Lloyd's Construction, PPI, The Richard Group, and Dakota Turf. The site visit occurred from 1000-1100 CST with a solicitation number of W91QRS-BA019.

The subsequent pages detail on-site contractor questions, which primarily focus on site logistics and construction constraints. Key questions addressed include office space availability, clean and repair areas, construction limits due to flight line restrictions, base access and delivery options, and infrastructure details. Specific notes indicate that rooms 106, 102, 104, and 105 can be used as KTR spaces, though some areas will require repainting and repair. The inspection gate for the 934th APS is not available until Summer 2026, and commercial access will be limited. The site visit notes also mention a buried structure on plan sheets C101 and C101, with potential implications for equipment operations.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MSP B820 Site Walk_Sign-in Sheet

MSP B820 Site Walk_Qs pg. 1
MSP B820 Site Walk_Qs pg. 2

File details come from the government source that posted it. Updated .