W912QR25BA009_CertF_SpecsV2-0000.pdf
PDF 7 MB Posted
- Attached to
- Construct Fire Base - Youngstown ARS, OH Federal contract opportunity
- Solicitation number
- W912QR25BA009
About this file
This file contains specifications for Volume 2 of a Design-Bid-Build project to construct a Base Fire Station at Youngstown Air Reserve Station in Ohio. The specifications cover technical details for Divisions 07-23, including thermal and moisture protection, insulation, and roofing systems. The project number is W912QR25BA009, with the design consultant being Tetra Tech, Inc. from Louisville, Kentucky. The certified final specifications document is dated 13 March 2025 and is part of a three-volume set of specifications for the project.
The document provides comprehensive technical requirements for various building systems, including detailed specifications for materials like pipe insulation, roof and wall panel assemblies, air barriers, flashing, and thermal insulation. It includes precise guidelines for installation methods, material properties, performance standards, and quality assurance requirements. The specifications are intended to ensure high-quality construction that meets energy efficiency, durability, and performance standards for a military fire station facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Results - W912QR25BA009.docx | DOCX document | |
| W912QR25BA009_CertF_Plans-0004.pdf | ||
| W912QR25BA009_CertF_Specs-0004.pdf | ||
| W912QR25BA009_CertF_FFE-0003.pdf | ||
| W912QR25BA009_CertF_Specs-0003.pdf | ||
| W912QR25BA009_CertF_Plans-0003.pdf | ||
| Site visit Log.pdf | ||
| W912QR25BA009-0002.pdf | ||
| W912QR25BA009-0001.pdf | ||
| W912QR25BA009_CertF_PlansV1-0000.pdf | ||
| JA Monaco (MEI) Fire System - YARS Fire Station (REDACTED)_Redacted.pdf | ||
| JA UTILITES - OHIO EDISON - YARS Fire Station_Redacted.pdf | ||
| W912QR25BA009_CertF_SpecsV1-0000.pdf | ||
| W912QR25BA009_CertF_SpecsV3-0000.pdf | ||
| W912QR25BA009_CertF_SID-0000.pdf | ||
| W912QR25BA009_CertF_PlansV2-0000.pdf | ||
| W912QR25BA009_CertF_FFE-0000.pdf | ||
| EAL FORM - SOLICITATION W912QR25BA009.xlsx | XLSX spreadsheet | |
| JA Best Cylinder Housing - YARS Fire Station (REDACTED)_Redacted.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Base Fire Station Youngstown ARS, OH
P2: 513392
Design-Bid-Build
Specifications – Volume 2 of 3 (Div 07 – 23) Certified Final Design
13 March 2025
W912QR25BA009
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR25BA009_CertF_SpecsV2-0000
THIS PAGE INTENTIONALLY LEFT BLANK
CERTIFIED FINAL
P2#: 513392, YARS Fire Station
AIR FORCE RESERVE BASE, YOUNGSTOWN, OH
PROFESSIONAL SEALS PAGE
PROFESSIONAL SEALS PAGE
BASE FIRE STATION
Youngstown Air Reserve Station, Ohio
P2#: 513392
Project No: ZDEL239001
Design Consultant Tetra Tech, Inc.
2000 Warrington Way, Suite 245
Louisville, Kentucky 40222
Phone (502) 584-5555 / Fax (502) 584-5696
Tt Project No.: 213-11568-23001
11/26/2024 11/26/2024
STRUCTURAL ARCHITECTURAL CIVIL
11/26/2024
FIRE PROTECTION MECHANICAL / PLUMBING ELECTRICAL / TELECOMMUNICATIONS
THIS PAGE INTENTIONALLY LEFT BLANK
P2#: 513392, YARS FIRE STATION
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 04/21, CHG 1: 06/23 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 32 01.00 06 10/23 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
02 61 13 02/10, CHG 1: 02/21 EXCAVATION AND HANDLING OF
CONTAMINATED MATERIAL
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 11/22 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 6: 11/23 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
05 52 00 08/23 METAL RAILINGS
PROJECT TABLE OF CONTENTS Page 1
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 08/23 BITUMINOUS DAMPPROOFING
07 19 00 08/23 WATER REPELLENTS
07 21 13 08/23 BOARD AND BLOCK INSULATION
07 21 16 08/23 BUILDING INSULATION
07 22 00 08/23 ROOF AND DECK INSULATION
07 27 10 08/23 BUILDING AIR BARRIER SYSTEM
07 27 19.01 08/23 SELF-ADHERING AIR BARRIERS
07 27 26 08/23 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 63 11/16 FABRICATED ROOF PANEL ASSEMBLIES
07 42 63 05/11, CHG 4: 08/20 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 08/23 FLASHING AND SHEET METAL
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/23 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 36 13 08/20 SECTIONAL OVERHEAD DOORS
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 51 13 05/19 ALUMINUM WINDOWS
08 60 45 08/20 TRANSLUCENT PANELS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 08/20 VISUAL DISPLAY UNITS
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
PROJECT TABLE OF CONTENTS Page 2
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 PPE LOCKERS
10 56 13 04/06 STEEL SHELVING
DIVISION 11 - EQUIPMENT
11 24 00 01/23 ROOFTOP FALL PROTECTION EQUIPMENT
DIVISION 12 - FURNISHINGS
12 24 13 08/20 ROLLER WINDOW SHADES
12 48 13 08/23 ENTRANCE FLOOR MATS AND FRAMES
(RECESSED SS GRILLS)
12 93 00 08/17, CHG 1: 08/18 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS
EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 05/22 COMMON PIPING FOR HVAC
23 05 48.19 05/18, CHG 2: 08/20 BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00 05/23 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING
SYSTEM
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 35 16.17 10 05/20 MECHANICAL ENGINE EXHAUST SYSTEMS
23 52 43.00 20 05/15, CHG 2: 08/18 LOW PRESSURE WATER HEATING BOILERS
(UNDER 800,000 BTU/HR OUTPUT)
23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS
PROJECT TABLE OF CONTENTS Page 3
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
25 05 11.01 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS (MECHANICAL BAS)
25 05 11.02 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS (FIRE ALARM)
25 05 11.03 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS (LIGHTING)
25 05 11.04 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS (FIREFIGHTER ALERT)
DIVISION 26 - ELECTRICAL
26 05 73 08/23 POWER SYSTEM STUDIES
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 41 00 08/23 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
26 56 20 02/19 AIRFIELD AND HELIPORT LIGHTING AND
VISUAL NAVIGATION AIDS
DIVISION 27 - COMMUNICATIONS
27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 20 00 07/24 FIREFIGHTER ALERT SYSTEM
27 41 00 11/21 AUDIO-VISUAL SYSTEMS
27 51 23 11/21 INTERCOMMUNICATION SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 21 13 11/18 RADON MITIGATION
31 31 16.13 08/22, CHG 1: 11/23 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 05/22 BASE COURSE FOR RIGID AND SUBBASE FOR
FLEXIBLE PAVING
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 06 06/18 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
PROJECT TABLE OF CONTENTS Page 4
SECTION 07 11 13
BITUMINOUS DAMPPROOFING
08/23
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C208 (2022) Standard Specification for Cellulosic Fiber Insulating Board
ASTM C728 (2017a; R 2022) Standard Specification for Perlite Thermal Insulation Board
ASTM D41/D41M (2011; R 2016) Standard Specification for Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing
ASTM D226/D226M (2017) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
ASTM D227/D227M (2003; R 2018) Standard Specification for Coal-Tar-Saturated Organic Felt Used in Roofing and Waterproofing
ASTM D1187/D1187M (1997; R 2018) Standard Specification for Asphalt-Base Emulsions for Use as Protective Coatings for Metal
ASTM D1227/D1227M (2013; R 2019; e1) Standard Specification for Emulsified Asphalt Used as a Protective Coating for Roofing
ASTM D4263 (1983; R 2018) Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method
1.2 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-07 Certificates
Materials
SECTION 07 11 13 Page 1
1.3 DELIVERY AND STORAGE
Deliver materials in sealed containers bearing manufacturer's original labels. Labels must include date of manufacture, contents of each container, performance standards that apply to the contents and recommended shelf life. While in storage, do not allow water based bituminous damproofing to freeze.
PART 2 PRODUCTS
2.1 ASPHALT PRIMER
ASTM D41/D41M.
2.2 EMULSION-BASED ASPHALT DAMPPROOFING
2.2.1 Fibrated Emulsion-Based Asphalt
Provide cold-applied fibrated emulsion-based asphalt dampproofing conforming to ASTM D1227/D1227M Type II, Class 1, asbestos-free, manufactured of refined asphalt, emulsifiers and selected clay, fibrated with mineral fibers. For spray or brush application, emulsion must contain a minimum of 59 percent solids by weight, 56 percent solids by volume. For trowel application, emulsion must contain a minimum of 58 percent solids by weight, 55 percent solids by volume.
2.2.2 Non-Fibrated Emulsion-Based Asphalt
Provide cold-applied non-fibrated emulsion-based asphalt dampproofing conforming to ASTM D1187/D1187M Type II or ASTM D1227/D1227M Type III, manufactured of refined asphalt, emulsifiers and selected clay. Asphalt must contain a minimum 58 percent solids by weight, 55 percent solids by volume.
2.3 SURFACE PROTECTION
2.3.1 Saturated Felt
ASTM D226/D226M, Asphalt Saturated, Type I, 15 pound; ASTM D227/D227M, Coal-Tar Saturated.
2.3.2 Protection Board
Wood Fiber Board, ASTM C208, or Perlite Board, ASTM C728.
PART 3 EXECUTION
3.1 SURFACE PREPARATION
Remove or cut form ties and repair surface defects as required in Section 03 30 00 CAST-IN-PLACE CONCRETE. Clean concrete and masonry surfaces to receive dampproofing of foreign matter and loose particles. Apply dampproofing to clean dry surfaces. Moisture test in accordance with ASTM D4263. If test indicates moisture, allow a minimum of seven additional days after test completion for curing. If moisture still exists, redo test until substrate is dry.
SECTION 07 11 13 Page 2
3.2 Protection of Surrounding Areas
Before starting the dampproofing work, protect the surrounding areas and surfaces from spillage and migration of dampproofing material onto other work.
3.3 APPLICATION
Apply dampproofing after priming coat is dry, but prior to any deterioration of primed surface, and when ambient temperature is above 40 degrees F.
3.3.1 Surface Priming
Prime surfaces to receive asphalt or . Apply primer when ambient temperature is above 40 degrees F and at rate of approximately one gallon per 100 square feet, fully covering entire surface to be dampproofed.
3.3.2 Cold-Application Method
3.3.2.1 Emulsion-Based Asphalt
Do not perform emulsion-based asphalt dampproofing work in temperatures below 40 degrees F. Emulsions must have a smooth and uniform consistency at time of application. Apply dampproofing materials in accordance with manufacturer's published instructions to produce a smooth uniform dry film of not less than 12 mils thick without voids or defects. Recoat any dull or porous spots. Seal dampproofing materials tightly around pipes and other items projecting through dampproofing. Apply materials at rates as follows:
a. Primer: 1/2 gallon per 100 square feet, cold-applied.
b. Fibrated Dampproofing: 2 gallons per 100 square feet, cold-applied with spray, brush or trowel.
c. Non-fibrated Dampproofing: 2 gallons per 100 square feet, cold-applied with spray, brush or trowel.
3.4 PROTECTIVE COVERING
Protect dampproofed surfaces against which backfill will be placed with one layer of 15 pound saturated felt. Use asphalt-saturated felt where the dampproofing material is asphalt and use coal-tar-saturated felt where the dampproofing material is coal-tar pitch. Embed felts in the second coating of bitumen and lap edges and ends not less than one inch .
-- End of Section --
SECTION 07 11 13 Page 3
SECTION 07 19 00
WATER REPELLENTS
08/23
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA 501.2 (2015) Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 259 (2002; R 2017) Standard Method of Test for Resistance of Concrete to Chloride Ion Penetration
AASHTO T 260 (2021) Standard Method of Test for Sampling and Testing for Chloride Ion in Concrete and Concrete Raw Materials
ASTM INTERNATIONAL (ASTM)
ASTM C140/C140M (2022c) Standard Test Methods for Sampling and Testing Concrete Masonry Units and Related Units
ASTM C642 (2021) Standard Test Method for Density, Absorption, and Voids in Hardened Concrete
ASTM D1653 (2013; R 2021) Standard Test Methods for Water Vapor Transmission of Organic Coating Films
ASTM D2369 (2020) Standard Test Method for Volatile Content of Coatings
ASTM D3278 (2021) Standard Test Methods for Flash Point of Liquids by Small Scale Closed-Cup Apparatus
ASTM E96/E96M (2022a; E 2023) Standard Test Methods for Gravimetric Determination of Water Vapor Transmission Rate of Materials
ASTM E514/E514M (2020) Standard Test Method for Water Penetration and Leakage Through Masonry
SECTION 07 19 00 Page 1
ASTM G154 (2023) Standard Practice for Operating Fluorescent Ultraviolet (UV) Lamp Apparatus for Exposure of Materials
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.1000 Air Contaminants
1.2 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Water Repellents
SD-06 Test Reports
Water Absorption
Accelerated Weathering
Resistance to Chloride Ion Penetration
Moisture Vapor Transmission
Water Penetration and Leakage
SD-07 Certificates
Manufacturer's Qualifications
Applicator's Qualifications
Evidence of Acceptable Variation
Warranty
SD-08 Manufacturer's Instructions
Application Instructions
Manufacturer's Safety Data Sheets
1.3 QUALITY ASSURANCE
1.3.1 Qualifications
a. Manufacturer's qualifications: Minimum five years record of successful in-service experience of water repellent treatments manufactured for concrete masonry, application.
b. Applicator's qualifications: Minimum five years successful experience in projects of similar scope using specified or similar treatment materials and manufacturer's approval for application.
SECTION 07 19 00 Page 2
1.3.2 Performance Requirements
a. Water absorption: ASTM C140/C140M. Comparison of treated and untreated specimens.
b. Moisture vapor transmission: ASTM E96/E96M. Comparison of treated and untreated specimens.
c. Water penetration and leakage through masonry: ASTM E514/E514M .
d. Resistance to chloride ion penetration: AASHTO T 259 and AASHTO T 260 .
e. Resistance to Accelerated weathering: ASTM G154
1.3.3 Evidence of Acceptable Variation
If a product proposed for use does not conform to requirements of the referenced specification, submit for approval to the Contracting Officer, evidence that the proposed product is either equal to or better than the product specified. Include the following:
a. Identification of the proposed substitution;
b. Reason why the substitution is necessary;
c. A comparative analysis of the specified product and the proposed substitution, including tabulations of the composition of pigment and vehicle ;
d. The difference between the specified product and the proposed substitution; and
e. Other information necessary for an accurate comparison of the proposed substitution and the specified product.
1.4 SAMPLE TEST PANEL
The approved Sample Test Panel will serve as the standard of quality for all other water repellent coating work. Do not proceed with application until the sample panel has been approved by the Contracting Officer.
1.4.1 Preparation of Sample Test Panel
Prior to commencing work, including bulk purchase and delivery of material, apply water repellent treatment to a minimum 4 feet high by 4 feet long concrete masonry, test-panel specified in. Provide a full height expansion joint at mid-panel length. Prepare and seal joint with materials approved for project use.
1.4.1.1 Testing
Similar to AAMA 501.2 hose testing, provide field water testing of water repellent treated surfaces in the presence of the Contracting Officer and the water repellent treatment manufacturer's representative as follows.
a. Apply water repellent to left side of mock-up and allow to cure prior to application of treatment to right side.
SECTION 07 19 00 Page 3
b. Twenty days after completion of application of treatment, test mock-up with 5/8 inch garden hose, with spray nozzle, located 10 feet from wall and aimed upward so water strikes wall at 45-degree downward angle. After water has run continuously for three hours observe back side of mock-up for water penetration and leakage. If leakage is detected, make changes as needed and retest.
c. Coordinate testing procedures and modify project treatment application as required to pass mock-up tests for water penetration and leakage resistance.
1.4.1.2 Approval
Proceed with water repellent treatment work only after completion of field test application and approval of mock-up and tests by the Contracting Officer.
1.4.2 Pre-Installation Meeting
a. Attend pre-installation meeting required prior to commencement of concrete masonry, installation.
b. Review procedures and coordination required between water repellent treatment work and work of other trades which could affect work to be performed under this section of the work.
c. Convene additional pre-installation meeting prior to water repellent treatment application for coordination with work not previously coordinated including joint sealants.
1.5 REGULATORY REQUIREMENTS
1.5.1 Environmental Protection
Provide coating materials that conform to the restrictions of the Local Air Pollution Control jurisdiction . Notify the Contracting Officer of water repellent coating specified herein which fails to conform to the local Air Quality Management District Rules at the location of the Project. In localities where the specified coating is prohibited, the Contracting Officer may direct the substitution of an acceptable coating.
1.6 DELIVERY, STORAGE, AND HANDLING
Deliver materials in original sealed containers, clearly marked with the manufacturer's name, brand name, type of material, batch number, percent solids by weight and volume, and date of manufacturer. Store materials off the ground, in a dry area where the temperature will be not less than 50 degrees F nor more than 85 degrees F.
1.7 SAFETY METHODS
Apply coating materials using safety methods and equipment.
1.7.1 Toxic Materials
To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:
a. The coating manufacturer when using solvents or other chemicals. Use
SECTION 07 19 00 Page 4 impermeable gloves, chemical goggles or face shield, and other recommended protective clothing and equipment to avoid exposure of skin, eyes, and respiratory system. Conduct work in a manner to minimize exposure of building occupants and the general public.
b. 29 CFR 1910.1000 .
c. Threshold Limit Values (R) of the American Conference of Governmental Industrial Hygienists.
d. Manufacturer's Safety Data Sheets.
1.8 ENVIRONMENTAL CONDITIONS
1.8.1 Weather and Substrate Conditions
Do not proceed with application of water repellents under any of the following conditions, except with written recommendations of manufacturer.
a. Ambient temperature is less than 40 degrees F.
b. Substrate faces have cured less than one month.
c. Rain or temperature below 40 degrees F are predicted for a period of 24 hours before or after treatment.
d. Earlier than three days after surfaces are wet.
e. Substrate is frozen or surface temperature is less than 40 degrees F and falling.
1.8.2 Moisture Condition
Determine moisture content of substrate meets manufacturer's requirements prior to application of water repellent material.
1.9 SEQUENCING AND SCHEDULING
1.9.1 Masonry Surfaces
Do not start water repellent coating until all joint tooling, pointing and masonry cleaning operations have been completed. Allow masonry to cure for at least 60 days under normal weather conditions before applying water repellent.
1.9.2 Plaster Surfaces
Do not start water repellent coating until all shrinkage and stress cracks are repaired and sound, all surfaces are free of defects and cleaning operations have been completed. Allow plaster to cure for at least 30 days under normal weather conditions before applying water repellent.
1.9.3 Concrete Surfaces
Do not start water repellent coating until all patching, pointing and cleaning operations have been completed and concrete has cured a minimum of 30 days under normal weather conditions.
SECTION 07 19 00 Page 5
1.9.4 Sealants
Do not apply water repellents until the sealants for joints adjacent to surfaces receiving water repellent treatment have been installed and cured.
a. Water repellent work may precede sealant application only if sealant adhesion and compatibility have been tested and verified using substrate, water repellent, and sealant materials identical to those used in the work.
b. Provide manufacturers' test results of compatibility.
1.10 INSPECTIONS
Notify the manufacturer's representative a minimum of 72 hours prior to scheduled application of water repellents for field inspection. Inspect surfaces and obtain approval in writing from the manufacturer's representative prior to application of water repellent coating.
1.11 SURFACES TO BE COATED
Coat all exterior masonry, surfaces where indicated on Drawings. This includes back faces of parapets, top of walls, edges and returns adjacent to windows and door frames and free-standing walls.
1.12 WARRANTY
Provide a warranty, issued jointly by the manufacturer and the applicator of the water repellent treatment against moisture penetration through the treated structurally sound surface for a period of five years. Warranty to provide the material, labor, and equipment necessary to remedy the problem. At the satisfactory completion of the work, complete the warranty sign, notarize, and submit to the Contracting Officer.
PART 2 PRODUCTS
2.1 MATERIALS
Provide a clear, non-yellowing, deep-penetrating, VOC compliant water repellent solution. Material must not stain or discolor and must produce a mechanical and chemical interlocking bond with the substrate to the depth of the penetration.
2.2 WATER REPELLENTS
2.2.1 Silane, 20 Percent Solids
Penetrating water repellent. A monomeric compound containing approximately 20 percent alkyltrialkoxysilanes with alcohol, mineral spirits, water, and other proprietary solvent carrier.
a. Composition: Modified alkylalkoxysilane.
b. Active alkylalkoxysilane content: ASTM D2369 20 percent by weight, plus or minus 1 percent.
c. Appearance: White, milky liquid.
d. Average depth of penetration: Up to 3/8 inch depending on substrate.
SECTION 07 19 00 Page 6
e. VOC content: Less than 350 grams per liter.
f. Flash point, ASTM D3278.
g. Specific gravity, at 78 degrees F: 0.96 to 0.98.
h. Density: .0 to 8.2 pounds per gallon.
2.2.2 Silane, 40 Percent Solids
Penetrating water repellent. A monomeric compound containing approximately 40 percent alkyltrialkoxysilanes with alcohol, mineral spirits, or water.
a. Composition: Modified alkylalkoxysilane.
b. Active alkylalkoxysilane content: ASTM D2369 40 percent by weight, plus or minus 1.5 percent.
c. Appearance: White, milky liquid.
d. Average depth of penetration: Up to 3/8 inch depending on substrate.
e. VOC content: Less than 350 grams per liter.
f. Flash point, ASTM D3278.
g. Specific gravity, at 78 degrees F: 0.94 to 0.97.
h. Density: 7.8 to 8.1 pounds per gallon.
2.2.3 Silane, 85 Percent Solids or Greater
Penetrating water repellent. A monomeric compound containing 85 percent or greater alkyltrialkoxysilanes with alcohol, mineral spirits, or water.
a. Composition: Modified alkylalkoxysilane.
b. Active alkylalkoxysilane content: ASTM D2369 85 percent by weight, plus or minus 1 percent.
c. Appearance: White, milky liquid.
d. Average depth of penetration: Up to 3/8 inch depending on substrate.
e. VOC content: Less than 350 grams per liter.
f. Flash point, ASTM D3278.
g. Specific gravity, at 78 degrees F: 0.96 to 0.98.
h. Density: 8.0 to 8.2 pounds per gallon.
2.2.4 Siloxanes
Penetrating water repellent. Alkylalkoxysiloxanes that are oligomerous with alcohol, ethanol, mineral spirits, or water.
SECTION 07 19 00 Page 7
a. Solids by weight: ASTM D2369, 7.5 to 16.0 percent.
b. Volatile Organic Content (VOC) after blending: Less than 175 grams per liter.
c. Density, activated: 8.4 pounds per gallon, plus or minus one percent.
d. Flash point, ASTM D3278: Greater than 212 degrees F.
2.2.5 Low-Solids Acrylic
Water-clear, breathing coating of acrylic resins, water-based, solvent-based, or acrylic emulsions solution containing less than 15 percent solids by volume.
2.2.6 High-Solids Acrylic
Water-clear, breathing coating of acrylic resins, water-based, solvent-based, or acrylic emulsions solution containing 15 percent solids or more by volume.
2.2.7 VOC-Complying Water Repellents
Products certified by the manufacturer that they comply with local regulations controlling use of volatile organic compounds (VOC's).
2.3 PERFORMANCE CRITERIA
2.3.1 Silane, 20 Percent Solids
a. Water absorption test: ASTM C642 and ASTM E514/E514M .
b. Moisture vapor transmission: ASTM D1653, 28.33 perms or 51.61 percent maximum compared to untreated surfaces.
c. Resistance to chloride ion penetration: AASHTO T 259 and AASHTO T 260 .
d. Water penetration and leakage through masonry, ASTM E514/E514M percentage reduction of leakage: 97 percent minimum.
e. Resistance to accelerated weathering, ASTM G154 testing 2,500 hours:
No loss in repellency.
f. Drying time under normal conditions: Four hours per 75 degrees F.
2.3.2 Silane, 40 Percent Solids
a. Average depth of penetration: 3/8 inches depending on substrate
b. Resistance to chloride ion penetration, AASHTO T 259 and AASHTO T 260 .
c. Water absorption test, ASTM E514/E514M : 0.42 percent per 48 hours;
1.2 percent per 50 days.
d. Moisture vapor transmission: ASTM D1653, 28.33 perms or 51.61 percent maximum compared to untreated surfaces.
e. Resistance to accelerated weathering, ASTM G154. Testing 2,500 hours: No loss in repellency.
SECTION 07 19 00 Page 8
f. Drying time under normal conditions: Four hours per 75 degrees F.
2.3.3 Silane, 85 Percent Solids or Greater
a. Average depth of penetration: 3/8 inches depending on substrate.
b. Resistance to chloride ion penetration, AASHTO T 259 and AASHTO T 260 .
c. Water absorption test, ASTM E514/E514M : 0.42 percent per 48 hours;
1.2 percent per 50 days.
d. Moisture vapor transmission: ASTM D1653, 28.33 perms or 51.61 percent maximum compared to untreated surfaces.
e. Resistance to accelerated weathering, ASTM G154. Testing 2,500 hours: No loss in repellency.
f. Drying time under normal conditions: Four hours per 75 degrees F.
2.3.4 Siloxanes
a. Dry time for recoat, if necessary: One to two hours depending on weather conditions.
b. Penetration: 3/8 inch, depending on substrate.
c. Water penetration and leakage through masonry, ASTM E514/E514M , percentage reduction of leakage: 97.0 percent minimum.
d. Moisture vapor transmission, ASTM E96/E96M: 47.5 perms or 82 percent maximum compared to untreated sample.
e. Resistance to accelerated weathering, ASTM G154. Testing 2,500 hours: No loss in repellency.
f. Resistance to chloride ion penetration, AASHTO T 259 and AASHTO T 260 .
PART 3 EXECUTION
3.1 EXAMINATION
Examine concrete, or masonry surfaces to be treated to ensure that:
a. All visible cracks, voids or holes have been repaired.
b. All mortar joints in masonry are tight and sound, have not been re-set or misaligned and show no cracks or spalling.
c. Moisture contents of walls does not exceed 15 percent when measured on an electronic moisture register, calibrated for the appropriate substrate.
d. Concrete surfaces are free of form release agents, curing compounds and other compounds that would prevent full penetration of the water repellent material.
Do not start water repellent treatment work until all deficiencies have been corrected, examined, and found acceptable to the Contracting Officer
SECTION 07 19 00 Page 9 and the water repellent treatment manufacturer. Do not apply treatment to damp, dirty, dusty, or otherwise unsuitable surfaces. Comply with the manufacturer's recommendations for suitability of surface.
3.2 PREPARATION
3.2.1 Surface Preparation
Prepare substrates in accordance with water repellent treatment manufacturer's recommendation. Clean surfaces of dust, dirt, efflorescence, alkaline, and foreign matter detrimental to proper application of water repellent treatment.
3.2.2 Protection
Provide masking or protective covering for materials which could be damaged by water repellent treatment.
a. Protect glass, glazed products, and prefinished products from contact with water repellent treatment.
b. Protect landscape materials with breathing-type drop cloths; plastic covers are not acceptable.
3.2.3 Compatibility
a. Confirm treatment compatibility with each type of joint sealer within or adjacent to surfaces receiving water repellent treatment in accordance with manufacturer's recommendations.
b. When recommended by joint sealer manufacturer, apply treatment after application and cure of joint sealers. Coordinate treatment with joint sealers.
3.3 MIXING
Mix water repellent material thoroughly in accordance with the manufacturer's recommendations. Mix, in quantities required for that day's work, all containers prior to application. Mix each container the same length of time.
3.4 APPLICATION
In strict accordance with the manufacturers written requirements. Do not start application without the manufacturer's representative being present or their written acceptance of the surface to be treated. Submit manufacturer's instructions including preparation, application, recommended equipment to be used, safety measures, and protection of completed application.
3.4.1 Water Repellent Treatment
3.4.1.1 Spray Application
Spray apply water repellent material to exterior concrete, and masonry surfaces using low-pressure airless spray equipment in strict accordance with manufacturer's printed application, instructions, and precautions.
Maintain copies at the job site. Apply flood coat in an overlapping pattern allowing approximately 8 to 10 inch rundown on the vertical
SECTION 07 19 00 Page 10 surface. Maintain a wet edge at all overlaps, both vertical and horizontal. Hold gun maximum 18 inches from wall.
3.4.1.2 Brush or Roller Application
Brush or roller apply water repellent material only at locations where overspray would affect adjacent materials and where not practical for spray applications.
3.4.1.3 Covered Surfaces
Coat all exterior concrete, or masonry surfaces including back faces of parapets, tops of walls, edges and returns adjacent to window and door frames, window sills, and free-standing walls.
3.4.1.4 Rate of Application
Apply materials to exterior surfaces at the coverages recommended by the manufacturer and as determined from sample panel test. Increase or decrease application rates depending upon the surface texture and porosity of the substrate to achieve even appearance and total water repellency.
3.4.1.5 Number of Coats
The results of the sample panel test determines the number of coats required to achieve full coverage and protection.
3.4.1.6 Appearance
If unevenness in appearance, lines of work termination or scaffold lines exist, or detectable changes from the approved sample panel occur, the Contracting Officer may require additional treatment at no additional cost to the Government. Apply required additional treatment to a natural break off point.
3.5 CLEANING
Clean all runs, drips, and overspray from adjacent surfaces while the water repellent treatment is still wet in a manner recommended by the manufacturer.
3.6 FIELD QUALITY CONTROL
Do not remove drums containing water repellent material from the job site until completion of all water repellent treatment and until so authorized by the Contracting Officer.
3.6.1 Field Testing
At a time not less than twenty days after completion of the water repellent coating application, subject a representative wall area of the building to the Navy Hose Stream Field Test similar to AAMA 501.2 hose test to simulate rainfall for a period of three hours. Use a minimum 5/8 inch diameter hose and a fixed lawn sprinkler spray head which will direct a full flow of water against the wall. Place the sprinkler head so that the water will strike the wall downward at a 45-degree angle to the wall.
If the inside of the wall shows traces of moisture during or following the test, apply another coat of water repellent, at the manufacturer's recommended coverage rate to the entire building. Repeat testing and
SECTION 07 19 00 Page 11 re-coating process until no moisture shows on the inside wall face.
Accomplish required work retesting and re-coating at no additional cost to the Government.
3.6.2 Site Inspection
Inspect treatment in progress by manufacturer's representative to verify compliance with manufacturer instructions and recommendations.
-- End of Section --
SECTION 07 19 00 Page 12
SECTION 07 21 13
BOARD AND BLOCK INSULATION
08/23
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C578 (2023) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C930 (2019) Standard Classification of Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D3833/D3833M (1996; R 2019) Standard Test Method for Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM E96/E96M (2024) Standard Test Methods for Gravimetric Determination of Water Vapor Transmission Rate of Materials
ASTM E154/E154M (2008a; R 2019) Standard Test Methods for Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, on Walls, or as Ground Cover
1.2 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Manufacturer's Standard Details
SD-03 Product Data
Environmental Data for Materials
Block or Board Insulation
Vapor Retarder; FIO
Pressure Sensitive Tape
SECTION 07 21 13 Page 1
Accessories including sealants
SD-08 Manufacturer's Instructions
Insulation Installation and Handling
SD-11 Closeout Submittals
Draft Guarantee
Final Guarantee
Draft Warranty
Final Warranty
1.3 MANUFACTURER'S DETAILS
Submit manufacturer's standard details indicating methods of attachment and spacing, transition and termination details, and installation details. Include verification of existing conditions.
1.4 PRODUCT DATA
Include environmental data for materials descriptions, recommendations for product shelf life, requirements for precautions for flammability and toxicity. Include data to verify compatibility of sealants with insulation.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver materials to the site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.5.2 Storage
Inspect materials delivered to the site for damage and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling. Keep materials wrapped and separated from off-gassing materials (such as drying paints). Do not use materials that have visible moisture or biological growth. Comply with manufacturer's recommendations for handling, storage, and protection of materials before and during installation.
1.6 SAFETY PRECAUTIONS
1.6.1 Other Safety Considerations
Comply with the safety requirements of ASTM C930.
SECTION 07 21 13 Page 2
1.7 SPECIAL WARRANTIES
1.7.1 Guarantee
Guarantee insulation installation against failure due to ultraviolet light exposure for a period of three years from the date of Beneficial Occupancy or Substantial Completion. Submit draft guarantee and final guarantee.
1.7.2 Warranty
Provide manufacturer's material warranty for all system components for a period of three years from the date of Beneficial Occupancy or Substantial Completion. Submit draft warranty and final warranty.
PART 2 PRODUCTS
2.1 BLOCK OR BOARD INSULATION
Provide thermal insulating materials as recommended by manufacturer for each type of application indicated. Provide insulation with the following physical properties and in accordance with the following standards:
a. Extruded Preformed Cellular Polystyrene (XPS): ASTM C578 REV A, TypeIV
2.1.1 Prohibited Materials
Do not provide materials containing asbestos.
2.2 VAPOR RETARDER
2.2.1 Vapor Retarder under Floor Slab
a. Water vapor permeance: 0.2 Perm or less when tested in accordance with ASTM E96/E96M.
b. Puncture resistance: Maximum load no less than 40 pounds when tested according to ASTM E154/E154M REV A.
2.3 PRESSURE SENSITIVE TAPE
As recommended by manufacturer of vapor retarder(s). Match water vapor permeance rating for each vapor retarder specified. Provide tape in accordance with ASTM D3833/D3833M .
2.4 ACCESSORIES
2.4.1 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Insulation Installation and Handling
Provide insulation in accordance with the manufacturer's printed installation instructions. Keep material dry and free of extraneous
SECTION 07 21 13 Page 3 materials.
3.1.2 Cold Climate Requirement
Place insulation on the outside of pipes.
3.1.3 Continuity of Insulation
Butt tightly against adjoining boards, studs, rafters, joists, sill plates, headers and obstructions. Provide continuity and integrity of insulation at corners, wall to ceiling joint, roof, and floor. Avoid creating thermal bridges and voids. Provide and verify continuity of insulative barrier throughout the building enclosure.
3.1.4 Coordination
Verify final installed insulation thicknesses comply with thicknesses indicated and with the approved insulation submittal(s).
3.2 PERIMETER AND UNDER SLAB INSULATION
Install perimeter thermal insulation where heated spaces are adjacent to exterior walls, slab edges in slab-on-grade, or floating slab construction.
3.2.1 Manufacturer's Instructions
Layout insulation, tape edges, provide vapor retarder and other required accessories to protect against vermin, insects, and damage in accordance with manufacturer's printed instructions.
3.2.2 Insulation on Vertical Surfaces
Provide thermal insulation on exterior of foundation walls below grade on edges of slabs-on-grade. Fasten insulation with mechanical fasteners.
3.2.3 Insulation Under Slab
Provide insulation horizontally under slab on grade for a distance of two feet from the edge of slab. Install insulation on top of vapor retarder and turn retarder up over the outside edge of insulation to top of slab.
3.2.4 Protection of Insulation
Protect insulation from damage during construction and back filling by application of protection board or a coating. Do not leave installed vertical insulation unprotected overnight. Protect installed insulation from weather, including rain and ultraviolet light, from mechanical abuse, compression, and dislocation. Install protection over entire exposed exterior insulation board.
SECTION 07 21 13 Page 4
SECTION 07 21 16
BUILDING INSULATION
08/23
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C665 (2023) Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
ASTM C930 (2019) Standard Classification of Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D3833/D3833M (1996; R 2019) Standard Test Method for Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM D5359 (1998; R 2021) Standard Specification for Glass Cullet Recovered from Waste for Use in Manufacture of Glass Fiber
ASTM E84 (2023) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2022a; E 2023) Standard Test Methods for Gravimetric Determination of Water Vapor Transmission Rate of Materials
ASTM E136 (2022) Standard Test Method for Assessing Combustibility of Materials Using a Vertical Tube Furnace at 750 Degrees C
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2017; Version 1.2) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
SECTION 07 21 16 Page 1
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 31 (2020) Standard for the Installation of Oil-Burning Equipment
NFPA 54 (2021) National Fuel Gas Code
NFPA 70 (2023; ERTA 4 2023) National Electrical Code
NFPA 211 (2019) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
TECHNICAL ASSOCIATION OF THE PULP AND PAPER INDUSTRY (TAPPI)
TAPPI T803 OM (2010) Puncture Test of Container Board
U.S. DEPARTMENT OF ENERGY (DOE)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2022) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Sound Attenuation Batt Insulation
Rigid Polyisocyanurate Board Insulation
Energy Star Label for Insulation Materials
Spray Polyurethane Foam Insulation - Thermal SPF
Vapor Retarder
SECTION 07 21 16 Page 2
Pressure Sensitive Tape
Accessories
SD-07 Certificates
Indoor Air Quality for Adhesives
SD-08 Manufacturer's Instructions
Insulation
1.3 CERTIFICATIONS
Submit required indoor air quality certifications and validations in one submittal package.
1.3.1 Insulation Products
Provide product certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs. Provide current product certification from certification body.
1.3.2 Adhesives and Sealants
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.4.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.
1.5 SAFETY PRECAUTIONS
1.5.1 Respirators
Provide installers with dust/mist respirators, training in their use, and
SECTION 07 21 16 Page 3 protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134 .
1.5.2 Other Safety Concerns
Consider other safety concerns and measures as outlined in ASTM C930.
PART 2 PRODUCTS
2.1 SOUND ATTENUATION BATT INSULATION
ASTM C665, Type I, blankets without membrane coverings; Class A, membrane-faced surface with a flame spread of 25 or less, except a flame spread rating of 25 or less and a smoke developed rating of 150 or less when tested in accordance with ASTM E84.
Provide insulation with R-Value as indicated on drawings
2.1.1 Recycled Materials
Provide insulation materials containing the following minimum percentage of recycled material content by weight:
a. Fiberglass: 20 percent glass cullet complying with ASTM D5359
b. Mineral wool: 75 percent recovered materials content from slag
2.1.2 Energy Star
Provide insulation materials that are Energy Star labeled. Provide data identifying Energy Star label for insulation materials.
2.1.3 Prohibited Materials
Do not provide asbestos-containing materials.
2.1.4 Reduced Volatile Organic Compounds (VOC) for Insulation Materials
Provide certification of indoor air quality for insulation materials.
2.2 RIGID POLYISOCRYANURATE BOARD INSULATION - EXTERIOR WALS
Rigid Polyisocyanurate Board Insulation: Cellular themal insulation with glass fiber-reinforced Polyisocyanurate closed-cell foam core and aluminum foil facing laminated to both sides: complying with FS HH-I-1972/1, Class 2; aged r-values of 7.2 and 8 at 40 and 75 degrees F (4.4 and 23.9 degrees C), respectively, and as follows:
Surface Burning Characteristics: Maximum values for flame spread and smoke developed of 20 and 150, respectively.
2.3 BLOCKING
Wood, metal, unfaced mineral fiber blankets in accordance with ASTM C665, Type I, or other approved materials. Use only non-combustible materials meeting the requirements of ASTM E136 for blocking around chimneys and heat producing devices.
SECTION 07 21 16 Page 4
2.4 SPRAY POLYURETHANE FOAM INSULATION - THERMAL SPF
At locations indicated on Drawings.
ASTM C 1029, Type II, closed-cell, with maximum flame-spread and smoke-developed indexes of 75 and 450, respectively, per ASTM E 84.
a. Minimum density of 1.5 lb/cu. ft., thermal resistivity of 6.2 degrees F x h x sq. ft./Btu x in. at 75 degrees F.
b. S pray-Applied Insulation: Apply spray-applied insulation according to manufacturer's written instructions. Do not apply insulation unit installation of pipes, ducts, conduits, wiring, and electrical outlets in walls in completed and windows, electrical boxes, and other items not indicated to receive insulation are masked.
c. Miscellaneous Voids: Install insulation in miscellaneous voids and cavity spaces where required to receive insulation are masked
d. Thermal Resistance Value (R-Value) of SPF: As indicated on Drawings.
2.5 VAPOR RETARDER
a. Membrane with the following properties:
Water Vapor Permeance: ASTM E96/E96M: 1 perm
Maximum Flame Spread: ASTM E84: 25
Combustion Characteristics: Passing ASTM E136
Puncture Resistance:…