W912QR25B0003_Plans-0000.pdf
PDF 45 MB Posted
- Attached to
- Buckhorn Boat Ramp Reconstruction
- Solicitation number
- W912QR25B0003
About this file
This file appears to be a Plans document based on the filename (W912QR25B0003_Plans-0000.pdf), but no actual content from the document was provided to summarize. The associated federal contract opportunity indicates this is a Design-Build construction project for the Buckhorn Boat Ramp Reconstruction at Buckhorn Reservoir in Perry County, Kentucky, with an estimated cost between $1-5 million. The solicitation is being handled by the US Army Corps of Engineers Louisville District.
The contract is being awarded through full and open competition with a HUBZone 10% price evaluation preference, under NAICS code 237990 with a size standard of $45M. The award will be made based on lowest total price to the Government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Buckhorn Lake Boat Ramp Reconstruction Site Visit Slides.pptx | PPTX presentation | |
| Buckhorn Lake Boat Ramp Site Visit Sign-in sheet_Redacted.pdf | ||
| W912QR25B0003 Amendment 1.pdf | ||
| W912QR25B003.pdf | ||
| W912QR25B0003_Specs-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOUISVILLE DISTRICT
OF ENGINEERS
US ARMY CORPS
NOVEMBER 2024
CERTIFIED FINAL
P2# 511801
BUCKHORN, KENTUCKY
PERRY COUNTY
BOAT RAMP RECONSTRUCTION 2024
BUCKHORN RESERVOIR DAM
AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET.
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
Reviewed by:*
Approval Recommended:*
Approved:*
SCOPE OF THEIR EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.
DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE
LOUISVILLE DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION
* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,
QUALITY CONTROL
PE/A
ENGINEERING DIVISION, CHIEF
DATE
DATE
DATE
JEFF ESTERLE, P.E., P.G.
BILL DORSCH, P.E.
IAN MITCHELL, P.E.
APPROVAL OF ALL DRAWINGS IN THIS SET.
OFFICIAL RECOMMENDATION AND
SIGNATURES AFFIXED BELOW INDICATE
APPROVAL RECOMMENDED: *
CERTIFICATION.
REVIEWS ARE COMPLETE, INCLUDING ITR/ATR
INDICATES DESIGN AND QUALITY CONTROL
*APPROVAL RECOMMENDED SIGNATURE
BILL DORSCH, PE
TECHNICAL LEAD
CHIEF, ENGINEERING DIVISION
IAN F. MITCHELL, PE
ER 1110-1-8152.
SIGNATURES ARE REQUIRED BY
THE SCOPE OF THIER EMPLOYMENT.
THESE DOCUMENTS ARE OPERATING WITHIN
REGISTRATION DESIGNATIONS APPEAR ON
INDIVIDUALS WHOSE SIGNATURES AND
DISTRICT.
ARMY CORPS OF ENGINEERS, LOUISVILLE
** THIS PROJECT WAS DESIGNED BY THE U.S.
APPROVED: **
CIVIL
DESIGNER: BILL DORSCH
CHECKER: ROB HARRIS
GEOTECHNICAL
DESIGNER: JUSTIN ROOSA
CHECKER: ERIC SPRINGSTON
IN THE FOLLOWING DRAWING SET.
AND CHECKERS ON ALL SHEETS INCLUDED
SIGNATURES BELOW INCLUDE DESIGNERS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C O
V E
R S
H E
E T
GI001
B U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
B S
A Y
L O
R
R H
A R
R
IS
A N
S I
D
L
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
10 January 2025
W912QR25B0003
W
2Q R
B0
3_
Pl an s-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
IN
E X
O F
D R
A W
IN
G
GI002
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
B S
A Y
L O
R
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
A1
SCALE: NTS
INDEX OF DRAWINGS
W
2Q R
B0
3_
Pl an s-
PROJECT LOCATION
PROJECT LOCATION
PERRY COUNTY
KENTUCKY
TENNESSEE
WEST VIRGINIA
VIRGINIA
NORTH CAROLINA
KY 28
KY 28
K Y
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
C A
T
IO
N A
N D
V
IC
IN
IT
Y M
A P
GI003
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
B S
A Y
L O
R
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
M
A R
T
IN
L U
T H
E R
K
IN
G J
R
P L
A C
E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
D1
NTS
AREA MAP
N
A12
NTS
LOCATION MAP
N
H12
NTS
VICINITY MAP
N
W
2Q R
B0
3_
Pl an s-
TOPOGRAPHIC SYMBOLS
IW
P
UP
RIPRAP
POWER LINES DUCTS
FORCE MAIN FM
S
SD
T
TU
PT
TELEPHONE DUCTS
POST INDICATOR VALVE
POWER POLE
POWER POLE WITH GUY
SPIGOT
VALVE
555CONTOUR
SPOT ELEVATION
CONTRACTOR WORK LIMITS
FLOW DIRECTION
LIFT STATION
HEADWALL
SUBDRAIN
BORING
CHAIN LINK FENCE
LS
C.O.
SD
FLOW
TD (2-4")
ED (3-4")
STEAM LINE
CB
TELEPHONE LINE - UNDERGROUND
EDGE OF GRAVEL
CLEANOUT
PIV
LOW PRESSURE GAS
MEDIUM PRESSURE GAS
HIGH PRESSURE GAS
TELEPHONE LINE - AERIAL
GAS LINE G
POWER LINE - UNDERGROUND
POWER LINE - AERIAL
SANITARY SEWER LINE
STORM DRAINAGE LINE
TELEPHONE AND POWER - AERIAL
WATER LINE
FIRE MAIN
SS
W
F
CATCH BASIN
G(LP)
G(MP)
G(HP)
INDUSTRIAL WASTE
MH-1
FHFIRE HYDRANT
MANHOLE W/DESIGNATION
BENCHMARK/CONTROL POINT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
A N
D A
R D
S Y
M B
O
GI004
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
B S
A Y
L O
R
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
M
A R
T
IN
L U
T H
E R
K
IN
G J
R
P L
A C
E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
W
2Q R
B0
3_
Pl an s-
& AND
AB ANCHOR BOLT
ABSW AIR BREAK SWITCH
ADDL ADDITIONAL
ADJ ADJACENT, ADJUSTABLE
AFB AIR FORCE BASE
A.F.F. ABOVE FINISHED FLOOR
AFFF AQUEOS FILM FORMING FOAM
AGGR AGGREGATE
AL ALUMINUM
ALTN ALTERNATE
AMP AMPERE
AP ACCESS PANEL
APPROX APPROXIMATELY
ASPH ASPHALT
ATTEN ATTENUATE
AUTO AUTOMATIC
AUX AUXILIARY
AVG AVERAGE
AWG AMERICAN WIRE GAGE
BLDG BUILDING
BLK BLOCK
BM BEAM, BENCH MARK
BOT BOTTOM
BRG BEARING
BRK BRICK
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BUR BUILT - UP ROOF
CAP CAPACITY, CAPACITOR
C-C CENTER TO CENTER
CEM CEMENT
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CIP CAST IRON PIPE
CKT CIRCUIT
CLG CEILING
CLO CLOSET
CLR CLEAR
CLWG CLEAR WATER GLASS
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CNDS CONDENSATE
CO CLEANOUT
CLWG CLEAR WIRE GLASS
CW COLD WATER
COL COLUMN
CONC CONCRETE
COND CONDUCTOR, CONDENSER
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS, CONTROL
CONTD CONTINUED
CONV CONVERTER
COP COPPER
CORR CORRUGATE
CPE CHLORINATED POLYETHYLENE
CPLG COUPLING
CSPE CHLOROSULFONATED POLYETHYLENE
CSK COUNTERSINK
CT CERAMIC TILE
CTR CENTER
CU CUBIC
CU FT CUBIC FEET
CU YD CUBIC YARD
CUR CURRENT
DB DRY BULB
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISC DISCONNECT
DISCH DISCHARGE
DL DEAD LOAD
DN DOWN
DOD DEPARTMENT OF DEFENSE
DPNL DISTRIBUTION PANEL
DR DOOR
DS DOWNSPOUT
E EAST
EA EACH
ELEC ELECTRIC
ELEV ELEVATE, ELEVATOR
EMER EMERGENCY
EMT ELECTRICAL METALLIC TUBING
ENTR ENTRANCE
EPDM ETHELENE PROPOLENE DIANENE MONOMER
EQL. EQUAL
EQUPT. EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXST EXISTING
EXP EXPANSION
EXT EXTERIOR
F FAHRENHEIT, FACE
FD FLOOR DRAIN
FDN FOUNDATION
FDR FEEDER
FFE FINISH FLOOR ELEVATION
FHC FIRE HOSE CABINET
FIG FIGURE
FLA FULL - LOAD AMPERES
FLEX FLEXIBLE
FLL FLOW LINE
FLMB FLAMMABLE
FLOUR FLOURESCENT
FNSH FINISH
FR FRAME
FRP FIBERGLASS REINFORCED POLYESTER
FRT FIRE RETARDENT TREATMENT
FTG FOOTING
FU FUSE
GA GAGE
GAL GALLON
GALV GALVANIZED
GL GLASS
GND GROUND
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRADE
GSU GLAZED STRUCTURAL UNIT
GWB GYPSUM WALL BOARD
GYP GYPSUM
HDW HARDWARE
HGT HEIGHT
H.I.D. HIGH INTENSITY DISCHARGE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSEPOWER, HIGH PRESSURE
HR HOUR
HTG HEATING
HTR HEATER
HW HOT WATER
HVY HEAVY
ID INSIDE DIAMETER
IDENT IDENTIFICATION
IN INCH
INCAND INCANDESCENT
INSUL INSULATION
INTR INTERIOR
INVT INVERT
JT JOINT
J JOIST
JB JUNCTION BOX
JC JANITOR CLOSET
JCT JUNCTION
KCP KEENE'S CEMENT PLASTER
KIT KITCHEN
KO KNOCK OUT
KV KILOVOLT
KVA KILOVOLT - AMPERE
KW KILOWATT
LA LIGHTNING ARRESTOR
LAV LAVATORY
LB POUND
LG LENGTH, LONG
LIQ LIQUID
LP LOW PRESSURE
LTG LIGHTING
LV LOW VOLTAGE
MACH MACHINE
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MAX MAXIMUM
MBH THOUSAND BTU PER HOUR
MECH MECHANICAL
MET METAL
MH MANHOLE
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MK MARK
MN MAIN
MO MOTOR-OPERATED, MASONRY OPENING, MONTH
MP MEDIUM PRESSURE
MT MOUNT
MTD MOUNTED
MTG MOUNTING
MTL METAL
N NORTH
N.B.P. NITRILE THERMOPLASTIC (FOR FUTURE FIRE RATING)
NC NORMALLY CLOSED
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NORMALLY OPEN, NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER
OPN OPERATION
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
BCCMP BITUMINOUS COATED CORRUGATED METAL PIPE
FB FIELD BOLTED
FEC
GP GUARD POST
ACST ACOUSTIC
ACU AIR CONDITIONING UNIT
C CONVERTOR
CC COOLING COIL
CP CIRCULATING PUMP
D DEEP
DA DRIP ASSEMBLY
DWG DRAWING
DWP DRINKING WATER DISPENSER
DWH DOMESTIC WATER HEATER
EF EACH FACE, EXHAUST FAN
EL ELEVATION, EXHAUST LOUVER
ER EXHAUST REGISTER
FH FIRE HYDRANT
FC FLEXIBLE CONNECTION
FT FORT, FOOT, FEET, FLASH TANK
FS FULL SIZE, FLOOR SINK
GV GATE VALVE, GLOBE VALVE
HB HOSE BIB
HDWL HEADWALL
IL INTAKE LOUVER
MOD MODEL (FOR GENERAL USE ONLY), MODIFY,
MOTOR OPERATED DAMPER
MKA MAKE UP AIR UNIT
ARCH ARCHITECTURE,ARCHITECTURAL
BD BOARD
CENTERLINE
CAV CAVITY
CFCI CONTRACTOR FURNISHED,CONTRACTOR INSTALLED
CHAN CHANNEL
CJ CONTROL JOINT
DK DECK
FLAT BRACKETF.B.
FE FIRE EXTINGUISHER
FF FINISH FLOOR
GFGI GOVERNMENT FURNISHED,GOVERNMENT INSTALLED
GFCI GOVERNMENT FURNISHED,CONTRACTOR INSTALLED
HC HEATING COIL,HANDICAPPED
IAW IN ACCORDANCE WITH
LVR LOUVER
MFD MANUFACTURED
MFG MANUFACTURING
MSRY MASONRY
OFCE OFFICE
OPP HND OPPOSITE HAND
ATC ACOUSTICAL TILE CEILING
EJ EXPANSION JOINT
BEJ BRICK/BLOCK EXPANSION JOINT
EW EACH WAY, EYE WASH
EW/DS EYE WASH/DELUGE SHOWER
LC
CPT CARPET
DP DEPTH, DEEP
MFR MANUFACTURE, MANUFACTURER
DI DUCTILE IRON PIPE
CV CHECK VALVE
CWL CONTRACTOR WORK LIMITS
CHW CHILLED WATER
CHG CHARGE, CHANGE
IPBC INFANTRY PLATOON BATTLE COURSE
FIRE EXTINGUISHER CABINET
LZ/PZ LANDING ZONE/PICKUP ZONE
MAT MOVING ARMOR TARGET
MGB MACHINE GUN BANKER
MIT MOVING INFANTRY TARGET
MSD MORTAR SIMULATION DEVICE
A/C AIR CONDITIONING
AHU AIR HANDLING UNIT
ASTM AMERICAN SOCIETY FOR TESTING MATERIALS
BNCH BENCH
@ AT
ABV ABOVE
AFTER ACTION REVIEWAAR
AFP AERIAL FIRING POINT
AGI AIR / GROUND INTEGRATION
FARP FORWARD ARMING AND REFUELING POINT
FL FLOW
FO FIBER OPTIC LINE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
A N
D A
R D
A B
B R
E V
IA
T
IO
N
GI005
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
B S
A Y
L O
R
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
M
A R
T
IN
L U
T H
E R
K
IN
G J
R
P L
A C
E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
2Q R
B0
3_
Pl an s-
PB PULL BOX, PUSH BUTTON
PH PHASE
PI POINT OF INTERSECTION
PIB POLYISOBUTLENE
PIV POST INDICATOR VALVE
PLAS PLASTER
PLYWD PLYWOOD
PNL PANEL
POL POLISH
PR PAIR
PRELIM PRELIMINARY
PRESS PRESSURE
PRI PRIMARY
PS PULL SWITCH
PSF POUND FORCE PER SQUARE FOOT
PSI POUND FORCE PER SQUARE INCH
PT'D PAINTED
P.U.F. POLYURETHANE FOAM
PVC POINT OF VERTICAL CURVE, POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENT
QT QUARRY TILE, QUART
QTY QUANTITY
QUAL QUALITY
R RISER, RADIUS
RA RETURN AIR
RAD RADIUS
RCPT RECEPTACLE
RD ROAD, ROOF DRAIN
RDC REDUCE
RDCN REDUCTION
REINF REINFORCE
REQD REQUIRED
RET RETAIN
REV REVISION
RM ROOM
R.O. ROUGH OPENING
RND ROUND
RPM REVOLUTIONS PER MINUTE
S SOUTH
SCHED SCHEDULE
SECT SECTION
SVCE SERVICE
SGL SINGLE
SIM SIMILAR
SLP SLOPE
SMH SANITARY MANHOLE
SOL SOLENOID
SP SINGLE POLE, SPACING, SPARE
SPEC SPECIFICATION
SPR SINGLE PLY ROOF
SPRT SUPPORT
SQ SQUARE
SQ FT SQUARE FOOT
S.S.T. STAINLESS STEEL
ST STEAM, STREET
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
ST PR STATIC PRESSURE
STRL STRUCTURAL
SYS SYSTEM
T TOILET
TAN TANGENT
T & B TOP AND BOTTOM
TBM TEMPORARY BENCH MARK
TC TOP OF CURB
TEL TELEPHONE
TEMP TEMPERATURE
TERM TERMINAL
THK THICK
THR THRESHOLD
THRU THROUGH
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TSCT THIN SET CEREMIC TILE
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
US UNITED STATES
UTIL UTILITY
V VOLT, VALVE
VAC VACUUM
VC VITRIFIED CLAY
VCP VITRIFIED CLAY PIPE
VCT VINYL COMPOSITION TILE
VEL VELOCITY
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VOL VOLUME
VS VENT STACK
VTR VENT THROUGH ROOF
W WEST, WATT, WIDTH, WASTE
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD, WINDOW DIMENSION
WDO WINDOW
WI WROUGHT IRON
WL WATER LEVEL
WS WASTE STACK, WATER SURFACE
WT WEIGHT
WTHPRF WEATHERPROOF
WTR WATER
WWM WELDED WIRE MESH
XBRA CROSS BRACING
XFMR TRANSFORMER
XSTR EXTRA STRONG
YD YARD
YR YEAR
VR VAPOR RETARDER
PD PUMP DISCHARGE
PRV PRESSURE REDUCING VALVE
RCP REINFORCED CONCRETE PIPE,
RECIRCULATING PUMP
RG RETURN GRILLE
SD CFM SUPPLY DIFFUSER (HVAC)
SH SHEET, SHOWER
SR SUPPLY REGISTER
SS SERVICE SINK
STR STRAIGHT, STRENGTH, STREAM, STRAINER
TG TRANSFER GRILLE
U UNION
URN URINAL
WHA WATER HAMMER ARRESTOR
SUSP SUSPENDED
PLSTC LAM PLASTIC LAMINATE
PNT PAINT
PT POINT,PRESERVATIVE TREATMENT
QTB QUARRY TILE BASE
SAN SANITARY
SATC SUSPENDED ACOUSTICAL TILE CEILING
SCRN SCREEN
VWC VINYL WALL COVERING
U.N.O. UNLESS NOTED OTHERWISE
VASW VINYL ACRYLIC SHEET WALLCOVERING
P PAINT
PL PLATE, PLASTIC LAMINATE
QTG QUARRY TILE GROUT
VB VINYL BASE
RWM RECESSED WALK-OFF MAT
SW SWITCH
SV SEAMLESS VINYL FLOORING
PSV PADDED SEAMLESS VINYL SHEET FLOORING
ROC-S
ROCA
RANGE OPERATIONAL CENTER-SMALL
RANGE OPERATIONS/CONTROL AREA
SAT STATIONARY ARMOR TARGET
SIT STATIONARY INFANTRY TARGET
UXO UNEXPLODED ORDNANCE
P.O.C. POINT OF CONNECTION, POINT ON CURVE
P.C. POINT OF CURVATURE
P.T. PRESERVATIVE TREATMENT, POINT OF TANGENCY
P.O.T. POINT ON TANGENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
A N
D A
R D
A B
B R
E V
IA
T
IO
GI006
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
B S
A Y
L O
R
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
M
A R
T
IN
L U
T H
E R
K
IN
G J
R
P L
A C
E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
2Q R
B0
3_
Pl an s-
CONSTRUCTION.
CLOSE THE RAMP ACCESS ROAD TO THE PUBLIC DURING
3. CONTRACTOR TO PROVIDE TYPE III BARRICADES TO
IN THEIR SAME VICINITY. COORDINATE WITH COR.
STORED, AND REINSTALLED AT THE END OF CONSTRUCTION
SIGNS IN CONFLICT WITH CONSTRUCTION SHALL BE MOVED,
2. ANY EXISTING BROWN RECREATION INFORMATION/DIRECTION
UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
INSTALLED IN ACCORDANCE WITH THE MANUAL ON
1. ALL PAVEMENT MARKINGS AND SIGNAGE SHALL BE
TRAFFIC CONTROL
AT SLOPE BREAKS.
LANE LINES, BOTTOM FACE OF CURBS, AND
PROVIDED AT CENTERLINE, EDGES OF PAVEMENT,
2. ELEVATIONS INDICATED ON CROSS SECTIONS ARE
SHOWN IN CROSS SECTIONS IS APPROXIMATE.
1. SEE TYPICAL SECTIONS FOR PAVEMENT SECTIONS. PAVEMENT
CROSS SECTIONS
PAVEMENT WORK.
5. PAVEMENT EDGE KEY AND WEDGE SHALL BE INCIDENTAL TO
4. COORDINATES SHOWN IN PLANS ARE TO EDGE OF PAVEMENT.
SITE PLANS.
3. FOR CURB AND GUTTER TERMINATION LOCATIONS, SEE
ARE GIVEN TO THE EDGE OF PAVEMENT.
2. DIMENSIONS (IE. RADII, PAVEMENT WIDTHS)
INFORMATION.
1. SITE PLANS PROVIDE GENERAL ROADWAY CONSTRUCTION
SITE PLANS
11. TREE FELLING IS ONLY PERMITTED FROM NOVEMBER 1 TO MARCH 30.
RELEASES WILL NOT BE PERMITTED.
AUTHORIZED STAGE LEVELS. MODIFICATION OF RESERVOIR
10. RESERVOIR RELEASES ARE CONTROLLED BY CONGRESSIONALLY
REQUIRED, CONTACT THE CONTRACTING OFFICER.
MATERIALS. IF ADDITIONAL MATERIAL STORAGE AREAS ARE
LIMITS INDICATED. THIS SHALL INCLUDE STORAGE OF CONSTRUCTION
CONSTRUCTION ACTIVITY TO THE AREA WITHIN THE CONSTRUCTION
9. THE CONTRACTOR SHALL CONFINE ALL GROUND DISTURBING
AREA DEVELOPMENT.
PRIOR TO STARTING WORK TO COORDINATE STAGING AND LAYDOWN
8. CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER,
REPORTED TO THE CONTRACTING OFFICER.
LOCATIONS AS SHOWN ON PLANS. ANY DIFFERENCES SHALL BE
SHALL VERIFY EXISTING ELEVATIONS AND ROADWAY AND UTILITY
7. BEFORE CONSTRUCTION OF SITE WORK BEGINS, THE CONTRACTOR
CONTROL POINTS PROVIDED.
HORIZONTAL CONTROL ON SITE FOR PROJECT CONSTRUCTION FROM
6. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING VERTICAL AND
REFERENCE DOCUMENTS TO THE SPECIFICATIONS.
5. HISTORICAL RESERVOIR SURFACE ELEVATIONS ARE PROVIDED AS
PROJECT OFFICE,
FROM THE TOPOGRAPHIC SURVEY, AND FROM PLANS PROVIDED BY THE
3. EXISTING UTILITY SIZES AND LOCATIONS SHOWN WERE COMPILED
COORDINATE SYSTEM (NAD 83).
HORIZONTAL CONTROL BASED ON KENTUCKY SOUTH STATE PLANE
NGVD 1929. THE CONVERSION FACTOR TO NAVD 88 IS -0.43.
2. VERTICAL CONTROL BASED ON COE DAM DATUM (EQUIVALENT TO
1. HORIZONTAL DATUM IS KENTUCKY STATE PLANE SOUTH 1602 (NAD 83).
GENERAL
INSTALLED BY AEP.
THE CONTRACTOR'S WORK PLAN SHALL BE PROVIDED AND
2. ALL NEW/RELOCATED UTILITY POLES NECESSITATED BY
INSTALLATION WITH AMERICAN ELECTRIC POWER (AEP).
1. THE CONTRACTOR SHALL COORDINATE THE LIGHTING
ELECTRIC UTILITIES
EXCAVATION IS INITIATED TO LOCATE UTILITIES.
5. CONTRACTOR TO CALL 811 BEFORE ANY NEW
GOVERNMENT.
THE CONTRACTOR AT NO ADDITIONAL COST TO THE
DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED BY
NOT DESIGNATED FOR DEMOLITION OR RELOCATION. ANY
4. CONTRACTOR SHALL PROTECT ANY EXISITNG UTILITIES
COORDINATING UTILITY RELOCATIONS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MANHOLES, ETC.) FOUND IN THE FIELD.
UTILITY MAPS AND UTILITY APPURTENANCES (VALVES,
2. LOCATIONS WERE DETERMINED BASED ON HISTORICAL
APPROXIMATE.
1. EXISTING UNDERGROUND UTILITY LOCATIONS ARE
GENERAL UTILITY NOTES
OF STRUCTURE.
12. MANHOLE LOCATIONS HAVE BEEN INDICATED AT CENTER
OF PIPE END.
11. HEADWALL COORDINATE LOCATIONS HAVE BEEN INDICATED AT CENTER
IN THE DRAINAGE DETAILS.
LINING SHALL ALSO RECEIVE A FILTER FABRIC AS INDICATED
10. ALL LOCATIONS TO RECEIVE KY CLASS II CHANNEL
STRUCTURES WHERE INDICATED OR EXIT THE SIDE SLOPE.
9. SUBDRAINS SHALL TIE INTO THE DRAINAGE
LOCATIONS AND FLOW DIRECTIONS.
8. GRADING PLANS ALSO PROVIDE SUBDRAIN
LOCATIONS.
SIZES, INVERTS, AND DRAINAGE STRUCTURE LAYOUT
7. THE STORM SEWER PROFILES PROVIDE THE PIPE
ITEM INFORMATION.
DRAINAGE STRUCTURE TYPES, AND EROSION CONTROL
6. GRADING AND EROSION CONTROL PLANS PROVIDE
DRAINAGE STRUCTURES PRIOR TO COMPLETION OF CONSTRUCTION.
5. ALL SILT, SAND, AND SEDIMENT SHALL BE REMOVED FROM ALL
MUST BE ADJUSTED TO PROVIDE THE FINISHED GRADE AS SHOWN.
SLABS ON GRADE, TOPSOIL, SOD OR ANY OTHER FEATURE WHICH
OPERATIONS FOR PROPER PLACEMENT OF PAVEMENT, SIDEWALKS,
4. CONTRACTOR SHALL MAKE ALLOWANCES DURING GRADING
POND WATER.
THE SITE AT ALL TIMES, AND SHALL NOT CREATE AREAS WHICH
3. THE CONTRACTOR SHALL PROVIDE FOR POSITIVE DRAINAGE OF
CONTRACTOR DURING CONSTRUCTION. SEE GC SERIES SHEETS.
2. SEDIMENT AND EROSION CONTROLS SHALL BE PROVIDED BY THE
OF THE PROJECT SITE.
PROCESS TO INTERCEPT SILT AND PROVIDE POSITIVE DRAINAGE
SEDIMENT CONTROLS SHALL BE CONSTRUCTED EARLY IN THE
1. EROSION CONTROL IS OF GREAT CONCERN. DITCHES WITH
GRADING, DRAINAGE AND EROSION CONTROL PLANS
(GRADE 60, UNCOATED BARS - NORMAL WEIGHT CONCRETE)
PER ACI 318-19 TABLE 25.4.2.3
CLASS B TENSION LAP SPLICES
BAR SIZE
#3 f'c = 4,000 psi
1'-7" f'c = 4,500 psi
1'-6" f'c = 5,000 psi
1'-5"
#4 2'-1" 2'-0" 1'-11"
#5 2'-7" 2'-6" 2'-4"
#6 3'-1" 2'-11" 2'-10"
#7 4'-6" 4'-3" 4'-1"
#8 5'-2" 4'-11" 4'-8"
#9 5'-10" 5'-6" 5'-3"
#10 6'-7" 6'-2" 5'-11"
#11 7'-3" 6'-10" 6'-6"
+30%FRESH CONCRETE CAST BELOW THE SPLICED BARS
ANY HORIZONTAL SPLICED BARS W/ MORE THAN 12" OFD.
+20%EPOXY-COATED BARS FOR ALL OTHER CONDITIONSC.
+50%SPLICES LESS THAN 6 BAR DIAMETERS
BAR DIAMETERS OR W/ CLEAR SPACING BETWEEN
EPOXY-COATED BARS W/ CLEAR COVER LESS THAN 3B.
+35%LIGHTWEIGHT CONCRETE A.
SPLICE TABLE AS FOLLOWS (INCREASES ARE ACCUMULATIVE):
INCREASE TENSION DEVELOP LENGTHS AND LAP LENGTHS FOR LAP 1.
f'c = 6,000 psi
1'-4"
1'-9"
2'-2"
2'-7"
3'-9"
4'-3"
4'-9"
5'-4"
5'-11"
EXCEED 1.5.
RATIO OF LENGTH TO WIDTH OF PANELS MUST NOT
MAXIMUM LENGTH OF POUR DOES NOT EXCEED 100'-0".
SF OF CONCRETE IS POURED IN A SINGLE POUR AND THE
IN CONCRETE FLOORS [AND ROOFS] SO LESS THAN 10,000
DESIGN REQUIREMENTS. LOCATE CONSTRUCTION JOINTS
POSITIONED TO PREVENT CHANGE IN STRUCTURAL
APPROVAL. CONSTRUCTION JOINTS MUST BE
LAYOUTS TO THE CONTRACTING OFFICER FOR
PRIOR TO PLACEMENT OF CONCRETE, SUBMIT JOINT 19.
ELECTROLYTIC ACTION BETWEEN ALUMINUM AND STEEL.
TO PREVENT ALUMINUM-CONCRETE REACTION AND
CONFORMING TO ASTM D1187, ASPHALT-BASE EMULSION,
WITH CONCRETE. COAT ALUMINUM WITH COATING
ALUMINUM MUST NOT BE PLACED IN DIRECT CONTACT 18.
OR WHERE CHAMFER INDICATED.
PROVIDE 3/4" CHAMFER AT EXPOSED CONCRETE EDGES 17.
FACILITATE PLACEMENT OF EMBEDDED ITEMS.
NORMAL SPACING. DO NOT CUT REINFORCEMENT TO
WHERE BAR SPACING WILL NOT EXCEED 1.5 TIMES THE
ANCHORS, RECESSES AND OTHER EMBEDDED ITEMS
SPREAD CONCRETE REINFORCEMENT AT SLEEVES, 16.
PLACE PRIOR TO AND DURING CONCRETE PLACEMENT.
ACCURATELY POSITIONED AND SECURELY MAINTAINED IN
EMBEDDED ITEMS MUST BE PROPERLY PLACED, 15.
STEEL VERTICAL SURFACES.
SLABS ON GROUND ABUT CONCRETE, MASONRY, OR
PROVIDE 1/2" THICK JOINT FILLER MATERIAL WHERE 14.
MUST CONFORM TO ACI 318.
LENGTH. STIRRUPS, TIES, AND 180 & 135 DEGREE HOOKS
AND EXTEND A MINIMUM OF 12 BAR DIAMETERS IN
PROVIDE STANDARD HOOKS WITH 90 DEGREE BENDS 13.
3"ALL OTHER CONDITIONSB.
3"CONCRETE CAST AGAINST EARTHA.
BE IN ACCORDANCE WITH ACI 318 AND UFC 3-301-01:
MINIMUM CONCRETE COVER FOR REINFORCEMENT MUST 12.
2'-0" LAP MINIMUM.
1'-0" AROUND CORNERS OR PROVIDE CORNER BARS WITH
BEND HORIZONTAL WALL AND FOOTING REINFORCEMENT 11.
PER ACI 318.
SPLICES MUST BE MADE BY LAPPING WITH CLASS B LAPS
CONCRETE REINFORCEMENT MUST BE CONTINUOUS. 10.
CONCRETE PLACEMENT.
SUPPORT MUST BE MAINTAINED PRIOR TO AND DURING
AND BE POSITIVELY AND CONTINUOUSLY SUPPORTED.
MUST BE LOCATED IN THE MIDDLE THIRD OF THE SLAB
CONCRETE REINFORCEMENT FOR SLABS ON GROUND 9.
EXPOSED TO VIEW.
TIPPED), OR STAINLESS STEEL CHAIRS FOR CONCRETE
PROVIDE PLASTIC, PLASTIC-COATED (NOT PLASTIC 8.
PROVIDE SUPPORTS FOR REINFORCEMENT. 7.
BEND.
SHOP FABRICATE BENDS AND HOOKS. DO NOT FIELD 6.
A706, GRADE 60.
INDICATED, REINFORCEMENT MUST CONFORM TO ASTM
INDICATED. WHERE WELDING REINFORCEMENT IS
DO NOT WELD CONCRETE REINFORCEMENT UNLESS 5.
BARS CONFORMING TO ASTM A615, GRADE 60.
CONCRETE REINFORCEMENT MUST BE STEEL DEFORMED 4.
CONCRETE DENSITY MUST BE NORMAL WEIGHT.3.
DAY COMPRESSIVE STRENGTH (f'c) OF 4,500 PSI.
CAST-IN-PLACE CONCRETE MUST ATTAIN A MINIMUM 28-2.
303), AND 2004 "ACI DETAILING MANUAL" (ACI SP-66).
"SPECIFICATIONS FOR STRUCTURAL CONCRETE" (ACI
FOR STRUCTURAL CONCRETE" (ACI 318), 2014
INSTITUTE (ACI) 2019 "BUILDING CODE REQUIREMENTS
MUST CONFORM WITH THE AMERICAN CONCRETE
STRUCTURAL CONCRETE DESIGN AND CONSTRUCTION 1.
STRUCTURAL CONCRETE
(GRADE 60, UNCOATED BARS - NORMAL WEIGHT CONCRETE)
PER ACI 318-19 TABLE 25.4.3.2
TENSION DEVELOPMENT LENGTHS FOR 90 AND 180 DEGREE HOOKED BARS
BAR SIZE
#3 f'c = 4,000 psi
#4
#5
#6
#7
#8
#9
#10
#11
+25%THAN 2.5"
COLUMN WITH SIDE COVER LESS
HOOKED BARS TERMINATING INSIDEE.
+25%USED IN COLUMNS
THAN 6 BAR DIAMETERS WHEN NOT
HOOK BARS WITH SIDE COVER LESSD.
+60%DIRECTION OF THE BAR INTENTION.
DEVELOPMENT LENGTH IN THE
HOOKS FOR AT LEAST 75% OF THE
OR STIRRUPS THAT INCLOSE THE
DIAMETERS AND A LACK OF TIES
HOOK SPACING LESS THAN 6 BARC.
+20%DUAL-COATED REINFORCEMENT
EPOXY COATED OR ZINC AND EPOXYB.
+35%LIGHTWEIGHT CONCRETEA.
(INCREASES ARE ACCUMULATIVE):
NCREASE DEVELOPMENT LENGTH OF HOOKED BARS AS FOLLOWS 1.
BEND DIA.
0' - 2.5"
0' - 3"
0' - 4"
0' - 4.5"
0' - 5.5"
0' - 6"
0' - 9"
0' - 10.5"
0' - 11.5"
0' - 6"
0' - 6"
0' - 8"
0' - 10"
1' - 1"
1' - 3"
1' - 6"
1' - 10"
2' - 2"
L dh
L ext
0' - 5"
0' - 6"
0' - 8"
0' - 9"
0' - 11"
1' - 0"
1' - 2"
1' - 3"
1' - 5"
0' - 6"
0' - 6"
0' - 8"
0' - 10"
1' - 0"
1' - 3"
1' - 6"
1' - 9"
2' - 1"
L dh
L ext
0' - 5"
0' - 6"
0' - 8"
0' - 9"
0' - 11"
1' - 0"
1' - 2"
1' - 3"
1' - 5"
L dh
L ext
0' - 5"
0' - 6"
0' - 8"
0' - 9"
0' - 11"
1' - 0"
1' - 2"
1' - 3"
1' - 5"
0' - 6"
0' - 6"
0' - 8"
0' - 10"
1' - 0"
1' - 3"
1' - 6"
1' - 9"
2' - 1"
0' - 6"
0' - 6"
0' - 7"
1' - 0"
1' - 5"
1' - 9"
2' - 0"
L dh
L ext
0' - 5"
0' - 6"
0' - 8"
0' - 9"
1' - 0"
1' - 2"
1' - 3"
1' - 5"
0' - 10"
1' - 3"
0' - 11" f'c = 4,500 psi f'c = 5,000 psi f'c = 6,000 psi
TABLE AND MODIFY THE LENGTHS AS NOTED:
HOOKED BAR DEVELOPMENT LENGTHS PER THE FOLLOWING 21.
AND MODIFY LENGTHS AS NOTED:
B. LAP TENSION SPLICES PER THE FOLLOWING TABLE
LARGER BAR.
A. LAP COMPRESSION SPLICES 30 BAR DIAMETERS OF
LAP SPLICES20.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
N E
R A
L N
O T
GI007
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
T F
R O
S T
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
2Q R
B0
3_
Pl an s-
EXISTING DEBRIS BOOM
USACE - STATUS SET
BRASS DISK IN CONRETE
ELEV. 875.37
E. 2,303,142.35
N. 2,015,156.54
M12
N 2,015,237.87
E 2,302,640.30
N 2,015,161.60
E 2,302,630.65
N 2,015,185.63
E 2,302,481.67
N 2,015,243.55
E 2,302,557.56
N 2,015,267.01
E 2,302,541.48
N 2,015,274.07
E 2,302,468.76
N 2,015,183.74
E 2,302,377.81
N 2,014,943.25
E 2,302,373.17
N 2,014,718.90
E 2,302,408.55
N 2,014,368.95
E 2,302,604.40
N 2,014,112.72
E 2,302,649.72
N 2,014,151.92
E 2,302,900.86
N 2,014,607.49
E 2,302,678.20
N 2,014,608.88
E 2,302,586.63
N 2,014,798.67
E 2,302,522.36
N 2,014,964.64
E 2,302,494.62
N 2,015,125.07
E 2,302,497.85
N 2,015,156.04
E 2,302,479.82
N 2,014,006.67
E 2,302,763.37
N 2,014,006.86
E 2,302,900.77 N 2,014,328.43
E 2,302,826.55
N 2,014,467.40
E 2,302,424.16
N 2,014,369.15
E 2,302,508.79
N 2,014,558.26
E 2,302,478.78
(ABOVE WINTER POOL)
EXISTING BOAT RAMP
RESERVOIR CONTROL TOWER
USACE MAINTENANCE
B U
C K
H O
R N R
E S
E R
V O
IR
D
A M
A C
C E
S S T
O L
A K
E O
F F
IC
E
BUCKHORN
RESERVOIR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
CONTRACTOR WORK LIMITS
SURVEY CONTROL POINT
GENERAL SHEET NOTES
LEGEND
CONTROL PROVIDED.
CONTROL WORK. EXISTING TOPOGRAPHY IS BASED ON
CONTRACTOR TO USE CONTROL PROVIDED TO LAY OUT AND 5.
AND NOTIFY COR OF ANY DISCREPANCIES.
CONTRACTOR TO VERIFY CONTROL PRIOR TO CONSTRUCTION 4.
DATUM.
VERTICAL DATUM IS LOCAL U.S. ARMY CORPS OF ENIGNEERS 3.
(NAD83).
HORZONTAL DATUM IS KENTUCKY STATE PLANE SOUTH 1602 2.
VF402.
FOR CONTROL POINT DESCRIPTIONS, SEE SHEETS VF401 AND 1.
USACE - STATUS SET
MAG NAIL IN CONCRETE DOCK
ELEV. 793.23
E. 2,302,671.66
N. 2,014,427.82
#5 REBAR W/ USACE CAP - STATUS SET
ELEV. 876.87
E. 2,302,669.63
N. 2,014,425.83
N T
R O
L P
O
IN
T L
O C
A T
IO
N
S
A N
D C
O N
T R
A C
T O
R W
O R
K L
IM
IT
VA100
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
T F
R O
S T
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
R
IA
L
P H
O T
O G
R A
P H
A1
AND CONTRACTOR WORK LIMITS CONTROL POINT LOCATIONS, AERIAL PHOTOGRAPH,
1"=80'SCALE:
NORTH
PLAN
80' 160'0
W
2Q R
B0
3_
Pl an s-
USACE - STATUS SET
BRASS DISK IN CONRETE
ELEV. 875.37
E. 2,303,142.35
N. 2,015,156.54
M12
(ABOVE WINTER POOL)
EXISTING BOAT RAMP
RESERVOIR CONTROL TOWER
USACE MAINTENANCE
B U
C K
H O
R N R
E S
E R
V O
IR
D
A M
A C
C E
S S T
O L
A K
E O
F F
IC
E
BUCKHORN
RESERVOIR
VF101
VF102
VF103
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
CONTRACTOR WORK LIMITS
SURVEY CONTROL POINT
GENERAL SHEET NOTES
LEGEND
AND VF402.
FOR CONTROL POINT DESCRIPTIONS SEE SHEETS VF401 1.
USACE - STATUS SET
MAG NAIL IN CONCRETE DOCK
ELEV. 793.23
E. 2,302,671.66
N. 2,014,427.82
#5 REBAR W/ USACE CAP - STATUS SET
ELEV. 876.87
E. 2,302,669.63
N. 2,014,425.83
VF100
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
T F
R O
S T
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
V E
R A
L L
E X
IS
T
IN
G
S U
R V
E Y
C O
N D
IT
IO
N S
A1
OVERALL EXISTING SURVEY CONDITIONS
1"=80'SCALE: 80' 160'0
NORTH
PLAN
W
2Q R
B0
3_
Pl an s-
RIM ELEV. 794.57
CB 5028
INV EL. 790.71
INV EL. 790.78
INV EL. 782.10
NO PARKING SIGN
EX. LIGHT POLE
CONC. PAD
CONC. PAD
GRILL
PICNIC TABLE PAD
CONCRETE
EX. CURB
BUCKHORN LAKE
E X
IS
TI
N
G C
O N C R E
TE
R
A M P
EXISTING ASPHALT
EXISTING
CONCRETE
PAVEMENT
EXI
STI
NG
A
SP
HALT
P
AVEM
ENT
EX.
" R
CP
EX. LIGHT POLE
EX. DIRT PATH
TREE LINE
TREE LINE
M A
T C
H L
IN
E
S E
E S
H E
E T
V F
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
CONTRACTOR WORK LIMITS
SURVEY CONTROL POINT
GENERAL SHEET NOTES
LEGEND
AND VF402.
FOR CONTROL POINT DESCRIPTIONS SEE SHEETS VF401 1.
VF101
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
T F
R O
S T
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
M
A R
T
IN
L U
T H
E R
K
IN
G J
R
P L
A C
E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
X
IS
T
IN
G S
U R
V E
Y C
O N
D
IT
IO
N
S
A1
EXISTING SURVEY CONDITIONS
1"=20'SCALE:
NORTH
PLAN
20' 40'0
W
2Q R
B0
3_
Pl an s-
895 900
INV EL. 834.20
INV EL. 831.71
RIM ELEV. 835.56
CB 5361
RIM ELEV. 814.38
CB 5349
INV EL. 831.53
INV EL. 810.41
INV EL. 810.48
EXIS
TIN
G A
SP
HALT
PAVEMENT
EX.
" R
CP
EX.
" R
CP
EX. LIGHT POLE
EX. GUARDRAIL
EX. PAVED DIT
CH
EX. LIGHT POLE
EX. LIGHT POLE
EX. HEADWALL
TREE LINE
SHALE/ROCK FACE
BUCKHORN LAKE
M A
T C
H L
IN
E
S E
E S
H E
E T
V F
M A
T C
H L
IN
E
S E
E S
H E
E T
V F
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
CONTRACTOR WORK LIMITS
SURVEY CONTROL POINT
GENERAL SHEET NOTES
LEGEND
AND VF402.
FOR CONTROL POINT DESCRIPTIONS SEE SHEETS VF401 1.
VF102
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
T F
R O
S T
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
M
A R
T
IN
L U
T H
E R
K
IN
G J
R
P L
A C
E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
IS
T
IN
G S
U R
V E
Y C
O N
D
IT
IO
N
S
A1
EXISTING SURVEY CONDITIONS
1"=20'SCALE: 20' 40'0
NORTH
PLAN
W
2Q R
B0
3_
Pl an s-
885 890
DAM INFORMATION SIGN
METAL T-POST
YIELD SIGN
EXISTING ASPHALT PAVEMENT
EX. GUARDRAIL
EX. ELEC. POLE
EX. ELEC. POLE
EX. ELEC. POLE
EX. PAVED DITCH
D A
M R
O A
D
T O L
A K
E O
F F
IC
E
SHALE/ROCK FACE
ROCK OUTCROP
M A
T C
H L
IN
E
S E
E S
H E
E T
V F
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
CONTRACTOR WORK LIMITS
SURVEY CONTROL POINT
GENERAL SHEET NOTES
LEGEND
AND VF402.
FOR CONTROL POINT DESCRIPTIONS SEE SHEETS VF401 1.
VF103
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
T F
R O
S T
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
IS
T
IN
G S
U R
V E
Y C
O N
D
IT
IO
N
S
A1
EXISTING SURVEY CONDITIONS
1"=20'SCALE: 20' 40'0
NORTH
PLAN
W
2Q R
B0
3_
Pl an s-
PROJECT:
DATE:
SKETCH OF STATION
STATION
LONGITUDE
ELEVATION
LATITUDE N
W
CONV.
V
COMB. FACTOR
NORTHING
EASTING
(M)
LOCATION:
PROJECT:
DATE:
SKETCH OF STATION
STATION
LONGITUDE
ELEVATION
LATITUDE N
W
CONV.
V
COMB. FACTOR
NORTHING
EASTING
(M)
LOCATION:
DESCRIPTION:
DESCRIPTION:
GEOGRAPHIC COORDINATES (NAD83)
SET set
(US FT)
(FT)(FT)
2015245.83 2014427.82
876.87
2302569.63 2302671.66
GEOGRAPHIC COORDINATES (NAD83)
(US FT)
(US FT)
(US FT)
dec 2023 dec 2023
BUCKHORN, KY
BOAT RAMP TOPO FY24
BUCKHORN lAKE
KENTUCKY SOUTH 1602 (NAD83) KENTUCKY SOUTH 1602 (NAD83)
dec 2023 dec 2023
PROJECT:
DATE:
SKETCH OF STATION
STATION
LONGITUDE
ELEVATION
LATITUDE N
W
CONV.
V
COMB. FACTOR
NORTHING
EASTING
(M)
LOCATION:
CORPS OF ENGINEERS
PROJECT:
DATE:
SKETCH OF STATION
STATION
LONGITUDE
ELEVATION
LATITUDE N
W
CONV.
V
COMB. FACTOR
NORTHING
EASTING
(M)
LOCATION:
CORPS OF ENGINEERS
DESCRIPTION:
DESCRIPTION:
GEOGRAPHIC COORDINATES (NAD83)
SET
The station is a 5/8" rebar with a yellow usace louisville cap.
the station is a magnetic nail set in concrete boat dock.
set
(US FT)
N
(FT)(FT)
N
793.23
GEOGRAPHIC COORDINATES (NAD83)
(US FT)
(US FT)
(US FT)
BUCKHORN, KY
BOAT RAMP TOPO FY24
BUCKHORN lAKE
BUCKHORN FY24 BOAT RAMP TOPO
northeasterly of southwesterly corner of concrete boat dock.
13.6 feet southeasterly of center of sign base and 10.3 feet of boat ramp parking area; 41.3 feet easterly of storm catch basin, Monument 105 is located on the conrete dock near the southerly end pavement.
southerly of gaurdrail and 1.2 feet northerly of north edge of edge of pavement, 18.7 feet westerly of utility pole, 3.2 feet on the west end of buckhorn lake dam; 98.8 feet easterly of west
MONUMENT 1 IS LOCATED IN THE GRASS near the north edge of pavement
10.3' .3
BUCKHORN FY24 BOAT RAMP TOP
37°20'27.27501"
83°28'19.38444"
37°20'19.16506"
83°28'18.36558"
SCALE
NOT TO
SCALE
NOT TO
0.99994541 0.99994540
01°22'53.36" 1°22'53.98"
18.7'
1.2'
98.8' 3.2'
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
GENERAL SHEET NOTES
FOR CONTROL POINT LOCATIONS SEE SHEET VA1001.
VF401
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
T F
R O
S T
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
M
A R
T
IN
L U
T H
E R
K
IN
G J
R
P L
A C
E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
U R
V E
Y C
O N
T R
O L
P O
IN
T
D E
S C
R
IP
T
IO
N S
A1
SURVEY CONTROL POINT DESCRIPTIONS
SCALE: NTS
W
2Q R
B0
3_
Pl an s-
PROJECT:
DATE:
SKETCH OF STATION
STATION
LONGITUDE
ELEVATION
LATITUDE N
W
CONV.
V
NORTHING
EASTING
(M)
LOCATION:
DESCRIPTION:
GEOGRAPHIC COORDINATES (NAD83)
SET
(US FT)
(FT)
2,015,156.53
875.37
2,303,142.35 (US FT)
DEC 2023
M12 kentucky south SPC ZONE 1602 (NAD83)
DEC 2023
PROJECT:
DATE:
SKETCH OF STATION
STATION
LONGITUDE
ELEVATION
LATITUDE N
W
CONV.
V
SCALE FACTOR
NORTHING
EASTING
(M)
LOCATION:
COE
DESCRIPTION:
GEOGRAPHIC COORDINATES (NAD83)
SET
FLUSH WITH THE GROUND.
The station is a CORPS OF ENGINEERS BRASS DISK SET IN CONCRETE, BEING
(US FT)
(FT)
N
(US FT)
buckhorn, KY
BOATRAMP & ROCKFACE FY24
buckhorn lake buckhorn lake fy 24 - tailwater bank erosion
AND 62.6 FEET NORTHERLY OF MONUMENT A1.
FEET EASTERLY OF MONUMENT M13, 121.0 FEET WESTERLY OF MONUMENT M11
THE EDGE OF PAVEMENT AND GUARDRAIL ON TAILWATER CAMP ROAD; 119.5
monument M12 IS LOCATED IN THE NORTHERLY GRAVEL SHOULDER, BETWEEN
38°32'46.38139
95°02'05.93260"
SCALE
NOT TO
1.00016948
-05°37'51.57"
121.0'
119.5'
I
D G
E
S E
R V I
C E
TAILWATER CAMP ROAD
TO M13
TO M11
MON A1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
GENERAL SHEET NOTES
FOR CONTROL POINT LOCATIONS SEE SHEET VA1001.
VF402
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
B D
O R
S C
H
T F
R O
S T
R H
A R
R
IS
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
M
A R
T
IN
L U
T H
E R
K
IN
G J
R
P L
A C
E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
U R
V E
Y C
O N
T R
O L
P O
IN
T
D E
S C
R
IP
T
IO
N S
A1
SURVEY CONTROL POINT DESCRIPTIONS
SCALE: NTS
W
2Q R
B0
3_
Pl an s-
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
BUCKHORN LAKE
E X
IS
TI
N
G C
O N C R E
TE
R
A M P
EXISTING
CONCRETE
PAVEMENT
EXI
STI
NG
A
SP
HALT
P
AVEM
ENT
TP-4
TP-3
TP-2
TP-1
TP-5
TP-6
HA-1
HA-1A
HA-2HA-2A
HA-3
HA-3A
HA-4
HA-4A
DISTURB LIMIT
NORTH
PLAN
RECOMPACTED PER SPECIFICATION 31 00 00.00 06 EARTHWORK.
TEST PITS WERE LOOSELY BACKFILLED AND SHALL BE EXCAVATED AND 2.
FOR BORING AND TEST PIT LOGS , REFER TO SHEETS B-201 AND B-202.1.
GENERAL SHEET NOTES
LEGEND
HAND AUGER HA-XX
TEST PIT TP-XX
B-101
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
J R
O O
S A
G
J O
N E
S
E S
P R
IN
G
S T
O N
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
M
A R
T
IN
L U
T H
E R
K
IN
G J
R
P L
A C
E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
R
IN
G
A N
D T
E S
T P
IT
L
O C
A T
IO
N
P L
A N
A1
BORING AND TEST PIT LOCATION PLAN
1"=20'SCALE: 20' 40'0
W
2Q R
B0
3_
Pl an s-
MAJOR DIVISIONS LEGENDS
UNIFIED SOIL CLASSIFICATION
(INCLUDING IDENTIFICATION AND DESCRIPTION)
FIELD IDENTIFICATION PROCEDURES
AND BASING FRACTIONS ON ESTIMATED WEIGHTS)
(EXCLUDING PARTICLES LARGER THAN 3 INCHES
C O
A R
S E
-G R
A
IN
E D
S O
IL
S
M O
R E
T H
A N
H A
L F
O F
M A
T E
R
IA
L I
S L
A R
G E
R T
H A
N N
O
S
IE
V
E S
IZ
E
TYPICAL NAMES LABORATORY CLASSIFICATION CRITERIA
LITTLE OR NO FINES.
WELL-GRADED GRAVELS, GRAVEL-SAND MIXTURES,
AMOUNTS OF ALL INTERMEDIATE PARTICLE SIZES.
WIDE RANGE IN GRAIN SIZES AND SUBSTANTIAL
WITH SOME INTERMEDIATE SIZES MISSING.
PREDOMINANTLY ONE SIZE OR A RANGE OF SIZES
(FOR IDENTIFICATION PROCEDURES SEE ML BELOW).
NONPLASTIC FINES OR FINES WITH LOW PLASTICITY
(FOR IDENTIFICATION PROCEDURES SEE CL BELOW).
PLASTIC FINES
OF ALL INTERMEDIATE PARTICLE SIZES.
WIDE RANGE IN GRAIN SIZE AND SUBSTANTIAL AMOUNTS
WITH SOME INTERMEDIATE SIZES MISSING.
PREDOMINANTLY ONE SIZE OR A RANGE OF SIZES
(FOR IDENTIFICATION PROCEDURES SEE ML BELOW).
NONPLASTIC FINES OR FINES WITH LOW PLASTICITY
SILTY SANDS, SAND-SILT MIXTURES.
SANDS, LITTLE OR NO FINES.
POORLY-GRADED SANDS, GRAVELLY
SANDS, LITTLE OR NO FINES.
WELL-GRADED SANDS, GRAVELLY
CLAYEY GRAVELS, GRAVEL-SAND-CLAY MIXTURES.
LITTLE OR NO FINES.
POORLY-GRADED GRAVELS, GRAVEL-SAND MIXTURES,
SM
SP
SW
GC
GM
GP
GW
(FOR IDENTIFICATION PROCEDURES SEE CL BELOW).
PLASTIC FINES
L E
S S
T H
A N
L
IQ
U
ID
L
IM
IT
S
IL
T S
A N
D C
L A
Y S
G R
E A
T E
R T
H A
N
E Q
U A
L T
O
IQ
U
ID
L
IM
IT
S
IL
T S
A N
D C
L A
Y S
M O
R E
T H
A N
H A
L F
O F
M A
T E
R
IA
L I
S S
M A
L L
E R
T H
A N
N O
S
IE
V E
S
IZ
E
F
IN
E -G
R A
IN
E
D S
O
IL
S
HIGHLY ORGANIC SOILS PT PEAT AND OTHER HIGHLY ORGANIC SOILS.
PLASTICITY, ORGANIC SILTS.
ORGANIC CLAYS OF MEDIUM TO HIGH
OH
CH FAT CLAYS.
INORGANIC CLAYS OF HIGH PLASTICITY,
SOILS, ELASTIC SILTS.
DIATOMACEOUS FINE SANDY OR SILTY
INORGANIC SILTS, MICACEOUS OR
MH
OL OF LOW PLASTICITY.
ORGANIC SILTS AND ORGANIC SILTY CLAYS
CLAYS, SILTY CLAYS, LEAN CLAYS.
PLASTICITY, GRAVELLY CLAYS, SANDY
INORGANIC CLAYS OF LOW TO MEDIUM
CL
ML OR CLAYEY SILTS WITH SLIGHT PLASTICITY.
ROCK FLOUR, SILTY OR CLAYEY FINE SANDS
INORGANIC SILTS AND VERY FINE SANDS,
ON FRACTION SMALLER THAN NO. 40 SIEVE SIZE.
IDENTIFICATION PROCEDURES
CHARACTERISTICS)
(CRUSHING
DRY STRENGTH
TO SHAKING)
(REACTION
DILATANCY
NEAR PL)
(CONSISTENCY
TOUGHNESS
NONEQUICK TO SLOW NONE TO SLIGHT
MEDIUM TO HIGH MEDIUM
SLIGHTSLOW
MEDIUM
SLIGHT TO
MEDIUM
SLIGHT TO
SLOW TO NONE
MEDIUM
SLIGHT TO
HIGH
VERY HIGH
HIGH TO
NONE
MEDIUM
SLIGHT TO
VERY SLOW
NONE TO
MEDIUM TO HIGH
TEXTURE.
SPONGY FEEL AND FREQUENTLY BY FIBROUS
READILY IDENTIFIED BY COLOR, ODOR,
E Q
U
IV
A L
E N
T T
O T
H E
N O
S
IE
V E
S
IZ
E
(F O
R V
IS
U
A L
C L
A S
S
IF
IC
A
T
IO
N
T H
E
/4 I
N
S
IZ
E M
A Y
B E
U S
E D
A S
IS
S
M A
L L
E R
T H
A N
N O
.4 S
IE
V
E S
IZ
E
M O
R E
T H
A N
H A
L F
O F
C O
A R
S E
F R
A C
T
IO
N
S A
N D
S
IS
L
A R
G E
R T
H A
N N
O .4
S
IE
V E
S
IZ
E
M O
R E
T H
A N
H A
L F
O F
C O
A R
S E
F R
A C
T
IO
A V
E L
S
31 4 6
F
IN
E S
(L E
S S
T H
E A
N G
R A
V E
L S
F
IN
E
S
(M O
R E
T H
F
A V
E L
S W
H
F
IN
E S
(L E
S S
T H
E A
N S
A N
D S
F
IN
E
S
(M O
R E
T H
F
E S
S A
N D
S W
H
GENERAL NOTES
TERMS FOR THICKNESS OF ROCK BEDDINGTERMS FOR HARDNESS OF BEDROCK
WEATHERING
RELATIVE DENSITY AND CONSISTENCY
CORRELATION OF PENETRATION RESISTANCE (ASTM D 1586) WITH
SOIL DESCRIPTIVE TERMS SIZE
ABBREVIATIONS
NOT MEETING ALL GRADATION REQUIREMENTS FOR GW
"A" LINE WITH PI LESS THAN 4
ATTERBERG LIMITS BELOW
"A" LINE WITH PI GREATER THAN 7
ATTERBERG LIMITS ON OR ABOVE SYMBOLS.
REQUIRING USE OF DUAL
ARE BORDERLINE CASES
PI BETWEEN 4 AND 7
ABOVE "A" LINE WITH
NOT MEETING ALL GRADATION REQUIREMENTS FOR SW
"A" LINE WITH PI GREATER THAN 7
ATTERBERG LIMITS ON OR ABOVE
"A" LINE WITH PI LESS THAN 4
ATTERBERG LIMITS BELOW
t o
M O
R E
T H
A N
L E
S S
T H
A N
B O
R D
E R
L
IN
E C
A S
E S
R E
Q U
IR
IN
G D
U A
L S
Y M
B O
L S
G M
G
C S
M S
C
G W
G
P
S W
S
P
FOR LABORATORY CLASSIFICATION OF FINE-GRAINED SOILS
LIQUID LIMIT
PLASTICITY CHART
P L
A S
T
IC
IT
Y
I N
D E
X
WITH INCREASING PLASTICITY INDEX
TOUGHNESS AND DRY STRENGTH INCREASE
COMPARING SOILS AT EQUAL LIQUID LIMIT,
"U
LI
N E
"A " L
IN
E
ML OR OL
C L
O R O
L
CL-ML
90 10080706050403020100
U S
E G
R A
IN
-S
IZ
E
C U
R V
E I
N I
D E
N T
IF
Y
IN
G
T H
E F
R A
C T
IO
N
S A
S G
IV
E
N U
N D
E R
F
IE
L D
I D
E N
T
IF
IC
A
T
IO
N
C O
A R
S E
-G R
A
IN
E D
S O
IL
S
A R
E C
L A
S S
IF
IE
D A
S F
O L
L O
W S
D E
P E
N D
IN
G
O N
P E
R C
E N
T A
G E
O F
F
IN
E S
F
R A
C T
IO
N
S M
A L
L E
R T
H A
N N
O
S
IE
V
E S
IZ
E
D E
T E
R M
IN
E
P E
R C
E N
T A
G E
S O
F G
R A
V E
L A
N D
S A
N D
F R
O M
G R
A
IN
-S
IZ
E C
U R
V E
60 10 D X D
C
C = 30 BETWEEN 1 AND 3
(D )
D
U
C = 60 GREATER THAN 6
D
60 10 D X D
C
C = 30 BETWEEN 1 AND 3
(D )
D
U
C = 60 GREATER THAN 4
D
50 TO 100%MOSTLY
30 TO 45%SOME
15 TO 25%LITTLE
5 TO 10% FEW
LESS THAN 5%TRACE
0.075 MM TO 0.425 MMFINE SAND
0.425 MM TO 2 MMMEDIUM SAND
2 MM TO 1/4 INCHCOARSE SAND
1/4 INCH TO 3/4 INCHFINE GRAVEL
3/4 INCH TO 3 INCHESCOARSE GRAVEL
3 INCHES TO 12 INCHESCOBBLE
>12 INCHESBOULDER
HARD OVER 30
VERY STIFF 15-30 CLAYS
STIFF 8-15 AND
MED STIFF 4-8 SILTS
SOFT 2-4
VERY SOFT 0-2
(BLOWS PER FOOT)
CONSISTENCY PENETRATION RESISTANCE,N60
VERY DENSE GRAVELS OVER 50
AND 30-50 DENSE
MED DENSE 10-30 SANDS
LOOSE 4-10
VERY LOOSE 0-4
(BLOWS PER FOOT)
RELATIVE DENSITY PENETRATION RESISTANCE,N60
THERE IS A LARGE CHANGE IN VOLUME, BUT THE SOIL HAS NOT BEEN SIGNIFICANTLY TRANSPORTED.
RESIDUAL SOIL - ALL ROCK MATERIAL IS CONVERTED TO SOIL. THE MASS STRUCTURE AND MATERIAL FABRIC DESTROYED.
IS STILL LARGELY INTACT.
DECOMPOSED - ALL ROCK MATERIAL IS DECOMPOSED AND/OR DISINTEGRATED TO SOIL. MASS STRUCTURE/TEXTURE
TEXTURE INDISTINCT BUT FABRIC PRESERVED. STRENGTH GREATLY REDUCED.
DISCOLORED ROCK IS PRESENT EITHER AS A DISCONTINUOUS FRAMEWORK OR AS CORE STONES.
HIGHLY WEATHERED - MORE THAN HALF OF THE ROCK MATERIAL IS DECOMPOSED OR DISINTEGRATED. FRESH OR
TEXTURE PRESERVED BUT STRENGTH LESS THAN UNWEATHERED ROCK.
DISCOLORED ROCK IS PRESENT EITHER AS A CONTINUOUS FRAMEWORK OR AS CORE STONES.
MODERATELY WEATHERED - 10 T0 50 PERCENT OF THE ROCK MATERIAL IS DECOMPOSED OR DISINTEGRATED. FRESH OR
- SLIGHT DISCOLORATION OR ALTERATION ON SURFACES AND DISCONTINUITIES. STRENGTH PRESERVED. SLIGHTLY WEATHERED
PERHAPS SLIGHT DISCOLORATION ON MAJOR DISCONTINUITY SURFACES.
UNWEATHERED - NO VISIBLE SIGN OF ROCK MATERIAL WEATHERING (I.E., NO CHEMICAL OR MECHANICAL ALTERATION).
>3.0 FEETMASSIVE
1.0 TO 3.0 FEET THICK BED
0.5 TO 1.0 FOOTMEDIUM BED
0.2 TO 0.5 FOOTTHIN BED
0.02 TO 0.2 FOOTBAND
<0.02 FOOTPARTING
SEVERAL HARD HAMMER BLOWS TO BREAK SPECIMEN.
CANNOT BE SCRATCHED WITH KNIFE. - VERY HARD
HARD HAMMER BLOW TO BREAK SPECIMEN.
DIFFICULT TO SCRATCH WITH KNIFE. - HARD
HARD - CANNOT BE SCRATCHED WITH FINGERNAIL.
CAN BE SCRATCHED EASILY WITH KNIFE.MODERATELY
ONLY EDGES CAN BE BROKEN WITH FINGERS.
CAN BE SCRATCHED WITH FINGERNAIL. - SOFT
CAN BE INDENTED EASILY WITH THUMB.VERY SOFT -
IS PERFORMED BY OTHERS.
GENERAL NOTE 6 MAY NOT BE APPLICABLE WHEN EXPLORATION AND TESTING14.
OTHERWISE.
THE MODIFIED PROCTOR METHOD IN ACCORDANCE WITH ASTM D1557, UNLESS NOTED
MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT WERE OBTAINED USING13.
TIME OF DRILLING. THE ELEVATION MAY HAVE CHANGED SINCE THAT TIME.
SURFACE ELEVATION SHOWN ON THE DRILLING LOGS IS THE ELEVATION AT THE12.
CONTENT OF MATERIAL ON DATE TESTED.
MOISTURE CONTENT (MC) AS SHOWN ON GRAPHIC LOG REPRESENTS THE MOISTURE 11.
WITH DIAMOND BIT, UNLESS OTHERWISE INDICATED.
CORE HOLES WERE COMPLETED BY AN NX OR NQ WIRE LINE SIZE CORE BARREL 10.
DRIVE SAMPLES WERE TAKEN WITH A 1 3/8" I.D. -2" O.D. X 2'-8" SPLIT SPOON.9.
DRILLING WATER LOST IN THE DRILL HOLE.
THE TERM "LOST WATER" IF SHOWN ON THE LOGS INDICATES A QUANTITY OF8.
WITHHELD INFORMATION ON SUBSURFACE CONDITIONS.
RESULTS, SHALL NOT BE GROUNDS FOR A CLAIM THAT THE GOVERNMENT
REPRESENTED BY THE DRILLING LOGS, INCLUDING LABORATORY TEST
FAILURE OF THE CONTRACTOR TO AVAIL THEMSELVES OF THE INFORMATION 7.
FEDERAL OFFICE BUILDING, LOUISVILLE, KY.
ENGINEER. U.S. ARMY ENGINEER DISTRICT, LOUISVILLE, CORPS OF ENGINEERS,
PERFORMED) AND EDITED LOGS MAY BE VIEWED IN THE OFFICE OF THE DISTRICT
LABORATORY TESTS FOR SHEAR, CONSOLIDATION, PERMEABILITY, ETC. WHEN
FIELD BOOKS, FIELD LOGS, LABORATORY LOGS (PRESENTING THE RESULTS OF6.
BY ANALYSIS IN THE LABORATORY, AS APPROPRIATE.
ON THE DRILLING LOGS WERE DETERMINED IN THE FIELD AND LATER SUPPLEMENTED
CLASSIFICATIONS AND PHYSICAL CHARACTERISTICS OF SOIL AND ROCK AS SHOWN5.
MATERIAL IS DENOTED AS OVERBURDEN.
RECOVERING SAMPLES ABOVE ROCK, SUITABLE FOR EXAMINATION OR TESTS, THE
WHEREVER THE METHOD OF EXPLORATION PRECLUDED THE POSSIBILITY OF 4.
DRILL LOCATION.
BE CONSTRUED AS INDICATING THE ABSENCE OF GROUNDWATER AT A PARTICULAR
OBSERVATIONS. THE OMISSION OF GROUNDWATER ELEVATIONS SHALL NOT NECESSARILY
ANY DATE OTHER THAN THAT SHOWN ON THE LOGS MUST BE DETERMINED BY SEPARATE
FLUCTUATIONS, AND STREAM STAGES, THEREFORE, ACTUAL LEVEL OF GROUNDWATER ON
GROUNDWATER LEVELS WILL VARY IN ACCORDANCE WITH RAINFALL, RESERVOIR POOL3.
TRUE GROUNDWATER LEVEL.
BY DRILLING OPERATIONS AND SHOULD NOT BE CONSTRUED AS INDICATING THE
WATER ELEVATIONS INDICATED ON THE DRILLING LOGS MAY HAVE BEEN INFLUENCED2.
LOGS FOR THE EXPLORATION METHOD USED.
IMPRACTICAL WITH THE EXPLORATION METHOD USED. SEE THE INDIVIDUAL DRILLING
REFUSAL IS DEFINED AS THE POINT BEYOND WHICH FURTHER PENETRATION WAS1.
CLAYEY SANDS, SAND-CLAY MIXTURES.
RQD ROCK QUALITY DESIGNATION
RECOVERYREC
RC ROCK CORE
STRENGTH PER ASTM D2166
UNCONFINED COMPRESSIVE QU
PP POCKET PENETROMETER
PLASTIC LIMITPL
PI PLASTICITY INDEX
OPTIMUM MOISTURE CONTENT OMC
FREE-FALL HAMMER ENERGY (60%)
SPECIFIED PERCENTAGE OF THE THEORETICAL
BLOW COUNT CORRECTED FOR THEN60
BLOW COUNT (PENETRATION RESISTANCE)N
MAXIMUM DRY DENSITYMDD
MC MOISTURE CONTENT
LL LIQUID LIMIT
HOLLOW STEM AUGER HSA
CONTINUOUS FLIGHT AUGERCFA
SYMBOLS.
REQUIRING USE OF DUAL
ARE BORDERLINE CASES
PI BETWEEN 4 AND 7
ABOVE "A" LINE WITH
SILTY GRAVELS, GRAVEL-SAND-SILT MIXTURES.
C H O
R O
H
VERY SLOW
NONE TO
MH OR OH
SC
SYMBOLS
GROUP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
B-200
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
SOIL AND ROCK CLASSIFICATION
SCALE: NTS
J R
O O
S A
G
J O
N E
S
E S
P R
IN
G
S T
O N
S O
IL
A
N D
R O
C K
C L
A S
S
IF
IC
A
T
IO
N
W
2Q R
B0
3_
Pl an s-
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
B-201
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
BORING LOGS
SCALE: NTS
A N
S
J O
N
J
R
O O
S A
E S
P R
IN
G
S T
O N
B O
R
IN
G L
O G
S
W
2Q R
B0
3_
Pl an s-
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
B-202
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
BORING LOGS
SCALE: NTS
G
J O
N E
S
E S
P R
IN
G
S T
J
R
O O
S A
B O
R
IN
G L
O G
S
W
2Q R
B0
3_
Pl an s-
(ABOVE WINTER POOL)
EXISTING BOAT RAMP
RESERVOIR CONTROL TOWER
USACE MAINTENANCE
B U
C K
H O
R N R
E S
E R
V O
IR
D
A M
A C
C E
S S T
O L
A K
E O
F F
IC
E
BUCKHORN
RESERVOIR
GC101
GC102
GC103
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
CONTRACTOR WORK LIMITS
STOCKPILE AREAS.
REMOVE AND RESTORE ALL TEMPORARY LAYDOWN, STAGING, AND 17.
REMOVE ALL TEMPORARY EPSC CONTROLS INCLUDING TURBIDITY BARRIER.16.
REINSTALL PERMANENT DITCH CHECK AS NECESSARY.15.
AFTER STABILIZATION, REMOVE TEMPORARY TOE OF CUT SLOPE CONTROLS.14.
REMOVE TEMPORARY PAVEMENT EDGE CONTROLS.
PERMANENT DITCH CHANNEL LINING, RIPRAP SLOPE PROTECTION, AND
REMOVE DITCH CHECKS, REMOVE ANY SEDIMENT ACCUMULATION, PLACE 13.
CONSTRUCT PAVEMENT AND INSTALL CURB TURNOUT CONTROLS.12.
ESTABLISH CONCRETE WASHOUT FACILITY.11.
INSPECT AND ADJUST CONTROLS.10.
PREPARE PAVEMENT SUBGRADE.9.
APPLY SLOPE STABILIZATION MEASURES.8.
PERFORM CUT AND FILL OPERATIONS.7.
ROUGH GRADE DITCHES AND INSTALL DITCH CHECKS.6.
INSTALL INLET PROTECTION.5.
CONTROLS.
INSTALL DOWNSLOPE EDGE OF PAVEMENT AND CUT TOE OF SLOPE 4.
BEGIN CLEARING, THEN DEMOLITION.3.
INSTALL PERIMETER CONTROLS.2.
ESTABLISH CONSTRUCTION ENTRANCE. COORDINATE LOCATION WITH COR.1.
PLAN PRE-CONSTRUCTION SUBMITTAL.
NOTE: CONTRACTOR MUST PROVIDE ACTUAL SEQUENCE OF WORK IN THE SITE
ASSUMED CONSTRUCTION SEQUENCE
LEGEND
PERCENT SLOPES, VERY STONY FINISHED GRADIENT MAX. STEEPNESS = 2:1.
SITE SOILS = uShgF - SHELOCTA-HIGHSPLINT-GILPIN COMPLEX, 20 TO 70
TOTAL LAND DISTURBANCE = 1.50 ACRES7.
(SWPPP) IN ACCORDANCE WITH SPECIFICATION SECTION 01 57 00.00 09.
IMPLEMENT THE APPROVED STORMWATER POLLUTION PREVENTION PLAN 6.
REINFORCING SYSTEM.
NOT TO RECEIVE ROCK SURFACING, PAVING, OR SPECIAL TURF
TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKET ON ALL AREAS 5.
WITH IDENTIFYING SIGNAGE. COORDINATE LOCATION WITH COR.
PRIOR TO ANY CONCRETE DELIVERY, INSTALL CONCRETE WASHOUT STATION 4.
COORDINATE LOCATIONS WITH THE COR.
INSTALL PERIMETER CONTROL FOR ALL TEMPORARY STOCKPILES. 3.
NECESSARY TO ACCOMMODATE THE WORK.
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE TO ADJUST CONTROLS AS
EPSC MEASURES SHOWN ENCOMPASS BASE BID AND OPTIONED 2.
AND LABELS ARE SHOWN SOLID AND UNSHADED.
EXISTING CONTOUR LINES SHOWN ARE SHADED. PROPOSED CONTOURS 1.
GENERAL SHEET NOTES
FLOW ARROW
D S
E D
IM
E
N T
C O
N T
R O
L P
L
GC100
U
C K
H O
R N
R E
S E
R V
O
IR
D A
M
B O
A T
R A
M P
R E
P L
A C
E M
E N
T
P
F Y
K -1
.1
/2
I.
W
E
IL
B A
K E
R
B S
A Y
L O
R
C
C A
R T
E R
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y
E
R A
L L
E R
O S
IO
N
P R
E V
E N
T
IO
N
A1
SCALE: 1"=80'
OVERALL EROSION PREVENTION AND SEDIMENT CONTROL PLAN
NORTH
PLAN
80' 160'0
W
2Q R
B0
3_
Pl an s-
CD
CD
CD
CD
CD
CD
T B
TB
TB
TB
TB
T B
TB
CD
CD
CD
CD
CD
CD
IP
IP
IP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
C E
R T
IF
IE
D F
IN
A
L
N O
V E
M B
E R
B D
O R
S C
H
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
PERCENT SLOPES, VERY STONY FINISHED GRADIENT MAX. STEEPNESS = 2:1.
SITE SOILS = uShgF - SHELOCTA-HIGHSPLINT-GILPIN COMPLEX, 20 TO 70
TOTAL LAND DISTURBANCE = 1.50 ACRES.7.
(SWPPP) IN ACCORDANCE WITH SPECIFICATION SECTION 01 57 00.00 09.
IMPLEMENT THE APPROVED STORMWATER POLLUTION PREVENTION PLAN 6.
REINFORCING SYSTEM.
NOT TO RECEIVE ROCK SURFACING, PAVING, OR SPECIAL TURF
TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKET ON ALL AREAS 5.
WITH IDENTIFYING SIGNAGE. COORDINATE LOCATION WITH COR.
PRIOR TO ANY CONCRETE DELIVERY, INSTALL CONCRETE WASHOUT STATION 4.
COORDINATE LOCATIONS WITH THE COR.
INSTALL PERIMETER CONTROL FOR ALL TEMPORARY STOCKPILES. 3.
NECESSARY TO ACCOMMODATE THE WORK.
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE TO ADJUST CONTROLS AS
EPSC MEASURES SHOWN ENCOMPASS BASE BID AND OPTIONED 2.
AND LABELS ARE SHOWN SOLID AND UNSHADED.
EXISTING CONTOUR LINES SHOWN ARE SHADED. PROPOSED CONTOURS 1.
GENERAL SHEET NOTES
SHEET KEYNOTES
SEE SHEET GC502, DETAIL H1.
BIODEGRADABLE, FIBER ROLL SLOPE INTERUPTION;13.
POTENTIAL SPRING OUTLET. VERIFY IN FIELD AND EXERCISE CAUTION.12.
TEMPORARY FLOATING TURBIDITY BARRIER FOR RESERVOIR APPLICATION.11.
SEE SHEET CS503, DETAIL M1.
PERMANENT RIPRAP SLOPE PROTECTION PER SITE PLAN;10.
SEE SITE PLANS AND SHEET SHEET CS503.
PERMANENT SLOPE STABILIZATION OF TURF REINFORCEMENT MAT AND SOD; 9.
TEMPORARY CURB FLUME PROTECTION; SEE…