This document is an amendment (Amendment 0005) to Solicitation W912QR24R0052 for the Design/Build Construction of the Network Enterprise Center (NEC) located at Fort Hunter Liggett in Jolon, California.

The amendment revises the Price Breakout Schedule by reducing the Utility Connection Fees (Item 0004) to $0.01. It also clarifies that the Native CADD files will be provided to the awarded contractor after contract award, rescinding a previous statement that they had been added. Offerors are required to acknowledge all amendments. All other terms and conditions remain unchanged.

The overall solicitation is for the design and construction of an NEC facility, including a primary NEC Information Systems building, a secondary NEC Pre-Engineered building, and associated site work. Pricing is provided for the base proposal as well as several options, such as demolition of existing facilities, removal of hazardous materials, and furnishing/installing "Bona Fide Need" equipment. The solicitation is being issued by the U.S. Army Corps of Engineers, Engineering District Louisville.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

(See Continuation Page)

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR24R0052

X 9B. DATED (SEE ITEM 11)

10-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Nov-2024

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR24R0052-0005

W912QR24R0052

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

Solicitation No. W912QR24R0052 for the Design/Build Construction of the Fort Hunter Liggett (FHL) Network Enterprise Center (NEC) located at Fort Hunter Liggett in Jolon, CA is hereby amended as follows:

A. SECTION 00 10 00 – SOLICITATION, PRICE BREAKOUT SCHEDULE has been revised for Base

Proposal, Item 0004 for Utility Connection Fees to reflect an amount of $0.01.

B. Due to an administrative error, Amendment 0004, SECTION SF 30 - BLOCK 14 CONTINUATION

PAGE (SF 30), line F. provided that the Native CADD files have been added. Offerors are advised that, should this solicitation result in an award, the Native CADD files will be provided to the awarded contractor following contract award. Accordingly, line F is rescinded.

C. Offerors must acknowledge all Amendments.

D. All other terms and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The following have been modified:

PRICE BREAKOUT SCHEDULE

PRICE BREAKOUT SCHEDULE

PROJECT: Network Enterprise Center (NEC) LOCATION: Fort Hunter Liggett, California

PROPOSER’S NAME: _________________________________________________

BASE PROPOSAL

ITEM

NO. DESCRIPTION UNIT AMOUNT

0001 Primary Facility – NEC Information Systems job $ Building

0002 Secondary Facility – NEC Pre-Engineered job $ Building

0003 Primary Facility - Site Work job $

0004 Utility Connection Fees job $ 0.01

0005 Project Design Fees job $

TOTAL BASE PROPOSAL $

OPTIONS PRICING

ITEM

NO. DESCRIPTION UNIT AMOUNT

0006 Option: Demolition of Existing NEC job $ Building 197 and adjacent NEC Warehouse Facility Including Foundations

0007 Option: Removal of Hazardous Materials job $ Associated with CLIN Item 0006

0008 Option: Demolition of Fencing around job $ Facilities associated with CLIN Item 0006

0009 Option: Hazmat line item for and additional job $ 2,000 SF of unstable LBP’s throughout the Facility

0010 Option: Hazmat line item for and additional job $ 500 SF of pipe insulation throughout the facility

0011 Option: CFCI Operations and Maintenance – job $

Army Reserve (OMAR) Funded Bona Fide Need Equipment

TOTAL ALL OPTIONS PROPOSAL $

TOTAL BASE W/ ALL OPTIONS PROPOSAL $

Description of Proposal Items

(a) Item No. 0001 “Primary Facility – NEC Information Systems Building” includes all construction work associated with the construction of the facility, antiterrorism/force protection, and all applicable regulatory permitting and survey work and fees required within a line five (5) feet outside of this building.

(b) Item No. 0002 “Secondary Facility – NEC Pre-Engineered Building.” includes all construction work associated with the construction of the facility, antiterrorism/force protection, and all applicable regulatory permitting and survey work and fees required within a line five (5) feet outside of this building.

(c) Item No. 0003 “Primary Facility Site Work” includes all demolition and construction work required to support the Primary Facility including all utility work beyond the five (5) foot line referenced in Item No. 0001.

(d) Item No. 0004 “Utility Connection Fee’s” is required for any Utility Connections to the new Facility.

(e) Item No. 0005 “Project Design Fees” includes the fees for the Offeror’s design professionals to complete the Base Proposal design and construction documents for the project.

(f) Item No. 0006 “Demolition of Existing NEC Building 197 and adjacent NEC Warehouse” includes all construction work associated with the Demolition of both existing facilities, utilities, and foundations as described in the contract drawings and specifications.

*This option may be exercised within 90 days from Notice to Proceed.

(g) Item No. 0007 “Removal of Hazardous Materials associated with CLIN Item 0006” includes all construction work associated with the removal of any and all hazardous materials as described in the contract drawings and specifications.

(h) Item No. 0008 “Demolition of Fencing around Two (2) existing facilities associated with CLIN Item

0006” (Option) includes all work required to remove the existing fence around the existing facilities being demolished.

(i) Item No. 0009 “Hazmat line item for additional 2,000 SF of unstable LBP’s throughout the Two (2) existing facilities associated with CLIN item 0006” (Option) includes all work required to remove an additional 2000 sf of unstable LBP’s if found throughout the facility that is above and beyond what is described in the RFP and the Hazmat report.

*This option may be exercised within 180 days from Notice to Proceed.

(j) Item No. 0010 “Hazmat line item for additional 500 SF of pipe insulation throughout the facilities associated with CLIN item 0006” (Option) includes all work required to remove an additional 500 sf of pipe insulation if found throughout the facility that is above and beyond what is described in the RFP and the Hazmat report.

*This option may be exercised within 180 days from Notice to Proceed.

(k) Item No. 0011 “CFCI Operations and Maintenance – Army Reserve (OMAR) Funded Bona Fide Need

Equipment” (Option)” includes all work required to furnish and install “Bona Fide Need Funded Equipment” for the facility. Bona Fide Need Equipment is to be contractor provided and installed, unless otherwise noted. Contractor to review drawings and specifications to locate all Bona Fide Need Equipment. Bona Fide Need Equipment for the facility includes but is not limited to the following.

• Surface mounted entry mat’s

• Fire extinguishers, window blinds, & trash cans

• Microwave ovens

• Refrigerators

• Televisions

*This option may be exercised within 365 days from Notice to Proceed.

(End of Summary of Changes)