W912QR24R0025_Plans-0001.pdf

PDF 1 MB Posted

Attached to
LTC Hernan G. Pesquera ARC Microgrid in Juana Diaz, Puerto Rico
Solicitation number
W912QR24R0025
Issued by

About this file

This document contains engineering drawings and specifications for the LTC Hernan G. Pesquera ARC Microgrid project in Juana Diaz, Puerto Rico under Solicitation Number W912QR24R0025. The project involves the construction of a parking lot canopy with photovoltaic panels, a training center canopy, an energy control center, and associated electrical infrastructure. Key details include:

The project has an estimated construction cost between $10-25 million and falls under NAICS code 237130 (Power and Communication Line and Related Structures Construction). It is a full and open competition with a HUBZone 10% price evaluation preference. The drawings provide specifications for the electrical systems, including the energy control center, photovoltaic inverter enclosures, and underground raceway details. The single line diagram shows the major electrical equipment and distribution. The panel schedules detail the electrical loads. Contractors must be registered in the System for Award Management (SAM) database to be eligible for this opportunity.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

PARKING

LOT

PARKING CANOPY

WITH PV

(TYP)

A

A

A

A

TRAINING

CENTER

CANOPY 1

CANOPY 2

CANOPY 3

CANOPY 4

CANOPY 5

GROUND

MOUNTED

PV 2

GROUND

MOUNTED

PV 1

BESS-JD-01

BESS-JD-02

BESS-JD-03

A1 E-507

D1 E-507

A A

A A

A

A A

A A

A A

A A

A

A A

A A

A A

A A

A

A A

A A

A A

A A

A

A A

A A

A A

A A

A

B

B

B

D

D

US Army Corps of Engineers Louisville District

SHEET

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

2x

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

M

AR

K D

ES

C

R

IP

TI

O

N

D R

AW

IN

G C

O D

E.

-17 N

O V

B.

D

O M

BR

O

W

SK

I

FI

LE

N

AM

E:

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

E N

TU

C

KY

PR

AR

E

RC

IP

M

IC

R

O G

R

ID

S

PR

O

JE

C

T

NU

M

BE

R:

, P

PE

SQ

U

ER

A

AR

M Y

R

ES

ER

VE

C

EN

TE

R

, J U

AN

A

D

IA

Z

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

M ai n St re et

Fo rt

W or th , T

X

CERTIFIED FINAL

C .M

AN

IS

C . M

AN

IS

H .W

R

IG

H T

E-104

PA

R

TI

AL

S

IT

E

PL

AN

LI

G

H

TI

N G

3- E-

GENERAL NOTES

A REFER TO SHEET E-001 FOR SYMBOLS AND GENERAL NOTES

AND E-002 FOR ABBREVIATIONS.

B REFER TO SHEET E-702 FOR LIGHTING EQUIPMENT

SCHEDULE..

C REFER TO SHEET E-201 FOR ENLARGED PLAN OF INVERTER

ENCLOSURE AND ELEVATION VIEW.

KEYNOTES

1 LED CANOPY LT. FIXTURE MTD. HT. 12FT (TYP.)

2 LED FLOODLIGHT LT. FIXTURE MTD. HT. 12FT(TYP)

3 CANOPY 5 AND ACCOMPANYING CONDUIT, LUMINAIRES,

LIGHTNING PROTECTION, TRANSITION BOXES, GROUNDING,

AND PV ARE PART OF BID OPTION 1.

4 LIGHTING FIXTURE "D" MTD. HEIGHT 8' (TYP.) REFER TO E-702

FOR SCHEDULE

SCALE 1" = 40'-0"A1 PARTIAL SITE PLAN - LIGHTING

C .M

AN

IS

C . M

AN

IS

H .W

R

IG

H T

AM

EN

D

M

EN

T 0 0

D

AT

E /1 6/

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

W

2Q R

R

_P la ns -0

ARIMS: 200A Disposition: Maintain for 15 yrs after construction.

1.

.5

Energy Control Center

ECCSTATUS AUTO MANUAL

SECT 1 SECT 3 SECT 4

NO T-BUS

T-BUS

19.5 IN

T-BUS

19.5 IN

BESS-

JD-01

225 AT

BESS-

JD-02

225 AT

BESS-

JD-03

225 AT

ATS

1000 AT

SPARE

100AF

SECT 5

XFMR-01

100AT

XFMR-02

100AT

SPARE

250AF SPD 240 KA

DG-01

600 AT

T-BUS

19.5 IN

T-BUS

19.5 IN

SECT 2

PV-DISC

700 AT

36.0 30.0 36.0 30.0 30.0

UTIL-

JD-01

1200 AT

.0

.5

47.5

36.0 11.0

0.5 3.0

NOTE: ALL DEVICES REQURING DRILLING OR INSERTION IN MOUNTING PAD

SUCH AS CONDUIT, ANCHORING STUDS, SLEEVE INSERTS, ECT.

SHOULD BE INSTALLED BEFORE SETTING EQUIPMENT IN PLACE

NOTE

A MINIMUM IF 2.00/[51]

CLEARANCE BEHIND THE

SWITCHBOARD IS REQUIRED

FOR TOP COVER OVERHANG

.75/[19] DIA

MTG HOLES OFFSET

3.00/[76] TYP

FOR SIDE

2' - 9"

.5

1' - 0 1/2"

10' - 2"

21' - 0"

45 KVA XFMR

XFMR-JD-02

1' - 8"

1' - 7"

1' - 8"

6"

225A PANEL

PP-JD-02

FRONT

REAR

30.0 30.0 36.0 30.0 36.0

US Army Corps of Engineers Louisville District

SHEET

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

2x

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D R

AW

IN

G C

O D

E.

-17 N

O V

B.

D

O M

BR

O

W

SK

I

FI

LE

N

AM

E:

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

E N

TU

C

KY

PR

AR

E

RC

IP

M

IC

R

O G

R

ID

S

PR

O

JE

C

T

NU

M

BE

R:

, P

PE

SQ

U

ER

A

AR

M Y

R

ES

ER

VE

C

EN

TE

R

, J U

AN

A

D

IA

Z

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

M ai n St re et

Fo rt

W or th , T

X

CERTIFIED FINAL

C .M

AN

IS

C . M

AN

IS

H .W

R

IG

H T

E-200

EN

ER

G Y

C O

N

TR

O L

C

EN

TE

R

P

LA

N A

N D

EL

EV

AT

IO

N

3-

E-

GENERAL NOTES

A REFER TO MECHANICAL AND STRUCTURAL SITE PLANS

FOR SWITCHGEAR, PAD MOUNTED TRANSFORMER AND

ECC LOCATIONS.

B ARRANGEMENT OF SECTION-1, MAIN AND SECTION-5,

MAIN GENERATOR IN THE NEW METAL CLAD

SWITCHGEAR.

C REFER TO E-001 FOR SYMBOLS AND GENERAL NOTES

AND E-002 FOR ABBREVIATIONS.

D 3.5 FEET WORKING SPACE IN FRONT OF ELECTRICAL

EQUIPMENT WITH LIVE PARTS AT 480V PER NEC 2020

TABLE 110.26(A)(1).

SCALE 3/4" = 1'-0"E2 ECC ELEVATION FRONT

SCALE 3/4" = 1'-0"E1 ECC SIDE ELEVATION

SCALE 3/4" = 1'-0"A1 ECC FLOOR PLAN

KEYNOTES

1 CONCRETE BLOCK STRUCTURE FOR ECC ENCLOSURE.

REFERENCE STRUCTURAL FOR ADDITIONAL INFORMATION.

2 FINAL DIMENSIONS AND CUT OUTS TO BE COORDINATED BY

CONTRACTOR BASED ON SELECTED ENERGY CONTROL

CENTER EQUIPMENT.

3 PROVIDE WALL MOUNTED HVAC SYSTEM WITH CLIMATE

CONTROLS

HMI SECTION

C .M

AN

IS

C . M

AN

IS

H .W

R

IG

H T

M

AR

K D

ES

C

R

IP

TI

O

N

AM

EN

D M

EN

T

0 0

D

AT

E /1 6/

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

W

2Q R

R

_P la ns -0

PVPNL-JD-01

A5 E-201

INV_03

(PVPNL-JD-01)

- (8,10,12)(PVPNL-JD-01)

- (7,9,11)

INV_06

EMI FILTER

PVPNL-JD-01

INV_01

INV_02

INV_03

INV_04

INV_05

INV_06

INV_07

15' - 8"

9' - 0"

EMI FILTER

(PVPNL-JD-01)

- (1,3,5)

(PVPNL-JD-01)

- (19,21,23)

INV_07INV_01

INV_04

EMI FILTER

15' - 8"

9' - 0"

EMI FILTER

INV_05INV_02

(PVPNL-JD-01)

- (13,15,17)

(PVPNL-JD-01)

- (2,4,6)

US Army Corps of Engineers Louisville District

SHEET

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

2x

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D R

AW

IN

G C

O D

E.

-17 N

O V

B.

D

O M

BR

O

W

SK

I

FI

LE

N

AM

E:

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

E N

TU

C

KY

PR

AR

E

RC

IP

M

IC

R

O G

R

ID

S

PR

O

JE

C

T

NU

M

BE

R:

, P

PE

SQ

U

ER

A

AR

M Y

R

ES

ER

VE

C

EN

TE

R

, J U

AN

A

D

IA

Z

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

M ai n St re et

Fo rt

W or th , T

X

CERTIFIED FINAL

C .M

AN

IS

C . M

AN

IS

H .W

R

IG

H T

E-201

IN

VE

R

TE

R E

N C

LO

SU

R E

3- E-

GENERAL NOTES

A REFER TO SHEET E-001 FOR SYMBOLS AND GENERAL

NOTES AND E-002 FOR ABBREVIATIONS.

B REFER TO SHEET E-101 FOR EQUIPMENT LOCATION

C REFER TO SHEET E-702 FOR PV INVERTER REQUIREMENTS

KEYNOTES

1 NEMA 4X EMI SHIELDING ENCLOSURE FOR INVERTER

ENCLOSURE. SEE STRUCTURAL FOR PAD MOUNTING

INFORMATION.

2 PROVIDE EMI SHIELDING ON INVERTER ENCLOSURE TO

ATTENUATE HIGH FREQUENCY EMISSIONS BY 60 DB

MINIMUM

3 DOOR TO BE SHIELDED TO PROVIDE EMI ATTENUATION OF

60 DB MINIMUM

4 INVERTER 6 AND 7 ARE PART OF BID OPTION 2

5 INVERTER 5 IS PART OF BID OPTION 1.

SCALE 1/2" = 1'-0"A1 INVERTER ENCLOSURE PLAN - FLOOR LEVEL

SCALE 3/4" = 1'-0"A5 INVERTER ENCLOSURE ELEVATION

SCALE 1/2" = 1'-0"E1 INVERTER ENLOSURE PLAN - TOP LEVEL

SCALE 3/4" = 1'-0"E5 INVERTER ENCLOSURE EXTERNAL

SCALE 1/2" = 1'-0"C1 INVERTER ENCLOSURE PLAN - MIDDLE LEVEL

C .M

AN

IS

C . M

AN

IS

H .W

R

IG

H T

M

AR

K D

ES

C

R

IP

TI

O

N

AM

EN

D M

EN

T

0 0

D

AT

E /1 6/

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

W

2Q R

R

_P la ns -0

TOP OF FINISHED

CONCRETE SLAB

RGS COUPLING

PVC COUPLING

RIGID GALVANIZED

STEEL ELBOW

THREADED RGS COUPLING

WITH PLUG

PVC COATED

RGS RISER

TOP OF

FINISHED

CONCRETE

SLAB

THREADED COUPLING WITH PLUG

PVC COATED RGS EXTENSION AS REQ'D

PVC COATED RGS COUPLING

(PROVIDED WITH ELBOW)

PVC COUPLING

(PROVIDED WITH ELBOW)

3" UNREINFORCED CONCRETE

PVC COATED RGS

ELBOW AS REQ'D

SLOPE CONCRETE AWAY

FROM CONDUIT

FINISHED GRADE

CHAMFER

ALL SIDES

3" UNREINFORCED CONCRETE MIX

CLASS A1 PER SPECIFICATION

6" U

N O

THREADED COUPLING WITH PLUG

RIGID GALVANIZED

STEEL ELBOW AS REQ'D

PVC COATED RGS EXTENSION AS REQ'D

PVC COATED RGS COUPLING

(PROVIDED WITH ELBOW)

PVC COUPLING

(PROVIDED WITH ELBOW)

5'-0"

GENERATOR PAD

1/2" BOND BREAK

PVC S40

RIGID GALVANIZED STEEL ELBOW

PVC S40

PVC COATED

RGS RISER

1"

BOND

BREAK

2" OR LESSFLEX CONNECTOR

GREATER THAN 2"

PVC

COUPLING

BASE SIZE AND LOCATION AS

INDICATED ON S5000 SERIES DRAWINGS

THREADED RGS COUPLING WITH PLUG

SEE PLAN DWG FOR LOCATION

CHAMFER ALL SIDES

TOP OF FINISHED

CONCRETE SLAB

ELECTRICAL

EQUIPMENT

OR PULLBOX

BASE SIZE AND LOCATION AS

INDICATED ON S5000 SERIES

DRAWINGS

PVC COATED

RGS EXTENSION

AS REQ'D

COUPLING

COUPLING

RIGID GALVANIZED

STEEL ELBOW

CONCRETE WALL ASSEMBLY

PIPE OR CONDUIT

REFER TO CIVIL, ELECTRICAL,

AND MECHANICAL FOR

PENETRATION LOCATIONS

MIN. 1 1/4" SEALANT APPLIED

WITHIN ANNULUS, FLUSH WITH

BOTH SURFACES OF WALL

MINERAL WOOL INSULATION

FIRMLY PACKED INTO OPENING

AS REQUIRED TO

ACCOMODATE FILL MATERIAL

ELASTOMERIC

FLASHING MEMBRANE

SPARE INNERDUCTS

FIBER CABLE

EXTERNAL CONDUIT

SINGLE 3 CELL INNERDUCT

US Army Corps of Engineers Louisville District

SHEET

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

2x

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D R

AW

IN

G C

O D

E.

-17 N

O V

B.

D

O M

BR

O

W

SK

I

FI

LE

N

AM

E:

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

E N

TU

C

KY

PR

AR

E

RC

IP

M

IC

R

O G

R

ID

S

PR

O

JE

C

T

NU

M

BE

R:

, P

PE

SQ

U

ER

A

AR

M Y

R

ES

ER

VE

C

EN

TE

R

, J U

AN

A

D

IA

Z

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

M ai n St re et

Fo rt

W or th , T

X

CERTIFIED FINAL

C .M

AN

IS

C . M

AN

IS

H .W

R

IG

H T

E-504

TY

PI

C

AL

R

AC

EW

A

Y D

ET

AI

LS

3- E-

SCALE N.T.S.C1

TYPICAL EMBEDDED RACEWAY RISER

TERMINATING IN FOUNDATION

SCALE N.T.S.E4

TYPICAL UNDERGROUND RACEWAY

RISER TERMINATING IN CONCRETE SLAB

SCALE N.T.S.E1

TYPICAL UNDERGROUND RACEWAY

RISER TERMINATING IN SOIL

GENERAL NOTES

A RGS COUPLING SHALL BE PROVIDED FOR EACH RGS DUCT

TERMINATION. RGS NIPPLES AND INSULATIONS GROUNDING

BUSHINGS SHALL BE INSTALLED (PRIOR TO CABLE

INSTALLATION) ON ALL EXPOSED RIGID STEEL DUCT

COUPLING.

B WHEN HORIZONTAL, RACEWAY IS RGS. A STANDARD RGS

COUPLING ( OR AN ERICKSON COUPLING) SHALL BE USED

FOR CONNECTION TO RGS RISER ELBOW.

C RACEWAY SHALL BE PLUGGED UNTIL USED.

D EMBEDDED CONDUIT RISER ELBOWS SHALL HAVE A MINIMUM

CENTERLINE RADIUS EQUAL TO 6 TIMES THE NORMAL

DIAMETER OF THE CONDUIT.

SCALE N.T.S.A4 CONDUIT STUB UP TO GENERATOR PAD

SCALE N.T.S.C4

TYPICAL EMBEDDED RACEWAY RISER

TERMINATING IN FOUNDATION WITH EQUIPMENT BASE

C .M

AN

IS

C . M

AN

IS

H .W

R

IG

H T

SCALE 6" = 1'-0"A7 PENETRATION DETAIL

SCALE 3" = 1'-0"A1 INNERDUCT DETAIL VIEW

M

AR

K D

ES

C

R

IP

TI

O

N

AM

EN

D M

EN

T

0 0

D

AT

E /1 6/

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

W

2Q R

R

_P la ns -0

750 KVA

4160-480V

G

ARTC MDP

480V 800A

HA1

480V 225A

KH

480V 400A

HC1

480V 225A

LA1

208/120V 125A

LC1

208/120V 225A

K 208/120V 250A

MH1

480V 225A

DL1

208/120V 300A

PP2

208/120V 100A

30 KVA

480-208V

75 KVA

480-208V

75 KVA

480-208V

30 KVA

480-208V30 KVA

480-208V

100 A

20 A50 A 125 A

150 A 40 A 125 A

30 A

MH2

480V 225A

45 KVA

480-208V

PP3

208/120V 125A

75 KVA

480-208V

1000 A

500 A

300 A200 A

125 A

H1 480V 225A 125 A

H2 480V 225A 125 A

45 KVA

480-208V

L1 208/120V 300A

L2 208/120V 400A

WH1

480V 125A

100 A

G

ECC-JD-01 480V 1200 A, 3 P,4W + GND, 65 KAIC

E.O.

GEN-JD-01

275 KW

E.O.

32 R

BESS-

JD-01

140 KW

1200 A

600 A 225 A 225 A 225 A 1000 A 70 A

PP-JD-01, 208/120V, 150A,10KAIC

E.O.E.O.E.O.

600 KW

E.O.

250 A

INV-1100

KW

INV-2100

KW

INV-3100

KW

INV-4 INV-5

700 A E.O.

INV-6 INV-7

XFMR-JD-01

45 KVA

480-208V

BESS-

JD-02

140 KW

BESS-

JD-03

140 KW

125 A

FP-JD-01

1/3 HP

DEF-

JD-01/02

1/2 HP

M

SPARE

250 A

M-100 R-100

M-102 R-102

M-103 R-103

M-104 R-104

M-105 R-105

M-106 R-106

M-201 R-201

M-202 R-202

M-301 R-301

DC-JD-01

600 A

M-101 R-101

70 A

PP-JD-02, 208/120V, 150A, 10KAIC

XFMR-JD-02

45 KVA

480-208V

125 A

AC-01

LTG-JD

PVPNL-JD-01, 480/277V, 700A 42KAIC

150 A E.O. E.O. E.O. E.O. E.O.

80 A E.O.

KW

62.5

KW

KW

KW

150 A 150 A 150A 100 A

M-203 R-203

GAUX-

JD-01

AC-02

M-204 R-204

SITE DISTRIBUTION PANEL 480V 1200 A, 3 P + GND 42 KAIC

UTILITY

M-302/303 R-302/303

M-304/305 R-304/305

M-310 R-310

M-311 R-311

M-312 R-312

M-313 R-313

F

FFF PV-DISC 480/277V

700 A 65KAIC

M-205 R-205

MAIN-DISC 480/277V

1200 A 65KAIC

M-100 R-100

E.O.

80 A

M-107 R-107

M-108 R-108

M-109 R-109

M-110 R-110

M-111 R-111

M-112 R-112

9 9

ATS-01

20 A 30 A 20 A

40 A

20 A20 A20 A

20 A

TO UPSSPARE

100 AE.O. E.O.

US Army Corps of Engineers Louisville District

SHEET

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

2x

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D R

AW

IN

G C

O D

E.

-17 N

O V

B.

D

O M

BR

O

W

SK

I

FI

LE

N

AM

E:

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

E N

TU

C

KY

PR

AR

E

RC

IP

M

IC

R

O G

R

ID

S

PR

O

JE

C

T

NU

M

BE

R:

, P

PE

SQ

U

ER

A

AR

M Y

R

ES

ER

VE

C

EN

TE

R

, J U

AN

A

D

IA

Z

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

M ai n St re et

Fo rt

W or th , T

X

CERTIFIED FINAL

C .M

AN

IS

C .M

AN

IS

H .W

R

IG

H T

E-601

PA

R

TI

AL

S

IN

G

LE

L

IN

E D

IA

G

R

AM

N

EW

W

O R

K

3- E-

SCALE NTSA1 ONE-LINE DIAGRAM - NEW WORK

GENERAL NOTES

A REFER TO SHEET E-001 FOR SYMBOLS AND GENERAL

NOTES, E-002 FOR ABBREVIATIONS AND E-003 FOR ONE

LINE SYMBOLS.

B ALL CIRCUIT BREAKERS ARE 3 POLE UNLESS

OTHERWISE NOTED.

C REFER TO SHEET E-700 FOR CABLE AND CONDUIT

SCHEDULE.

D REFER TO SHEET IC-603 FOR INPUT AND OUTPUT LIST.

KEYNOTES

1 THE TIP OF AN AIR TERMINAL SHALL BE NOT LESS THAN

10 IN. (254MM) ABOVE THE OBJECT ABOVE THE OBJECT

OR AREA IT IS TO PROTECT. SEE SHEET E-502 FOR

STRIKE TERMINATION DETAILS.

2 INTERCEPT CONDUIT AND CONNECT TO MAIN_DISC

3 CONNECT NEW ECC AT ATS.

4 ALL ECC BREAKERS TO BE INSULATED CASE CIRCUIT

BREAKERS. (TYP.)

5 EMI SHIELD BARRIERS (TYP.)

6 CONTRACTOR TO PROVIDE FACILITY EMI FILTERS (TYP.)

7 CONNECTION TO PV PANELS CONTINUED ON SHEET

E-610

8 REFER TO SHEET E-603 FOR UPS SINGLE LINE

9 INVERTER 6 AND 7 ARE PART OF BID OPTION 2

10 INVERTER 5 IS PART OF BID OPTION 1.

M

AR

K D

ES

C

R

IP

TI

O

N

AM

EN

D M

EN

T

0 0

D

AT

E /1 6/

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

W

2Q R

R

_P la ns -0

US Army Corps of Engineers Louisville District

SHEET

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

2x

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D R

AW

IN

G C

O D

E.

-17 N

O V

B.

D

O M

BR

O

W

SK

I

FI

LE

N

AM

E:

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

E N

TU

C

KY

PR

AR

E

RC

IP

M

IC

R

O G

R

ID

S

PR

O

JE

C

T

NU

M

BE

R:

, P

PE

SQ

U

ER

A

AR

M Y

R

ES

ER

VE

C

EN

TE

R

, J U

AN

A

D

IA

Z

JA

C

O

BS

E N

G

IN

EE

R

IN

G

G R

O U

P

IN

C

M ai n St re et

Fo rt

W or th , T

X

CERTIFIED FINAL

C .M

AN

IS

C .M

AN

IS

H .W

R

IG

H T

E-701

PA

N

EL

S

C H

ED

U

LE

S

3- E-

Notes:

Total Est. Demand: 267 A

DER : 1666 A

DISTRIBUTED ENERGY RESOURCES 1385000 VA 100.00% 1385000 VA Total Conn.: 1933 A Receptacle 360 VA 100.00% 360 VA Total Est.: 1607447 VA Other 219574 VA 100.00% 219574 VA Total Conn. Load: 1606944 VA Lighting 2011 VA 125.00% 2513 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 1933 A

Total Conn. Load: 1606944 VA

8 ATS-01 3 1000 A 1000 A 245 A

7 XFMR-JD-02 3 150 A 70 A 18 A

6 XFMR-JD-01 3 150 A 70 A 4 A

5 PV-DISC 3 800 A 700 A 688 A

4 BESS-JD-03 3 250 A 225 A 168 A

3 BESS-JD-02 3 250 A 225 A 168 A

2 BESS-JD-01 3 250 A 225 A 168 A

1 DG-01 3 800 A 600 A 473 A

CKT Circuit Description # of Poles Frame Size Rating Load

Remarks

Notes:

Enclosure: CONCRETE MCB Rating: 1200 A Mounting: PAD Wires: 4 BUS Rating: 1200 A

Supply From: MAIN_DISC Phases: 3 Mains Type: MCB Location: ECC ENCLOSURE Volts: 480/277 Wye A.I.C. Rating: 65 K.A.I.C

Switchboard: ECC-JD-01

Notes:

Total Current 7 A 12 A 9 A

Total Load: 870 VA 1402 VA 1000 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 16 13 14 11 12

9 GVM-JD-01 20 A 1 30 VA 10

7 FUEL-LTG 20 A 1 198 VA 8

5 FPC-JD-01 20 A 1 1000 VA 6

3 DEF-JD-02 20 A 1 372 VA 1000 VA 1 20 A GAUX-JD-01 4

1 FPU-JD-01 20 A 1 300 VA 372 VA 1 20 A DEF-JD-01 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

NEMA: 3R

Mounting: Surface Wires: 4 MCB Rating 125 A

Supply From: XFMR-JD-01 Phases: 3 Bus Rating: 150 A Neutral Size: 100% Location: GENERATOR AREA Volts: 120/208 Wye Mains Type: MCB A.I.C. Rating: 10 KAIC

PP-JD-01

INVERTER 5 IS PART OF BID OPTION 1

INVERTERS 6 AND 7 ARE PART OF THE BID OPTION 2

Notes:

Total Current 688 A 688 A 688 A Total Load: 190667 VA 190667 VA 190667 VA

41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26

23 17667 VA 24

21 17667 VA 22

INV-07 150 A 3

17667 VA 20

17 22000 VA 17667 VA 18

15 22000 VA 17667 VA 16

INV-05 100 A 3

22000 VA 17667 VA

3 100 A INV-06

11 33333 VA 33333 VA 12

9 33333 VA 33333 VA 10

INV-03 150 A 3

33333 VA 33333 VA

3 80 A INV-04

5 33333 VA 33333 VA 6

3 33333 VA 33333 VA 4

INV-01 150 A 3

33333 VA 33333 VA

3 150 A INV-02

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

NEMA:

Mounting: Surface Wires: 4 MCB Rating 700 A

Supply From: PV-DISC Phases: 3 Bus Rating: 1000 A Neutral Size: 100% Location: INVERTER ENCLOSURE Volts: 480/277 Wye Mains Type: MCB A.I.C. Rating: 42 KAIC

PVPNL-JD-01

Notes:

Total Current 40 A 49 A 35 A

Total Load: 4679 VA 5777 VA 4217 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18

15 1667 VA 16

13 1667 VA 14

AC-02 30 A 3

1667 VA 12

9 10

7 360 VA 1 20 A ECCRECP-JD-01 8

5 ECCLTG-JD-02 20 A 1 50 VA 2500 VA 6

3 PVLTG-JD-01 20 A 1 1610 VA 2500 VA 4

1 ECCLTG-JD-01 20 A 1 160 VA 2500 VA

3 30 A AC-01

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

NEMA: 1

Mounting: Surface Wires: 4 MCB Rating 125 A

Supply From: XFMR-JD-02 Phases: 3 Bus Rating: 150 A Neutral Size: 100% Location: ECC ENCLOSURE Volts: 120/208 Wye Mains Type: MCB A.I.C. Rating: 10 KAIC

PP-JD-02

1 1

M

AR

K D

ES

C

R

IP

TI

O

N

AM

EN

D M

EN

T

0 0

D

AT

E /1 6/

R

EV

IS

ED

IN

A

C C

O R

D

AN

C E

W

IT

H A

M

EN

D M

EN

T

W

2Q R

R

_P la ns -0

E-104 PARTIAL SITE PLAN - LIGHTING
E-200 ENERGY CONTROL CENTER PLAN AND ELEVATION
E-201 INVERTER ENCLOSURE
E-504 TYPICAL RACEWAY DETAILS
E-601 PARTIAL SINGLE LINE DIAGRAM - NEW WORK
E-701 PANEL SCHEDULES

File details come from the government source that posted it. Updated .