This document is an amendment to Solicitation W912QR24R0025 for the construction of the LTC Hernan G. Pesquera ARC Microgrid in Juana Diaz, Puerto Rico. The estimated construction cost is between $10,000,000 and $25,000,000.

The amendment includes the following key details:

  • Several plan sheets and specification sections have been replaced or added
  • Paragraphs in Section 00 22 12 - Procedures for Submittal of Offers and Proposal Evaluation Criteria have been replaced
  • Section 00 00 10 - Price Breakout Schedule has been replaced
  • The due date has been extended from May 6, 2024 to May 16, 2024
  • All other terms and conditions remain unchanged

The solicitation is for a design-bid-build construction project to install a new microgrid system with a 690kW PV solar array, 570kWh/140kW BESS, 275kW diesel generator, and associated electrical infrastructure. It is a full and open competition with a HUBZone 10% price evaluation preference. The basis of award is the Best Value Trade-Off process.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SEE ATTACHED SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR24R0025

X 9B. DATED (SEE ITEM 11)

05-Mar-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0002

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3.EFFECTIVE DATE

03-May-2024

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR24R0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SUMMARY OF CHANGES AMDT 0002

Solicitation W912QR24R0025 for LTC Hernan G. Pesquera ARC Microgrid in Juana Diaz, Puerto Rico, is hereby amended as follows:

a. The following PLAN SHEETS have been replaced in their entirety:

E-002 ELECTRICAL ABBREVIATIONS

E-200 ENERGY CONTROL CENTER PLAN AND ELEVATION

E-601 PARTIAL SINGLE LINE DIAGRAM – NEW WORK

E-610A ONE LINE DIAGRAM BASE BID

E-610B ONE LINE DIAGRAM BID OPTION

E-702 EQUIPMENT AND LUMINAIRE SCHEDULE

MP501 MECHANICAL DETAILS

MP610 DIESEL UNLOADING STATION/STORAGE TANKS P&ID

MP611 DEF DISTRIBUTION SYSTEM P&ID

MP701 MECHANICAL SCHEDULES

b. The following SPECIFICATION SECTIONS have been replaced in their entirety:

PROJECT TABLE OF CONTENTS

00 80 00.01 06-B SUBMITTAL REGISTER

33 52 43.11 FUEL AND DIESEL EXHAUST FLUID (DEF) MECHANICAL

EQUIPMENT

c. The following SPECIFICATION SECTIONS have been added in their entirety:

26 24 13 SWITCHBOARDS

d. The following paragraphs in Section 00 22 12 - PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA have been replaced in their entirety:

5.1.7 8.2.1 8.2.2

e. Section 00 00 10 – PRICE BREAKOUT SCHEDULE has been replaced in its entirety.

f. The due date has been extended from 6 May 2024 to 16 May 2024.

g. All other terms and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 06-May-2024 02:00 PM to 16-May-2024 02:00 PM.

(End of Summary of Changes)

AMDT 0002**************************************************************************

Price Breakout Schedule Section 00 00 10 – Solicitation Contract Form

BID SCHEDULE

PROJECT: – LTC Hernan G. Pesquera ARC Microgrid LOCATION: Juana Diaz, Puerto Rico

PROPOSER’S NAME: _________________________________________________

BASE PROPOSAL

ITEM DESCRIPTION UNIT AMOUNT

0001 Primary Facility – Microgrid job $ ___________

0002 Site Work – Microgrid job $ ___________

0003 275 kW Standby Generator job $ ___________

0004 Generator Auxiliary Systems job $ ___________

0005 Energy Control Center job $ ___________

0006 480 kW PV Array job $ ___________

0007 570 kWh L-ion Energy Storage job $ ___________

0008 Electrical connection Fee job $ 20,000.00

0009 LUMA Permit Fee job $ 30,000.00 .

SUBTOTAL BASE PROPOSAL $_________________________

0010 Municipal Tax (7% of Subtotal) job $ ___________

0011 Patente Tax (0.5% of Subtotal) job $ ___________

TOTAL BASE PROPOSAL $ _________________________

OPTION PRICING

ITEM DESCRIPTION UNIT AMOUNT

0012 84 kW Solar Array (Canopy 5)

0012a Solar Array Construction (Canopy 5) job $___________

0012b Municipal Tax (7% of item 0012a) job $___________

0012c Patente Tax (0.5% of item 0012a) job $___________

ITEM NO. 0012a, 0012b, 0012c TOTAL $

0013 126 kW Solar Array (Ground Mount)

0013a Solar Array Construction (Ground Mount) job $___________

0013b Municipal Tax (7% of item 0013a) job $___________

0013c Patente Tax (0.5% of item 0013a) job $___________

ITEM NO. 0013a, 0013b, 0013c TOTAL $

TOTAL ALL OPTIONS PROPOSAL $

TOTAL BASE with all OPTIONS PROPOSAL $

NOTES FOR PROPOSAL SCHEDULE

1. The company name should be indicated on the face of the proposal schedule to preclude being misplaced.

2. Proposers must insert a price on all numbered items of the Proposal Schedule. The price may be zero dollars or a deduct amount. Failure to do so will disqualify the proposal.

3. Description of Proposal Items - The general outline of the principal features of each item as listed below does not in any way limit the responsibility of the proposer for making a thorough investigation of the drawings and the specifications to determine the scope of work including each item of the proposal form.

Description of Base Proposal Items

(a) Item No. 0001 “Primary Facility – Microgrid” includes all construction work associated with the microgrid, and all applicable regulatory permitting and survey work and fees required within the bounds of this project, except that work covered by Option Item No. 0012 and Option Item No. 0013.

(b) Item No. 0002 “Site Work – Microgrid” includes all demolition and construction work beyond a line five feet outside the Training Building.

(c) Item No. 0003 “275 kW Standby Generator” includes all work associated with the design and installation of one diesel generator and enclosure as described on the drawings and specifications.

(d) Item No. 0004 “Generator Auxiliary Systems” includes all work associated with the installation of a 4,000-gallon aboveground diesel fuel storage tank, DEF system, and associated piping as described on the drawings and specifications.

(e) Item No. 0005 “Energy Control Center” includes all work associated with the switchgear and control system as described on the drawings and specifications.

(f) Item No. 0006 “480 kW PV Array” includes all work associated with the solar canopies, canopy structure, inverters, and wiring as described on the drawings and specifications.

(g) Item No. 0007 “570 kWh L-ion Energy Storage” includes all work associated with the battery storage system as described on the drawings and specifications.

(h) Item No. 0008 “Electrical Connection Fee” includes a fee required to be paid to PREPA.

(i) Item No. 0009 “LUMA Permit Fee” includes a fee required to be paid to LUMA for utility interconnection.

(j) Item No. 0010 “Municipal Tax” - Pursuant to San Juan Municipality local regulations, taxes may apply with each award of the base and options under this contract. The contract price will be adjusted to compensate the Contractor for the amount of construction taxes. No mark-ups will be allowed in this line item. The Contractor will be paid on the basis of proof of payment from the appropriate Commonwealth of Puerto Rico or Municipal authority.

(k) Item No. 0011 “Patente Tax” - Pursuant to San Juan Municipality local regulations, taxes may apply with each award of the base and options under this contract. The contract price will be adjusted to compensate the Contractor for the amount of construction taxes. No mark-ups will be allowed in this line item. The Contractor will be paid on the basis of proof of payment from the appropriate Commonwealth of Puerto Rico or Municipal authority.

Description of Option Proposal Items

(l) Item No. 0012a (Option) “Solar Array Construction (Canopy 5)” includes all work associated with the installation of a Photovoltaic Solar Array system, including the structural framework as described in the drawings.

(m) Item No. 0012b (Option) “Municipal Tax” - Pursuant to San Juan Municipality local regulations, taxes may apply with each award of the base and options under this contract. The contract price will be adjusted to compensate the Contractor for the amount of construction taxes.

No mark-ups will be allowed in this line item. The Contractor will be paid on the basis of proof of payment from the appropriate Commonwealth of Puerto Rico or Municipal authority.

(n) Item No. 0012c (Option) “Patente Tax” - Pursuant to San Juan Municipality local regulations, taxes may apply with each award of the base and options under this contract. The contract price will be adjusted to compensate the Contractor for the amount of construction taxes. No mark-ups will be allowed in this line item. The Contractor will be paid on the basis of proof of payment from the appropriate Commonwealth of Puerto Rico or Municipal authority.

This Option may be exercised within 60 days from issuance of Notice to Proceed.

(o) Item No. 0013a (Option) “Solar Array Construction (Ground Mount)” includes all work associated with the installation of a Photovoltaic Solar Array system, including the structural framework as described in the drawings.

(p) Item No. 0013b (Option) “Municipal Tax” - Pursuant to San Juan Municipality local regulations, taxes may apply with each award of the base and options under this contract. The contract price will be adjusted to compensate the Contractor for the amount of construction taxes.

No mark-ups will be allowed in this line item. The Contractor will be paid on the basis of proof of payment from the appropriate Commonwealth of Puerto Rico or Municipal authority.

(q) Item No. 0013c (Option) “Patente Tax” - Pursuant to San Juan Municipality local regulations, taxes may apply with each award of the base and options under this contract. The contract price will be adjusted to compensate the Contractor for the amount of construction taxes. No mark-ups will be allowed in this line item. The Contractor will be paid on the basis of proof of payment from the appropriate Commonwealth of Puerto Rico or Municipal authority.

This Option may be exercised within 60 days from issuance of Notice to Proceed.

**************************************************************************AMDT 0002

SECTION 00 22 12

PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA

1. Overview.

1.1 The intent of this solicitation is to select one contractor for the construction of a new Microgrid for

Juana Diaz (LTC Hernan G. Pesquera USARC, PR010), Puerto Rico. The basis of award is the Best Value Trade-Off Process. The Contracting Officer will award a firm fixed price contract to the responsible offeror whom the Source Selection Authority (SSA) determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.

1.2 The proposed project is a Design-Bid-Build new construction of a microgrid system for Juana

Diaz, Puerto Rico. The project will install a new microgrid system capable of islanding the Juana Diaz (LTC Hernan G. Pesquera USARC, PR010) electrical distribution system starting at the automated distribution switch, the point of common coupling with Puerto Rico Electric Power Authority (PREPA). The microgrid system will incorporate: a 690kW non-tracking, new carport structure, Photovoltaic (PV) solar array, a 570kWh/140kW Battery Energy Storage System (BESS), a 275kW Tier 4 compliant peak shaving diesel generator, and a 2,000-gallon fuel tank.

The microgrid system will include a master microgrid controller, switchgear, synchronization control, and automated distribution switch controlling the PREPA grid connection of Juana Diaz.

The system installation includes solar panels, an energy storage unit, inverters, distribution lines, transformers, controls and communication, AC/DC wiring with conduit, and security measures.

2. Submittal of offers

2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's past performance and technical approach necessary for successful completion of the project.

Requirements stated in this Request for Proposal (RFP) are minimums.

2.2 Offerors shall submit their proposals to the US Army Corps of Engineers through the Procurement

Integrated Enterprise Environment (PIEE) - https://piee.eb.mil/. Proposals are not to be submitted any later than the time and date specified in Block 13 of Standard Form 1442.

2.3 Offerors are required to submit a proposal made up of Past Performance, Technical capability, and

Price and Pro Forma. All proposal materials shall be submitted with a table of contents. The sections should parallel the submission requirements identified below. Volumes I and II shall be submitted electronically. Failure to place the required submission information under the appropriate tab may result in a lower rating if the evaluators cannot readily find the appropriate information.

*NOTE: Provide the complete Volume I proposal submittal including text, renderings, drawings, photographs, etc. in electronic format. Provide the complete Volume II proposal submittal electronically with the final price breakout schedule.

2.4 Volume I – Past Performance and Technical Approach, shall be submitted electronically and include the following information:

Volume I – Factor I: Past Performance

Volume I – Factor II: Technical Approach

Volume I – Factor III: Small Business Participation Plan

2.5 Volume II – Price and Proforma Information, shall be submitted electronically and shall include the following information:

Volume II – Tab A: Standard Form 1442 and Price Breakout Schedule

Volume II – Tab B: Joint Venture Agreements

Volume II – Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability

Volume II – Tab D: Pre-Award Information

Volume II – Tab E: Subcontracting Plan

3. Proposal Evaluation Process

3.1 A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of

Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence.

Technical proposals will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone who is not involved in the evaluation and award process or to other offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is Best Value Trade-Off, as stated in paragraph 1.1 above.

3.2 The evaluation process essentially consists of four parts: proposal compliance review and responsibility determination, technical evaluation, price evaluation, and price/technical trade-off analysis.

3.2.1 Proposal Compliance Review: This is an initial review to ensure that all required forms and certifications are complete and that both a technical and price proposal were received, and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.

3.2.2 Technical Evaluation: The SSEB will evaluate and rate the Volume I proposals against the RFP requirements. Factor I – Past Performance will be rated using Tables 1 and 2 below. The rating will be based on overall confidence in performance, with the final confidence assessment rating based on the extent of recent, relevant past experience and the quality of the offeror’s performance. Factor II – Technical Approach will be rated using Table 3 below. Factor III – Small Business Participation Plan will be rated using Table 4 below.

3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the technical evaluation. The SSEB will not have access to price information until completion of the technical evaluation.

3.2.4 Technical Trade-off Analysis: After all above evaluations are complete, the Contracting

Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.

4. Proposal Information and Related Evaluation Factors

4.1 Proposals will be evaluated in accordance with the factors below, listed in relative order of importance. All evaluation factors, other than price, when combined are considered approximately equal to price. Offerors are reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interest of the Government.

4.2 Volume I – Factor I – Past Performance 1st

4.3 Volume I - Factor II – Technical Approach 2nd

4.4 Volume I – Factor III – Small Business Participation Plan 3rd

4.5 Volume II - Price and Pro Forma Information

Tab A: Standard Form 1449 and Price Breakout Schedule Not Rated

Tab B: Joint Venture Agreements Not Rated

Tab C: Evidence of Ability to Obtain Bonding and Proof Not Rated of Financial Ability

Tab D: Pre-Award Information Not Rated

Tab E: Subcontracting Plan Acceptable/Unacceptable

4.6 Ratings

Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.

Table 1

Table 2

Performance Confidence Assessments

Rating Description Substantial Confidence

Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence

Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence

No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence

Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence

Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.

Past Performance Relevancy Ratings

Rating Description

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant

Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Table 3

Table 4

Technical/Risk Assessment Ratings Adjectival

Rating Description

Outstanding Proposal demonstrates an exceptional approach and understanding of the requirements and contains multiple strengths and/or at least one significant strength, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength or significant strength, and risk of unsuccessful performance is low to moderate.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable, and/or risk of performance is unacceptably high.

Small Business Ratings Rating Description

Acceptable Proposal indicates an adequate approach and understanding of small business objectives.

Unacceptable Proposal does not meet small business objectives

4.7 Definitions:

Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

Strength. An aspect of an offerors’ proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

Significant Strength. An aspect of an offerors’ proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance.

See FAR 15.001.

Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).

Clarifications. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).

Risk, as it pertains to source selection, is the potential for unsuccessful contract performance.

The consideration of risk assesses the degree to which an offeror’s proposed approach to achieving the technical factor or subfactor may involve risk of disruption of schedule, increased cost or degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.

5.0 Volume I – Factor I: Past Performance

5.1 Submission Requirements:

5.1.1 Provide descriptions of up to three (3) projects substantially complete or completed by the Prime

Contractor within the last five (5) years (from the solicitation issue date) that are similar to this project in size and scope. Projects completed more than five (5) years before the solicitation issue date may be considered for evaluation purposes but may lessen the overall relevancy rating for that project. Projects are considered substantially complete if enough work has been performed such that it demonstrates the ability to successfully complete all phases of the project.

An Indefinite Delivery Indefinite Quantity (IDIQ) contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.

5.1.2 Projects considered similar in size shall include construction of a microgrid demonstrating the following size elements. Sizes greater than those identified below will be considered similar in size:

a. Installation & construction of distributed energy resources (DER) to handle loads of 100kW – 500kW.

b. Installation of electrical and telecommunication duct back for control of distributed energy resources of 100kW and above.

c. Install of switchgear and necessary breakers for systems control of distributed energy resources of 100kW and above.

5.1.3 Projects considered similar in scope shall include construction of a microgrid demonstrating the following scope elements:

a. Installation of Photovoltaic systems

b. Installation of Battery Energy Storage systems

c. Installation of centralized diesel generation

d. Installation of electrical and telecommunication duct bank and controls for Microgrids

e. Commissioning of Microgrid systems

f. Implementation of control systems for electrical peak shaving

5.1.4 The prime contractor must have self-performed at least 15 percent of the direct contract labor (including testing and layout personnel), exclusive of other general conditions or field overhead personnel, material, equipment, or subcontractors to be considered similar.

5.1.5 Additional consideration may be given for projects that contain the following features:

a. New construction project for USACE

b. New construction project located in Puerto Rico

c. New construction project that pursued LEED v4.0 certification at a Silver level

5.1.6 The following information shall be provided for each project:

a. Project Title, Location, and Contract Number/Unique Identifier

b. Current percentage of construction complete and the date it was or will be complete

i. For projects that are not yet complete, provide description of work remaining to be completed.

d. Scope of the project, to include purpose/use of facility

e. Size of the project, differentiate square footage of new construction versus renovation if the project includes both.

f. Portion and percentage of work that was self-performed

g. Two references for the project, with emails and telephone numbers

AMDT 0002*************************************************************************

5.1.7 For this factor, also include any ratings, letters, awards, etc. that support past performance on these projects. Any of this information that is submitted shall clearly identify to which of the submitted projects it pertains. A sample Past Performance Questionnaire is attached for your convenience. If used, the Past Performance Questionnaire must be submitted by the offeror with the proposal submission and not sent directly to the agency from the reference. For each project, the offeror may provide information on problems encountered on the identified contracts and the offeror’s respective corrective action.

NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. Projects performed by contractors other than the offeror, including, but not limited to, teaming partners, subcontractors, sister or parent companies, and affiliates will not be evaluated for past performance, unless those other contractors are part of a joint venture offeror as demonstrated by a signed joint venture agreement. If more than one contractor is listed in Block 14, or the offeror listed in Block 14 is a joint venture (JV), the offeror shall be registered in the System for Award Management (SAM) as a legal entity separate from the individual joint venture members. However, each member of the JV must submit its own Unique Entity Identifier (UEI) with the proposal. A copy of the offeror's signed joint venture agreement shall be submitted with the proposal. In addition to the joint venture agreement, small business offerors submitting a proposal as a Mentor-Protégé JV under the SBA Mentor-Protégé program (MPP) shall submit a copy of their SBA-approved Mentor-Protégé agreement. Projects performed by other contractors than the offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless those other contractors are part of a JV offeror as demonstrated by a signed JV agreement. If the offeror represents the combining of two or more companies as a JV for the purpose of this RFP, each company in the JV may submit project examples, but the total submitted by the JV will not exceed three (3).

*************************************************************************AMDT 0002

5.2 Evaluation Criteria:

5.2.1 Past Performance will first be evaluated for recency. Recency is defined in Section 5.1 above.

The SSEB will then evaluate the relevancy of recent past performance identified in the proposal in response to paragraph 5.1 above. By using the criteria identified above, the SSEB will determine how relevant a past project is when compared to the scope, size, and magnitude of effort and complexities of the solicited project. A relevancy rating will be assigned to each submitted project using the Past Performance Relevancy Ratings table above.

5.2.2 The SSEB will next review how well the offeror performed on those projects. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction. The Government also reserves the right to not contact the provided references. In addition to the information submitted by the offeror, the Government reserves the right to review any other sources of relevant information for evaluating past performance, including projects other than those submitted by the offeror. The Government reserves the right to review past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/Unique Entity Identifier numbers. Other sources may include, but are not limited to, past performance information retrieved from inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

5.2.3 The SSEB will review all past performance information collected and determine the quality of the offeror’s performance, general trends, and usefulness of the information and incorporate this information into the performance confidence assessment. The SSEB will assign a final, overall Performance Confidence rating, using the ratings in the Performance Confidence Assessment table, Table 2, above, based on the SSEB’s assessment of (1) the degree of the offeror’s recent, relevant experience, and (2) how well the offeror performed that experience.

6.0 Volume I – Factor II: Technical Approach

6.1 Submission Requirements:

6.1.1 Management Plan: Provide a narrative for the project that describes how your labor, resources, designers, subcontractors, and material suppliers will be managed, supervised, coordinated, and used to ensure successful completion of the project. Additionally, the Management Plan shall include the following information:

Identify significant areas of risk and provide your plan for mitigating the identified risk during contract performance.

Describe your process for managing, coordinating, and tracking changes that arise during construction.

NOTE: There is a page limit of eight (8) single sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides for the Management Plan element.

6.1.2 Schedule Narrative: Based on the project budget and scope, provide a schedule narrative describing the construction sequence/process for successful completion of the project (Construction, Commissioning, and Close-Out) within the duration shown in FAR 52.211-10. At a minimum, the Schedule Narrative shall address the timing and process(es) necessary to complete the key activities indicated below:

Pre-Construction Submittals and Government Review

Long Lead Items

SWPPP Activities

Key Permits

Equipment lightoff through full system Commissioning Activities and Critical Submittals

Project Closeout Planning and Coordination (including Red Zone Meeting)

As-Builts

Additionally, offerors are to provide a simple bar chart that shows the key activities indicated above.

NOTE: There is a page limit of five (5) single sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides, for the narrative portion of this element. There is a page limit of three (3) single sided, 11” x 17” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides, for the bar chart portion of this element.

6. 2 Evaluation Criteria:

The SSEB will be using Table 3, Technical/Risk Analysis Rating, in section 4.6 to evaluate the Technical Approach.

Management Plan narratives will be evaluated based on the level of understanding of the work and the involvement the contractor will have in the management, oversight, control, coordination of the work, the identification and mitigation of risk and management of changes performed during construction of the project. Narratives that demonstrate a clear understanding of the project requirements and provide a thorough approach for successfully managing the solicited project may be rated more favorably by the SSEB.

The schedule narrative will be evaluated based on the understanding of events identified in paragraph 6.1.2 above and the offeror’s capability to complete the schedule within the contract duration. The bar chart will be evaluated based on the offeror’s understanding of the appropriate sequencing and durations of the identified key activities. Narratives that demonstrate a clear understanding of the schedule impacts of the key activities and provide a thorough approach for successfully completing the solicited project within the contract duration may be rated more favorably by the SSEB.

NOTE: The SSEB will evaluate the offeror’s schedule using calendar days, not dates.

7.0 Volume I – Factor III: Small Business Participation Plan

7.1 Submission Requirements

ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS PARTICIPATION

PLAN. The Small Business Participation Plan shall be based on the offeror’s best effort and is required to address each of the following areas individually:

The extent to which the small business programs listed in FAR 19 (small business, small disadvantaged business, woman-owned small business, HubZone, service disabled veteran owned small business, etc.) are specifically identified in the Small Business Participation Plan;

The extent of participation of such firms in terms of the value of the total acquisition in %’s for the base year and for each individual option year; the extent of commitment to use such firms (for example, enforceable commitments, i.e., teaming agreements signed, are to be considered more heavily than non-enforceable ones);

The complexity and variety of the work small firms are to perform on this acquisition;

The practicality of the Small Business Participation Plan, i.e., aggressive goals.

The Small Business Participation Plan shall be organized as follows:

(1) Prime Contractor type of business (check all that apply):

( ) Large ( ) Small (also check type of small business)

( ) Small Non-Disadvantaged Business ( ) Small Disadvantaged Business ( ) Woman-Owned Small Business ( ) HUBZone Small Business ( ) Veteran Owned Small Business ( ) Service Disabled, Veteran Owned Small Business

(2) Percentage of your participation as a prime contractor: __________________ %

NOTE: Small Business primes’ self-performance counts as Small Business Participation, and small business primes may achieve small business participation goals through their own performance/participation as a prime and/or through subcontracting to other small businesses.

(3) Percentage of total contract value of subcontracts planned for:

% of Total Contract Value

Large % Total Small % Small Non-Disadvantaged % Small Disadvantaged % Small Woman Owned % Small HUB Zone % Small Veteran Owned % Small Service Disabled Veteran Owned

Each percentage above shall be accompanied by detailed supporting documentation regarding individual commitments.

NOTE: The sum of the percentages of Small Non-Disadvantaged and Small Disadvantaged should equal the entries for the Total Small; however, the sum of all of the percentages need not equal 100% since the prime is not included and individual subcontractors may be counted towards more than one category.

(4) List principal supplies/services (be specific) to be subcontracted to:

Name of Company

Type of Service/Supply

Large Small Non-Disadvantaged Small Disadvantaged Small Woman Owned Small HUB Zone Small Veteran Owned Small Service Disabled Veteran Owned

(5) Prior Performance Information: Provide any information substantiating the offeror’s track record of utilizing small business on past contracts.

(6) For Large and Small Businesses provide descriptive information for all small business categories. Any information concerning long-term relationships with Small Business subcontractors, such as mentor-protégé relationships, should be provided.

(7) Extent of Commitment: Provide documentation regarding enforceable commitments to utilize any small business category as defined in FAR Part 19 as subcontractors.

(8) Small Business Subcontracting Plan: Each Large Business Offeror shall provide a

Small Business Subcontracting Plan that contains all of the elements required by FAR Clause 52.219-9 Alt. II. This Plan shall be submitted separately from the Small Business Participation information required above which applies to both Large and Small Businesses. The Subcontracting Plan is not a requirement for evaluation in source selection but rather a requirement for award to a Large Business. The approved Small Business Subcontracting Plan will be incorporated into any resultant contract(s).

7.2 Evaluation Criteria:

ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS

PARTICIPATION PLAN. In accordance with Table 4, Small Business Ratings, the Small Business Participation Plan will be evaluated based on the offeror’s best efforts, the level of small business commitment that is being demonstrated for the proposed acquisition, and the prior level of commitment to utilizing small businesses in performance of prior contracts. The Small Business Participation Plan must meet the minimum Total Small Business Participation goal of 20% of the total contract value (through collective small business participation from any type of small business or sub-category small business).

Pursuant to DFARS PGI 215.304(c), the following elements will be considered in evaluating an offeror’s Participation Plan:

• The extent to which such firms, as defined in FAR Part 19, are specifically identified in plans;

• The extent of commitment to use such firms (enforceable commitments will be weighted more heavily than non-enforceable ones);

• The complexity and variety of the work such firms are to perform;

• The practicality of the plans;

• Past performance of offerors in complying with the requirements of the Subcontracting Plan

Goals for such firms and monetary targets for participation;

• The extent of participation of such firms in terms of the proposed subcontracted value; and

• The extent to which the offeror provides detailed explanations/documentation supporting the proposed participation percentages, or lack thereof. The Department of Defense (DOD) has established small business goals to help ensure small business receives a fair proportion of DOD awards.

8.0 Volume II - Price and Proforma Information

8.1 Tab A - Standard Form 1442 and Proposal Price Breakout Schedule.

8.1.1 Submission Requirements:

The offeror shall complete and submit Standard Form 1442 and the Proposal Price Breakout Schedule. Both of these forms are included in this solicitation.

8.1.2 Evaluation Criteria:

The price will be evaluated on base proposal plus all options. The price will be evaluated by the Contracting Officer/SSA for fair and reasonableness through the use of a price analysis. Price will also be checked for unbalancing of line items. Offerors are cautioned to distribute costs appropriately.

8.2 Tab B – Joint Venture and Mentor-Protégé Agreements

AMDT 0002 ************************************************************************

8.2.1 Submission Requirements:

If more than one contractor is listed in Block 14, or the offeror listed in Block 14 is a joint venture (JV), the offeror shall be registered in the System for Award Management (SAM) as a legal entity separate from the individual joint venture members. However, each member of the JV must submit its own Unique Entity Identifier (UEI) with the proposal. A copy of the offeror's signed joint venture agreement shall be submitted with the proposal.

In addition to the joint venture agreement, small business offerors submitting a proposal as a Mentor-Protégé JV under the SBA Mentor-Protégé program (MPP) shall submit a copy of their SBA-approved Mentor-Protégé agreement.

8.2.2 Evaluation Criteria:

This information will be used for the purpose of completing the Pre-Award Survey and will not be rated. Small business joint venture agreements must comply with the relevant regulations in Title 13 of the Code of Federal Regulations in order for an offeror to be eligible for any small business set-aside acquisitions and/or small business-related price preference.

*************************************************************************AMDT 0002

8.3 Tab C – Evidence of Ability to Obtain Bonding and Proof of Financial Ability

8.3.1 Submission Requirements:

A. Financial Capability. Submit Proof of Financial Ability (Most recent financial statement covering assets and liabilities). Include the name, address and telephone number of the offeror’s banking institution. If the offeror is a joint venture, submit this information for each joint venture member.

B. Bonding Capability. Submit information showing the offeror's ability to be bonded for this project. Include the name, address and telephone number of the offeror’s bonding company.

8.3.2 Evaluation Criteria:

be rated. See FAR Part 28 for information related to bonds.

8.4 Tab D - Pre-Award Information

8.4.1 Submission Requirements:

A. The offeror shall submit one completed copy of the included Representations and Certifications.

B. The offeror shall submit the following information:

a) Number of years the firm has been in business

b) Name, address and telephone numbers of two credit/trade references

c) A list of present commitments, including the dollar value

8.4.2 Evaluation Criteria:

be rated.

8.5 Tab E – Subcontracting Plan

8.5.1 Submission Requirements:

Large business offerors shall submit a Subcontracting Plan in accordance with FAR Clauses 52.219-8 and 52.219-9 Alt. II. To be acceptable, plans must adequately address the required statutory elements and provide sufficient information to enable the Contracting Officer to answer affirmatively questions 1 through 13 of Appendix DD, Part 3, AFARS 5119.705. The offeror may use the attached sample sub-contracting plan as a starting point. Percentage goals apply to the total amount being subcontracted.

8.5.2 Evaluation Criteria:

Submitted information will be evaluated for acceptability in accordance with AFARS 5119.705.

To be acceptable, subcontracting plans must:

(a) Adequately address the required statutory elements.

(b) Provide sufficient information to enable the Contracting Officer to answer affirmatively questions 1 through 13 of Appendix DD (AFARS 5119.705), a copy of which is attached.

(c) To be acceptable, subcontracting plans must meet all of the requirements outlined in Appendix DD, Part 3, AFARS 5119.705. If discussions with offerors are necessary, those areas where the plan is deficient will be reviewed with each offeror with the goal of correcting deficiencies.

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: Unique Entity Identifier:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS.

CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1.…