W912QR24R0022_Plans-0000.pdf
PDF 29 MB Posted
- Solicitation number
- W912QR24R0022
About this file
This request for proposal solicits bids for the design-build-construction of a military equipment parking lot addition in Cedar Rapids, Iowa. The project scope includes land clearing, paving, fencing, general site improvements and utility connections to construct an approximately 9,200 square yard fenced and lighted parking expansion. The base bid includes only a portion of the parking area being paved with the remainder as gravel. The contract duration is 240 calendar days with a project magnitude anticipated between $5-10 million. This is an unrestricted, firm-fixed price solicitation from the Department of the Army Corps of Engineers to be awarded using a best value evaluation considering past performance, technical factors and price. Proposals are due by the date specified in SAM.gov where the solicitation and amendments will be posted electronically. Offerors must have an active SAM registration to be eligible for award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR24R0022_Plans-0001.pdf | ||
| W912QR24R0022_Specs-0001.pdf | ||
| W912QR24R0022_Specs-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
PLAN NORTH
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
D
EC
EM
BE
R
A.
H
AU
TM
AN
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
G-001
C O
VE
R
S H
EE
T
CEDAR RAPIDS, IOWA
MILITARY EQUIPMENT PARKING EXPANSION
P2: 503171
PROJECT SITESVICINITY MAP AREA MAP
GENERAL
G-001 COVER SHEET
C-101 MEP LOT SITE LAYOUT PLAN
CG101 MEP LOT SITE GRADING PLAN
CG102 MEP LOT EROSION & SEDIMENT CONTROL AND LANDSCAPING PLAN
CU101 WATER LINE PLAN
CU201 WATER LINE PROFILES
C-501 CIVIL DETAILS
C-502 CIVIL DETAILS
C-503 CIVIL DETAILS
C-504 CIVIL DETAILS
C-505 CIVIL DETAILS
C-506 EROSION CONTROL DETAILS
C-507 FENCE DETAILS
C-508 FENCE DETAILS
C-509 FENCE DETAILS
C-510 DETENTION POND AND LANDSCAPE DETAILS
C-511 DETENTION POND DETAILS
CIVIL
VA101 SITE AERIAL
V-101 MEP LOT EXISTING CONDITIONS AND DEMOLITION PLAN
MEP PARKING EXPANSION PROJECT SITE
N N
B-101 SOIL BORING LOGS
ELECTRICAL
GENERAL INFORMATION - ELECTRICAL
SITE PLAN - MEP LOT - ELECTRICAL
DETAILS - MEP LOT - ELECTRICAL
SCHEDULES & DIAGRAMS - ELECTRICAL
E-001
ES101
E-501 E-601
DIVISION 1-GENERAL PROVISIONS
1.IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION, REQUIRES VERBAL NOTICE TO IOWA ONE-CALL 1-800-292-8989, NOT LESS THAN 48 HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS AND
HOLIDAYS.
2.THE CITY OF CEDAR RAPIDS IS RESPONSIBLE FOR INSPECTION WITHIN THE PUBLIC RIGHT-OF-WAYS. INSPECTIONS FOR PUBLIC WATER MAIN EXTENSIONS AND WATER SERVICES SHALL BE PROVIDED BY THE UTILITIES DEPT. INSPECTIONS FOR OTHER PUBLIC IMPROVEMENTS WILL BE PROVIDED BY THE CEDAR RAPIDS PUBLIC WORKS DEPARTMENT CONSTRUCTION ENGINEERING DIVISION. PROVIDE A
MINIMUM OF 72 HOURS NOTICE PRIOR TO STARTING CONSTRUCTION.
3.ABANDONED UTILITIES NOT SHOWN ON THE PLANS MAY EXIST WITHIN THE CONSTRUCTION LIMITS. IF ENCOUNTERED, CONTRACTOR SHALL CONFIRM SAID UTILITIES ARE ABANDONED. CONTRACTOR IS
RESPONSIBLE FOR REMOVING THESE LINES AS NECESSARY FOR CONSTRUCTION.
4.CONTRACTOR SHALL VERIFY SANITARY AND STORM SEWER PIPE SIZES AND INVERTS PRIOR TO CONSTRUCTION AND PRIOR TO ORDERING MANHOLES AND/OR PIPE.
5.CONTRACTOR SHALL REPAIR ALL FIELD/DRAIN TILES ENCOUNTERED DURING CONSTRUCTION AS SPECIFIED OR AT A MINIMUM TO ALLOW FLOW USING LIKE MATERIAL IN NEW CONDITION WITH CITY OF CEDAR RAPIDS APPROVED CONNECTIONS. CONTRACTOR SHALL RECORD EXISTING TYPE, SIZE, LOCATION AND DEPTH OF ALL FIELD/DRAIN TILES ENCOUNTERED AND REPAIRED DURING CONSTRUCTION.
PROVIDE DATA TO THE CITY OF CEDAR RAPIDS FOR INCORPORATION INTO RECORD DRAWINGS.
6.CONTRACTOR SHALL NOT STORE EQUIPMENT AND/OR MATERIALS WITHIN PUBLIC RIGHT-OF-WAY ON STREETS AND/OR ALLEYS OPEN TO TRAFFIC. CONTRACTOR SHALL PROVIDE AREAS AS NEEDED FOR
STORAGE OF EQUIPMENT AND/OR MATERIALS.
DIVISION 5-WATER NOTES 3-21-22
1. ALL PERMITS SHALL BE SECURED AND FEES SHALL BE PAID PRIOR TO START OF CONSTRUCTION.
2.CONTACT WATER ENGINEERING AT 319-286-5950 OR WATER-ENGINEERING-ADMIN@CEDAR-RAPIDS.ORG TO SCHEDULE THE FOLLOWING WORK REQUESTS:
5-DAY MINIMUM NOTICE REQUIRED FOR:
· WATER CONSTRUCTION START AND STOP
48-HOUR MINIMUM NOTICE REQUIRED FOR:
· WATER SHUT-DOWN OR SUPPLY INTERRUPTION.
24-HOUR MINIMUM NOTICE REQUIRED FOR EACH OF THE FOLLOWING:
· WATER TAP 2 INCHES OR SMALLER.
· WATER TAP LARGER THAN 2 INCHES AND UP TO 12 INCHES.
· WATER MAIN FILL AND FLUSH.
· WATER MAIN DISINFECTION AND HYDROSTATIC TESTING.
· OTHER WATER DISTRIBUTION RELATED SERVICES.
3.THE CONTRACTOR IS REQUIRED TO NOTIFY IOWA ONE CALL (1-800-292-8989) NOT LESS THAN 48 HOURS PRIOR TO EXCAVATION, EXCLUDING WEEKENDS AND LEGAL HOLIDAYS.
4.CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CEDAR RAPIDS WATER DIVISION FOR ANY VARIANCE FROM THE APPROVED PLAN.
5.WATER MAIN INSTALLATION WILL BE INSPECTED BY CEDAR RAPIDS WATER DIVISION. THE WATER DIVISION SHALL OPERATE ALL SYSTEM VALVES AND FIRE HYDRANTS IN CONJUNCTION WITH THE WORK.
6.CONTRACTOR SHALL INSTALL TRACER WIRE ON ALL PUBLICLY AND PRIVATELY OWNED WATER MAINS AND FIRE SERVICE LINES IRRESPECTIVE OF WATER MAIN MATERIAL.
7.WATER MAINS AND LARGE SERVICES (4 INCH OR LARGER) OVER 20 FEET IN LENGTH ARE REQUIRED TO BE DISINFECTED, FLUSHED, FILLED AND PRESSURE TESTED.
DO NOT ALLOW HEAVILY CHLORINATED WATER TO REMAIN IN THE PIPELINE FOR MORE THAN 48 HOURS. THOROUGHLY FLUSH CHLORINATED WATER FROM THE PIPELINE UNTIL THE REPLACEMENT WATER WILL BE EQUAL IN QUALITY TO PERMANENT SOURCE OF SUPPLY THROUGHOUT THE LENGTH OF THE PIPELINE. NEUTRALIZE THE CHLORINATED WATER BY TREATING WITH SODIUM BISULFITE, SODIUM SULFITE, SODIUM THIOSULFATE OR EQUAL APPROVED CHEMICAL BEFORE DISPOSAL.
THE CONTRACTOR IS RESPONSIBLE FOR WATER MAIN FLUSHING OPERATIONS. THIS RESPONSIBILITY INCLUDES, BUT IS NOT LIMITED TO, VERIFYING PROCEDURES, PROVIDING ADEQUATE PERSONNEL AND EQUIPMENT, OBTAINING APPROVAL TO DISCHARGE INTO STORM OR SANITARY SEWERS, MONITORING SEWERS FOR BACK-UPS, MONITORING FLOW AND DECHLORINATION RESULTS. DISPOSAL OF HIGHLY CHLORINATED WATER SHALL BE IN COMPLIANCE WITH LOCAL, STATE, AND FEDERAL CODES.
8.UNLESS SPECIFICALLY APPROVED OTHERWISE, ALL LATERAL CONNECTIONS TO EXISTING MAINS (4 INCH OR LARGER) THAT HAVE BEEN PREVIOUSLY TESTED AND TURNED INTO SERVICE SHALL UTILIZE A
LIVE TAP WITH AN APPROVED TAPPING VALVE ASSEMBLY.
9.ALL SERVICE TAP MATERIALS ARE TO BE FURNISHED BY THE CONTRACTOR. THE CEDAR RAPIDS WATER DIVISION WILL MAKE TAPS UP TO 12 INCHES USING CONTRACTOR SUPPLIED MATERIALS THAT COMPLY WITH CEDAR RAPIDS STANDARD SUPPLEMENTAL SPECIFICATION TO SUDAS. TAPS LARGER THAN 12 INCHES MUST BE MADE BY QUALIFIED CONTRACTOR WITH WATER DIVISION PERSONNEL ON
SITE.
10. WARRANTY: FOR THAT PORTION OF THE WATER SYSTEM IMPROVEMENTS THAT ARE TO BE ACCEPTED INTO THE PUBLIC WATER DISTRIBUTION SYSTEM, THE CONTRACTOR SHALL WARRANT THE WORKMANSHIP AND MATERIAL OF THE INSTALLED IMPROVEMENTS FOR A PERIOD OF FOUR (4) YEARS FROM DATE OF ACCEPTANCE AND SHALL FURNISH THE MUNICIPALITY WITH A MAINTENANCE BOND COVERING THE COST OF THE WATER IMPROVEMENTS FOR THAT PERIOD. NO WATER SERVICE SHALL BE PROVIDED PRIOR TO RECEIPT OF THE REQUIRED MAINTENANCE BOND.
DIVISION 9-EROSION CONTROL NOTES
1.CONTRACTOR SHALL FURNISH AND MAINTAIN EROSION CONTROL AND WATER QUALITY SYSTEMS PER THE PLAN SWPPP. TO SATISFY THE REQUIREMENTS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT, THE CONTRACTOR SHALL FURNISH, INSTALL AND MAINTAIN THE TEMPORARY EROSION AND SEDIMENT CONTROL SYSTEMS. CONTRACTOR SHALL ALSO PREPARE, PROVIDE, AND MAINTAIN A STORMWATER POLLUTION PREVENTION PLAN PER SUDAS 9040.
2.CONTRACTOR AND ALL SUBCONTRACTORS WORKING ON THE SITE SHALL SIGN THE NPDES PERMIT AS CO-PERMITEES PRIOR TO CONDUCTING ANY LAND DISTURBING ACTIVITIES ON THE SITE.
3.CONTRACTOR IS RESPONSIBLE TO PROTECT AND MAINTAIN ALL EXISTING AND CONSTRUCTED DRAINAGE CHANNELS AND DRAINAGE STRUCTURES. CONTRACTOR IS LIABLE FOR ALL DAMAGE TO PUBLIC OR PRIVATE PROPERTY CAUSED BY THEIR ACTION OR INACTION IN THE HANDLING OF STORM WATER FLOWS DURING CONSTRUCTION. EXTRA GRADING WORK NECESSARY TO MAINTAIN POSITIVE DRAINAGE WITHIN THE CONSTRUCTION LIMITS IS CONSIDERED INCIDENTAL TO CONSTRUCTION OR RELATED BID ITEMS.
12-7-2023 W
2Q R
R
_P la ns -0
ARIMS: 200A Disposition: Maintain for 15 yrs after construction.
W912QR24R0022
06 March 2024
C/E C/E C/E
X X
X X X
X
SD
SD
SD
SD
X X X X X
X X
X X
X X
X X X X X X
X X
X X
X X
X X
X X
X
XXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X
W W
W G
G
G
G
MAGNAIL
MAGNAIL
CO
SCO
C
IPIN
IPIN
IPIN
IPIN
IPIN
C C
S
C
C
C
C
T
T
D
XCUT
D
C
T
CB
S
C
T C
C
T
CB
T
C T
IPIN
IPIN
IPIN
G
MAGNAIL MAGNAIL
MAGNAIL
MAGNAIL
MAGNAIL
SAN
SAN
FF 840.76
FF 840.75
FF 840.76
SSMH RIM 849.33
INV. 8" VCP 837.93
SSMH RIM 852.03
INV. 8" VCP 840.28
SA
N
SA
N
E E E
E
G E
W W
W T T
T
EXISTING CONCRETE
EXISTING DETENTION POND
EXISTING BUILDING
FFE = 840.75
EXISTING
PARKING
LOT
W R
IG
H
T BR
O
TH
ER
S C T.
8" D
IP
12" D
IP
8" DIP
SITE BENCHMARK
MAG NAIL
N: 3429510.03 E: 5414407.68
ELEV: 838.98
SITE BENCHMARK
MAG NAIL
N: 3429546.23 E: 5414514.67
ELEV: 839.48
SITE BENCHMARK
IRON PIN
N: 3427802.30 E: 5413265.94
ELEV: 850.88
SITE BENCHMARK
MAG NAIL
N: 3427813.37 E: 5413497.42
ELEV: 856.84
SITE BENCHMARK
MAG NAIL
N: 3427807.86 E: 5413699.55
ELEV: 856.46
P8P7
P1
P2 P3
P4 P5 P6
SA
N
SA
N
X X X X
X X
X X
XX
SD
IPIN
IPIN
IPIN
IPIN
MAGNAIL
MAGNAIL
S
S
W W
W
C
IPIN
SITE BENCHMARK
IRON PIN
N: 3427562.34 E: 5413309.31
ELEV: 852.74
PIV
EXISTING DETENTION AREA
VMS-2
VMS-1
VMS-3
30' PRIVATE UTILITY EASEMENT
10' UTILITY EASEMENT
10' UTILITY EASEMENT
10' U
TILITY EASEM
EN
T
C/E
C /E
C /E
C/E C/E
C /E
C /E
WB-67 - Interstate Semi-Trailer
W W
WWW
x x x x x xxx
WRIGHT BROTHER BLVD
W R
IG
H
T
BR
O
TH
ER
S
C T
LA
W
R
EN
C E
D R
E
LA
W
R
EN
C E
D R
W
WELTY PARK LN
TH
S T
ARMED FORCES
RESERVE CENTER
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
PLAN NORTH
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
VA101
D
EC
EM
BE
R
A.
H
AU
TM
AN
200' 400'100'
SCALE: 1 INCH = 200 FEET
200' 0'
MEP PARKING LOT SITE
VMS
CONTRACTOR TRAILER
AND MEP LAYDOWN
AREA
SI
TE
A
ER
IA
L
12-7-2023 W
2Q R
R
_P la ns -0
ARIMS: 200A Disposition: Maintain for 15 yrs after construction.
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
E
E
E
SD
SD
SD
SD
SD
SD
SD
SD
SD
X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
W
W W
W W
W W
W W
W W
W W
W W
W W
G G
G G
G G
G G
G
G
G
G
G G
G G
G G
G
C C
S
C
C
C
C
T
T
DD
C
T
CB
S
C
T C
C
T
CB
T
C T
IPIN
IPIN
G
MAGNAIL MAGNAIL
MAGNAIL
MAGNAIL
MAGNAIL
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SD
15" RCP 847.22
CB TOP 852.09
INV. 15" RCP 848.29
STM MH RIM 850.87
INV. 15" 846.8 (SE)
INV. 15" 846.54 (W)
INV. 15" 846.4 (N)
STM MH RIM 850.77
INV. 15" 846.82 (E)
INV. 15" 846.92 (NW)
SSMH RIM 849.33
INV. 8" VCP 837.93
SSMH RIM 852.03
INV. 8" VCP 840.28
EXISTING
PARKING
LOT
W R
IG
H
T BR
O
TH
ER
S C T.
12" D
IP
8" DIP
SITE BENCHMARK
IRON PIN
N: 3427802.30 E: 5413265.94
ELEV: 850.88
SITE BENCHMARK
MAG NAIL
N: 3427813.37 E: 5413497.42
ELEV: 856.84
SITE BENCHMARK
MAG NAIL
N: 3427807.86 E: 5413699.55
ELEV: 856.46
P8P7
P1
P2 P3
P4 P5 P6
X X X X X X X X X X X X X X X X X X X X X X X
X
XSD
SD SD
CB
CB
CB
INV. 10" CPP 843.58
SITE BENCHMARK
IRON PIN
N: 3427562.34 E: 5413309.31
ELEV: 852.74
846 847 848
851851
853853
854854
30" DIA. CONC. STRUCTURE
T/GRATE 847.85
INV. 12" CPP 842.35
INV. 15" CPP 842.85
BOT. 842.52
VERT. 15" PVC
DRAIN STRUCTURE
T/PVC 845.43
INV. 12" PVC 842.88
BOT. 841.79
DOMED CB
T/CURB 845.28
INV. 15" CPP 842.09
INV. 18" RCP 841.06
850857
EXISTING DETENTION AREA
30' PRIVATE UTILITY EASEMENT
10' UTILITY EASEMENT
10' UTILITY EASEMENT
10' U
TILITY EASEM
EN
T
PRIVATE DETENTION POND EASEMENT
C/EC/EC/EC/E
C /E
C /E
C /E
C/ E
C /E
C/E
C/E C/E
C/ E
C /E
C/E
C/E C/E C/E C/E C/E C/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C/E C/E
C/E C/E
C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
PLAN NORTH
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
V-101
D
EC
EM
BE
R
A.
H
AU
TM
AN
40' 80'
SCALE: 1 INCH = 40 FEET
20'40' 0'
SITE KEYNOTES
REMOVE CURB
NOT USED
SAWCUT AND REPLACE PAVEMENT FOR UTILITY INSTALLATION
(SEE SHEET C-101)
94'
LIMITS OF CONSTRUCTION
GENERAL NOTES:
1. SURVEY BASED ON IOWA STATE PLANE, NORTH ZONE, US FOOT, NAD83(2011).
VERTICAL DATUM IS NAVD88. SURVEY DATE: 9/6/2022.
2. UNDERGROUND UTILITIES WERE CAPTURED FROM RECORD DRAWINGS AND
FIELD SURVEY. ACTUAL LOCATIONS MAY VARY FROM WHAT IS SHOWN HEREON.
CONTRACTOR MUST FIELD VERIFY ANY UTILITIES THAT MAY INTERFERE WITH
ALL EXCAVATIONS.
3. CONTRACTOR SHALL VERIFY THE POSITION OF SURVEY CONTROL POINTS
PRIOR TO CONSTRUCTION ACTIVITIES AND ESTABLISH NEW CONTROL POINTS
AS REQUIRED TO MAINTAIN SURVEY CONTROL FOR THE PROJECT AND SHALL BE
BASED ON THE PRIMARY CONTROL POINTS.
4. SEE SHEET B-101 FOR BORING LOGS.
A1 MEP LOT EXISTING CONDITIONS AND DEMOLITION PLAN
SCALE: 1" = 40'
CONTRACTOR LAYDOWN AREA
AND ANTICIPATED LOCATION
OF CONTRACTOR TRAILER
M
EP
L O
T E
XI
ST
IN
G
C O
N D
IT
IO
N S
A N
D D
EM
O
LI
TI
O N
PL
A
N
EXISTING WATER
LATERAL PLUG EXISTING LEGEND
AC UNIT
SQUARE CATCH BASIN
CLEAN OUT
COMMUNICATION MANHOLE
GUY WIRE
ELECTRIC BOX
ELECTRIC METER
ELECTRIC MANHOLE
ELECTRIC/POWER POLE
FIRE HYDRANT
FINISH FLOOR ELEVATION
GAS METER
GAS VALVE
IRON PIN
LIGHT POLE
MONITORING WELL
POST
SANITARY MANHOLE
SIGN
STORM MANHOLE
TREE
UTILITY MANHOLE
UTILITY VALVE
WATER VALVE
CB
CO
C
E
E
FFE
G
G
IPIN
MW
S
D
U
U
FIRE DEPARTMENT CONNECTIONFDC
FO FIBER OPTICS
G G GAS
E E E E E ELECTRIC UNDERGROUND
X X X FENCE
TREELINE
SAN SAN SANITARY
SD SD STORM
W W W W WATER
SOIL BORING
12-7-2023 W
2Q R
R
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
B-101
D
EC
EM
BE
R
A.
H
AU
TM
AN
A1 SOIL BORING LOGS
SCALE: 1" = 10'
SO
IL
B O
R
IN
G L
O G
S
W
2Q R
R
_P la ns -0
SD
SD
SD
SD
SD
SD
SD
SD
SD
E
E
E
SD
SD
SD
SD
SD
SD
SD
SD
SD
X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
W
W W
W W
W W
W W
W W
W W
W W
W W
G G
G G
G G
G G
G
G
G
G
G G
G G
G G
G
C C
S
C
C
C
C
T
T
DD
C
T
CB
S
C
T C
C
T
CB
T
C T
IPIN
IPIN
G
MAGNAIL MAGNAIL
MAGNAIL
MAGNAIL
MAGNAIL
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SD
15" RCP 847.22
CB TOP 852.09
INV. 15" RCP 848.29
STM MH RIM 850.87
INV. 15" 846.8 (SE)
INV. 15" 846.54 (W)
INV. 15" 846.4 (N)
STM MH RIM 850.77
INV. 15" 846.82 (E)
INV. 15" 846.92 (NW)
SSMH RIM 849.33
INV. 8" VCP 837.93
SSMH RIM 852.03
INV. 8" VCP 840.28
EXISTING
PARKING
LOT
W R
IG
H
T BR
O
TH
ER
S C T.
12" D
IP
8" DIP
SITE BENCHMARK
IRON PIN
N: 3427802.30 E: 5413265.94
ELEV: 850.88
SITE BENCHMARK
MAG NAIL
N: 3427813.37 E: 5413497.42
ELEV: 856.84
SITE BENCHMARK
MAG NAIL
N: 3427807.86 E: 5413699.55
ELEV: 856.46
P8P7
P1
P2 P3
P4 P5 P6
X X X X X X X X X X X X X X X X X X X X X X X
X
XSD
SD SD
CB
CB
CB
INV. 10" CPP 843.58
SITE BENCHMARK
IRON PIN
N: 3427562.34 E: 5413309.31
ELEV: 852.74
30" DIA. CONC. STRUCTURE
T/GRATE 847.85
INV. 12" CPP 842.35
INV. 15" CPP 842.85
BOT. 842.52
VERT. 15" PVC
DRAIN STRUCTURE
T/PVC 845.43
INV. 12" PVC 842.88
BOT. 841.79
DOMED CB
T/CURB 845.28
INV. 15" CPP 842.09
INV. 18" RCP 841.06
EXISTING DETENTION AREA
30' PRIVATE UTILITY EASEMENT
10' UTILITY EASEMENT
10' UTILITY EASEMENT
10' U
TILITY EASEM
EN
T
PRIVATE DETENTION POND EASEMENT
C/EC/EC/EC/E
C /E
C /E
C /E
C/ E
C /E
C/E
C/E C/E
C/ E
C /E
C/E
C/E C/E C/E C/E C/E C/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C/E C/E
C/E C/E
C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
W W
W
W
W W W W W W W W W W W W
WWWWWWWWWWWWWWWWWWW
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxx
R 45'
R1
'R 30'
R
N 3427760.82 E 5413891.35
N 3427606.90 E 5413892.41
N 3427780.96 E 5413911.21
N 3427584.04 E 5413912.57
N 3427580.41 E 5413385.52
N 3427645.79 E 5413319.23
N 3427776.87 E 5413318.33
N 3427757.49 E 5413407.72
N 3427603.52 E 5413401.85
N 3427769.50 E 5413266.07
N 3427675.93 E 5413271.01
N 3427662.24 E 5413367.41
N 3427726.51 E 5413353.04
N 3427752.26 E 5413229.36
N 3427740.93 E 5413291.24
N 3427706.40 E 5413307.09
N 3427607.98 E 5413468.40
N 3427598.98 E 5413468.47
N 3427610.04 E 5413768.15
N 3427601.04 E 5413768.21
N 3427756.31 E 5413817.42
N 3427765.27 E 5413817.36
N 3427754.24 E 5413517.43
N 3427763.20 E 5413517.37
N 3427653.18 E 5413272.38 N 3427653.65
E 5413341.04
N 3427607.43 E 5413387.91
SITE KEYNOTES
PROJECT SIGNAGE PER CP 310-1-6A. FINAL LOCATION TO BE
DETERMINED BY CONTRACTING OFFICER'S REPRESENTATIVE.
6" INTEGRAL CURB (SEE DETAIL E4/C-501)
CONTRACTION JOINT (SEE DETAIL A4/C-505)
CONCRETE SIDEWALK (SEE DETAIL E1/C-505)
BOLLARD (SEE DETAIL A1/C-501)
FIRE HYDRANT AND GATE VALVE (SEE DETAIL E1/C-502). TYPE I
FOR HYDRANTS AT THE END OF THE WATER LINE. TYPE II FOR
INTERMEDIATE HYDRANTS PERPENDICULAR TO WATER LINE.
8" DUCTILE IRON PIPE (DIP) FIRE WATER LINE. NITRILE GASKETS
SHALL BE REQUIRED ON DIP.
FE6 GATE (SEE DETAIL ON SHEET C-508)
45° BEND
90° BEND
CONCRETE DRIVEWAY (SEE DETAIL A1/C-504)
FE6-TR-84 CHAIN LINK SECURITY FENCE (7' FABRIC HEIGHT, 8'
FENCE HEIGHT MIN.) (SEE DETAILS ON SHEETS C-507 AND C-509)
3' GRAVEL MOW STRIP WITH STEEL EDGING CENTERED ON FENCE
(SEE DETAIL B8/C-501
12" X 8" TAPPING SLEEVE AND VALVE (SEE DETAIL F1/C-501)
8" X 6" MECHANICAL JOINT ANCHOR TEE
THICKENED EDGE JOINT AT GRASS, AGGREGATE, OR EXISTING
PAVEMENT (TYP) (SEE DETAIL B6/C-503)
SITE LIGHTING (SEE ES101 FOR ADDITIONAL INFORMATION)
UTILITY PAD (SEE ES101 FOR ADDITIONAL INFORMATION)
LEGEND
HEAVY-DUTY CONCRETE (SEE DETAIL E1/C-501)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
PLAN NORTH
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
C-101
D
EC
EM
BE
R
A.
H
AU
TM
AN
491'
442'
59'
1017'
10'
LIMITS OF CONSTRUCTION
40' 80'
SCALE: 1 INCH = 40 FEET
20'40' 0'
GENERAL NOTES:
1. SURVEY BASED ON IOWA STATE PLANE, NORTH ZONE, US FOOT, NAD83(2011).
VERTICAL DATUM IS NAVD88. SURVEY DATE: 9/6/2022.
2. UNDERGROUND UTILITIES WERE CAPTURED FROM RECORD DRAWINGS AND
FIELD SURVEY. ACTUAL LOCATIONS MAY VARY FROM WHAT IS SHOWN HEREON.
CONTRACTOR MUST FIELD VERIFY ANY UTILITIES THAT MAY INTERFERE WITH
ALL EXCAVATIONS.
3. CONTRACTOR SHALL VERIFY THE POSITION OF SURVEY CONTROL POINTS
PRIOR TO CONSTRUCTION ACTIVITIES AND ESTABLISH NEW CONTROL POINTS
AS REQUIRED TO MAINTAIN SURVEY CONTROL FOR THE PROJECT AND SHALL BE
BASED ON THE PRIMARY CONTROL POINTS.
4. CONCRETE PAVEMENT OPTIONS (REMAINDER TO BE AGGREGATE PAVEMENT):
-BASE: CONCRETE DRIVE ENTRANCE AND TRACKED SPACE PARKING AREA
(16,500 SF CONCRETE ; 66,500 SF AGGREGATE) (AS SHOWN ON PLAN)
-OPTION 1: CONCRETE ADDITIONAL 225' (52,200 SF CONCRETE), LEAVING 200' OF
AGGREGATE PAVEMENT(30,800 SF AGGREGATE).
-OPTION 2: CONCRETE ENTIRE PARKING AREA (83,000 SF)
5. ALL WATER PIPES TO HAVE 66" MIN. COVER.
6. PAVEMENT MARKINGS FOR PARKING AND EQUIPMENT LAYOUT ARE NOT
INCLUDED IN CONTRACT.
7. FIRE HYDRANT FLOW TEST DATA
-DATE AND TIME: 19 OCTOBER 2023 @ 0830 CST
-FLOW HYDRANT: 3627A-E
-PRESSURE HYDRANT: 3627A-F
-STATIC PRESSURE: 60 PSI
-RESIDUAL PRESSURE: 42 PSI
-FLOW RATE: 1,082 GPM
8. CONSTRUCTION DETAILS SHALL BE ACCORDING TO SUDAS (STATEWIDE URBAN
STANDARDS AND SPECIFICATIONS) AS MODIFIED BY CEDAR RAPIDS
SUPPLEMENTAL DOCUMENTS
(HTTPS://CEDAR-RAPIDS.ORG/LOCAL_GOVERNMENT/DEPARTMENTS_G_V/
PUBLIC_WORKS/SUPPLEMENTAL_SPECIFICATIONS.PHP) UNLESS NOTED
OTHERWISE OR IN CONFLICT WITH THE UFC (UNIFIED FACILITIES CRITERIA). IF IN
CONFLICT, THE UFC SHALL TAKE PRECEDENCE.
A1 MEP LOT SITE LAYOUT PLAN
SCALE: 1" = 40'
CONCRETE SIDEWALK (SEE DETAIL E1/C-505)
LAYDOWN AREA AND
ANTICIPATED
CONTRACTOR TRAILER
REINFORCED HEAVY-DUTY CONCRETE (SEE
DETAIL E1/C-501 AND DETAIL C4/C-501)
AGGREGATE PAVEMENT (SEE DETAIL D1/C-501)
PAVEMENT TRENCH REPAIR (SEE DETAIL D6/C-503)
3 TYP
14'
14.56'
M
EP
L O
T
SI
TE
L
A
YO
U T
PL
A
N
3' 3'
153.9230484'
225.13' (OPTION 1 PAVING)
23'
20'
20'
2'
17 17
17 17 17
12-7-2023 W
2Q R
R
_P la ns -0
SD
SD
SD
SD
SD
SD
SD
SD
SD
E
E
E
SD
SD
SD
SD
SD
SD
SD
SD
SD
X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
W
W W
W W
W W
W W
W W
W W
W W
W W
G G
G G
G G
G G
G
G
G
G
G G
G G
G G
G
C C
S
C
C
C
C
T
T
DD
C
T
CB
S
C
T C
C
T
CB
T
C T
IPIN
IPIN
G
MAGNAIL MAGNAIL
MAGNAIL
MAGNAIL
MAGNAIL
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SD
15" RCP 847.22
CB TOP 852.09
INV. 15" RCP 848.29
STM MH RIM 850.87
INV. 15" 846.8 (SE)
INV. 15" 846.54 (W)
INV. 15" 846.4 (N)
STM MH RIM 850.77
INV. 15" 846.82 (E)
INV. 15" 846.92 (NW)
SSMH RIM 849.33
INV. 8" VCP 837.93
SSMH RIM 852.03
INV. 8" VCP 840.28
EXISTING
PARKING
LOT
W R
IG
H
T BR
O
TH
ER
S C T.
12" D
IP
8" DIP
SITE BENCHMARK
IRON PIN
N: 3427802.30 E: 5413265.94
ELEV: 850.88
SITE BENCHMARK
MAG NAIL
N: 3427813.37 E: 5413497.42
ELEV: 856.84
SITE BENCHMARK
MAG NAIL
N: 3427807.86 E: 5413699.55
ELEV: 856.46
P8P7
P1
P2 P3
P4 P5 P6
X X X X X X X X X X X X X X X X X X X X X X X X
XSD
SD SD
CB
CB
CB
INV. 10" CPP 843.58
SITE BENCHMARK
IRON PIN
N: 3427562.34 E: 5413309.31
ELEV: 852.74
846 847 848
851851
853853
854854
30" DIA. CONC. STRUCTURE
T/GRATE 847.85
INV. 12" CPP 842.35
INV. 15" CPP 842.85
BOT. 842.52
VERT. 15" PVC
DRAIN STRUCTURE
T/PVC 845.43
INV. 12" PVC 842.88
BOT. 841.79
DOMED CB
T/CURB 845.28
INV. 15" CPP 842.09
INV. 18" RCP 841.06
850857
EXISTING DETENTION AREA
30' PRIVATE UTILITY EASEMENT
10' UTILITY EASEMENT
10' UTILITY EASEMENT
10' U
TILITY EASEM
EN
T
PRIVATE DETENTION POND EASEMENT
C/EC/EC/EC/E
C /E
C /E
C /E
C/ E
C /E
C/E
C/E C/E
C/ E
C /E
C/E
C/E C/E C/E C/E C/E C/E C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C/E C/E
C/E C/E
C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
W W
W
W
W W W W W W W W W W W W
WWWWWWWWWWWWWWWWWWW
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxx
853.05
857.87
859.01
860.16
855.73
854.70
851.42
852.42
853.75
2.0%1.0%
1.0%
2.3
2.3
1.
5%
2.3
2.3
1.
6%
1.
5%
1.
7%
3.5
2.4
851.66
853.97
D
D O
NOT
P
OLLU
TE
R A I N
S
T O
W A
T E
R W
A Y
S
D U C T I L E
IR
O N
N Y L
O P L A S T
D
DO
NOTPOLLU
TE
R A I N S
T O
W A T E
RW
A Y
S
D U
C T
I
L E
I R O N
N Y L O P L A S T
32 LF 18" HDPE @ 0.95%
855 855
851851 851 851
852 852
854 854
851 852 853 854
855856
859859
65 LF 24" RCP @ 1.39%
RIP-RAP EMERGENCY OVERFLOW WEIR
(20' BOTTOM WIDTH)
BOTTOM ELEV. 850.60
104 LF 18" HDPE @
1.45%
130 LF 18" HDPE @ 1.45%
18" CMP OUTLET CONTROL RISER
N: 3427423.40 E: 5413616.02
TOP: 849.43
2" DIA. HOLE @ 848.60
18" HDPE E INV. 848.00
36" BUBBLE UP STRUCTURE
N: 3427279.06 E: 5413815.89
RIM 848.10
18" HDPE NW INV. 844.30
CONCRETE HEADWALL
N: 3427588.31 E: 5413541.21
24" RCP S INV. 849.50
CONCRETE HEADWALL
N: 3427526.75 E: 5413520.56
24" RCP N INV. 848.60
STORM MANHOLE
N: 3427371.86 E: 5413769.99
RIM 849.43
18" HDPE W INV. 845.80
18" HDPE SE INV. 845.80
WATER QUALITY UNIT
N: 3427413.24 E: 5413646.38
RIM 852.00
18" HDPE W INV. 847.70
18" HDPE E INV. 847.70
847.80
847.50
847.80
847.50
845.80845.80
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
PLAN NORTH
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
CG101
D
EC
EM
BE
R
A.
H
AU
TM
AN
LIMITS OF CONSTRUCTION
SITE KEYNOTES
CONCRETE PIPE APRON & FLARED END GUARD (SEE DETAILS E7
AND A1 ON SHEET C-505)
RIP-RAP OUTLET PROTECTION (SEE DETAIL E5/C-505)
PROPOSED DETENTION POND (SEE DETAILS ON SHEET C-511)
AGGREGATE DRAIN SPACED 50' O.C. SLOPED INTO GRASS SWALE.
SEE NOTE 4 AND DETAIL E8/C-501.
EXCESS CUT TO BE STORED ON SITE. DRAINAGE TO BE ROUTED TO
DRAINAGE SWALE OR DETENTION POND.
BUBBLE UP STRUCTURE (SEE DETAIL A1/C-510)
STORM MANHOLE (SEE DETAIL A1/C-503)
40' 80'
SCALE: 1 INCH = 40 FEET
20'40' 0'
GENERAL NOTES:
1. SURVEY BASED ON IOWA STATE PLANE, NORTH ZONE, US FOOT, NAD83(2011).
VERTICAL DATUM IS NAVD88. SURVEY DATE: 9/6/2022.
2. UNDERGROUND UTILITIES WERE CAPTURED FROM RECORD DRAWINGS AND
FIELD SURVEY. ACTUAL LOCATIONS MAY VARY FROM WHAT IS SHOWN HEREON.
CONTRACTOR MUST FIELD VERIFY ANY UTILITIES THAT MAY INTERFERE WITH
ALL EXCAVATIONS.
3. CONTRACTOR SHALL VERIFY THE POSITION OF SURVEY CONTROL POINTS
PRIOR TO CONSTRUCTION ACTIVITIES AND ESTABLISH NEW CONTROL POINTS
AS REQUIRED TO MAINTAIN SURVEY CONTROL FOR THE PROJECT AND SHALL BE
BASED ON THE PRIMARY CONTROL POINTS.
4. THE AGGREGATE DRAIN SHOULD BE BACKFILLED WITH CLEAN, WELL-GRADED
GRANULAR MATERIAL MEETING IDOT POROUS BACKFILL (GRADATION 29,
SECTION 4131) CRITERIA OR ALTERNATIVE FREE-DRAINING GRANULAR
MATERIAL ENCAPSULATED WITH SUITABLE FILTER FABRIC.
A1 MEP LOT SITE GRADING PLAN
SCALE: 1" = 40'
CONTRACTOR TRAILER
AND LAYDOWN AREA
POND DATA
4:1 SIDE SLOPES
TOP: 851.60
BOTTOM 848.60
18" RISER:
INV. 18" HDPE @ 845.00
TOP OF RISER @ 849.43
2" DIA. HOLE @ 848.60
OVERFLOW WEIR:
20' WIDE @ 850.60
M
EP
L O
T
SI
TE
G
R A
D
IN
G P
LA
N
WATER QUALITY UNIT SPECS
WATER QUALITY FLOW RATE: 3.15 CFS
BYPASS FLOW RATE: 5.05 CFS
SEE DRAWING FOR DEPTHS AND INVERT ELEVATIONS
RIP-RAP LEVEL SPREADER
12-7-2023 W
2Q R
R
_P la ns -0
SD
SD
SD
SD
SD
SD
SD
SD
SD
E
E
E
SD
SD
SD
SD
SD
SD
SD
SD
SD
X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
W
W W
W W
W W
W W
W W
W W
W W
W W
G G
G G
G G
G G
G
G
G
G
G G
G G
G G
G
C C
S
C
C
C
C
T
T
DD
C
T
CB
S
C
T C
C
T
CB
T
C T
IPIN
IPIN
G
MAGNAIL MAGNAIL
MAGNAIL
MAGNAIL
MAGNAIL
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SD
15" RCP 847.22
CB TOP 852.09
INV. 15" RCP 848.29
STM MH RIM 850.87
INV. 15" 846.8 (SE)
INV. 15" 846.54 (W)
INV. 15" 846.4 (N)
STM MH RIM 850.77
INV. 15" 846.82 (E)
INV. 15" 846.92 (NW)
SSMH RIM 849.33
INV. 8" VCP 837.93
SSMH RIM 852.03
INV. 8" VCP 840.28
EXISTING
PARKING
LOT
W R
IG
H
T BR
O
TH
ER
S C T.
12" D
IP
8" DIP
SITE BENCHMARK
IRON PIN
N: 3427802.30 E: 5413265.94
ELEV: 850.88
SITE BENCHMARK
MAG NAIL
N: 3427813.37 E: 5413497.42
ELEV: 856.84
SITE BENCHMARK
MAG NAIL
N: 3427807.86 E: 5413699.55
ELEV: 856.46
P8P7
P1
P2 P3
P4 P5 P6
X X X X X X X X X X X X X X X X X X X X X X X X
XSD
SD SD
CB
CB
CB
INV. 10" CPP 843.58
SITE BENCHMARK
IRON PIN
N: 3427562.34 E: 5413309.31
ELEV: 852.74
846 847 848
851851
853853
854854
30" DIA. CONC. STRUCTURE
T/GRATE 847.85
INV. 12" CPP 842.35
INV. 15" CPP 842.85
BOT. 842.52
VERT. 15" PVC
DRAIN STRUCTURE
T/PVC 845.43
INV. 12" PVC 842.88
BOT. 841.79
DOMED CB
T/CURB 845.28
INV. 15" CPP 842.09
INV. 18" RCP 841.06
850857
EXISTING DETENTION AREA
30' PRIVATE UTILITY EASEMENT
10' UTILITY EASEMENT
10' UTILITY EASEMENT
10' U
TILITY EASEM
EN
T
PRIVATE DETENTION POND EASEMENT
C/EC/EC/EC/E
C /E
C /E
C /E
C/ E
C /E
C/E
C/E C/E
C/ E
C /E
C/E
C/E C/E C/E C/E C/E C/E C
/E C
/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C/E C/E
C/E C/E
C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
W W
W
W
W W W W W W W W W W W W
WWWWWWWWWWWWWWWWWWW
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxx
SF
SF
D
D O
NOT
P
OLLU
TE
R A I N
S
T O
W A
T E
R W
A Y
S
D U C T I L E
IR
O N
N Y L
O P L A S T
D
DO
NOTPOLLU
TE
R A I N S
T O
W A T E
RW
A Y
S
D U
C T
I
L E
I R O N
N Y L O P L A S T
32 LF 18" HDPE @ 0.95%
855 855
851851 851 851
852 852
854 854
851 852 853 854
855856
859859
65 LF 24" RCP @ 1.39%
RIP-RAP EMERGENCY OVERFLOW WEIR
(20' BOTTOM WIDTH)
BOTTOM ELEV. 850.60
104 LF 18" HDPE @
1.45%
130 LF 18" HDPE @ 1.45%
18" CMP OUTLET CONTROL RISER
N: 3427423.40 E: 5413616.02
TOP: 849.43
2" DIA. HOLE @ 848.60
18" HDPE E INV. 848.00
36" BUBBLE UP STRUCTURE
N: 3427279.06 E: 5413815.89
RIM 848.10
18" HDPE NW INV. 844.30
CONCRETE HEADWALL
N: 3427588.31 E: 5413541.21
24" RCP S INV. 849.50
CONCRETE HEADWALL
N: 3427526.75 E: 5413520.56
24" RCP N INV. 848.60
STORM MANHOLE
N: 3427371.86 E: 5413769.99
RIM 849.43
18" HDPE W INV. 845.80
18" HDPE SE INV. 845.80
WATER QUALITY UNIT
N: 3427413.24 E: 5413646.38
RIM 852.00
18" HDPE W INV. 847.70
18" HDPE E INV. 847.70
SF
SF
SF
SF
SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF SF SF SF SF SF
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
PLAN NORTH
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
CG102
D
EC
EM
BE
R
A.
H
AU
TM
AN
LIMITS OF CONSTRUCTION/
DISTURBANCE, 6± AC.
SITE KEYNOTES
SILT FENCE (SEE DETAIL D1/C-506)
RIP-RAP OUTLET PROTECTION (SEE DETAIL E5/C-505)
INLET PROTECTION (SEE DETAIL A5/C-506)
TEMPORARY CONSTRUCTION EXIT (SEE DETAIL E7/C-506)
CONCRETE WASHOUT (SEE DETAIL A8/C-506)
ROCK CHECK DAM (SEE DETAIL A1/C-506)
40' 80'
SCALE: 1 INCH = 40 FEET
20'40' 0'A1 MEP LOT EROSION & SEDIMENT CONTROL AND LANDSCAPING PLAN
SCALE: 1" = 40'
6 6 6
LEGEND
TEMPORARY EROSION CONTROL MATTING WITH SEEDING
(INSTALL PER MANUFACTURER INSTRUCTIONS)
CONTRACTOR TRAILER
AND LAYDOWN AREA
M
EP
L O
T
ER
O
SI
O N
S
ED
IM
EN
T
C O
N
TR
O L
A N
D
LA
N D
SC
A
PI
N
G P
LA
N
PERMANENT SEEDING
RIP-RAP LEVEL SPREADER
SO - SHINGLE OAK
CH - COMMON HACKBERRY
PLANTING SCHEDULE
KEY QUANTITY BOTANICAL NAME COMMON NAME COND SIZE SPACING REMARKS
SO 3 QUERCUS
IMBRICARIA SHINGLE OAK B&B 2" - 2.5" CAL. 30' O.C. STRAIGHT TRUNK,
FULL CANOPY
CH 4 CELTIS
OCCIDENTALIS
COMMON
HACKBERRY B&B 2"-2.5" CAL. 30' O.C. STRAIGHT TRUNK,
FULL CANOPY
NOTE: FOR TREE PLANTING DETAIL SEE B7/C-510
TREE LEGEND
EXISTING TREES
SIZE QUANTITY UNITS LU
GREATER
THAN 8" 13 EA 14 182
FROM 4" TO
8" 28 EA 11 308
FROM 2.5" TO
4" 73 EA 9 657
FROM 1.25"
TO 2.5" 108 EA 4 432
3' HIGH
EARTHEN
BERM
660 FEET .05/LF 33
BUFFERYARD DISTANCE 660 FT.
REQUIRED 2.2 LU PER LIN. FT. 1425 LU REQ.
TOTAL LU PROVIDED 1612 LU PROV.
DO NOT DISTURB VEGETATION
AND EARTHEN BERM
1|CH
1|SO
1|SO
1|SO
3|CH
12-7-2023 W
2Q R
R
_P la ns -0
SD
SD
SD
SD
SD
SD
SD
E
E
E
SD
SD
SD
SD
SD
SD
SD
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
W
W W
W W
W W
W W
W W
W W
W G
G G
G G
G
G
G
G
G
G G
G G
G
G
DD
C
T
CB
S
C
T C
C
T
CB
T
C T
IPIN
IPIN
G
MAGNAIL MAGNAIL
MAGNAIL
MAGNAIL
MAGNAIL
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SD
CB TOP 852.09
INV. 15" RCP 848.29
STM MH RIM 850.87
INV. 15" 846.8 (SE)
INV. 15" 846.54 (W)
INV. 15" 846.4 (N)
STM MH RIM 850.77
INV. 15" 846.82 (E)
INV. 15" 846.92 (NW)
SSMH RIM 852.03
INV. 8" VCP 840.28
EXISTING
PARKING
LOT
W R
IG
H
T BR
O
TH
ER
S C T.
12" D
IP
8" DIP
SITE BENCHMARK
IRON PIN
N: 3427802.30 E: 5413265.94
ELEV: 850.88
SITE BENCHMARK
MAG NAIL
N: 3427813.37 E: 5413497.42
ELEV: 856.84
SITE BENCHMARK
MAG NAIL
N: 3427807.86 E: 5413699.55
ELEV: 856.46
P8P7
P1
P2 P3
P4 P5 P6
SITE BENCHMARK
IRON PIN
N: 3427562.34 E: 5413309.31
ELEV: 852.74
851851
853853
854854
850857
30' PRIVATE UTILITY EASEMENT
10' UTILITY EASEMENT
10' U
TILITY EASEM
EN
T
PRIVATE DETENTION POND EASEMENT
C /E
C /E
C /E
C/ E
C /E
C/E
C/E C/E
C/ E
C /E
C/E
C/E C/E C/E C/E C/E C/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C/E C/E
C/E C/E
C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E C/E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
C /E
W W
W
W
W W W W W W W W W W W W
WWWWWWWWWWWWWWWWWWW
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxxxxxxx
D
D
O
NOTPOLLU
TE
R
A I N
S
TO
W A
T E
R W
A Y
S D U C T I L E
I
RO
N
N Y L
O P L A S T
32 LF 18" HDPE @ 0.95%
855 855
851851 851 851
852 852
854 854
851 852 853 854
855856
859859
65 LF 24" RCP @ 1.39%
RIP-RAP EMERGENCY OVERFLOW WEIR
(20' BOTTOM WIDTH)
BOTTOM ELEV. 850.60
104 LF 18" HDPE @
1.45%
130 LF 18" HDPE @ 1.45%
18" CMP OUTLET CONTROL RISER
N: 3427423.40 E: 5413616.02
TOP: 849.43
2" DIA. HOLE @ 848.60
18" HDPE E INV. 848.00
CONCRETE HEADWALL
N: 3427588.31 E: 5413541.21
24" RCP S INV. 849.50
CONCRETE HEADWALL
N: 3427526.75 E: 5413520.56
24" RCP N INV. 848.60
STORM MANHOLE
WATER QUALITY UNIT
N: 3427413.24 E: 5413646.38
RIM 852.00
18" HDPE W INV. 847.70
18" HDPE E INV. 847.70
0+00.00 1+00.00 2+00.00 3+00.00 4+00.00 5+00.00 5+88.07
0+00.00
1+00.00
2+00.00 3+00.00 4+00.00 5+00.005+14.75
PI: 0+68.67
PI: 1+34.50
0+50.00
1+50.00 2+50.00 3+50.00 4+50.00
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
PLAN NORTH
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
CU101
D
EC
EM
BE
R
A.
H
AU
TM
AN
40' 80'
SCALE: 1 INCH = 40 FEET
20'40' 0'A1 WATER LINE PLAN
SCALE: 1" = 40'
W A
TE
R
L
IN
E
PL
A N
WATER LINE 2
(8" DIP)
WATER LINE 1
(8" DIP)
12-7-2023 W
2Q R
R
_P la ns -0
WATER LINE 1 PROFILE PROFILE STA. -0+25 TO 6+00
SCALE: 1"=30' H
1"=3' V
-0+25 0+00 0+25.00 0+50.00 0+75.00
1+00 1+25.00 1+50.00 1+75.00
2+00 2+25.00 2+50.00 2+75.00
3+00 3+25.00 3+50.00 3+75.00
4+00 4+25.00 4+50.00 4+75.00
5+00 5+25.00 5+50.00 5+75.00
6+00
8" DIP (66" DEPTH MIN)
(MAINTAIN 18" VERTICAL CLEARANCE AT CROSSINGS)
8" X 8" TEE
STA 2+88.07
11.25° BEND
STA 3+18.86
8" DIP (66" DEPTH MIN)
(MAINTAIN 18" VERTICAL CLEARANCE AT CROSSINGS)
EX. GAS MAIN
EX. GAS MAIN
EX 8" SSWR
INV 839.06
PROPOSED
SURFACE
EXISTING
SURFACE
90° BEND TO
HYDRANT
STA 5+88.07
12" X 8" TAPPING SLEEVE
AND VALVE
STA 0+00
WATER LINE 2 PROFILE STA. -0+25 TO 5+50
SCALE: 1"=30' H
1"=3' V
-0+25 0+00 0+25.00 0+50.00 0+75.00
1+00 1+25.00 1+50.00 1+75.00
2+00 2+25.00 2+50.00 2+75.00
3+00 3+25.00 3+50.00 3+75.00
4+00 4+25.00 4+50.00 4+75.00
5+00 5+25.00
5+50
8" DIP (66" DEPTH MIN)(MAINTAIN 18" VERTICAL CLEARANCE AT CROSSINGS)
45° BEND
STA 0+68.67
45° BEND
STA 1+34.50
8" X 8" TEE
STA 2+14.99
11.25° BEND
STA 2+92.70
8" DIP (66" DEPTH MIN)
(MAINTAIN 18" VERTICAL CLEARANCE AT CROSSINGS)
8" DIP (66" DEPTH MIN)
(MAINTAIN 18" VERTICAL CLEARANCE AT CROSSINGS)
EX. GAS MAIN
PROPOSED
SURFACE
EXISTING
SURFACE
CONNECTION TO
8" STUB
STA 0+00
90° BEND TO
HYDRANT
STA 5+14.75
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
PLAN NORTH
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
CU201
D
EC
EM
BE
R
A.
H
AU
TM
AN
40' 80'
SCALE: 1 INCH = 40 FEET
20'40' 0'A1 WATER LINE PROFILES
SCALE: 1" = 40'
W A
TE
R
L
IN
E
PR
O
FI
LE
S
12-7-2023 W
2Q R
R
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
C-501
D
EC
EM
BE
R
A.
H
AU
TM
AN
6" DENSE GRADED
CRUSHED STONE
(IDOT 4120.02
GRADATION 11)
AGGREGATE PAVEMENTD1
A1
SUBGRADE AS APPROVED BY
SOILS ENGINEER
6" PCC PAVEMENT (4,000 PSI) FC
(IDOT 2301.02)
SUBGRADE AS APPROVED BY
SOILS ENGINEER
6" WELL-GRADED CRUSHED STONE
(IDOT 4121 GRADATION 12A)
HEAVY DUTY CONCRETE PAVEMENTE1
4" DRAINAGE LAYER-
RAPID DRAINING MATERIAL CONTAINING 0%
PASSING U.S. NO. 16 SIEVE (IDOT 4121
GRADATION 12A)
REINFORCED CONCRETE PANEL
NTSC4
WELDED WIRE FABRIC
(T
4)
3"
3" 3"
"T" VARIES (SEE
CONCRETE SECTIONS E1
AND F1 ON THIS SHEET)
6"x6"xW4xW4 WWM
3"
REINFORCED PANELS
6"x6"xW4xW4 WWM
CONTROL
JOINTS
COMPACT SUBGRADE
SEE DETAIL E1/C-501 FOR
PAVEMENT SECTION
3:1
VARIES
6" TYP.
12" TYP.
5%
3'
5%
AGGREGATE DRAIN AS
SHOWN ON CG101
INTEGRAL CURB DETAIL
NTSE4
NTSE8 AGGREGATE DRAIN DETAIL
C
IV
IL
D
ET
A
IL
S
GEOTEXTILE (IDOT SECTION 4196)
GEOTEXTILE (IDOT SECTION 4196)
12"
7" WELL-GRADED CRUSHED STONE
(IDOT 4121 GRADATION 12A)
12"
GEOTEXTILE (IDOT SECTION
4196)
A
A
SECTION A-A FROM
EDGE OF PAVEMENT
12"
8"
AGGREGATE DRAIN NOTES:
1. MATCH GEOTEXTILE OVERLAP TO
TRENCH WIDTH
2. SLOPE THE BOTTOM OF THE
TRENCH TO DRAIN.
3. CONSTRUCT AGGREGATE DRAINS
AFTER COMPLETION OF GRANULAR
PAVEMENT COURSES.
4. EXCAVATE THE TRENCH TO FURNISH
A CLEAN EXPOSURE OF THE
GRANULAR PAVEMENT COURSES.
5. PLACE SUITABLE BACKFILL
MATERIAL ABOVE THE TRENCH.
GEOTEXTILE (IDOT SECTION
4196)
IDOT 4121 GRADATION 12A
GRAVEL MOW STRIP
NTSB8
LAWN/GRASS
#2 ROCK SOIL SEPARATOR FABRIC
(8 MIL THICK PERFORATED
POLY FABRIC)
4"
STEEL EDGING
1'-6"
FENCE
STEEL EDGING
1'-6"
TAPPING SLEEVE
N.T.S.F1
THRUST
BLOCK
STAINLESS
STEEL TAPPING
WITH CAST
IRON FLANGE
EXISTING
WATER MAIN
TAPPING VALVE
FINISHED
GRADE
SLIDE OR
SCREW TYPE
VALVE BOX
1'-6" X 1'-6" PSI
CONCRETE I
WATER
MAIN
PROVIDE
CONCRETE
BEARING PAD
PLAN
PROFILE
NOTES:
SIZE ON SIZE TAPS ARE
NOT PERMITTED ON
MAINS LARGER THAN 12"
IN DIAMETER.
12-7-2023 W
2Q R
R
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
C-502
D
EC
EM
BE
R
A.
H
AU
TM
AN
TRENCH BEDDINGA1 N.T.S.
FIRE HYDRANT INSTALLATIONE1 N.T.S.
C
IV
IL
D
ET
A
IL
S
NOTE:
FIRE HYDRANT TO BE INSTALLED TO MEET CEDAR RAPIDS SUPPLEMENT TO
SUDAS, DIVISION 5 - SECTION 5920, 2.02.
12-7-2023 W
2Q R
R
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
C-503
D
EC
EM
BE
R
A.
H
AU
TM
AN
STORM MANHOLE
N.T.S.A1
C
IV
IL
D
ET
A
IL
S
PCC SURFACE RESTORATION AND UTILITY INSTALLATION
N.T.S.D6
5 FT MIN
eh NEW
EXISTING PAVEMENT
VA
R
IE
S"
PAVEMENT
THICKENED EDGE JOINT BETWEEN NEW AND EXISTING PAVEMENT
SEE JOINT SEALANT
FIGURE A7/C-505
NEW
VA
R
IE
S
PAVEMENT
THICKENED EDGE JOINT BETWEEN NEW
PAVEMENT AND GRASS
EXISTING
GRASS
THICKENED EDGE JOINTS AT AGGREGATE / PAVEMENT OR GRASS
NTSB6
5 FT MIN
12-7-2023 W
2Q R
R
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
C-504
D
EC
EM
BE
R
A.
H
AU
TM
AN
A1
E1
C
IV
IL
D
ET
A
IL
S
12-7-2023 W
2Q R
R
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
C-505
D
EC
EM
BE
R
A.
H
AU
TM
AN
E7E1
NOTE:
TAILWATER < O.5 Ød AND ASSUMING FULL CULVERT FLOW
(HIGH TAILWATER CONDITIONS).
MINIMUM VALUES, SEE PLAN
NOTES:
1. La IS THE LENGTH OF THE RIP-RAP APRON.
2. MATERIAL CONFORMING TO IDOT 4196 EMBANKMENT EROSION CONTROL
FABRIC TO BE INSTALLED UNDER RIP-RAP.
END SECTION, CONCRETE
FLOOR OR RIP-RAP (TYP.)
GEOTEXTILE (SEE NOTE 2)
IDOT 4130 CLASS E REVETMENT
D
La d
W
3d
W2 = d + 0.4 La
OUTLET D (IN) V25 (FT/S) LA (FT) W1 (FT) W2 (FT)
< 18 < 18 < 18 8 3.75 4.50
18 18 18 9 4.50 5.25
24 24 24 20 6 13
36 36 36 32 9 16
E5
A1 A4 JOINT SEALANTS
NTSA7
CONTRACTION JOINT CONSTRUCTION JOINT EXPANSION JOINT
BUTTED JOINT JOINT
FILLER
INITIAL SAWCUT
(1 8")
LUBRICATE
AS SPECIFIED
LUBRICATE
AS SPECIFIED
LUBRICATE
AS SPECIFIED
PREFORMED
COMPRESSION
SEAL
PREFORMED
COMPRESSION
SEAL
PREFORMED
COMPRESSION
SEAL
PAVEMENT
SURFACEPAVEMENT
SURFACE
PAVEMENT
SURFACE
PAVEMENT
SURFACEW W W
3/4" MIN.
D D D
PREFORMED COMPRESSION SEAL
NOTE:
1. DEPTH AND WIDTH OF UNCOMPRESSED SEAL SHALL BE RECOMMENDED BY MANUFACTURER, EXCEPT THE STALL DEPTH SHALL
NOT BE LESS THAN 1.5 INCHES.
2. TOP OF PREFORMED SEAL SHALL BE 18 TO 14 INCH BELOW THE PAVEMENT SURFACE. IN AREAS TO BE GROOVED, THE JOINT SEAL
SHALL BE RECESSED BELOW THE DEPTH OF THE GROOVES.
3. COMPRESSION SEALS MUST BE IN COMPRESSION AT ALL TIMES.
4. JOINTS WITHIN LIQUID OXYGEN (LOX) AREA WILL NOT BE SEALED
JOINT SPACING
(FEET)
WIDTH (IN.)
MIN. MAX.
20 1/2 5/8
20 (NAVY) 3/8 ---
C
IV
IL
D
ET
A
IL
S
SEE DETAIL C4/C-505 FOR
FOOTING
C4
12-7-2023 W
2Q R
R
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
C-506
D
EC
EM
BE
R
A.
H
AU
TM
AN
D1
A5
E7
10' MINIMUM
VARIES
B B
WOOD FRAME SECURELY
FASTENED AROUND
ENTIRE PERIMETER
WITH TWO STAKES
TWO-STACKED
2X12 ROUGH
WOOD FRAME
STAKE
(TYP)
TYPE "ABOVE GROUND"
WITH WOOD PLANKS
VARIES
10' MINIMUM
AA
3'
LATH AND
FLAGGING ON
3 SIDES
10 mil PLASTIC LINING PLAN
NOT TO SCALE
SECTION A-A
NOT TO SCALE
BERM
SANDBAG
SANDBAG
10 mil PLASTIC LINING
BERM
STRAW BALE
STRAW BALE
(TYP)
10 mil PLASTIC LINING
VARIES
10' MINIMUM
BINDER WIRE
NATIVE MATERIAL
(OPTIONAL)
STAPLES
(2 PER BALE)
WOOD OR
METAL STAKES
(2 PER BALE)
SECTION B-B
NOT TO SCALE
10 mil PLASTIC LINING
B B
PLAN
NOT TO SCALE
TYPE "ABOVE GRADE"
WITH STRAW BALES
10 mil PLASTIC LINING
SECTION B-B
NOT TO SCALE
PLAN
NOT TO SCALE
TYPE "BELOW GRADE"
2"
8"1.12" DIA
STEEL WIRE
STAPLE
DETAIL
NOTES:
1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD.
2. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE
WASHOUT FACILITIES SHALL BE REMOVED FROM THE SITE
OF THE WORK AND DISPOSED OF OR RECYCLED.
3. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE
CAUSED BY THE REMOVAL OF THE TEMPORARY CONCRETE
WASHOUT FACILITIES SHALL BE BACKFILLED, REPAIRED,
AND STABILIZED TO PREVENT EROSION.
NTS
CONCRETE WASHOUTA8
WOOD OR
METAL STAKES
(2 PER BALE)
A1
ER
O
SI
O
N C
O N
TR
O
L D
ET
A
IL
S
12-7-2023 W
2Q R
R
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
C-507
D
EC
EM
BE
R
A.
H
AU
TM
AN
A1
⅜ ⅜
¾
FE
N
C E
D
ET
A
IL
S
7'
12-7-2023 W
2Q R
R
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
C-508
D
EC
EM
BE
R
A.
H
AU
TM
AN
A1
⅝ ⅝
⅜
FE
N
C E
D
ET
A
IL
S
7'
7'
12-7-2023 W
2Q R
R
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
C-509
D
EC
EM
BE
R
A.
H
AU
TM
AN
A1
FE
N
C E
D
ET
A
IL
S
12-7-2023 W
2Q R
R
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
C-510
D
EC
EM
BE
R
A.
H
AU
TM
AN
D
ET
EN
TI
O
N P
O N
D A
N D
L A
N D
SC
A
PE
D
ET
A
IL
S
CIRCULAR BUBBLE UP STRUCTURE
NTSA1
4D
BUBLE UP STRUCTURE (PLAN)
N.T.S.
5'
12" RIP-RAP (IDOT 4130 CLASS E REVETMENT).
GEOTEXTILE MATERIAL CONFORMING TO IDOT
4196 EMBANKMENT EROSION CONTROL FABRIC
TO BE INSTALLED UNDER RIP-RAP.
36" BUBBLE UP STRUCTURE
TOP: 848.10
18" HDPE 842.30
18" HDPE
TRASH RACK
NTSD8
TREE PLANTING DETAIL
NTSB7
12-7-2023 W
2Q R
R
_P la ns -0
SHEET ID
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
TE
M
A R
K D
ES
C
R
IP
TI
O
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
FI
LE
N
AM
E:
FI
LE
N U
M
BE
R
C
ED
A R
R A
PI
D
S, IO
W A
A.
W
EB
ER
A.
W
EB
ER
W .D
AW
SE
Y
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
EQ
U
IP
M
EN
T
PA
R
K
IN
G E
XP
A
N
SI
O N
P2 : 5
C-511
D
EC
EM
BE
R
A.
H
AU
TM
AN
A1
D
ET
EN
TI
O N
P O
N D
D
ET
A
IL
S
TOP OF CREST=851.60
OUTLET PIPE
RECOMPACTED SOIL
FLOWABLE FILL,
MIN. 6" ALL SIDES
ALONG 2/3 THE
LENGTH OF THE
PIPE
SAND BACKFILL, MIN. 6"
ALL SIDES ALONG 1/3 THE
LENGTH OF THE PIPE.
FILTER FABRIC
0.75 INCH
CRUSHED STONE,
MIN. 6" ALL SIDES
POND EMBANKMENT NOTES:
1. AREAS UNDER THE EMBANKMENT OR ANY STRUCTURAL
WORKS RELATED TO THE BASIN SHALL BE CLEARED,
GRUBBED AND STRIPPED OF TOPSOIL TO REMOVE TREES,
VEGETATION, ROOTS, OR OTHER OBJECTIONABLE MATERIAL.
IN ORDER TO FACILITATE CLEANOUT AND RESTORATION, THE
AREA OF MOST FREQUENT INUNDATION (MEASURED FROM
THE TOP OF THE PRINCIPAL SPILLWAY) WILL BE CLEARED OF
ALL BRUSH AND TREES.
2. THE PLACING AND SPREADING OF EMBANKMENT MATERIALS
IS TO BE STARTED AT THE LOWEST POINT AND BROUGHT UP
IN HORIZONTAL LAYERS OF 8" THICKNESS. SAID MATERIAL IS
TO BE FREE OF SOD, ROOTS, FROZEN SOIL OR ANY OTHER
DECOMPOSABLE MATERIAL. THE RELATIVE COMPACTION OF
EACH LAYER SHALL NOT BE LESS THAN 95% OF STANDARD
PROCTOR TEST AT OPTIMUM MOISTURE CONTENT +/- 3% IN
ALL AREAS.
3. FOR EARTH-FILL EMBANKMENTS, A CUTOFF TRENCH SHALL
BE INSTALLED ALONG THE CENTERLINE OF THE
EMBANKMENT. THE TRENCH MUST EXTEND AT LEAST 2 FEET
INTO STABLE IMPERVIOUS SOIL WITH A MINIMUM BOTTOM
WIDTH OF 4 FEET AND SIDE SLOPES OF 2:1. COMPACTION
REQUIREMENTS SHALL BE THE SAME AS THOSE FOR THE
EMBANKMENT. THE TRENCH SHALL BE DRAINED DURING THE
BACKFILLING/COMPACTING OPERATIONS.
4. THE EMBANKMENT SHALL BE CONSTRUCTED TO AN
ELEVATION 10 PERCENT HIGHER THAN THE DESIGN HEIGHT
TO ALLOW FOR SETTLEMENT IF COMPACTION IS OBTAINED
WITH HAULING EQUIPMENT. IF COMPACTORS ARE USED FOR
COMPACTION, THE OVERBUILD MAY BE REDUCED TO NOT
LESS THAN 5 PERCENT.
5. THE EMBANKMENT OF THE POND SHALL BE STABILIZED WITH
PERMANENT VEGETATION IMMEDIATELY AFTER INSTALLATION
OF THE BASIN.
6. PROPERLY STABILIZED PIPE THROUGH EMBANKMENT WITH
PROPER COMPACTION OF NO LESS THAN 95% OF STANDARD
PROCTOR TEST IN ALL AREAS. HAND COMPACT AROUND PIPE
TO ENSURE ADEQUATE COMPACTION. DO NOT OVER
COMPACT SO MUCH THAT UPLIFT IS CREATED ON THE PIPE.
USE A MINIMUM OF 2 FEET OF FILL OVER BARREL BEFORE
DRIVING OVER. WATER TIGHT WRAPPED AND GASKETED
JOINTS ARE REQUIRED.
EMBANKMENT DETAIL
N.T.S.
18" DIAMETER
10' WIDE
WQV ELEV : 848.60
DETENTION POND DETAIL
4:1 SLOPE
POND BOTTOM
ELEV=848.60
N.T.S.
18" HDPE @ 0.95% SLOPE
EMERGENCY SPILLWAY DETAIL
± 20'
N.T.S.
ELEV=850.60 3:1 SLOPE
(MAX)3:1 SLOPE
(MAX)
ELEV=851.60 ELEV=851.60
4:1 SLOPE
TOP OF POND
851.60
TOP OF 18" CMP RISER
849.43
18" INV. 845.00
TOP OF POND
851.60
5 YR ELEV : 849.58
10 YR ELEV : 849.73
25 YR ELEV : 850.00
100 YR ELEV : 850.59
10' MIN.
10' MIN.
TOP OF EMERGENCY
SPILLWAY = 850.60
TRASH RACK (SEE
DETAIL D8/C-510)
12" RIP-RAP (IDOT 4130 CLASS E REVETMENT).
GEOTEXTILE MATERIAL CONFORMING TO IDOT
4196 EMBANKMENT EROSION CONTROL FABRIC
TO BE INSTALLED UNDER RIP-RAP.
2" DIA. HOLE @ 848.60
(WQV ELEV)
1/2 ROUND SECTION 12" PERFORATED CMP WITH 1" DIA HOLES
3" O.C E.W. AND SOLID TOP/BOTTOM WELDED TO RISER.
RISER (OUTLET CONTROL) PLAN VIEW
N.T.S.
12-7-2023 W
2Q R
R
_P la ns -0
NOTE: NOT ALL ABBREVIATIONS MAY BE USED.
(A) EXISTING TO BE ABANDONED
(D) EXISTING TO BE DEMOLISHED
(E) EXISTING TO REMAIN
(F) FUTURE
(R) EXISTING TO BE RELOCATED
A AMPERE
AC ALTERNATING CURRENT OR AIR CONDITIONER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AIC AMPS INTERRUPTING CAPACITY
ANNC ANNUNCIATOR
AWG AMERICAN WIRE GAUGE
BPS BOLTED PRESSURE SWITCH
C CONDUIT
CB CIRCUIT BREAKER
CCTV CLOSED CIRCUIT TELEVISION
CKT CIRCUIT
CM CONSTRUCTION MANAGER
DC DIRECT CURRENT
DP DISTRIBUTION PANELBOARD
DTT DOUBLE TWIN TUBE
EB ELECTRONIC BALLAST
EC ELECTRICAL CONTRACTOR
EM EMERGENCY
EMT ELECTRICAL METAL TUBING
EWC ELECTRIC WATER COOLER
FA FIRE ALARM
FLA FULL LOAD AMPS
G GROUND
GC GENERAL TRADES CONTRACTOR
GFCI GOVERNMENT FURNISHED, CONTRACTOR INSTALLED
GEN GENERATOR
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HPC HIGH PRESSURE CONTACT SWITCH
HZ HERTZ
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
NOTE: NOT ALL ABBREVIATIONS MAY BE USED.
INCD INCANDESCENT
KVA KILOVOLT AMPERE
KW KILOWATT
LTG LIGHTING OR LIGHT
LRA LOCKED ROTOR AMPS
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MLO MAIN LUGS ONLY
MOCP MAXIMUM OVERCURRENT PROTECTION
MSB MAIN SWITCHBOARD
MH METAL HALIDE
MTS MANUAL TRANSFER SWITCH
NAC NOTIFICATION APPLIANCE CIRCUIT
NC NORMALLY CLOSED
NO NORMALLY OPEN
NF NON-FUSED
OCC OCCUPANCY
PA PUBLIC ADDRESS
PB PULL BOX OR PUSH BUTTON
PVC POLYVINYL CHLORIDE (PLASTIC PIPE)
PWR POWER
RECPT RECEPTACLE
STP SHIELDED, TWISTED PAIR
TC TIME CLOCK
TRT TRIPLE TUBE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
UTP UNSHIELDED, TWISTED PAIR
V VOLT
W WATT
WAP WIRELESS ACCESS POINT
WH WATTHOUR
WP WEATHERPROOF, NEMA 3R UNO
XFMR TRANSFORMER
Z IMPEDANCE
PHASE
ABBREVIATIONSABBREVIATIONS
COR CONTRACTING OFFICER REPRESENTATIVE
DP&L DAYTON POWER AND LIGHT
Ø
AES APPLIED ENERGY SERVICES
GFI GROUND FAULT CIRCUIT INTERRUPTER
EES EARTH ELECTRODE SUBSYSTEM
SITE SYMBOLS
20A DUPLEX RECEPTACLE WITH COVER PLATE: X=TYPE,
Y"=NON-STANDARD MOUNTING HEIGHT, Z=SPECIAL
DESIGNATION, (18" AFF TYPICAL)
X Y Z
X Y Z
STANDARD FUSED DISCONNECT SWITCH: X=DISCONNECT SIZE,
Y=FUSE SIZE, Z=NUMBER OF POLES
UTILITY TAP BOX
PANELBOARD
WEATHER RESISTANT DUPLEX RECEPTACLE, GROUND FAULT
CIRCUIT INTERRUPTING WITH IN-USE COVER
WP
POLE MOUNTED SITE LUMINAIRE:
REFER TO LUMINAIRE SCHEDULE FOR ADDITIONAL
INFORMATION
T
NOTE: NOT ALL SYMBOLS MAY BE USED.
NICHOLAS R.
SAINATO
P24398
L
IC
EN
SE
D PROFESS IONAL ENG
INEER
IO W A
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
12/6/2023
E-001
G E
N E
R A
L I
N F
O R
M A
T
IO
N
E L
E C
T R
IC
A
L
C E
D A
R R
A P
ID
S
IO
W A
N S
A
IN
A T
O
A E
C
N A
L B
A U
G H
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
E Q
U
IP
M E
N T
P A
R K
IN
G
E X
P A
N S
IO
N
P
W
2Q R
R
_P la ns -0
G
D D
CB
CB
S
SSMH RIM 852.03
INV. 8" VCP 840.28
T
T
T
T
T
IPIN
IPIN
XCUT
IPIN
IPIN
IPIN
MAGNAIL MAGNAIL
MAGNAIL
MAGNAIL
MAGNAIL
IPIN
C
C
C
C
C
PL1 PL1 PL1
PL1
PL1 PL1 PL1 PL1
WP WP WP WP
WP WP WP WP
MEP
MEP-2 MEP-2 MEP-2 MEP-2
MEP-1 MEP-1 MEP-1
MEP-1
MEP-4MEP-4MEP-6MEP-6
MEP-3MEP-3MEP-5MEP-5
MEP-7
WP
NICHOLAS R.
SAINATO
P24398
L
IC
EN
SE
D PROFESS IONAL ENGINEER
IO W A
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
PLAN NORTH
12/6/2023
ES101
S
IT
E P
L A
N
M E
P L
O T
E
L E
C T
R
IC
A L
C E
D A
R R
A P
ID
S
IO
W A
N S
A
IN
A T
O
A E
C
N A
L B
A U
G H
CERTIFIED FINAL - DECEMBER 2023
M
IL
IT
A
R Y
E Q
U
IP
M E
N T
P A
R K
IN
G
E X
P A
N S
IO
N
P
SCALE: 1" = 30'-0"
A1
SITE PLAN - MEP LOT - ELECTRICAL
GENERAL SHEET NOTES
1. THE ELECTRICAL SITE PLAN DOES NOT SHOW ALL OF THE EXISTING
UTILITIES OR UNDERGROUND CONDITIONS. COORDINATE WITH THE UTILITY
COMPANIES, ALL TRADES, AND EXISTING CONDITIONS TO LOCATE ALL
UNDERGROUND SERVICES AND CLEARLY INDICATE LOCATIONS PRIOR TO
THE START OF EXCAVATING.
2. UNDERGROUND ROUTING SHOWN IS SCHEMATIC. COORDINATE EXACT
ROUTING WITH SITE CIVIL PLANS AND EXISTING CONDITIONS. ROUTE NEW
UNDERGROUND ELECTRIC ABOVE OR BELOW EXISTING UTILITIES AND
EQUIPM…
This is the start of the file's text. The full file is on GovTribe.