W912QR24R0021_CF_Specs_Vol2-0002.pdf
PDF 17 MB Posted
- Solicitation number
- W912QR24R0021
About this file
This document appears to be Volume 2 of the Contract Specifications for Solicitation W912QR24R0021, which is a design-build solicitation for maintenance and repair of Army Reserve facilities at Fort Snelling, MN.
The key details are: Solicitation W912QR24R0021 is for the "Design-Build Maintenance and Repair Army Reserves (MRAR) Fort Snelling B505" project, issued by the Department of the Army Corps of Engineers, Engineering District Louisville. The solicitation is seeking proposals for the design and construction of maintenance and repair work on Army Reserve facilities at Fort Snelling. The contract type is not specified. No set-aside or pricing terms are provided. The document appears to be technical specifications for the required construction and repair work, but does not contain information on submission requirements, award dates, or other solicitation details.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Maintenance/Renovation Army Reserves (MRAR) Building 505, Fort Snelling, Minneapolis, MN
P2: 510375 Design-Build
Specifications Vol. 2 of 3
18 March 2024
W912QR24R0021
Phase 1
17 June 2024
W912QR24R0021-0002
Certified Final
ARIMS: 200A Disposition: Maintain for 15yrs after construction.
W912QR24R0021_CF_Specs_Vol2-0002
P2# 510375 - Repair Bldg. 505, USAR Center Ft Snelling, Minneapolis, MN
February 2020 version Table of Contents ToC - 1 of 3
CERTIFIED FINAL DESIGN SUBMITTAL
DESIGN/BUILD RFP FOR
Repair Bldg. 505, USAR Center
Fort Snelling, Minneapolis, MN
Table of Contents
SPECIFICATION VOLUME 1 of 3
Division 00 – Procurement and Contracting Requirements
00 10 00 Solicitation – [Offer and Award DF 1442], Price Breakout Schedule 00 21 00 Instructions 00 22 00 Supplementary Instructions
0011x Procedures for Submittal and Evaluation of Offers for Phase One
0011x Procedures for Submittal and Evaluation of Offers for Phase Two
0045 00 Representations and Certifications 00 70 00 Conditions of the Contract 00 73 00 Supplementary Conditions 00 80 00.00 06 Special Provisions Construction Project Signage Submittal Register
Division 01 – General Requirements Specifications
01 02 00.00 48 Statement of Work Table of Contents Part 1 Design Objectives, Functional and Area Requirements Part 2 Design Criteria and Coordination with Local Authorities Part 3 Site Civil Design Part 4 Site Electrical Design Part 5 Landscape Architecture Design Part 6 Architectural and Interior Design Part 7 Structural Design Part 8 Thermal Design Part 9 Plumbing Design Part 10 Electrical Design Part 11 HVAC Design Part 12 Energy Conservation and Sustainable Design Part 13 Fire Protection Design
Part 14 Commissioning and Building Envelope Sealing Performance Requirements
Part 15 Telecommunications Design
February 2020 version Table of Contents ToC - 2 of 3
CERTIFIED FINAL DESIGN SUBMITTAL
Attachment A Preliminary Subsurface Characterization Report Attachment B1 Fire Flow Data (Sloan Boulevard) Attachment B2 Fire Flow Data (Minnehaha Ave) Attachment C Site Photographs
Attachment D Room-by-Room Supplemental Requirements
Attachment E Airport Layout Plan
Attachment F1 Alta Survey Drawings 2005
Attachment F2 City of Minneapolis Utility Maps 2004
Attachment G Existing Building 505 Drawings
Attachment H 2020 Roof As-Built Drawings and Specifications
SPECIFICATION VOLUME 2 of 3
01 02 00.00 48 Attachments to the Statement of Work (continued)
Attachment I Review of Building Enclosure Fort Snelling Building
Attachment J Existing Building 506 Floor Plans
Attachment K1 Hazardous Building Materials and Radon Survey Report
Attachment K2 Asbestos and Lead Paint Inspection Summary
Attachment K3 Additional Radon Test Results Room113B
Attachment L 88th Readiness Division Interior Signage
Attachment M Federal Aviation Administration (FAA) 7460 Report
Attachment N Arms Vault Weapons Rack List (Redacted)
Attachment O UFGS Specification Section 02 41 00 ‘Demolition and
Deconstruction’ (to be edited by the DOR)
February 2020 version Table of Contents ToC - 3 of 3
CERTIFIED FINAL DESIGN SUBMITTAL
Attachment P UFGS Specification Section 02 82 00 ‘Asbestos
Remediation’ (to be edited by the DOR)
Attachment Q UFGS Specification Section 02 83 13.00 06 ‘Lead in
Attachment R UFGS Specification Section 09 67 23.13 ‘Standard Resinous
Flooring’
Attachment S Army Reserve Enterprise Building Control System (EBCS) Design Guide (October 2021)
Attachment T Existing Building 505-506 Connector Link Floor Plans
01 03 00.00 48 Design Submission Requirements After Award 01 04 00.00 48 The Design/Build Process 01 32 01.00 06 Project Schedule 01 33 00 Submittal Procedures 01 33 29.00 06 Sustainability Reporting
Attachment A - LEED Credit Guidance 01 35 26.00 06 Government Safety Requirements
01 42 00 Sources for Reference Publications 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) 01 45 04.10 06 Contractor Quality Control 01 45 35 Special Inspections 01 46 00.00 06 Total Building Commissioning (Contractor CxA) 01 50 00 Temporary Construction Facilities and Controls 01 57 19.00 Temporary Environmental Controls
01 74 19 Construction Waste Management and Disposal 01 78 23 Operation and Maintenance Data
SPECIFICATION VOLUME 3 of 3
Divisions 03-41 D/B RFP Outline Technical Specifications
See separate Table of Contents with Outline Technical Specifications.
P2 #510375 – Repair Bldg. 505, USAR Center Fort Snelling, Minneapolis, MN
Attachment ‘I’ 01 02 00.00 48
Section 01 02 00.00 48
ATTACHMENT I
REVIEW OF BUILDING ENCLOSURE – FT SNELLING, BUILDING 505
FEBRUARY 6TH, 2024
REVIEW OF BUILDING ENCLOSURE
FORT SNELLING, BUILDING 505
88 DIVISION ROAD, MINNEAPOLIS, MN 55111
23-13945-07
Prepared For:
Tim Grundtner
RSP Architects
1220 Marshall St NE
Minneapolis, MN 55413 tim.grundtner@rsparch.com
St. Paul, Minnesota
• BUILDING ENVELOPE CONSULTING • SPECIFICATIONS • DESIGN • QUALITY ASSURANCE OBSERVATION • TESTING •
Prepared By:
Mary Owen
Project Designer
RSI Building Envelope
2400 Prior Avenue North
St. Paul, MN 55113
Phone: 651-639-0644 www.rsi-be.com http://www.rsi-be.com/
Client: Tim Grundtner Project: Fort Snelling, Building 505
RSP Architects 88 Division Road, Minneapolis, MN 55111
Date: February 6th, 2024 RSI Project #: 23-13945-07 Page 2
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
I. INTRODUCTION:
On November 30th, 2023, we were present at the above referenced facility to perform a review of the existing building enclosure:
In general, our scope of work was as follows:
A. Perform a visual review of the in-place exterior wall assembly;
B. Obtain photographs to substantiate our findings;
C. Based on the information obtained, develop a report as to the condition of the exterior wall assembly with conclusions and recommendations for repair and/or replacement.
Our work was requested and authorized by Tim Grundtner of RSP Architects, and authorized on site by Dan Nickols of Fort Snelling’s Facility Operations.
II. BACKGROUND INFORMATION:
Building 505 was constructed in 1977 (with as-built drawings dated 1983) at the North-East corner of the Minneapolis-St. Paul International Airport on what is now part of the Minneapolis-
St. Paul Joint Air Reserve Station of Fort Snelling. A small entry addition was added (date unknown) to the building after the initial construction. An enclosed connecting walkway was added at the time of construction for the adjacent building (506) for secure access between the two buildings.
The existing exterior wall assembly consists of exterior brick veneer, 1.5” expanded polystyrene insulation, and a CMU backup wall. There is flashing material present at the head and sill of each window (assumption based on test openings at 2 window conditions), but the wall assembly does not include a vapor barrier or coating of any kind.
Photograph A: Destructive test opening at sill condition at first floor window.
Photograph B: Destructive test opening at head condition at first floor window.
Date: February 6th, 2024 RSI Project #: 23-13945-07 Page 3
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
III. FIELD OBSERVATIONS:
The following is a photographic summary of our field observations documenting the defects observed.
Specific defect locations are indicated on the attached elevations.
Bricks cracked and broken off at South-East building corner, possibly due to lawn maintenance equipment running into the building corner.
(Refer to Photograph #1)
Photograph #1
Evidence that a sign of some kind was previously hung at this location. Metal anchors were left in the mortar joint, which are rusting and causing discoloration of the brick.
(Refer to Photograph #2)
Photograph #2
Date: February 6th, 2024 RSI Project #: 23-13945-07 Page 4
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
Efflorescence was found at most sill conditions throughout the building.
(Refer to Photographs #3 & #4)
Deformation of the steel lintel at window head conditions were common throughout the building.
(Refer to Photograph #3)
Photograph #3
Deterioration of the brick sill at the edges of the bricks and at mortar joints.
(Refer to Photograph #4)
Photograph #4
All vertical control joints throughout the building are cracking, delaminating, or have voids in the sealant.
(Refer to Photograph #5)
Photograph #5
Date: February 6th, 2024 RSI Project #: 23-13945-07 Page 5
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
Voids were identified in the mortar joints at many sill locations.
(Refer to Photograph #6)
Photograph #6
Mortar joint is delaminating at head condition.
(Refer to Photograph #7)
Photograph #7
Steel lintels are rusting and deflecting at most window head locations.
(Refer to Photograph #8)
Photograph #8
Date: February 6th, 2024 RSI Project #: 23-13945-07 Page 6
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
Evidence that a sign of some kind was previously hung at this location. Metal anchors were left in the mortar joint, which are rusting and causing discoloration of the brick.
(Refer to Photograph #9)
Photograph #9
Discoloration was seen in the mortar joints at and under many sill locations throughout the building.
(Refer to Photographs #10 & #11)
Photograph #10
Efflorescence was found at most sill conditions throughout the building. The new window sealant joint has begun to delaminate from the older brick sealant joint at the corner of the sill.
(Refer to Photograph #11)
Photograph #11
Date: February 6th, 2024 RSI Project #: 23-13945-07 Page 7
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
Evidence of a masonry anchor of some kind was found under the coping cap at the entry addition, which damaged the brick either during its removal, addition, or created a hole for moisture infiltration and caused the area to spall.
(Refer to Photograph #12)
Photograph #12
Significant deflection of the brick sill was found at this particular West-facing upper floor window, deflecting both up towards the window assembly, and out proud of the exterior by approximately an inch. Sill bricks have cracked horizontally, and there is extensive deterioration of the mortar joints under the sill.
(Refer to Photograph #13)
Photograph #13
Interior photograph of the deflected sill seen above, showing cracking and delamination of the mortar joints at the sill. (Same window condition as shown in Photograph #13)
(Refer to Photograph #14)
Photograph #14
Date: February 6th, 2024 RSI Project #: 23-13945-07 Page 8
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
Bricks cracked and broken off at building corner of the entry addition, possibly due to lawn maintenance equipment or plows running into the building corner.
(Refer to Photograph #15)
Photograph #15
The sheet metal coping cap from the roof assembly has detached from its keeper strip.
(Refer to Photograph #16)
Photograph #16
Discoloration of the brick and mortar was found under most spigot housings throughout the building.
Discoloration of the brick was found behind most splash blocks around the building.
(Refer to Photograph #17)
Photograph #17
Date: February 6th, 2024 RSI Project #: 23-13945-07 Page 9
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
Interior photograph of water damage at the painted
CMU. Paint bubbling and water infiltration at the window opening stopped after window replacement work was completed.
(Refer to Photograph #18)
Photograph #18
Destructive test opening at head condition at first floor window location. Rust was found on the steel plate lintel under the flashing, showing signs that water has been getting under the flashing and causing damage to the steel lintel.
(Refer to Photograph #19)
Photograph #19
Destructive test opening at head condition at first floor window location. Turned hollow core brick has been lodged into the CMU backup wall with excessive amounts of mortar. This appears to have been the solution for continuation of the back up wall next to the wide flange steel structural lintel in lieu of cutting a CMU block in half or using a half block.
(Refer to Photograph #20)
Photograph #20
Date: February 6th, 2024 RSI Project #: 23-13945-07 Page 10
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
IV. CONCLUSIONS & RECOMMENDATIONS:
HEAD CONDITIONS:
Significant damage was found on and around the steel lintels at all window locations throughout the building. After a series of test openings, it was determined that the window heads are not properly flashed to accommodate the moisture infiltrating the wall assembly. Though no water appears to be entering the building any more after replacing the window assemblies throughout the building (verified by water testing done on 12/07/23), water is still entering the wall assembly.
Because the steel lintel bottom plate is exposed and ends flush with the brick, water is able to either get back into the wall assembly under the head flashing, or it is lead to the underside of the steel lintel bottom plate through capillary action. Under the head condition in the window opening, without direct sunlight, the assembly isn’t able to dry properly and the water sits for long periods of time on the steel lintel plate. During freeze/thaw cycles, water expands within the assembly and causes the steel lintel plate to deflect away from the brick, delaminating it from the mortar joint. This would also cause small cracks to form in the exterior coating, allowing the moisture to penetrate directly to the steel, causing the steel to rust over time. We recommend removing and replacing a minimum of 4 courses of brick above each head, repairing and applying a corrosion resistant coating to the steel lintel bottom plates as necessary, and installing through-wall flashing (with termination bar, stainless steel drip edge, end dams of 2” minimum, weep vents, and a thermal break) at the head of every exterior wall opening.
SILL CONDITIONS:
Deterioration and evidence of water infiltration is found at every window sill location with varying severity. The sills consist of horizontal bricks with mortar joints, and have sealant joints at either side of the window opening that are failing, delaminating and cracking. After a series of test openings, it was determined that the window sills are not properly flashed to accommodate the moisture infiltrating the wall assembly. Though no water appears to be entering the building any more after replacing the window assemblies throughout the building (verified by water testing done on 12/07/23) and replacement of the roof in 2021, water is still entering the wall assembly.
Water enters the system through the mortar joints in the sill, and either sits on top of the brick directly under them, or makes its way backwards into the cavity wall assembly. Because of the small overhang of the sill, the mortar joint directly beneath it doesn’t get direct sunlight and doesn’t dry properly. Efflorescence in the masonry is an indication of this; it is a buildup of salts from water infiltration and gradual evaporation. We recommend removing the brick-and-mortar sill, installing through-wall flashing (with termination bar, stainless steel drip edge, end dams of
2” minimum, and a thermal break) at the sill, and replacing with a cast-stone sill (with a sloped top and a drip edge) at every window and louver location throughout the entire building. We also recommend cleaning the efflorescence and discoloration off of the brick, and repointing all discolored or deteriorated mortar throughout the entire building.
JAMB CONDITIONS:
The brick return at the jambs causes a thermal bridge in the wall assembly and can lead to excess moisture in the wall system in the form of condensation. We recommend removing the brick at each jamb, adding a thermal break between the brick veneer and the CMU back-up wall, installing a flashing membrane at the jamb, and reinstalling the face brick as necessary at all jamb locations throughout the entire building.
Date: February 6th, 2024 RSI Project #: 23-13945-07 Page 11
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
EXISTING WALL ANCHORS:
At the locations where metal anchors are rusting and causing discoloration of the brick, we recommend removing the masonry anchors, cleaning the brick, and repointing the mortar joints as necessary. Where anchors appear to have damaged the brick, we recommend replacing bricks and repointing impacted mortar joints as necessary.
EXISTING MASONRY JOINTS:
All masonry sealant joints throughout the entire building are failing. This includes expansion joints, control joints, and joints around the existing brick sills (excluding the black sealant around the new window assemblies). We recommend replacing all sealant joints throughout the entire building.
EXISTING ROOF CAP:
At the location where the coping cap has detached from its keeper strip, we recommend reattachment as soon as possible to prevent water infiltration into the roof and wall assemblies.
WATER TESTING:
The water test (referenced above) consisted of a series of 3 two-hour tests conducted at a window opening. The interior wall is tested with a pin-point moisture meter to determine a baseline moisture level for the wall (average measurement of 6.6 baseline). Water is then directed at the exterior wall by an apparatus that simulates wind driven rain. After 2 hours, the interior wall is visually inspected for signs of water infiltration and tested again with the pin-point moisture meter to determine if the moisture level of the wall has increased from the baseline measurement.
This test was performed 3 times; below the window sill, on and around the window opening, and above the window head; each location was tested for 2 hours, for a total of 6 hours of water testing. No substantial increase of moisture or water infiltration was found on the interior wall
(average measurement of 7.7 after water testing).
The existing interior face of the CMU back-up wall shows signs of past water infiltration
(bubbling paint). Since the wall doesn’t have a high moisture level, we believe the paint bubbling was caused by past water intrusion via the original windows (recently replaced) and/or the old parapet cap condition (recently replaced). The recommended repairs should reduce the risk of further moisture issues in the CMU back-up wall.
Redacted
Date: February 6th, 2024 RSI Project #: 23-13945-07 Page 12
All information is submitted as the confidential property of our clients. Any copies or extractions are reserved pending our written approval.
Respectfully, RSI BUILDING ENVELOPE
Mary Owen
Project Designer
Redacted
Attachment ‘J’
ATTACHMENT J
EXISTING BUILDING 506 FLOOR PLANS
C
LA
S S R
O O
M
T .A . S
TO
R
A G E
C
LA
S S R
O O
M
C O
R R
ID
O R
LIB
R
A R
Y /C
LA
S S R
O O
M
C
LA
S S R
O O
M
C
LA
S S R
O O
M
1104A
V E S T
JA
N
M E N S
W O
M E N S
R O
O M
M E C
H A N
IC
A L
205TH ADVISOR
TECH
56TH
BN TECH
206TH
BN TECH
205TH
CDR
205TH
XO
205TH
S-3, 4
205TH
COMMONS
56TH MGT CH
CO CDR
56TH
CORRIDOR
CHIEF
56TH
CHIEF
56TH
REPRO
SIDPSE
882ND
205TH S-1
205TH RR
DRAFTING
CO CDR
13TH
13TH CDR
COMMONS
13TH S-1, 3, 4
XO/CSM
13TH
S-2
13TH
TECH
13TH
TECH
19TH
CDR
19TH
XO
19TH
MMC TANKS
56TH PETRO
19TH TM
CORRIDOR
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
F T
C F T
C F T
C F T
C F T
CFT
CFT
CFT
T
C
CFT
CFT
CFT
CFT
CFT
2-1-22
VAV
2-1-21
VAV
2-1-20
VAV
2-1-23
VAV
2-1-24
VAV
2-1-25
VAV
2-1-26
VAV
2-1-27
VAV
2-1-16
VAV
2-1-19
VAV
2-1-18
VAV
2-1-17
VAV
2-1-15
VAV
2-1-14
VAV
2-1-8
VAV
2-1-13
VAV
2-1-12
VAV
2-1-11
VAV
2-1-10
VAV
2-1-9
VAV
2-1-7
VAV
2-1-6
VAV
2-1-3
VAV
2-1-4
VAV
2-1-5
VAV
TYP OF (4)
C U
H5
TYP OF (2)
TYP OF (4)
TYP OF (8)
0 8' 32'16'
NORTH
PLAN
88TH ADVISOR
88TH IO
88TH ADVISOR
ADVISOR
88TH
LOBBY
385TH ADVISOR
RETENTION
VEST
CORRIDOR
PHOTO LAB
CHIEFS
205TH
88TH ADVISOR
56TH MMC
WOMENS
MENS
CORRIDOR
88TH ADVISOR
CE
385TH
TECH
385TH
882 CDR
PERS TECH
882ND
TECH
BD
205TH
TECH
205TH
TC SUP
205TH
BSO
205TH
TECH
205TH
TM
19TH
COMMONS
CDR38
5T
H
TE
CH38
5T H
CE36
7T
H
TE
CH36
7T H
XO38
5T
H
S-
5T H
CSM38
5T
H
PERS88
2N
D
83ENG
S-
7T
H
S-
7T H
85COMMONS
89ROOM
DRAFT
IN
G
TM13
TH
ENG33
6 11
PERS88
2N
D
94AC
COM
5T H
95CO
CDR
5T H
96RR/
EEO
5T H
CHAP38
5T
H
TE
CH38
5T
H 11
99CO
CDR
7T H
S-
7T H
CSM36
7T
H 12
CDR36
7T
H 12
XO36
7T
H
04CHAP36
7T
H 12
TE
CH36
7T H
TE
CH36
7T H
06ENGR41
6T H
07SURG36
7T H
93COMMONS
C O
R R
ID
O R
S T O
R A
G E
T E L E
C O
M
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T T T T T
TT
T
T
T
T T
T T
T T
T
T
T
T
T
T
T
CFT CFT
CFT CFT CFT CFT CFT CFT CFT CFT CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
1-1-23
VAV
1-1-22
VAV
1-1-24
VAV
1-1-25
VAV
1-1-26
VAV
1-1-27
VAV
1-1-28
VAV
1-1-29
VAV
1-1-31
VAV
1-1-30
VAV
1-1-21
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1- 1-
VAV
1-1-16
VAV
1-1-15
VAV
1-1-17
VAV
1-1-18
VAV
1-1-19
VAV 1-1-20
VAV
1-1-14
VAV
1-1-12
VAV
1-1-10
VAV
1-1-13
VAV
1-1-11
VAV
1-1-9
VAV
TYP OF (9)
5 3 5
6 6
TYP OF (2)
CFT
CFT
6 3
TYP OF (11)
TYP OF (5)
SURG36
7T
H
V E S T
O F F
IC
E
O F F
IC
E
L O
B B
Y
W O
M E
N S
M E
N S
C O
R R
ID
O R
S T O
R A
G E
T E L E
C O
M
A R
C H
IV
E R
O O
M
O F F
IC
E
C O
N F E
R E
N C
E
O F F
IC
E
O F F
IC
E
O P E
N O
F F
IC
E
O F F
IC
E
V E S T
S T A
IR
O F F
IC
E
O F F
IC
E
O F F
IC
E
O F F
IC
E
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
-1 -1
V A V
-1 -1
V A V
-1 -1
V A V
-1 -1
V A V
-1 -1
V A V
-1 -1
V A V
-1 -1
V A V
-1 -1
V A V
-1 -1
V A V
-1 -1
V A V
-1 -9V A V
-1 -8V A V
-1 -7V A V
-1 -6V A V
-1 -4V A V
-1 -3V A V
-1 -2V A V
-1 -1
V A V
-1 -5V A V
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
CFT
CFT
CFT
CFT
CFT
CFT
CFT
TYP OF (4)
TYP OF (4)
TYP OF (2)
TYP OF (3)
C U
H
B124
ROOM
ELEC
B130
UNIT STORAGE
B129
CORRIDOR
B128
ARMS VAULT
B131
CORRIDOR
B127
& COMM
205TH RADIO
B132
REPRO ROOM
B133
672ND ADMIN
B134
MAT LAB
B
C O
R R
ID
O R
B1
36ROOM
MECHANI
CAL
B1
37COMM
SEC
B
C O
R R
ID
O R
B1
39STORAGE
B1
40STORAGE
UNI
T
B1
41CORRI
DOR
B1
UNI
T
STORAGE
B1
43ROOM
MECHANI
CAL
T E L E
C O
N
T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
CFT CFT CFT CFT CFT
1-0-3
VAV
1-0-4
VAV 1-0-7
VAV
2 2 2 2 2
1 1
UH
UH
SMAC
UH
SMAC
1- 0-
8VAV
1- 0-
7VAV
VAV
VAV
ACCU-
R A
D
3 3
5 5
VAV
M-401
A1
B
B O
IL
E R
B
E L E
C T R
IC
A L
B
W O
M E
N
B
M E
N
B
T E L E
C O
N
B
M E
C H
A N
IC
A L
B
C O
N F E
R E
N C
E
B
S T O
R A
G E
B
F
IN
IS
H E
D S
P A
C E
B
U N F
IN
IS
H E
D S
P A
C E
S
T
S
T
S
T
T
T
T
S
T
T
T
T
T
T
T
T
T
SEMENT HVAC PLAN NEW WORK - C
C F T
C F T
C F T
C F T
C F T
CFT
CFT
CFT
CUH
CUH
C U
H
V A V -0 -7
V A V -0 -4
V A V -0 -2
V A V -0 -5
V A V -0 -3
V A V -0 -6
V A V -0 -1
V A V -0 -9
V A V -0 -1
2V A V -0 -1
V A V -0 -8
V A V -0 -1
TYP OF (5)
ACCU-
M-401
A9
B
C H
A
IR
S
TO
R
A G E
B
B A N
D S
TO
R
A G E
B
A S S E
M B
LY
H
A
LL
B
451S
T LIB
B
451S T C
D R
B
M E N S
TO
ILE
T
B
JA
N
ITO
R
B
TO
ILE
T
W O
M E N
SB
LO
B B Y
B
S
TO
R A G E
K
IT
C H E N
B
K
IT
C H E N
B
S C
U
LLE
R Y
B
C O
R R
ID
O R
B114
BAND STORAGE
B115
UNIT STORAGE
B116
CORRIDOR
B117
UNIT STORAGE
B118
ROOM
MECH
B119
SCIF
B120
CORRIDOR
B
C O
R R
ID
O R
B123
SEC
COMM
ROOM
ELEC
B125
ACCT
205TH PROP
B126
& COMM
205TH RADIO
T
T
T
T
T
T
T
T
T
T T
T
T
T
T
T
A C C
U -2
A C C
U -3
2-0-1
VAV
C F
TVAV
2-0-2 C F T
CUH
CUH
ACCU(S)
CFT
1-0-2
VAV
CFT
AHU
AHU
CFT1
JACE
E F
E F
CUH
C F T
C F T
CFT
1-0-1
VAV
C F T
C F T
0 8' 32'16'
NORTH
PLAN
BASEMENT FLOOR PLAN
FIRST FLOOR PLAN
SCALE: 3/32" = 1'-0"
SCALE: 3/32" = 1'-0"
MAIN SERVER ROOM B140-A
ROUTE COPPER AND FIBER TO THIS
SPACE FROM BUILDING 505 TR.
HEAD END
EQUIPMENT FOR
ACCESS CONTROL IN
ROOM 1148
Bldg. 506 Floor Plans
0 8' 32'16'
NORTH
PLAN
PM
205TH
S-1
205TH
RR/EEO
205TH
TECH
306TH
TECH
DCRM
88TH
STAFF
DCSPA
88TH
DCSPA
88TH
CDR
306TH
S-2
360TH
CO CDR
360TH
DCSPA
88TH
DCSPA
88TH
RR/EEO
88TH
COMMONS
COMMONS
SEC
MED
OFC
XO/CSM
360TH
DCSRM
88TH
DCSRM CH
88TH
MMC
56TH
ROOM
DRAFT
ROOM
REPRO
SURG
88TH
WOMENS
MENS
ADVISOR
205TH
MMC
56TH
JAG
117TH
S-2, 4
302ND
S-1
302ND
TECH
302ND
XO/CSM
302ND
CDR
302ND
SJA
88TH
ADVISOR
88TH
COMMONS
IG
88TH
CHAP
88TH
81DCSP
A88
TH
82DCSOI88
TH 21
83DCSOI88
TH
TE
CH88
TH 21
85HQ
CO88
TH
ACHI
EF
S
DCSOI88
TH
80TM
CHI
EF
S
0T H
88COMMONS
87ADVI
SOR
TH
B
DCSOI
C
HI
EF
S
TH
89CENTE
RMSG
90DSLOG88
TH
MMC56
TH
CONFE
RENCE
07COMMON
97DSLOG88
TH
98DSLOG88
TH
ATE
CHDSLOG88
TH
TE
CHDSLOG88
TH 22
RA36
4T
H 22
SEC88
TH 22
TE
CH88
TH
CS88
TH 22
CSM88
TH
CDR88
TH
06DEP
C
DR
TH
C O
R R
ID
O R
C O
R R
ID
O R
O F F
IC
E
O F F
IC
E
S T O
R A
G E
T E L
W C
P R
IV
A T E
T T T T T T T T T
T T
T T T T
T
T
T
T T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
B
T
S
S
S
S
T T
T
T
T T
T
T
T
S
S T
T
T
T
T
T
S T
1-2-56
VAV
1-2-57
VAV
1-2-58
VAV
1-2-60
VAV
1-2-61
VAV
1-2-59
VAV
1-2-62
VAV
1-2-55
VAV
1-2-64
VAV
1-2-63
VAV
1-2-67
VAV
1-2-68
VAV
1-2-65
VAV
1-2-66
VAV
1-2-70
VAV
1-2-69
VAV
1-2-72
VAV
1-2-73
VAV
1-2-74
VAV
1-2-75
VAV
1-2-76
VAV
1-2-77
VAV
1-2-78
VAV
1-2-79
VAV
1-2-80
VAV
1-2-71
VAV
1-2-81
VAV
1-2-82
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
VAV
1- 2-
6VAV
1- 2-
VAV
1- 2-
VAV 1-
2-
0VAV
1- 2-
1VAV
1- 2-
2VAV
1- 2-
3VAV
1- 2-
4VAV
1- 2-
5VAV
CFT CFT CFT CFT CFT CFT CFT CFT CFT
CFT CFT CFT CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
TYP OF (4)
TYP OF (9)
TYP OF (6)
TYP OF (8)
3 3
UH
3 3 3 3
3 3
UH
2 3
33333333
6 6
5 5
5 5 5
5 5
6 6
5 5 5
UH
UH
UH
5 5
C F T
C F T
C F T
C F T
C F T
1- 2-
VAV
CHI
EF
S
DCSOI88
TH
O F F
IC
E
O F F
IC
E
O F F
IC
E
O F F
IC
E
O F F
IC
E
C O
R R
ID
O R
W O
M E
N S
M E
N S
S T O
R A
G E
3T E L
C L A S S
R O
O M
C R T O
P E
N O
F F
IC
E
5W C
P R
IV
A T E
O F F
IC
E
O P E
N O
F F
IC
E
O F F
IC
E
O F F
IC
E
O F F
IC
E
S T O
R A
G E
O F F
IC
E2
S T A
IR
S
O F F
IC
E
O F F
IC
E
O F F
IC
E
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
-2 -1
V A V
-2 -1
V A V
-2 -1
V A V
-2 -1
V A V
-2 -1
V A V
-2 -1
V A V
-2 -1
V
-2 -1
V A V
-2 -3V A V
-2 -4V A V
-2 -5V A V
-2 -2V A V
-2 -1
V A V
-2 -6V A V
-2 -8V A V
-2 -7V A V
-2 -9V A V
-2 -1
V A V
-2 -1
V
T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
C F T
CFT
CFT
CFT
CFT
CFT
CFT
CFT
S M
A C
A C
C U
S M
A C
TYP OF (2)
TYP OF (2)
TYP OF (3)
TYP OF (4)
TYP OF (4)
5 5
C
LA
S S R
O O
M
C
LA
S S R
O O
M
C E N T E R
LE
A R
N
IN
G
C O
R R
ID
O R
C
LA
S S R
O O
M
TA
S
TO
R
A G E
M E N S
W O
M E N S
S
TO
R A G E
BD TECH
205TH
CHAP
205TH
ARM
302ND
TECH
302ND
TECH
205TH
CO CDR
205TH
MP
205TH
PM
205TH
S-1
205TH
RR/EEO
205TH
TEL ROOM
MMC
56TH
CHIEFS
302ND
COMMONS
DP CDR
205TH
CSM
205TH
TECH
205TH
C O
R R
ID
O R
C O
R R
ID
O R
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
SECOND FLOOR HVAC PLAN NEW WORK - A
2-2-36
VAV
2-2-35
VAV
2-2-34
VAV
2-2-33
VAV
2-2-32
VAV
2-2-38
VAV
2-2-37
VAV
2-2-41
VAV
2-2-40
VAV
2-2-42
VAV
2-2-39
VAV
2-2-53
VAV
2-2-45
VAV
2-2-43
VAV
2-2-44
VAV
2-2-46
VAV
2-2-47
VAV
2-2-48
VAV
2-2-49
VAV
2-2-50
VAV
2-2-51
VAV
2-2-52
VAV
2-2-29
VAV
2-2-28
VAV
2-2-30
VAV
2-2-31
VAV
C F T
C F T
C F
TC
F T
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
CFT
TYP OF (2)
TYP OF (2)
TYP OF (5)
TYP OF (7)
6 6
C F T
CFT
SECOND FLOOR PLAN
SCALE: 3/32" = 1'-0"
1TYP OF (2)
Attachment ‘K1’
ATTACHMENT K1
HAZARDOUS BUILDING MATERIALS AND RADON SURVEYS REPORT
March 6, 2024
Final Hazardous Building Materials and Radon Surveys Report
Fort Snelling Army Reserve Center, Building 505
506 Roeder Circle
Fort Snelling, Minnesota
FACID/Site Code: MN036
Prepared for:
RSP Architects 1220 Marshall Street NE and:
US Army Reserve
88th Readiness Division
506 Roeder Circle
Fort Snelling, MN 55111
Pinyon Project No.:
121143001.002
March 6, 2024
Fort Snelling Army Reserve Center, Building 505
506 Roeder Circle
Fort Snelling, Minnesota
FACID/Site Code: MN036
Prepared for:
RSP Architects
1220 Marshall Street NE and
US Army Reserve
88th Readiness Division
506 Roeder Circle
Fort Snelling, MN 55111
Pinyon Project No.:
121143001.002
Prepared by:
Darin Worden, Senior Hydrologist
Reviewed by:
Russ Cirillo, PE, Federal Market Manager
Final Hazardous Building Materials and Radon Survey Report
Fort Snelling Building 505 Renovation, US Army Reserve Center 506 Roeder Circle, Ft. Snelling, Minnesota 55111 Page i
Table of Contents
Executive Summary
1. Radon Survey
1.1 Testing Procedures
1.2 Testing Results
1.3 Conclusions
2. Hazardous Building Materials Survey
Tables
Table 1-1 Radon Sample Test Results
Table 2-1 Summary of Potential Hazardous Building Materials/Components
Figures
Figure 1 Site Location Map Figure 2 Radon Sample Locations 1st Floor
Figure 3 Radon Sample Locations 2nd Floor
Appendices
Appendix A. Radon Sample Laboratory Report
Fort Snelling Building 505 Reovation, US Army Reserve Center 505 Roeder Circle, Fort Snelling, Minnesota 55111 Page 1
Executive Summary
Pinyon Environmental, Inc., (Pinyon) presents the following report detailing the Hazardous Building
Material (HBM) and Radon Surveys conducted as part of the planning and design for the update/renovation of Building 505, US Army Reserve Center, located at 506 Roeder Circle, Fort Snelling, Minnesota 55111
(Figure 1, the Site). The mechanical room in Building 509 was also included in the HBM survey as this is the location where utility connections will be made for a new wash rack that is also part of the Building
505 renovation project.
The HBM and radon surveys were conducted the week of October 30, 2023. The HBM survey was conducted by Ms. Rachel Hernandez of Pinyon and Mr. Brett Brumbaugh of Castle Hill Associates on
October 30 and 31, 2023; and the radon survey was conducted by Mr. Brad Nyberg, Great River Radon
(GRR), under Minnesota License #MN00054 on October 30 through November 2, 2023. Castle Hill
Associates (asbestos and LBP) and GRR (radon) were subcontracted by Pinyon due to the specialized certification and licensing requirements for the surveys.
The two surveys indicated:
• Radon. Forty-six (46) radon samples were collected throughout Building 505 (Figures 2 and 3).
Analytical results indicated that one sample, collected from Room 113C (Figure 2), contained radon activity levels in excess of the Environmental Protection Agency (EPA) screening level of 4.0 picocuries per liter (pCi/L). The measured radon level in Room 113C was measured at 4.3 pCi/L. The radon survey is further detailed below in Section 1. Due to the Room 113C test results, Mr. Nyberg recommends re-testing Room 113C and all adjacent rooms that share a wall. The re-testing would be performed using Continuous Radon Monitors (CRM) to establish the most appropriate path forward to protect occupants. The 4 rooms that are recommended for re-testing using CRMs are 113C, 113, 113B, and 111 (Figure 2).
• Hazardous Building Materials (HBMs). Several building components associated with future construction or demolition were identified that have the potential to meet the definition of “hazardous waste” or regulated waste material if removed. This includes fluorescent bulbs, light ballasts, mercury switches, exit signs, emergency lights, smoke detectors, and fire extinguishers. A detailed list of the potential HBMs identified in Building 505 and the mechanical room of Building 509 is presented in
Section 2.
505 Roeder Circle, Fort Snelling, Minnesota 55111 Page 2
1. Radon Survey
Great River Radon (GRR) completed the Building 505 radon survey by collecting 46 samples at the locations identified on Figures 2 (1st Floor) and Figure 3 (2nd Floor). The purpose of the sampling was to evaluate indoor air radon levels of frequently occupied rooms, which include, but are not limited to, offices, work rooms, and common rooms. The building has two floors with no accessible areas below ground level. The sampling was conducted by GRR’s Minnesota licensed radon measurement and mitigation professional, Mr. Brad Nyberg (#MN00054).
1.1 Testing Procedures
The radon testing was initiated on October 30, 2023, by placing radon test kits (activated charcoal) at select locations throughout the building. The test kits were retrieved on November 2, 2023. The sampling was performed in accordance with the American National Standards Institute (ANSI) and American
Association of Radon Scientists and Technologists (AARST) procedures for radon testing. The sample locations were selected because facility personnel are likely to be present in these areas. The approved test kits were produced by Air Chek, Inc. of Mills River, North Carolina, and are approved by AARST.
The tests were conducted under ANSI/AARST protocol which requires:
• A test length of at least 48 hours.
• Tests to be located in breathing zones (between 20 inches and 96 inches from the floor).
• Ingress and egress activities be minimized.
• Indoor air temperatures above 65°F before and during sampling.
An overview of the radon sampling at the Property includes:
• On October 30, 2023, GRR placed 46 test kits throughout the building. The test kits were placed near the entrances in rooms identified on Figure 2 (1st floor) and Figure 3 (2nd floor). The sampling included 4 duplicate samples, and 5 blank samples and 37 primary samples.
• The test kits were left in place for over 48 hours, with retrieval of the kits on November 2, 2023.
• The HVAC system was operational when the test kits were placed, and when the test kits were retrieved.
• Upon collection of each sample, the test kits were sealed, and the date/time was documented. After the test kits were collected, sealed, and labeled, they were shipped to Air Chek, Inc. for analysis.
• The test kits were analyzed by Air Chek using a scintillation detector to count the gamma decay absorbed by the charcoal. The radon concentration for each sample was calculated using instrument calibration information.
505 Roeder Circle, Fort Snelling, Minnesota 55111 Page 3
• No test kits appeared to have been tampered with or moved in the time-period between deployment and retrieval.
Sample blanks were stored with the other testing devices. Upon deployment, the blanks were opened and then sealed immediately. The blanks were placed in Rooms 101, 116, 115, 127, and 209 (Figure 2 and
Figure 3). The blank sample cartridges were retrieved at the same time as all other testing devices and followed the same shipping to the laboratory. All blank sample results are expected to be under 0.3 picocuries per liter pCi/L.
1.2 Testing Results
The indoor radon sample laboratory report is presented in Appendix A. Radon levels in the samples collected at the Property ranged from <0.3 picocuries per liter (pCi/L) to 4.3 pCi/L. Blank sample results were less than 0.3 pCi/L. An overall summary of sample results is presented below in Table 1-1.
1.3 Conclusions
Based on laboratory analysis results of collected radon samples, one sample (Room 113C) exceeded EPA’s action level of 4.0 pCi/L (Figure 2).
To further evaluate this exceedance, it is recommended that Room 113C be retested and that all adjacent offices that share a wall also be tested. The recommended testing would use Continuous Radon Monitors
(CRM) to further evaluate risks and understand the extent of the potential impact. The four rooms recommended for CRM testing include 113C, 113, 113B, and 111.
505 Roeder Circle, Fort Snelling, Minnesota 55111 Page 4
Table 1-1
Radon Sample Test Results
Ft. Snelling Building 505
Notes:
pCi/L – picocuries per liter
< - less than
Bold – Concentration exceeds EPA screening level of 4.0 pCi/L
Test Kit
Number
Deployment
Date
Retrieval
Date Building
Building
Floor
Building
Room
Radon Result pCi/L Comment
7401437 10/30/2023 11/2/2023 505 2 201 <0.3
7401438 10/30/2023 11/2/2023 505 2 304 <0.3 Blank Sample/Room 101
7401439 10/30/2023 11/2/2023 505 2 201 0.8 Duplicate Sample
7401440 10/30/2023 11/2/2023 505 1 122 3.0
7401441 10/30/2023 11/2/2023 505 1 125-126 0.8
7401442 10/30/2023 11/2/2023 505 1 128A 1.1
7401443 10/30/2023 11/2/2023 505 1 124 0.6
7401444 10/30/2023 11/2/2023 505 1 123 1.5
7401445 10/30/2023 11/2/2023 505 2 209 1.2
7401446 10/30/2023 11/2/2023 505 2 222 0.6
7401447 10/30/2023 11/2/2023 505 1 127 1.0
7401448 10/30/2023 11/2/2023 505 1 128 <0.3
7401449 10/30/2023 11/2/2023 505 1 303 <0.3 Blank Sample/Room 116
7401450 10/30/2023 11/2/2023 505 2 202 1.2
7401451 10/30/2023 11/2/2023 505 2 305 <0.3 Blank Sample/Room 115
7401452 10/30/2023 11/2/2023 505 1 121 2.1
7401453 10/30/2023 11/2/2023 505 2 222 0.6 Duplicate Sample
7401454 10/30/2023 11/2/2023 505 2 206 1.0 Listed as room 26 on lab report
7401455 10/30/2023 11/2/2023 505 2 211 1.4
11693749 10/30/2023 11/2/2023 505 1 119 1.4
11693755 10/30/2023 11/2/2023 505 1 111A 1.5
11693771 10/30/2023 11/2/2023 505 1 113C 4.3
11693773 10/30/2023 11/2/2023 505 1 102 2.0
11693774 10/30/2023 11/2/2023 505 1 114 <0.3
11693775 10/30/2023 11/2/2023 505 1 111 1.0
11693779 10/30/2023 11/2/2023 505 1 113D 2.7
11693780 10/30/2023 11/2/2023 505 1 116 1.3
11693781 10/30/2023 11/2/2023 505 1 110-2 1.2
11693782 10/30/2023 11/2/2023 505 1 112 0.7
11693821 10/30/2023 11/2/2023 505 1 113B 0.9
11693823 10/30/2023 11/2/2023 505 1 110 1.1
11693824 10/30/2023 11/2/2023 505 1 108A <0.3
11693836 10/30/2023 11/2/2023 505 1 113 0.8
11693837 10/30/2023 11/2/2023 505 1 108 1.5
11693838 10/30/2023 11/2/2023 505 1 109 1.8
11693839 10/30/2023 11/2/2023 505 1 113 1.7 Duplicate Sample
11693840 10/30/2023 11/2/2023 505 1 117 1.7
11693892 10/30/2023 11/2/2023 505 1 113E 1.2
11693893 10/30/2023 11/2/2023 505 1 113A 0.9
11693894 10/30/2023 11/2/2023 505 1 301 <0.3 Blank Sample/Room 127
11693895 10/30/2023 11/2/2023 505 1 103 0.5
11693896 10/30/2023 11/2/2023 505 1 103A 1.0
11693897 10/30/2023 11/2/2023 505 1 102 1.6 Duplicate Sample
11693898 10/30/2023 11/2/2023 505 1 101 1.2
11693899 10/30/2023 11/2/2023 505 1 302 <0.3 Blank Sample/Room 209
11693900 10/30/2023 11/2/2023 505 1 115 1.2
505 Roeder Circle, Fort Snelling, Minnesota 55111 Page 5
2. Hazardous Building Materials Survey
Hazardous building materials include but are not limited to: asbestos (caulking, weather stripping, masonry joints); LBP; polychlorinated biphenyls (PCBs) in fluorescent light ballasts or electrical transformers;
mercury-containing fluorescent lamps, thermostats, and switches; and smoke detectors. The asbestos and
LBP survey for the Property is covered under a separate, stand-alone document prepared by Castle Hill
Associates (CHA). CHA is a subcontractor licensed and certified to conduct asbestos and LBP sampling in Minnesota. Pinyon and CHA together surveyed Building 505 and the mechanical room in Building 509, for mercury-containing devices, PCBs, and other potentially regulated equipment and/or building materials.
The non asbestos and LBP potentially hazardous building materials are covered below.
Pinyon and CHA surveyed Building 505 for PCB, mercury-containing equipment, and other potentially hazardous building materials on October 30 and November 1, 2023. The survey was conducted by experienced inspectors walking through the facility and documenting possible PCB-containing equipment, mercury-containing devices, and other potentially hazardous equipment and/or materials. No laboratory samples were collected. Two pad-mounted electrical transformers were noted outside of Building 505.
One transformer was observed northwest, and the 2nd west of Building 505. No leaks or stains were noted in the vicinity of either transformer.
Component removal or disassembly for internal inspection was not performed, except for HVAC system thermostats. The cover of approximately 10 HVAC system thermostats were removed and none contained mercury switches. Therefore, it was assumed that the Building 505 thermostats do not contain mercury.
Based solely on visual observation and prior experience, building components were identified and may require removal during construction or demolition and have the potential to meet the definition of
“hazardous waste” or other classification as a regulated waste material. Table 2-1 below provides a building component list and estimated quantities that were observed in Building 505 and the mechanical room of
Building 509.
No green markings were observed on fluorescent bulbs. Green markings suggest the bulbs may contain a small amount of mercury.
The use of PCBs was banned in 1978. Building 505 was constructed in 1979. Fluorescent light ballasts and other equipment, manufactured after 1978 likely do not contain PCBs. No markings were observed on the ballasts that would indicate the presence or non-presence of PCBs. Because of the construction date, it is possible that the building’s fluorescent lighting ballasts do not contain PCBs, but due to the lack of external markings, the actual content cannot be determined without laboratory analysis.
The building components referenced in Table 2-1 may require special handling if removal is performed.
Additional characterization may be required by receiving disposal facilities. The inspection was performed in a manner consistent with the level of care and expertise exercised by members of the hazardous building materials inspection and assessment profession. Those entities and persons involved with the inspection and generation of this report do not imply or guarantee that all potential materials on or in the structure have been identified. The inspection was intended to identify those accessible materials that were
505 Roeder Circle, Fort Snelling, Minnesota 55111 Page 6 reasonably suspect and were most likely to contain PCBs, mercury, or other potentially regulated equipment and/or materials.
Table 2-1. Summary of Potential Hazardous Building Materials/Components
Regulated Building
Material Location(s)
Estimated
Total Building
1,412 505
3 509
582 505
1 509
Compact fluorescent lighting Entryways 10 505
18 505
1 509
Emergency lights Walls 20 505
7 505
1 509
26 505
1 509
Electrical Transformers Exterior, northwest and west of Building 505 2 505
Fire extinguishers Walls
Smoke Detectors Ceilings
Fluorescent bulbs Ceilings
Ballasts for fluorescent lighting Ceilings
Exit signs Exit Sign
505 Roeder Circle, Fort Snelling, Minnesota 55111
Figures
Fort Snelling Army Reserve Center Building 505 Building 509
Figure 1 – Site Location Map Fort Snelling, Building 505 506 Roeder Circle, Fort Snelling, MN 55111
Test Location exceeded screening level Legend
Test Location less than screening level
Duplicate Test Location
128A
Cross hatch is remnant from previous map use.
It does not represent any condition for radon sampling.
Figure 2 Radon Sampling Locations
Building 505 1st Floor Ft. Snelling, MN November 2023
Map Source: Pansch, Martin R CTR USARMY 88 RD (USA) <martin.r.pansch.ctr@army.mil>
Test Location exceeded screening level Legend
Test Location less than screening level
Duplicate Test Location
Cross hatch is remnant from Previous map use. It does not represent any condition for radon sampling.
Figure 3 Radon Sampling Locations
Building 505 2nd Floor Ft. Snelling, MN November 2023
Map Source: Pansch, Martin R CTR USARMY 88 RD (USA) <martin.r.pansch.ctr@army.mil>
Appendices
Appendix A. Radon Survey Subcontractor Report
23-A1104
Fort Snelling Building 505
11/9/2023 c/o Darin Worden Pinyon Environmental Fort Snelling g
Building 505 Dear Mr. Worden, T s re
Radon Measurement Results
SSeeee llaabb rreeppoorrttss
23-A1104
#$%��&'()*��%+*%�,+%)��%+*%��$')��-.�,+%)��-.��$')��)'/0�1+2$3$%4� �&$3.$-5��66'��*67)2%��,�1366*��)8&3%�
9:��:
9� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���� �� I��J
9:��:
K� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H�
�:� �� I��J
9:��:
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���� �� �JK�
9:��::�� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���� ��
J��
9:��::�� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��H;��L� �� �JK�
9:��::�� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��KM� �� �J��
9:��::
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��:� �� �JL�
9:��:::� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��
� �� �JH�
9:��::H� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� �� � �� �J��
9:��::L� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���� �� �JL�
9:��::9� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��9� �� �J��
9:��::K� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��K� �� I��J
9:��:: � ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H�
� �� I��J
9:��:H�� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���� �� �J��
9:��:H�� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H�
�H� �� I��J
9:��:H�� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���� �� �J��
9:��:H
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���� �� �JL�
9:��:H:� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� �L� �� �J��
9:��:HH� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���� �� �J:�
��L 9: � ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� �� � �� �J:�
��L
9HH� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���M� �� �JH�
��L 99�� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��
N� �� :J
��L
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���� �� �J��
��L 99:� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��:� �� I��J
��L 99H� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���� �� �J��
��L 99 � ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��
O� �� �J9�
��L 9K�� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��L� �� �J
��L 9K�� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���;�� �� �J��
��L 9K�� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���� �� �J9�
��L K��� ���
| ;��;��� | <���>��� 9�� ?@AB�C�DEEF�G�H�H� �� |
| P� �� �J | � |
��L K�
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ���� �� �J��
��L K�:� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��KM� �� I��J
��L K L� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��
� �� �JK�
��L K 9� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� ��K� �� �JH�
��L K K� ���
;��;��� <���>��� 9�� ?@AB�C�DEEF�G�H�H� �� � �� �JK�
MQ��NR�S���
L�PTUV���P�QW���AW
���XQVVY�AQ���
| ����N��K9H | ; |
| K | �����R�Z�<�[K�K\�LK:;�K |
| �?>]<�[K�K\�LK:;K: | K |
"#$��%&'()��$*)$�+*$(��$*)$��#&(��,-�+*$(��,-��#&(��(&./�0*1#2#$3� �%#2-#,4��55&��)56(1$��+�0255)��(7%2$�
;8�;
;88;��� <���>��� ?�� @ABC�D�EFFG�H�I�I� 88
� 8� 8J?�
:K�� ��� ;8�;
;88;��� <���>��� ?�� @ABC�D�EFFG�H�I�I� 88?� 8� 8J?�
;8�;
;88;��� <���>��� ?�� @ABC�D�EFFG�H�I�I� 88
E� 8� 8J��
;8�;
| ;88;��� | <���>��� ?�� @ABC�D�EFFG�H�I�I� 88 |
| L� 8� �J | � |
: K� ��� ;8�;
;88;��� <���>��� ?�� @ABC�D�EFFG�H�I�I�
�8� 8� M��J
: I� ��� ;8�;
;88;��� <���>��� ?�� @ABC�D�EFFG�H�I�I� 8�
� 8� �JI�
: 9� ��� ;8�;
;88;��� <���>��� ?�� @ABC�D�EFFG�H�I�I� 8�
L� 8� 8J��
;8�;
;88;��� <���>��� ?�� @ABC�D�EFFG�H�I�I� 8��� 8� 8J9�
;8�;
;88;��� <���>��� ?�� @ABC�D�EFFG�H�I�I� 8�8� 8� 8J��
;8�;
;88;��� <���>��� ?�� @ABC�D�EFFG�H�I�I�
��� 8� M��J
;8�;
;88;��� <���>��� ?�� @ABC�D�EFFG�H�I�I� 88I� 8� 8J��
LN��OP�Q��8
9�RSTU���R�NV���BV
���WNUUX�BN���
| ����O��:?I | ; |
| : | �����P�Y�<�Z:�:[�9:K;�: |
| �@>\<�Z:�:[�9:K;:K | : |
Attachment ‘K2’
ATTACHMENT K2
ASBESTOS AND LEAD PAINT INSPECTION SUMMARY
Items: Summary Results of Asbestos & Lead-Based Paint, Site Visit, Visual Inspection, Lab Results
Site Visit: October 30, 2023
Inspector: Brett Brumbaugh - Castle Hill Associates
Findings: Asbestos containing materials are present in Building 505 Lead-based paint is present in Building 505
Note: There were no asbestos containing materials or lead-based paint identified in B509 where the renovations will be conducted for the utility tie-ins.
Asbestos Containing Materials Summary – Building 505
Asbestos Containing Material Locations Quantity
Black mastic on concrete floors under non-asbestos floor tile, yellow mastic, and carpeting
First Floor: Hallways, entries, stairwells, and Rooms 101, 102, 103, 103A, 104, 108, 108A, 109, 110, 111, 111A, 112, 112A, 113, 114, 115, 116, 117, 118, 119, 120, 121, 122, 124, 125, 126, 127, 129 Second Floor: Hallways, stairwells, and Rooms 201, 202, 202A, 206, 206A, 206B, 207, 208, 208A, 208B, 209, 209A, 209B 210, 211, 211A, 212, 213, 213A, 213B, 215.
36,740 sf
Exterior brown window frame caulking
All exterior window frames on 1st and 2nd floors windows
3 Boiler door and burner gaskets 3 boilers in boiler room 6 gaskets
(30 lf)
Lead Painted Materials – Building 505
Lead Painted or Lead Building Materials Locations
1 Metal lockers (interior orange paint and exterior gray paint)
1st and 2nd floor hallways
Asbestos Containing Materials (ACM) Summary – Building 509
Asbestos Containing Material Locations Quantity
1 None N/A N/A
Lead Painted Materials – Building 509
Lead Painted or Lead Building Materials Locations
1 None N/A
35% SCHEMATIC DESIGN SUBMISSION
ASBESTOS & LEAD PAINT INSPECTION SUMMARY
FORT SNELLING USARC – FT. SNELLING, MN
BUILDINGS 505 & 509 – RENOVATION PROJECT 35% SCHEMATIC DESIGN SUBMISSION
Date: November 12, 2023
35% SCHEMATIC DESIGN SUBMISSION
ASBESTOS & LEAD PAINT INSPECTION SUMMAR
FORT SNELLING USARC – FT. SNELLING, MN
BUILDINGS 505 & 509 – RENOVATION PROJECT
INSPECTION DATE:
OCTOBER 30, 2023
ENVIRONMENTAL CONSULTANT:
CASTLE HILL ASSOCIATES, LLC
1197 FARNSWORTH RD., UNIT E
WATERVILLE, OH 43566
567-952-0212
WWW.CASTLEHILLASSOCIATES.COM
ASBESTOS & LEAD PAINT SURVEY
FORT SNELLING USARC – FT. SNELLING, MN
BUILDINGS 505 & 509 – RENOVATION PROJECT
ASBESTOS & LEAD PAINT SAMPLING REPORT
for
BUILDINGS 505 & 509
FORT SNELLING USARC/AMSA #22
(MN036/27865)
506 ROEDER CIRCLE
FT. SNELLING, MN 55111
PREPARED FOR:
U.S. ARMY CORPS OF ENGINEERS
LOUISVILLE DISTRICT
600 MARTIN LUTHER KING JR PLACE
LOUISVILLE, KY 40202
ASBESTOS & LEAD PAINT SURVEY
FORT SNELLING USARC – FT. SNELLING, MN
BUILDINGS 505 & 509 – RENOVATION PROJECT
TABLE OF CONTENTS
ASBESTOS & LEAD-BASED PAINT INSPECTION SUMMARY ……………………………
APPENDIX A:
ASBESTOS BULK SAMPLING DESCRIPTIONS AND LAB RESULTS (TABLE 5) .….….
APPENDIX B:
ASBESTOS CONTAINING MATERIAL PHOTOS (TABLE 6) …………………………….…
APPENDIX C:
ASBESTOS HOMOGENEOUS SAMPLING AREAS (HSA) LIST (TABLE 7) …….….…...
APPENDIX D:
ASBESTOS HOMOGENEOUS SAMPLING AREAS (HSA) PHOTOS (TABLE 8) ……
APPENDIX E:
LEAD-BASED PAINT SAMPLING RESULTS (TABLE 9) ………………………………….…
APPENDIX F:
LEAD-BASED PAINT COMPONENT PHOTOS (TABLE 10) .………………………….…...
APPENDIX G:
LEAD-BASED PAINT TESTED MATERIAL PHOTOS (TABLE 11) …………………….….
APPENDIX H:
ASBESTOS LABORATORY REPORT …………………………………………………….….
APPENDIX I:
ASBESTOS LABORATORY CERTIFICATIONS ……………………………………………...
APPENDIX J:
INSPECTOR CERTIFICATIONS ……………………………………………………………….
APPENDIX K:
ASBESTOS SAMPLE AND MATERIAL LOCATION DRAWINGS ……………………….…
APPENDIX L:
LEAD-BASED PAINT XRF SAMPLE AND MATERIAL LOCATION DRAWINGS ………
APPENDIX M:
US ARMY ASBESTOS CONTAINING MATERIAL CHECKLISTS ……………………….….
APPENDIX N:
2004 ASBESTOS SURVEY – FLOOR PLANS AND LAB REPORT …………………….…..
APPENDIX O:
2013 ECP – LEAD DUST CLEANUP DOCUMENTATION FOR FORMER GUN RANGE …
FORT SNELLING USARC – FT. SNELLING, MN
BUILDINGS 505 & 509 – RENOVATION PROJECT
PROJECT SUMMARY
On October 30, 2023, Brett Brumbaugh of Castle Hill Associates performed an asbestos survey and lead (Pb) paint testing utilizing a Viken Detection Pb200i direct read X-Ray Fluorescence (XRF) analyzer prior to the planned interior renovations planned in Buildings 505 & 509 at the Ft.
Snelling USARC (United States Army Reserve Center) in Minneapolis, MN.
Building 505 was constructed in 1979 and is approximately 63,000 square feet (sf) in size. The building is on a concrete slab with no basement and has a flat roof rubber roof. The roof was recently replaced with an EDPM rubber roof and therefore not sampled due to warranty issues and conditions. Bulk samples were collected from suspect asbestos containing materials (ACM) that had not been sampled during previous asbestos surveys in the building. Thirty-eight (38) bulk samples were collected during the survey; this report summarizes the collection and laboratory analysis of the samples.
Building 509, which is a small metal maintenance shed, was tested because there is a water…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .