This solicitation is for the construction of an Army Reserve Center and associated facilities in Asheville, North Carolina. The construction project includes an Army Reserve Center building totaling 31,637 square feet constructed of insulated concrete forms with masonry veneer and reinforced concrete, a Vehicle Maintenance Shop of 9,781 square feet with the same construction, an 1,500 square foot Unheated Storage Building as a pre-engineered metal building, and supporting site work. The contract will be a firm-fixed-price design-bid-build contract with an estimated duration of 720 calendar days. The North American Industry Classification System code is 236220 and the acquisition will be a full and open competition. Proposals are due in April 2023 and will be evaluated using a best value tradeoff process considering technical approach and past performance.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For
Asheville, NC - Army Reserve Center
P2: 481815
Design-Bid-Build
Specifications - Vol. 3 of 3 (Div. 00-08)
Certified Final Submittal
07 February 2023
W912QR24R0011
ARIMS: 200A Disposition: Maintain for 15yrs after construction.
W912QR24R0011_Specs_Vol3-0000
Specifications (Vol III of III) Asheville USARC
Asheville, North Carolina Project Number: 79351; P2#: 481815
October 12, 2023
300 West Vine Street, Suite 1500, Lexington, KY 40507 | 859.252.9980 Certified Final Submittal
Louisville District
10/12/2023 10/12/202310/12/2023
10/12/2023
CERTIFIED FINAL
P2#: 481815 Asheville USARC Asheville, North Carolina
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 04/21 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 32 01.00 06 07/18 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 04/20 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 04/20 CONTRACTOR QUALITY CONTROL
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 50 00 11/20 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 74 19 02/19 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 05/10 DEMOLITION
DIVISION 03 - CONCRETE
03 11 19.00 06 09/17 INSULATING CONCRETE FORM (ICF) SYSTEM
03 30 00 02/19, CHG 1: 02/21 CAST-IN-PLACE CONCRETE
03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 11/15 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 08/18 STRUCTURAL STEEL
05 21 00 05/15 STEEL JOIST FRAMING
05 30 00 05/15 STEEL DECKS
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
PROJECT TABLE OF CONTENTS Page 1
FOR AIR TIGHTNESS
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 27 36 05/17, CHG 2: 08/20 SPRAY FOAM AIR BARRIERS
07 52 00.00 48 10/10 SBS-MODIFIED BITUMINOUS MEMBRANE
ROOFING SYSTEM
07 62 00.00 48 10/10 FLASHING AND SHEET METAL
07 84 00 05/10 FIRESTOPPING
07 92 00.00 48 10/10 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS
08 34 59 08/08, CHG 1: 11/12 VAULT DOORS AND DAY GATES
08 36 13 08/20 SECTIONAL OVERHEAD DOORS
08 51 14.00 48 03/06 ALUMINUM AND ENVIRONMENTAL CONTROL
ALUMINUM WINDOWS
08 71 00 02/16, CHG 3: 08/20 DOOR HARDWARE
08 81 00.00 48 09/06 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17 STATIC-CONTROL FLOORING
09 65 00 08/10 RESILIENT FLOORING
09 65 66 08/16 RESILIENT ATHLETIC FLOORING
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
09 97 13.16 05/11 INTERIOR COATING OF WELDED STEEL WATER
TANKS
09 97 13.27 02/21 HIGH PERFORMANCE COATING FOR STEEL
STRUCTURES
DIVISION 10 - SPECIALTIES
10 11 00 08/20 VISUAL DISPLAY UNITS
10 12 01.00 48 04/06 RECESSED DISPLAY CASES
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 22 13.00 48 01/11 WIRE MESH PARTITIONS
10 22 26.00 48 08/04 OPERABLE PARTITIONS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 00.00 48 04/06 TOILET AND BATH ACCESSORIES
10 44 13.00 48 04/06 FIRE EXTINGUISHERS AND CABINETS
10 51 26.64 08/15 PLASTIC LOCKERS AND BENCHES
10 56 13.00 48 10/05 METAL STORAGE SHELVING
PROJECT TABLE OF CONTENTS Page 2
10 75 00.00 48 04/06 FLAGPOLES
10 90 00.00 48 04/06 MISCELLANEOUS SPECIALTIES (PARTIAL
OMAR FUNDED)
DIVISION 11 - EQUIPMENT
11 46 01.00 48 12/09 KITCHEN EQUIPMENT
11 52 13.00 48 04/06 PROJECTION SCREENS
DIVISION 12 - FURNISHINGS
12 24 13 08/20 ROLLER WINDOW SHADES
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 08/20 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 23 00.00 20 04/06 WET CHEMICAL FIRE EXTINGUISHING FOR
KITCHEN CABINET
21 30 00 04/08 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 93.00 06 08/16 TESTING, ADJUSTING, AND BALANCING
(TAB) OF HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.01 02/19, CHG 1: 02/20 LONWORKS DIRECT DIGITAL CONTROL FOR
HVAC AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 23 00 10/07 REFRIGERANT PIPING
23 30 00 05/20 HVAC AIR DISTRIBUTION
23 35 16.17 10 05/20 MECHANICAL ENGINE AND WELDING FUME
EXHAUST SYSTEMS
23 52 00.00 48 04/06 WATER AND STEAM HEATING; OIL, GAS OR
BOTH; UP TO 20 MBTUH
23 54 16.00 48 04/06 HEATING SYSTEM; GAS-FIRED HEATERS
23 82 02.00 48 04/06 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 05/21 CYBERSECURITY FOR LOW-IMPACT HVAC
CONTROL SYSTEMS
25 05 11.02 05/21 CYBERSECURITY FOR FOR LOW IMPACT FIRE
ALARM AND MASS NOTIFICATION SYSTEMS
(FAMNS)
25 05 11.03 05/21 CYBERSECURITY FOR LOW-IMPACT PHYSICAL
ACCESS CONTROL SYSTEMS (PACS)
PROJECT TABLE OF CONTENTS Page 3
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20 INTERIOR LIGHTING
26 56 00 05/20 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM
27 05 28.36 48 04/20 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00.00 48 04/20 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 13 00.00 48 01/11 PHYSICAL ACCESS CONTROL SYSTEM
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK
31 31 16.13 08/22 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 08/17 AGGREGATE BASE COURSES
32 11 26 05/20 HOT-MIX BITUMINOUS BASE COURSE FOR
ROADS AND STREETS
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 06 06/18 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 15 00 05/17 AGGREGATE SURFACING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13.53 11/21 HIGH-SECURITY FENCES AND GATES
32 92 19 08/17 SEEDING
32 92 23 04/06 SODDING
32 93 00 08/17 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 16 15 11/20 WATER STORAGE STEEL TANKS
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 11/21 STORMWATER UTILITIES
PROJECT TABLE OF CONTENTS Page 4
33 51 15 08/19 NATURAL-GAS / LIQUEFIED PETROLEUM GAS
DISTRIBUTION PIPELINES
33 56 19 05/15, CHG 1: 11/20 FUEL IMPERMEABLE LINER SYSTEM
33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00.00 48 04/20 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
46 25 14 02/11, CHG 1: 11/13 COALESCING OIL-WATER SEPARATORS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
SECTION 23 35 16.17 10
MECHANICAL ENGINE AND WELDING FUME EXHAUST SYSTEMS
05/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL, INC. (AMCA)
AMCA 210 (2016) Laboratory Methods of Testing Fans for Aerodynamic Performance Rating
AMCA 300 (2014) Reverberant Room Method for Sound Testing of Fans
AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)
AHRI Guideline D (1996) Application and Installation of Central Station Air-Handling Units
AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)
ABMA 9 (2015) Load Ratings and Fatigue Life for Ball Bearings
ABMA 11 (2014) Load Ratings and Fatigue Life for Roller Bearings
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.21 (2016) Nonmetallic Flat Gaskets for Pipe Flanges
ASME BPVC SEC IX (2017; Errata 2018) BPVC Section IX-Welding, Brazing and Fusing Qualifications
AMERICAN WELDING SOCIETY (AWS)
AWS A5.8/A5.8M (2019) Specification for Filler Metals for Brazing and Braze Welding
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel
ASTM A53/A53M (2020) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
SECTION 23 35 16.17 10 Page 1
ASTM A167 (2011) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip
ASTM A193/A193M (2020) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications
ASTM A307 (2014; E 2017) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
ASTM A924/A924M (2020) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM A1011/A1011M (2018a) Standard Specification for Steel Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength
ASTM B32 (2008; R 2014) Standard Specification for Solder Metal
ASTM B117 (2019) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM E2016 (2020) Standard Specification for Industrial Woven Wire Cloth
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2018) Motors and Generators
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1520 (1999) Round Industrial Duct Construction Standards, 3rd Edition
1.2 SYSTEM DESCRIPTION
Construct, complete and operational, an exhaust system as specified herein. The exhaust system(s) shall provide adequate air exhaust quantities and velocities. All duct shall be properly sized for pressure loss and adequate velocity including locating intakes, ductwork size, layout, equipment and controls. Construction of the exhaust system shall be based on the referenced publications, and other provisions as specified herein. Furnish ductwork offsets, fittings, and any other accessories required, as specified, to provide a complete exhaust system installation and to eliminate interference with other construction. Controls shall be provided as specified in Section 23 09 00 INSTRUMENTATION AND CONTROL FOR
HVAC.
SECTION 23 35 16.17 10 Page 2
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 .00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Detail Drawings ; G
Exhaust System Installation ; G
SD-03 Product Data
Related Submittals
Ductwork Components ; G
Materials and Equipment
Spare Parts
Field Instructions
Final Acceptance Tests
Onsite Training ; G
Exhaust System Specialist ; G
SD-06 Test Reports
Final Acceptance Tests
SD-07 Certificates
Inspection ; G
SD-10 Operation and Maintenance Data
Exhaust System Operation and Maintenance Manuals
1.4 QUALITY ASSURANCE
1.4.1 Detail Drawings
Submit 3 copies of the Exhaust System Drawings, no later than 21 days prior to the start of exhaust system installation. The detail drawings shall consist of a complete list of equipment and materials, including manufacturer's descriptive and technical literature, performance charts and curves, catalog cuts, installation instructions, complete duct, wiring, and schematic diagrams and any other details to demonstrate that the system has been coordinated and will properly function as a unit.
Also show proposed layout and anchorage of equipment and appurtenances, SECTION 23 35 16.17 10 Page 3 and equipment in relation to other parts of the work including clearances required for maintenance and operation.
1.4.2 Exhaust System Specialist
Submit the name and documentation of certification of the proposed Exhaust System Specialists, no later than 14 days after the Notice to Proceed and prior to the submittal of the exhaust system drawings and hydraulic calculations. The Exhaust System Specialist shall prepare a list of the submittals from the Contract Submittal Register that relate to the successful installation of the exhaust systems(s). Submit the list no later than 7 days after the approval of the Exhaust System Specialist.
The related submittals identified on this list shall be accompanied by a letter of approval signed and dated by the Exhaust System Specialist when submitted to the Government. The Exhaust System Specialist shall be regularly engaged in the installation of the type and complexity of system specified in the Contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
1.5 DELIVERY, STORAGE, AND HANDLING
All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Additionally, all ductwork, flexible connections and pipes shall either be capped or plugged until installed.
1.6 EXTRA MATERIALS
Submit spare parts data for each item of equipment and material specified. The data shall include a complete list of parts and supplies, with current unit prices and source of supply, and a list of parts recommended by the manufacturer to be replaced after 1 year and 3 years of service. Include a list of special tools and test equipment required for maintenance and testing of the products supplied.
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
a. Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacture of the product and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening. Submit manufacturer's catalog data included with the Exhaust System Drawings for all items specified herein. The data shall be highlighted to show model, size, options, etc., that are intended for consideration. Data shall be adequate to demonstrate compliance with all contract requirements. In addition, a complete equipment list that includes equipment description, model number and quantity shall be provided.
b. Where an integrated, packaged exhaust system is furnished, all items will be the product of the system manufacturer. System component parts may be by other manufacturers. Equipment shall be supported by a service organization that is capable of responding to service calls within four hours.
c. Asbestos and asbestos-containing products are not acceptable.
SECTION 23 35 16.17 10 Page 4
2.2 NAMEPLATES
All equipment shall have a nameplate that identifies the manufacturer's name, address, type or style, model or serial number, and catalog number.
2.3 EQUIPMENT GUARDS AND ACCESS
Belts, pulleys, chains, gears, couplings, projecting setscrews, keys, and other rotating parts exposed to personnel contact shall be fully enclosed or guarded according to OSHA requirements. High temperature equipment and piping exposed to contact by personnel or where it creates a potential fire hazard shall be properly guarded or covered with insulation of a type specified. Catwalks, ladders, and guardrails shall be provided where shown and shall be constructed according to Section 05 51 33 METAL LADDERS.
2.4 DUCTWORK COMPONENTS
2.4.1 General
Duct shall be constructed of stainless steel sheets of the minimum gauge thickness for ducts as required in SMACNA 1520. Ducts shall be constructed and sealed in accordance with SMACNA 1520 for a negative pressure. Ducts, unless otherwise approved, shall be round with longitudinal lock seam and conform to the dimensions indicated. Ducts shall be straight and smooth on the inside with airtight joints. Where ducts with crimped ends are used to make up joints, the joints shall have crimp and bead. The bead shall provide a rigid stop for the mating open end to seat against. Steel spiral wound duct is not acceptable.
2.4.2 Fittings
Reducing fittings shall have a minimum of 1 inch increase in diameter per 8 inches in length. Elbows shall have a centerline radius of not less than 1.5 times the diameter. Branches shall stub into mains at main expansion points at an angle of not more than 30 degrees with the centerline of the main duct in the direction of air flow, unless otherwise indicated or approved. Where riser ducts with single or multiple inlets are indicated, the riser duct shall connect into the bottom of the main duct at an angle as specified for branches. Where flexible connections connect to the main duct, the duct branch takeoff or stub shall be braced with approved metal straps or members.
2.4.3 Cleanout
Cleanout shall be provided on the end of the main ductwork opposite the end of the fan suction connection. The cleanout opening shall be sized to the approximate inside area of the duct. Removable airtight caps or flange type covers of minimum gauge thickness as the main duct shall be provided. Other cleanout openings shall be provided where indicated.
2.4.4 Apparatus Connections
Where sheet metal connections are made to fan suction and discharge, or where ducts of dissimilar metals are connected, an approved noncombustible flexible connection approximately 6 inches wide shall be installed and securely fastened by zinc-coated steel clinch-type draw bands for round ducts. For rectangular ducts the flexible connections locked to metal collars shall be installed using normal duct construction methods.
SECTION 23 35 16.17 10 Page 5
2.4.5 Duct Test Holes
Test holes with covers shall be provided where indicated, directed, or where necessary in ducts and plenums for using Pitot tubes for taking air measurements to balance the air systems.
2.4.6 Duct Sleeves and Framed Openings
Duct sleeves shall be provided for all round ducts 15 inch diameter or less passing through floors, walls, ceilings, or roofs. Sleeves in non-load bearing walls shall be fabricated of 20 gauge steel sheets conforming to ASTM A924/A924M . Sleeves in load-bearing walls shall be fabricated of standard-weight galvanized steel pipe conforming to ASTM A53/A53M. Round ducts larger than 15 inch diameter and all square and rectangular ducts passing through floors, walls, ceilings, or roofs shall be installed through framed openings. Structural steel members for framed openings shall conform to ASTM A36/A36M. Framed openings shall provide 1 inch clearance between the duct and the opening. Closure collars of galvanized steel not less than 4 inches wide shall be provided on each side of walls or floors where sleeves or framed openings are provided. Collars for round ducts 15 inch diameter or less shall be fabricated from 20 gauge galvanized steel. Collars for round, square or rectangular ducts with minimum dimension over 15 inches shall be fabricated from 18 gauge galvanized steel.
2.5 EXHAUST HOSE SYSTEM
2.5.1 Tailpipe Adapters
Adapters shall be of the tapered-cone type with spring clips or other suitable devices for exhaust pipe attachment. The adapter shall fit 8 inch nominal diameter exhaust pipe.
2.5.2 Welding Fume Receptors
Welding fume receptors shall be constructed of not less than 20 gauge thick aluminum and shall be equipped with 1/2 inch mesh receptor screens;
shall have swivel connections, and magnets on receptor base.
2.5.3 Flexible Exhaust Hose
Flexible exhaust hose shall be approved heat-resistant wire reinforced glass fiber and silicone tubing. Wye connectors shall be provided where shown. Flexible tubing inside diameter and length shall be as shown. The tubing shall be connected to the bottom of the ductwork. A flanged connection shall be provided where the flexible tubing and overhead ductwork are joined. The flanged connection shall consist of steel flanges not less than 0.078 inch thick, 1/8 inch gasket. The gasket shall be suitable for the system design temperature shown, in accordance with ASME B16.21 , full face or self-centering flat ring type. It shall contain aramid fibers bonded with styrene butadiene rubber (SBR) or nitrile butadiene rubber (NBR). The flange shall be sized or designed to suit the hose as approved. The connection of the neoprene hose may be installed with an approved hose clamp or as recommended by the manufacturer.
SECTION 23 35 16.17 10 Page 6
2.5.4 Exhaust Hose Suspension System
The exhaust hose suspension system shall suspend the flexible tubing overhead when not in use; allowing it to be lowered to the operating level, when required. The suspension system shall be furnished complete with cable, and operating mechanism. The suspension system shall be counter-weighted typeor manually operated balancer type with safety ratchet lock or automatic brake having slip resistant hand grip.
2.6 DAMPERS
Dampers shall be of the type indicated and installed where shown. Dampers shall be of the circular disk type with quadrant locking device or blast gate type. Damper blades shall be not less than 16 gauge thickness of stainless steel. Blast gate dampers shall be two piece construction with adjustable sliding gate and setscrew.
2.7 MATERIALS
Materials shall conform to the following requirements.
2.7.1 Screen
ASTM E2016, type and class as required for the application.
2.7.2 Iron and Steel Sheets
2.7.2.1 Galvanized Iron and Steel
ASTM A924/A924M , Coating Designation G90.
2.7.2.2 Uncoated Steel
ASTM A1011/A1011M , condition, and type best suited to intended use.
2.7.2.3 Stainless Steel
ASTM A167, Type 304.
2.7.3 Steel Structural Shapes
ASTM A36/A36M.
2.7.4 Solder Silver
AWS A5.8/A5.8M , brazing alloy; grade to suit application.
2.7.5 Solder
ASTM B32, composition to suit application.
2.7.6 Bolts and Nuts
Bolts and nuts, except as required for high temperature exhaust applications, shall be in accordance with ASTM A307. Bolts and nuts used for exhaust applications where the temperature of the bolt may rise above 400 degrees F or used as flange bolts in corrosion resistant material shall be in accordance with ASTM A193/A193M Class 2. The bolt head shall be marked to identify the manufacturer and the standard with which the
SECTION 23 35 16.17 10 Page 7 bolt complies in accordance with ASTM A307 or ASTM A193/A193M as applicable.
2.8 ELECTRICAL WORK
Electrical motor-driven equipment specified shall be provided complete with motor, motor starter, and controls. Unless otherwise specified, electric equipment, including wiring and motor efficiencies, shall be according to Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Electrical characteristics and enclosure type shall be as shown. Unless otherwise indicated, motors of 1 hp and above shall be high efficiency type. Motor starters shall be provided complete with thermal overload protection and other appurtenances necessary. Each motor shall be according to NEMA MG 1 and shall be of sufficient size to drive the equipment at the specified capacity without exceeding the nameplate rating of the motor. Manual or automatic control and protective or signal devices required for the operation specified, and any control wiring required for controls and devices, but not shown, shall be provided. Where two-speed or variable-speed motors are indicated, solid-state variable-speed controller may be provided to accomplish the same function. Solid-state variable-speed controllers shall be utilized for motors rated 10 hp or less. Adjustable frequency drives shall be used for larger motors.
2.9 AIR MOVING DEVICES
2.9.1 General
Fans shall be tested and rated in accordance with the standards of AMCA 210, Type "D" Ducted Inlet, Ducted Outlet Configuration. Where V-belt drives are used, such drives shall be designed for not less than 150 percent of the connected driving capacity, and motor sheaves shall be adjustable to provide not less than an overall 20 percent speed variation. Sheaves shall be selected to drive the fan at such speed as to produce the specified capacity when set at the approximate midpoint of the sheave adjustment. Motors for V-belt drives shall be provided with adjustable rails or bases. Fans shall be provided with personnel screens or guards on both suction and supply ends except where ducts or dampers are connected to the fan. Fans and motors shall be provided with vibration isolation supports or mountings. Vibration isolation units shall be standard products with published load ratings, and shall be single rubber-in-shear, neoprene coated fiberglass, double rubber-in-shear springs, or springs under inertia base. Each fan shall be selected to produce the capacity required at the fan total pressure indicated.
Standard AMCA arrangements shall be provided unless otherwise indicated and the rotation and discharge shall be as indicated. Fans shall have nonoverloading characteristics. Fan housing shall be constructed with not less than 16 gauge thickness of steel. Fan impellers shall be constructed to meet AMCA Spark Resistance "B" Classification and accurately balanced both statically and dynamically when installed in the assembled fan unit.
Impeller and housing in the air stream shall be coated with neoprene, epoxy, phenolic resins, or otherwise be suitable to resist the corrosive gases and temperatures produced. Fans shall be free of objectionable vibration or noise. Certified performance curves indicating that the fan supplied will operate in its most efficient operating range will be provided. In addition, "sound power" ratings shall be furnished with each fan. Fans indicated to be mounted on exterior of building shall be provided with weatherproof covers for the motor drive unit or other weatherproofing as recommended by the manufacturer. Each fan shall be selected to produce the capacity required at the fan total pressure
SECTION 23 35 16.17 10 Page 8 indicated. Weather hoods, flashing, and bird screens shall be provided where indicated.
2.9.2 Fans
The sound power level shall be as indicated and values shall be obtained according to AMCA 300. Standard AMCA arrangement, rotation, and discharge shall be as indicated. Fans shall be tested and rated according to AMCA 210. Each fan shall be selected to produce the capacity required at the fan static pressure indicated. Fans may be connected to the motors either directly or indirectly with V-belt drive. V-belt drives shall be designed for not less than 150 percent of the connected driving capacity.
Motor sheaves shall be variable pitch for 15 hp and below and fixed pitch as defined by AHRI Guideline D . Variable pitch sheaves shall be selected to drive the fan at a speed which will produce the specified capacity when set at the approximate midpoint of the sheave adjustment. When fixed pitch sheaves are furnished, a replaceable sheave shall be provided when needed to achieve system air balance.
2.9.2.1 Protective Devices
Motors for V-belt drives shall be provided with adjustable rails or bases. Removable metal guards shall be provided for all exposed V-belt drives, and speed-test openings shall be provided at the center of all rotating shafts. Fans shall be provided with personnel screens or guards on both suction and supply ends, except that the screens need not be provided, unless otherwise indicated, where ducts are connected to the fan. Fan and motor assemblies shall be provided with vibration-isolation supports or mountings as indicated. Vibration-isolation units shall be standard products with published loading ratings.
2.9.2.2 Centrifugal Fans
Centrifugal fans shall be fully enclosed, single-width single-inlet, or double-width double-inlet, AMCA Pressure Class I, II, or III as required or indicated for the design system pressure. Impeller wheels shall be rigidly constructed, accurately balanced both statically and dynamically.
Fan blades may be forward curved, backward-inclined or airfoil design in wheel sizes up to 30 inches . Fan blades for wheels over 30 inches in diameter shall be backward-inclined or airfoil design. These fans shall be suitable for the temperatures encountered. The fan shaft shall be provided with a heat slinger to dissipate heat buildup along the shaft.
An access (service) door to facilitate maintenance shall be supplied with these fans. Fan wheels over 36 inches in diameter shall have overhung pulleys and a bearing on each side of the wheel. Indirect drive fan wheels 36 inches or less in diameter may have one or more extra long bearings between the fan wheel and the drive. Bearings shall be sleeve type, self-aligning and self-oiling with oil reservoirs, or precision self-aligning roller or ball-type with accessible grease fittings or permanently lubricated type. Grease fittings shall be connected to tubing and serviceable from a single accessible point. Bearing life shall be L50 rated at not less than 200,000 hours as defined by ABMA 9 and ABMA 11.
Fan shafts shall be steel, accurately finished, and shall be provided with key seats and keys for impeller hubs and fan pulleys. Each fan outlet shall be of ample proportions and shall be designed for the attachment of angles and bolts for attaching flexible connections. Motors, unless otherwise indicated, shall not exceed 1800 rpm and shall have totally enclosed enclosures. Motor starters shall be across-the-line reduced-voltage-start type with general-purpose enclosure.
SECTION 23 35 16.17 10 Page 9
2.10 FACTORY COATING
Equipment and component items, when fabricated from ferrous metal as defined by ASTM (or similar) standard, shall be factory finished with the manufacturers standard finish except that items located outside of building shall have weather-resistant finishes that will withstand 500 hours exposure to the salt spray test specified in ASTM B117.
PART 3 EXECUTION
3.1 EXAMINATION
After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.
3.2 INSTALLATION
Work shall be installed as shown and according to the manufacturer's diagrams and recommendations.
3.3 INSPECTION
The Exhaust System Specialist shall (1) Inspect the exhaust system periodically during the installation. (2) Witness the final tests, and sign approval of the test results. (3) Certify in writing that the system has been installed in accordance with the contract requirements. Any discrepancy shall be brought to the attention of the Contracting Officer in writing, no later than three working days after the discrepancy is discovered.
3.4 EXHAUST SYSTEM INSTALLATION
3.4.1 General Requirements
Welding and brazing shall conform to ASME BPVC SEC IX . Horizontal sections of the main duct shall be installed with the longitudinal lock seam on the top. Slip joints shall be sealed in accordance with SMACNA 1520. Riser duct shall be supported and anchored to the structure as indicated. Main duct shall be attached to the structural members of the building as recommended by SMACNA 1520.
3.4.2 Building Surface Penetrations
Sleeves or framed openings shall be utilized where duct penetrates building surfaces. Penetrations shall be sealed, and fireproofed in accordance with Section 07 84 00 FIRESTOPPING. The space between the sleeve or framed opening and the duct shall be packed with mineral wool or other approved material. Closure collars shall be installed around the duct on both sides of the penetrated surface. Collars shall fit tight against the building surfaces and snugly around the duct.
3.5 PIPE COLOR CODE MARKING
Color code marking of piping shall be as specified in Section 09 90 00
PAINTS AND COATINGS.
SECTION 23 35 16.17 10 Page 10
3.6 ONSITE TRAINING
Submit proposed Onsite Training schedule, at least 14 days prior to the start of related training for the operating staff as designated by the Contracting Officer. The training period shall consist of a total 8 hours of normal working time and shall start after the system is functionally completed but prior to final acceptance tests. The field instructions shall cover all of the items contained in the approved operation and maintenance manuals , as well as demonstrations of routine maintenance operations. Submit 6 manuals listing step-by-step procedures required for system startup, operation, shutdown, and routine maintenance, at least 14 days prior to on-site training. The manuals shall include the manufacturer's name, model number, list of parts and tools that should be kept in stock by the owner for routine maintenance including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment. Each service organization submitted shall be capable of providing 4 hour on-site response to a service call on an emergency basis. Notify the Contracting Officer at least 14 days prior to date of proposed conduction of the training course.
3.7 FINAL ACCEPTANCE TESTS
Each exhaust system and inlet shall be balanced to produce the indicated air quantities within 10 percent at the conditions shown. Control devices shall be set to control at the points indicated or directed. Bearings shall be lubricated, and the speed, direction or rotation of each fan shall be checked. The running current of each motor shall be checked.
Upon completion, and prior to acceptance of the installation, the exhaust system shall be tested at operating conditions to demonstrate satisfactory functional and operating efficiency.
a. Operating tests shall cover a period of not less than 2 hours for each system, and all tests shall be conducted in the presence of the Contracting Officer. If tests do not demonstrate satisfactory operation of the exhaust system, correct deficiencies and retest.
Provide all instruments, facilities, and labor required to properly conduct the tests. The electricity required for testing will be furnished by the Government.
b. Submit 3 copies of the completed Final Acceptance Tests Reports, no later that 7 days after the completion of the Tests. All items in the Final Acceptance Report shall be signed by the Exhaust System Specialist. Submit proposed diagrams, instructions, and other sheets, concurrent with the Final Acceptance Test Procedures. Framed instructions under glass or in laminated plastic shall be posted where directed, including wiring and control diagrams showing the complete layout of the entire system. Condensed operating instructions explaining preventive maintenance procedures, methods of checking the system for normal safe operation, and procedures for safely starting and stopping the system shall be prepared in typed form, framed as specified above for the wiring and control diagrams and posted beside the diagrams. The framed instructions shall be posted before acceptance testing of the systems.
c. Submit proposed procedures for Final Acceptance Tests, no later than 14 days prior to the proposed start of the tests.
d. Submit proposed date and time to begin Final Acceptance Tests, with
SECTION 23 35 16.17 10 Page 11 the Final Acceptance Test Procedures. Notification shall be provided at least 14 days prior to the proposed start of the test.
-- End of Section --
SECTION 23 35 16.17 10 Page 12
SECTION 23 52 00.00 48
WATER AND STEAM HEATING; OIL, GAS OR BOTH; UP TO 20 MBTUH
04/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z21.13 (2001; A 2002) Gas-Fired Low-Pressure Steam and Hot Water Boilers
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 52.1 (1992) Gravimetric and Dust-Spot Procedures for Testing Air-Cleaning Devices Used in General Ventilation for Removing Particulate Matter
AMERICAN WATER WORKS ASSOCIATION(AWWA)
AWWA C606 (2015) Grooved and Shouldered Joints
AMERICAN WELDING SOCIETY (AWS)
AWS A5.8 (1992) Filler Metals for Brazing and Braze Welding
AWS B2.2 (1991) Brazing Procedure and Performance Qualification
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B1.20.1 (2013; R 2018) Pipe Threads, General Purpose (Inch)
ASME B16.11 (2016) Forged Fittings, Socket-Welding and Threaded
ASME B16.15 (2018) Cast Copper Alloy Threaded Fittings Classes 125 and 250
ASME B16.18 (2018) Cast Copper Alloy Solder Joint Pressure Fittings
ASME B16.20 (2000) Metallic Gaskets for Pipe Flanges - Ring-Joint, Spiral Wound, and Jacketed
ASME B16.22 (2018) Standard for Wrought Copper and Copper Alloy Solder Joint Pressure Fittings
SECTION 23 52 00.00 48 Page 1
ASME B16.26 (2018) Standard for Cast Copper Alloy Fittings for Flared Copper Tubes
ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.34 (2017) Valves - Flanged, Threaded and Welding End
ASME B16.39 (2020) Standard for Malleable Iron Threaded Pipe Unions; Classes 150, 250, and 300
ASME B16.4 (2016) Standard for Gray Iron Threaded Fittings; Classes 125 and 250
ASME B16.5 (2017) Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME B16.9 (2018) Factory-Made Wrought Buttwelding Fittings
ASME B31.1 (2020) Power Piping
ASME B31.5 (2020) Refrigeration Piping and Heat Transfer Components
ASME B40.100 (2013) Pressure Gauges and Gauge Attachments
ASME BPVC SEC IV (2017) BPVC Section IV-Rules for Construction of Heating Boilers
ASME BPVC SEC IX (2017; Errata 2018) BPVC Section IX-Welding, Brazing and Fusing Qualifications
ASME BPVC SEC VIII D1 (2019) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
ASME CSD-1 (2016) Control and Safety Devices for Automatically Fired Boilers
ASTM INTERNATIONAL (ASTM)
ASTM A 105/A 105M (2005) Carbon Steel Forgings for Piping Applications
ASTM A 167 (2004) Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip
ASTM A 183 (2003) Carbon Steel Track Bolts and Nuts
ASTM A 193/A 193M (2005) Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service
SECTION 23 52 00.00 48 Page 2
ASTM A 234/A 234M (2005) Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service
ASTM A 515/A 515M (2003) Pressure Vessel Plates, Carbon Steel, for Intermediate- and Higher-Temperature Service
ASTM A 516/A 516M (2004) Pressure Vessel Plates, Carbon Steel, for Moderate- and Lower-Temperature Service
ASTM A 53/A 53M (2004a) Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A 536 (1984; R 2004) Ductile Iron Castings
ASTM A 653/A 653M (2009a) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM B 32 (2008) Standard Specification for Solder Metal
ASTM B 62 (2002) Composition Bronze or Ounce Metal Castings
ASTM B 75 (2002) Seamless Copper Tube
ASTM B 813 (2000e1) Liquid and Paste Fluxes for Soldering of Copper and Copper Alloy Tube
ASTM B 828 (2002) Making Capillary Joints by Soldering of Copper and Copper Alloy Tube and Fittings
ASTM B 88 (2003) Seamless Copper Water Tube
ASTM B 88M (2003) Seamless Copper Water Tube (Metric)
ASTM C 155 (1997; R 2002) Insulating Firebrick
ASTM C 27 (1998; R 2002) Fireclay and High-Alumina Refractory Brick
ASTM C 34 (2003) Structural Clay Load-Bearing Wall Tile
ASTM C 401 (1991; R 2000) Alumina and Alumina-Silicate Castable Refractories
ASTM D 1784 (2003) Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds
ASTM D 2000 (2005) Rubber Products in Automotive Applications
SECTION 23 52 00.00 48 Page 3
ASTM D 596 (2001) Reporting Results of Analysis of Water
ASTM F 1097 (1991; R 2001) Mortar, Refractory (High-Temperature, Air-Setting)
COPPER DEVELOPMENT ASSOCIATION (CDA)
CDA A4015 (2016; 14/17) Copper Tube Handbook
EXPANSION JOINT MANUFACTURERS ASSOCIATION (EJMA)
EJMA Stds (2003) EJMA Standards
HYDRONICS INSTITUTE DIVISION OF AHRI (HYI)
HYI-005 (2004) I=B=R Ratings for Boilers, Baseboard Radiation and Finned Tube (Commercial)
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-110 (2010) Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends
MSS SP-25 (2018) Standard Marking System for Valves, Fittings, Flanges and Unions
MSS SP-58 (2018) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and Installation
MSS SP-69 (2002) Pipe Hangers and Supports - Selection and Application
MSS SP-70 (2011) Gray Iron Gate Valves, Flanged and Threaded Ends
MSS SP-71 (2018) Gray Iron Swing Check Valves, Flanged and Threaded Ends
MSS SP-72 (2010a) Ball Valves with Flanged or Butt-Welding Ends for General Service
MSS SP-73 (2003) Brazing Joints for Copper and Copper Alloy Pressure Fittings
MSS SP-78 (2011) Cast Iron Plug Valves, Flanged and Threaded Ends
MSS SP-80 (2019) Bronze Gate, Globe, Angle and Check Valves
MSS SP-85 (2011) Gray Iron Globe & Angle Valves, Flanged and Threaded Ends
SECTION 23 52 00.00 48 Page 4
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250 (2018) Enclosures for Electrical Equipment (1000 Volts Maximum)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 54 (2021) National Fuel Gas Code
UNDERWRITERS LABORATORIES (UL)
UL FLAMMABLE & COMBUSTIBLE (2012) Flammable and Combustible Liquids and Gases Equipment Directory
UL 1738 (1993; Rev thru Dec 2000) Venting Systems for Gas-Burning Appliances, Categories II, III and IV
UL 795 (1999) Commercial-Industrial Gas Heating Equipment
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Piping Installation
Installation
Detail drawings consisting of equipment layout including installation details and electrical connection diagrams;
combustion and safety control diagrams; ductwork layout showing the location of supports and hangers, typical hanger details, gauge reinforcement, reinforcement spacing rigidity classification, and static pressure and seal classifications; and piping layout showing the location of guides and anchors, the load imposed on each support or anchor (not required for radiant floor tubing), and typical support details. Drawings shall include any information required to demonstrate that the system has been coordinated and will properly function as a unit and shall show equipment relationship to other parts of the work, including clearances required for operation and maintenance.
SD-03 Product Data
Specified manufacturer products are referenced to establish a standard of quality. When the specific product listed is submitted by the Contractor, that submittal will be considered For Information Only. When an equal to that named in this specification is submitted, it shall be for Government Approval (G). The following manufacturer products are specifically mentioned in this specification:
SECTION 23 52 00.00 48 Page 5
CONDENSING BOILER, Lochinvar, Fire Tube Condensing, Model FTX CONDENSING BOILER, Fulton, Pulse Combustion, Model PWH CONDENSING BOILER, HydroTherm Corp., Model AM- CONDENSING BOILER, Manuf. Prod. submitted as an "or equal" ; G RE.
Materials and Equipment
Manufacturer's catalog data shall be included with the detail drawings for the following items:
Boilers Unit Heaters Combustion Control Equipment Pumps Fittings and Accessories Water Treatment System
The data shall show model, size, options, etc., that are intended for consideration. Data submitted shall be adequate to demonstrate compliance with contract requirements. Data shall include manufacturer's written installation instructions and manufacturer's recommendations for operation and maintenance clearances for each item.
Spare Parts
Spare parts data for each different item of material and equipment specified.
Water Treatment System
Boiler Water Treatment
Six complete copies of the proposed water treatment plan. The plan shall include a layout, control scheme, a list of the existing water conditions including the items listed in paragraph BOILER WATER TREATMENT, a list of all chemicals, the proportion of chemicals to be added, the final treated water conditions, and a description of environmental concerns for handling the chemicals.
Heating System Tests
Unit Heaters
Proposed test procedures for the heating system tests and fuel system tests, at least 2 weeks prior to the start of related testing.
Welding
A copy of qualified welding procedures, at least 2 weeks prior to the start of welding operations.
A list of names and identification symbols of qualified welders and welding operators, at least 2 weeks prior to the start of welding operations.
Qualifications
SECTION 23 52 00.00 48 Page 6
A statement from the firms proposed to prepare submittals and perform installation and testing, demonstrating successful completion of similar services of at least five projects of similar size or scope, at least 2 weeks prior to the submittal of any other item required by this section.
Field Instructions
System layout diagrams that show the layout of equipment, piping, and ductwork and typed condensed operation manuals explaining preventative maintenance procedures, methods of checking the system for normal, safe operation, and procedures for safely starting and stopping the system, framed under glass or laminated plastic, at least 2 weeks prior to the start of related testing. After approval, these items shall be posted where directed.
Tests
Proposed test schedules for the heating system and fuel system tests, at least 2 weeks prior to the start of related testing.
SD-06 Test Reports
Heating System Tests
Test reports for the heating system tests and the fuel system test, upon completion of testing complete with results.
Water Treatment Testing
a. The water quality test report shall identify the chemical composition of the boiler water. The report shall include a comparison of the condition of the boiler water with the manufacturer's recommended conditions. Any required corrective action shall be documented within the report.
b. A test report shall identify the condition of the boiler at the completion of 1 year of service. The report shall include a comparison of the condition of the boiler with the manufacturer's recommended operating conditions.
SD-07 Certificates
Bolts
Written certification by the bolt manufacturer that the bolts furnished comply with the requirements of this specification. The certification shall include illustrations of product markings, the date of manufacture, and the number of each type of bolt to be furnished based on this certification.
Continuous Emissions Monitoring
Written certification by the boiler manufacturer that each boiler furnished complies with Federal, state, and local regulations for emissions. The certification shall also include a description of applicable emission regulations. If any boiler is
SECTION 23 52 00.00 48 Page 7 exempt from the emission regulations, the certification shall indicate the reason for the exemption.
SD-10 Operation and Maintenance Data
Operation and Maintenance Instructions
Six complete manuals listing step-by-step procedures required for system startup, operation, shutdown, and routine maintenance, at least 2 weeks prior to field training. The manuals shall include the manufacturer's name, model number, parts list, simplified wiring and control diagrams, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment. Each service organization shall be capable of providing 4 hour onsite response to a service call on an emergency basis.
Water Treatment System
Six complete copies of operating and maintenance manuals for the step-by-step water treatment procedures, including procedures for testing the water quality.
1.3 GENERAL REQUIREMENTS
1.3.1 Standard Products
Materials and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products and shall essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening. Equipment shall be supported by a service organization that is, in the opinion of the Contracting Officer, reasonably convenient to the site.
1.3.2 Asbestos Prohibition
Asbestos and asbestos-containing products shall not be used.
1.3.3 Nameplates
Each major component of equipment shall have the manufacturer's name, address, type or style, model or serial number, and catalog number on a plate secured to the equipment.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .